Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Test Readiness”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Post-Flight Performance Analysis of Navigation and Advanced Guidance Algorithms on a Terrestrial Suborbital Rocket Flight

There is currently renewed interest in robotic and crewed landers for a return to the lunar surface. Advanced guidance and navigation algorithms are essential to accurately delivering cargo and crew safely to the moon successfully. This paper reports the overall performance of an integrated set of navigation and guidance algorithms flown on a terrestrial suborbital rocket up to an altitude of approximately 100km. The navigation algorithm consists of an onboard extended Kalman Filter (EKF) that ingests multiple sensor measurements, one of which is the output from a terrain relative navigation (TRN) algorithm that cross-references camera images to on-board satellite imagery to perform feature correlation within the camera image. The guidance algorithm solves for a 6-degree-of-freedom (DoF) optimal trajectory using a successive convexification method during powered descent. The altitude range as well as the landing dynamics experienced during this test flight are realistic for an extraterrestrial landing and provide an invaluable data set to gauge the current development of these landing algorithms in an effort to advance the overall software readiness levels (SRL). This paper will delve into different aspects of each algorithm and present an analysis of the in-flight performance of the algorithms. This flight was conducted under the National Aeronautics and Space Administration (NASA) Safe and Precise Landing Integrated Capabilities Evolution (SPLICE) project focused on technology advancement for landing applications.

Guidance↗

Wire Arc Additive Manufacturing of Lightweight High Pressure Die Casting Tooling

Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE-20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ̊C.This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.

99 GENERAL AND MISCELLANEOUS↗

Wire Arc Additive Manufacturing of Lightweight High Pressure Die Casting Tooling

Oak Ridge National Laboratory (ORNL) and Mercury Marine partnered to develop and test methods for additively manufactured tooling for aluminum die casting applications under CRADA agreement NFE- 20-08193. Tooling is the largest capital expense for high production casting projects. The lead time for tooling is often measured in months with a typical project taking 9-12 months to realize Production Part Approval Process (PPAP) ready die cast samples. This project demonstrated the technical viability of rapidly produced steel components for high pressure die casting tooling via Wire Arc Additive Manufacturing (WAAM). A 410 stainless steel tool was redesigned and optimized with conformal cooling channels and additively manufactured. The finished tool was tested and used to produce over 4000 parts, which well surpassed expectations. A secondary objective was to evaluate the durability of multi-material additively manufactured (AM) components with conformal cooling. A large multi-material tool (H13 and 410SSNiMo) was manufactured using the same methods showing potential reductions in used material and cost. However, the H13 section sustained material cracking. Further analysis showed that the potential cause was the CTE mismatch of the two materials at higher temperatures. It is also suggested that the material mix can be used if the steel processing temperature does not exceed 600 ˚C. This project has shown high potential for using the WAAM technology for creating AM parts for aluminum dies casting. However, the multi-material approach requires extended study and tests.

36 MATERIALS SCIENCE↗

Fast and Accurate Machine Learning Strategy for Calculating Partial Atomic Charges in Metal–Organic Frameworks

Computational high-throughput screening using molecular simulations is a powerful tool for identifying top-performing metal–organic frameworks (MOFs) for gas storage and separation applications. Accurate partial atomic charges are often required to model the electrostatic interactions between the MOF and the adsorbate, especially when the adsorption involves molecules with dipole or quadrupole moments such as water and CO 2 . Although ab initio methods can be used to calculate accurate partial atomic charges, these methods are impractical for screening large material databases because of the high computational cost. We developed a random forest machine learning model to predict the partial atomic charges in MOFs using a small yet meaningful set of features that represent both the elemental properties and the local environment of each atom. The model was trained and tested on a collection of about 320 000 density-derived electrostatic and chemical (DDEC) atomic charges calculated on a subset of the Computation-Ready Experimental Metal–Organic Framework (CoRE MOF-2019) database and separately on charge model 5 (CM5) charges. The model predicts accurate atomic charges for MOFs at a fraction of the computational cost of periodic density functional theory (DFT) and is found to be transferable to other porous molecular crystals and zeolites. In conclusion, a strong correlation is observed between the partial atomic charge and the average electronegativity difference between the central atom and its bonded neighbors.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

2023 Project Peer Review Report

The Bioenergy Technologies Office (BETO) within the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy supports the research, development, and demonstration (RD&D) of technologies aimed at mobilizing domestic renewable carbon resources for the reduction of greenhouse gas emissions across the U.S. economy. BETO systematically prioritizes RD&D into technology opportunities across a range of emerging scientific breakthroughs and technology readiness levels in the subprogram areas illustrated in Figure 1. This approach supports a diverse portfolio while developing the most promising and widely applicable technologies, testing technologies as integrated processes, and demonstrating integrated processes to support scale-up. These technologies will use a broad variety of renewable carbon resources to produce increasing volumes of biofuels and bioproducts. More information on BETO’s mission, goals, and strategic approaches can be found in the Bioenergy Technologies Office Multi-Year Program Plan. The biennial Peer Review process enables external stakeholders to provide feedback on the responsible use of taxpayer funding and develop recommendations for the most efficient and effective ways to accelerate the development of a bioenergy industry. This report includes the results of the Project Peer Review meeting held on April 3–7, 2023, in Denver, Colorado.

09 BIOMASS FUELS↗

Analysis and testing of high entrainment single nozzle jet pumps with variable mixing tubes

An analytical model was developed to predict the performance characteristics of axisymmetric single-nozzle jet pumps with variable area mixing tubes. The primary flow may be subsonic or supersonic. The computer program uses integral techniques to calculate the velocity profiles and the wall static pressures that result from the mixing of the supersonic primary jet and the subsonic secondary flow. An experimental program was conducted to measure mixing tube wall static pressure variations, velocity profiles, and temperature profiles in a variable area mixing tube with a supersonic primary jet. Static pressure variations were measured at four different secondary flow rates. These test results were used to evaluate the analytical model. The analytical results compared well to the experimental data. Therefore, the analysis is believed to be ready for use to relate jet pump performance characteristics to mixing tube design.

Hickman, K. E.↗

Ultrasonic level sensors for liquids under high pressure

An ultrasonic level sensor of novel design continuously measures the level of a liquid subjected to a high pressure (up to about 40 MPa), as is sometimes required for the effective transfer of the liquid. The sensor operates as a composite resonator fabricated from a standard high-pressure plug. A flat-bottom hole is machined into the plug along its center line. An ultrasonic transducer is bonded rigidly to the interior surface of the bottom wall, while the exterior surface is in contact with the liquid. Although the bottom wall is designed to satisfy the pressure code, it is still sufficiently thin to permit ready excitation of the axisymmetric plate modes of vibration. The liquid level is measured by a conventional pulse-echo technique. A prototype sensor was tested successfully in a 2300-l water vessel at pressures up to about 37 MPa. A spectral analysis of the transmitted pulse reveals that the flexural, extensional, thickness-shear, and radial plate modes are excited into vibration, but none of these appears to be significantly affected by the pressurization of the liquid.

Zuckerwar, A. J.↗

Flight test results of the SHARE II monogroove heat pipe

The SHARE II (Space Station Heat Pipe Advanced Radiator Elements) flight experiment was flow in August 1991 on STS-43 in support of the Space Station Freedom (SSF) program. The flight experiment was designed to demonstrate startup and sustained microgravity operation of two 22 ft. long high capacity prototype SSF heat pipe radiator designs. The monogroove heat pipe radiator, one of the two heat pipe radiator designs flown on this experiment, is the subject of this paper. During the flight, the monogroove heat pipe, which contained 40 to 50 ppm of noncondensible gas to simulate end-of-life conditions, was shown to start up, vent bubbles as necessary, reprime under load, and operate successfully under all test conditions. The monogroove heat pipe operated under load for a total of 75 hours and achieved sustained heat transport of 50,000 watt-inches. This paper briefly describes the results of the previous SHARE flight experiment and the improvements made to the monogroove heat pipe as a result of that experiment. The test results of the SHARE II flight are discussed in detail. Based on the results of the SHARE II experiment, the monogroove heat pipe is ready for use in its intended application on SSF.

Brown, Richard F.↗

Update on the NASA GRC Stirling Technology Development Project

The Department of Energy, NASA Glenn Research Center (GRC), and Stirling Technology Company (STC) are developing a free-piston Stirling convertor for a Stirling radioisotope power system (SRPS) to provide spacecraft on-board electric power for NASA deep space missions. The SRPS has recently been identified for potential use on the Europa Orbiter and Solar Probe Space Science missions. Stirling is also now being considered for unmanned Mars rovers. NASA GRC is conducting an in-house project to assist in developing the Stirling convertor for readiness for space qualification and mission implementation. As part of this continuing effort, the Stirling convertor will be further characterized under launch environment random vibration testing, methods to reduce convertor electromagnetic interference (EMI) will be developed, and an independent performance verification will be completed. Convertor life assessment and permanent magnet aging characterization tasks are also underway. Substitute organic materials for the linear alternator and piston bearing coatings for use in a high radiation environment have been identified and have now been incorporated in Stirling convertors built by STC for GRC. Electromagnetic and thermal finite element analyses for the alternator are also being conducted. This paper discusses the recent results and status for this NASA GRC in-house project.

Thieme, Lanny G.↗

Recent Progress in Engine Noise Reduction Technologies

Highlights from NASA-funded research over the past ten years for aircraft engine noise reduction are presented showing overall technical plans, accomplishments, and selected applications to turbofan engines. The work was sponsored by NASA's Advanced Subsonic Technology (AST) Noise Reduction Program. Emphasis is given to only the engine noise reduction research and significant accomplishments that were investigated at Technology Readiness Levels ranging from 4 to 6. The Engine Noise Reduction sub-element was divided into four work areas: source noise prediction, model scale tests, engine validation, and active noise control. Highlights from each area include technologies for higher bypass ratio turbofans, scarf inlets, forward-swept fans, swept and leaned stators, chevron/tabbed nozzles, advanced noise prediction analyses, and active noise control for fans. Finally, an industry perspective is given from General Electric Aircraft Engines showing how these technologies are being applied to commercial products. This publication contains only presentation vu-graphs from an invited lecture given at the 41st AIAA Aerospace Sciences Meeting, January 6-9, 2003.

Huff, Dennis↗

Progress in the Development of Direct Osmotic Concentration Wastewater Recovery Process for Advanced Life Support Systems

Direct osmotic concentration (DOC) has been identified as a high potential technology for recycling of wastewater to drinking water in advanced life support (ALS) systems. As a result the DOC process has been selected for a NASA Rapid Technology Development Team (RTDT) effort. The existing prototype system has been developed to a Technology Readiness Level (TRL) 3. The current project focuses on advancing the development of this technology from TRL 3 to TRL 6 (appropriate for human rated testing). A new prototype of a DOC system is been designed and fabricated that addresses the deficiencies encountered during the testing of the original system and allowing the new prototype to achieve TRL 6. Background information is provided about the technologies investigated and their capabilities, results from preliminary tests, and the milestones plan and activities for the RTDT program intended to develop a second generation prototype of the DOC system.

Cath, Tzahi Y.↗

Flight Testing of the Space Launch System (SLS) Adaptive Augmenting Control (AAC) Algorithm on an F/A-18

The Marshall Space Flight Center (MSFC) Flight Mechanics and Analysis Division developed an adaptive augmenting control (AAC) algorithm for launch vehicles that improves robustness and performance on an as-needed basis by adapting a classical control algorithm to unexpected environments or variations in vehicle dynamics. This was baselined as part of the Space Launch System (SLS) flight control system. The NASA Engineering and Safety Center (NESC) was asked to partner with the SLS Program and the Space Technology Mission Directorate (STMD) Game Changing Development Program (GCDP) to flight test the AAC algorithm on a manned aircraft that can achieve a high level of dynamic similarity to a launch vehicle and raise the technology readiness of the algorithm early in the program. This document reports the outcome of the NESC assessment.

Dennehy, Cornelius J.↗

Design and Development of a 200-kW Turbo-Electric Distributed Propulsion Testbed

The National Aeronautics and Space Administration (NASA) Armstrong Flight Research Center (AFRC) (Edwards, California) is developing a Hybrid-Electric Integrated Systems Testbed (HEIST) Testbed as part of the HEIST Project, to study power management and transition complexities, modular architectures, and flight control laws for turbo-electric distributed propulsion technologies using representative hardware and piloted simulations. Capabilities are being developed to assess the flight readiness of hybrid electric and distributed electric vehicle architectures. Additionally, NASA will leverage experience gained and assets developed from HEIST to assist in flight-test proposal development, flight-test vehicle design, and evaluation of hybrid electric and distributed electric concept vehicles for flight safety. The HEIST test equipment will include three trailers supporting a distributed electric propulsion wing, a battery system and turbogenerator, dynamometers, and supporting power and communication infrastructure, all connected to the AFRC Core simulation. Plans call for 18 high performance electric motors that will be powered by batteries and the turbogenerator, and commanded by a piloted simulation. Flight control algorithms will be developed on the turbo-electric distributed propulsion system.

distributed↗

NASA Advanced Space Suit xEMU Development Report – Components

For the past several years, the Exploration Extra-Vehicular Mobility Unit (xEMU) team at NASA’s Johnson Space Center has focused on the development and detailed design of the xEMU to support missions to the International Space Station (ISS) and a moon landing in 2024. In that context, this paper examines the development and baseline detailed design of the xEMU helmet, extra-vehicular visor assembly (EVVA), hard upper torso (HUT), shoulders, liquid cooling and ventilation garment (LCVG), boots, waist brief hip (WBH), ancillary hardware, and environmental protection garment (EPG) . This paper will outline the challenging technical requirements, significant architectural trades, technical solutions required to overcome these challenges, and a current status of the detailed design. The preliminary results of Design Verification Testing (DVT) as it relates specifically to these components will also be provided, along with a forward strategy for final maturation into a flight-ready design.

Shane McFarland↗

Optimized Heat Pipe Backup Cooling System Tested with a Stirling Convertor

In a Stirling Radioisotope Power System (RPS), heat must be continuously removed from the General Purpose Heat Source (GPHS) modules to maintain the modules and surrounding insulation at acceptable temperatures. The Stirling convertor normally provides this cooling. If the Stirling convertor stops in the current system, the insulation is designed to spoil, preventing damage to the GPHS at the cost of an early termination of the mission. An alkali-metal variable conductance heat pipe (VCHP) can be used to passively allow multiple stops and restarts of the Stirling convertor by bypassing the heat during stops. In a previous NASA Small Business Innovation Research (SBIR) Program, Advanced Cooling Technologies, Inc. (ACT) developed a series of sodium VCHPs as backup cooling systems for the Stirling RPS. In 2012, one of these VCHPs was successfully tested at NASA Glenn Research Center with a Stirling convertor as an Advanced Stirling Radioisotope Generator (ASRG) backup cooling system. The prototype; however, was not optimized and did not reflect the final heat rejection path. ACT through further funding has developed a semioptimized prototype with the finalized heat path for testing at Glenn with a Stirling convertor. The semioptimized system features a two-phase radiator and is significantly smaller and lighter than the prior prototype to reflect a higher level of flight readiness. The VCHP is designed to activate and remove heat from the GPHS during stoppage with a small temperature increase from the nominal vapor temperature. This small temperature increase from nominal is low enough to avoid risking standard ASRG operation and spoiling of the multilayer insulation (MLI). The VCHP passively allows the Stirling convertor to be turned off multiple times during a mission with potentially unlimited off durations. Having the ability to turn the Stirling off allows for the Stirling to be reset and reduces vibrations on the platform during sensitive measurements or procedures. This paper presents the design of the VCHP and its test results with a Stirling convertor at Glenn. Tests were carried for multiple on and off cycles to demonstrate repeatability. The impacts associated with the addition of the VCHP to the system are also addressed in terms of mass and additional heat losses due to the presence of the VCHP.

Heat Pipe↗

Deployable Aeroshell Flexible Thermal Protection System Testing

Deployable aeroshells offer the promise of achieving larger aeroshell surface areas for entry vehicles than otherwise attainable without deployment. With the larger surface area comes the ability to decelerate high-mass entry vehicles at relatively low ballistic coefficients. However, for an aeroshell to perform even at the low ballistic coefficients attainable with deployable aeroshells, a flexible thermal protection system (TPS) is required that is capable of surviving reasonably high heat flux and durable enough to survive the rigors of construction handling, high density packing, deployment, aerodynamic loading and aerothermal heating. The Program for the Advancement of Inflatable Decelerators for Atmospheric Entry (PAIDAE) is tasked with developing the technologies required to increase the technology readiness level (TRL) of inflatable deployable aeroshells, and one of several of the technologies PAIDAE is developing for use on inflatable aeroshells is flexible TPS. Several flexible TPS layups were designed, based on commercially available materials, and tested in NASA Langley Research Center's 8 Foot High Temperature Tunnel (8ft HTT). The TPS layups were designed for, and tested at three different conditions that are representative of conditions seen in entry simulation analyses of inflatable aeroshell concepts. Two conditions were produced in a single run with a sting-mounted dual wedge test fixture. The dual wedge test fixture had one row of sample mounting locations (forward) at about half the running length of the top surface of the wedge. At about two thirds of the running length of the wedge, a second test surface drafted up at five degrees relative to the first test surface established the remaining running length of the wedge test fixture. A second row of sample mounting locations (aft) was positioned in the middle of the running length of the second test surface. Once the desired flow conditions were established in the test section the dual wedge test fixture, oriented at 5 degrees angle of attack down, was injected into the flow. In this configuration the aft sample mounting location was subjected to roughly twice the heat flux and surface pressure of the forward mounting location. The tunnel was run at two different conditions for the test series: 1) 'Low Pressure', and 2) 'High Pressure'. At 'Low Pressure' conditions the TPS layups were tested at 6W/cm2 and 11W/cm2 while at 'High Pressure' conditions the TPS layups were tested at 11W/cm2 and 20W/cm2. This paper details the test configuration of the TPS samples in the 8Ft HTT, the sample holder assembly, TPS sample layup construction, sample instrumentation, results from this testing, as well as lessons learned.

Hughes, Stephen J.↗

Threaded average temperature thermocouple

A threaded average temperature thermocouple 11 is provided to measure the average temperature of a test situs of a test material 30. A ceramic insulator rod 15 with two parallel holes 17 and 18 through the length thereof is securely fitted in a cylinder 16, which is bored along the longitudinal axis of symmetry of threaded bolt 12. Threaded bolt 12 is composed of material having thermal properties similar to those of test material 30. Leads of a thermocouple wire 20 leading from a remotely situated temperature sensing device 35 are each fed through one of the holes 17 or 18, secured at head end 13 of ceramic insulator rod 15, and exit at tip end 14. Each lead of thermocouple wire 20 is bent into and secured in an opposite radial groove 25 in tip end 14 of threaded bolt 12. Resulting threaded average temperature thermocouple 11 is ready to be inserted into cylindrical receptacle 32. The tip end 14 of the threaded average temperature thermocouple 11 is in intimate contact with receptacle 32. A jam nut 36 secures the threaded average temperature thermocouple 11 to test material 30.

Ward, Stanley W.↗

Assembling and Testing NASA’s Space Launch System for First Flight

NASA is planning its next step toward human expansion into the solar system. The Space Launch System (SLS) (Figure 1) is a critical enabling component of that expansion. SLS payloads for its early missions include the Orion crew vehicle and components for Gateway, a lunar outpost orbiting the Moon that will facilitate research, technology and partnerships for eventual Mars missions. All major core stage hardware for test and flight completed structural manufacturing in 2018. The major components for the first flight vehicle are complete or approaching completion of internal equipment installation. The core stage forward join operation is also complete. The 10 booster segments needed for first flight have been cast and are ready to ship to NASA’s Kennedy Space Center (KSC) for mating and stacking. The four RS-25 core stage engines completed processing at NASA’s Stennis Space Center (SSC) and are ready for core stage integration. The Orion Stage Adapter (OSA) joined the Interim Cryogenic Propulsion Stage (ICPS) at KSC to await the rest of SLS flight hardware. Production and preparation of hardware for the second mission is also underway. Looking ahead to a busy 2019, liquid oxygen (LOX) tank, liquid hydrogen (LH2) tank and intertank structural testing will take place. This paper will discuss the current and planned status of SLS development in context of NASA’s overall exploration plans.

Askin, Bruce R.↗