Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SPACE LOGISTICS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Logistics Operations Management Center: Maintenance Support Baseline (LOMC-MSB)

The Logistics Operations Management Center Maintenance Support Baseline is defined. A historical record of systems, applied to and deleted from, designs in support of future management and/or technical analysis is provided. All Flight elements, Ground Support Equipment, Facility Systems and Equipment and Test Support Equipment for which LOMC has responsibilities at Kennedy Space Center and other locations are listed. International Space Station Alpha Program documentation is supplemented. The responsibility of the Space Station Launch Site Support Office is established.

Kurrus, R.↗

A SysML Model Template for NASA Concurrent Engineering Studies

Systems Engineers at NASA Langley’s Engineering Design Studio (EDS) have been developing a SysML** template that models both the EDS concurrent engineering study process and the system of interest for the study. Specifically, the model template is used to develop end-to-end space-based mission concepts. The model template evolved through targeted use and technical feedback during several EDS studies in 2016-17. This year, a model template version was completed that is being tested for use throughout EDS studies. It features ease of navigation through the documented study process to create the logistical articles (e.g. session agenda) and technical articles (e.g. system requirements) connected in the study SysML model, resulting in demonstrable and trackable relationships between the system design and the study goals and objectives. The model template allows easy release of the system of interest portion at the end of the EDS study. The customers may use this as a starter model as their project moves forward. The model template design details and the motivation for them will be explained in this paper. This will be followed by the results of the first trials of the model template in an EDS study, and discussion of the integration of this template into the NASA MBSE Community of Practice.

Infeld, Samantha I.↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Analysis and Optimization of Test Plans for Advanced Exploration Systems Reliability and Supportability

Future crewed exploration missions beyond Low Earth Orbit (LEO) will operate farther from Earth and be logistically isolated for longer than any previous human spaceflight mission. Under these conditions, supportability and reliability willbestronger drivers of mission mass and risk than they have been in the past. Items with high failure rates, or uncertain failure rates, can result in high spares mass requirements and/or high risk on deep space missions. Testing is a critical element of system development which provides the opportunity to identify and resolve design issues, defects, or other failure modes before they cause problems during a mission. Reliability growth programs can reduce failure rates by identifying and remove failure modes via design changes, and long-duration life testing can provide valuable data to reduce failure rate estimate uncertainty and verify (to some level of confidence) that components are as reliable as expected. Testing activities take time and resources, however, and must be incorporated into program plans in order to be fully effective. This paper presents an integrated reliability test plan analysis and optimization methodology, which has been used to inform Advanced Exploration Systems (AES) Life Support Systems (LSS) ground test planning for future missions. The methodology determines the optimal number of test units to purchase and allocation of test time –split between reliability growth and uncertainty reduction testing –across a given set of items in order to minimize spares mass for a given mission under constraints on total test cost and schedule. Model outputs also include expected spares mass after testing and the expected number of modifications or refurbishments during testing, both of which can inform program planning. Discussion of the model, conclusions, and future work are also presented.

Testing↗

Recovery from Missed Thrust During Gateway's NRHO Insertion Using Auxiliary Propulsion

Various strategies are assessed by which the first two elements of Gateway could recover from missed thrust events during insertion into a Near Rectilinear Halo Orbit (NRHO). Recovery strategies are assessed in terms of their ability to maintain the desired NRHO insertion epoch ad well as their cost in terms of additional time and ∆v required to reach the NRHO. Strategies utilize a 50 kW Solar Electric Propulsion (SEP) system onboard the Power and Propulsion Element (PPE). Recovery solutions are found that, in the event of a missed thrust arc during the Insertion Phase of the Gateway Lunar Transit, deliver the space-craft into the NRHO within three additional revolutions (roughly 21 days) and 80 m/s ∆v.

missed thrust↗

NASA Lunar Mining and Construction Activities and Plans

The Space Exploration Policy enacted by the US Congress in 2005 calls for the US National Aeronautics and Space Administration (NASA) to implement a sustained and affordable human and robotic program to explore the solar system and beyond; Extend human presence across the solar system, starting with a human return to the Moon by the year 2020, in preparation for human exploration of Mars and other destinations; Develop the innovative technologies, knowledge, and infrastructures both to explore and to support decisions about the destinations for human exploration; and Promote international and commercial participation in exploration to further U.S. scientific, security, and economic interests. In 2006, NASA released the Lunar Architecture Study, which proposed establishing a lunar Outpost on the Moon with international participation to extend human presence beyond Earth's orbit, pursue scientific activities, use the Moon to prepare for future human missions to Mars, and expand Earth s economic sphere. The establishment of sustained human presence on the Moon for science and exploration combines the design, integration, and operation challenges experienced from both the short Apollo lunar missions and the build-up and sustained crew operations of the International Space Station (ISS). Apollo experience reminds developers and mission planners that hardware must operate under extremely harsh environmental and abrasive conditions and every kilogram of mass and payload must be critical to achieve the mission s objectives due to the difficulty and cost of reaching the lunar surface. Experience from the ISS reminds developers and mission planners that integration of all hardware must be designed and planned from the start of the program, operations and evolution of capabilities on a continuous basis are important, and long-term life-cycle costs and logistical needs are equally or more important than minimizing early development and test costs. Overarching all of this is the need to implement efforts that are sustainable and affordable. One area NASA is developing that can significantly change how systems required for sustained human presence are designed and integrated, as well as potentially break our reliance on Earth supplied logistics, is In-Situ Resource Utilization (ISRU). ISRU, also known living off the land, involves the extraction and processing of local resources into useful products. In particular, the ability to make propellants, life support consumables, fuel cell reagents, and radiation shielding can significantly reduce the cost, mass, and risk of sustained human activities beyond Earth. Also, the ability to modify the lunar landscape for safer landing, transfer of payloads from the lander an outpost, dust generation mitigation, and infrastructure placement and buildup are also extremely important for long-term lunar operations. While extra-terrestrial excavation, material handling and processing, and site preparation and construction may be new to NASA and other space agencies, there is extensive terrestrial hardware and commercial experience that can be leveraged. This paper will provide an overview of current NASA activities in lunar ISRU mining and construction and how terrestrial experience in these areas are important to achieving the goal of affordable and sustainable human exploration.

Sanders, Gerald B.↗

Topological network analysis of patient similarity for precision management of acute blood pressure in spinal cord injury

Background: Predicting neurological recovery after spinal cord injury (SCI) is challenging. Using topological data analysis, we have previously shown that mean arterial pressure (MAP) during SCI surgery predicts long-term functional recovery in rodent models, motivating the present multicenter study in patients. Methods: Intra-operative monitoring records and neurological outcome data were extracted (n = 118 patients). We built a similarity network of patients from a low-dimensional space embedded using a non-linear algorithm, Isomap, and ensured topological extraction using persistent homology metrics. Confirmatory analysis was conducted through regression methods. Results: Network analysis suggested that time outside of an optimum MAP range (hypotension or hypertension) during surgery was associated with lower likelihood of neurological recovery at hospital discharge. Logistic and LASSO (least absolute shrinkage and selection operator) regression confirmed these findings, revealing an optimal MAP range of 76–[104-117] mmHg associated with neurological recovery. Conclusions: We show that deviation from this optimal MAP range during SCI surgery predicts lower probability of neurological recovery and suggest new targets for therapeutic intervention. Funding: NIH/NINDS: R01NS088475 (ARF); R01NS122888 (ARF); UH3NS106899 (ARF); Department of Veterans Affairs: 1I01RX002245 (ARF), I01RX002787 (ARF); Wings for Life Foundation (ATE, ARF); Craig H. Neilsen Foundation (ARF); and DOD: SC150198 (MSB); SC190233 (MSB); DOE: DE-AC02-05CH11231 (DM).

59 BASIC BIOLOGICAL SCIENCES↗

Personnel Data Analysis and Retrieval of Phase 1 Move To LC-39 Area

As a technology major from Jackson State University (JSU) I was called in as a summer intern at Kennedy Space Center (KSC) to work in the NASA Engineering, Control and Data Systems (NE-C) Division supporting the Spaceport Command and Control System (SCCS) at the Space Station Processing Facility (SSPF). I was given a two-part project; the first consisted of lending support relocating SCCS Computer Equipment and Project Personnel to the Launch Control Center (LCC). This task involved me using a Microsoft Office data processing tool to assist with the analysis and information management of logistics worth millions of dollars. With the assistance of two other interns, I was responsible for collecting data on equipment used, on a daily basis, by over 200 KSC employees. The many network servers, enterprise switches, desktop computers, and fiber optics had to be handled in an equally prompt and precise manner in order to ensure a minimal amount of equipment down time; which is critical in ensuring a properly secured networking environment. The second part of my project was to assist KSC in developing a more cost effective way of maintaining and taking full advantage of the functionality of some new kiosk units. Since KSC currently has no expert on the servicing and maintenance of the units, I, as a computer technology major, was given the opportunity to assess the hardware and software of the machines. The goal was to learn to establish a secure and remote environment for the kiosks; a goal highly valuing convenience by preserving valuable man-hours saved by not having to travel to each individual kiosk location. In addition, I was to leave a clear and precise plan for future users and administrators of the devices to follow.

Davis, Derrick D.↗

Study of onboard expert systems to augment space shuttle and space station autonomy

The feasibility of onboard crew activity planning was examined. The use of expert systems technology to aid crewmembers in locating stowed equipment was also investigated. The crew activity planning problem, along with a summary of past and current research efforts, was discussed in detail. The requirements and specifications used to develop the crew activity planning system was also defined. The guidelines used to create, develop, and operate the MFIVE Crew Scheduler and Logistics Clerk were discussed. Also discussed is the mathematical algorithm, used by the MFIVE Scheduler, which was developed to aid in optimal crew activity planning.

Kurtzman, C. R.↗

Space shuttle auxiliary propulsion system design study. Executive summary

The development and characteristics of an auxiliary propulsion system for space shuttle applications are presented. The system design data necessary for selection of preferred system concepts and the requirements for complementing component design and test programs are analyzed. The use of cryogenic oxygen and hydrogen as a propellant combination is explained on the basis of high vehicle impulse requirements, safety factors, reuse, and logistics considerations. The final configurations for the alternate propellant system, with primary emphasis on earth storable propellants is described.

Kelly, P. J.↗

Storage Information Management System (SIMS) Spaceflight Hardware Warehousing at Goddard Space Flight Center

Goddard Space Flight Center (GSFC) on site and leased warehouses contain thousands of items of ground support equipment (GSE) and flight hardware including spacecraft, scaffolding, computer racks, stands, holding fixtures, test equipment, spares, etc. The control of these warehouses, and the management, accountability, and control of the items within them, is accomplished by the Logistics Management Division. To facilitate this management and tracking effort, the Logistics and Transportation Management Branch, is developing a system to provide warehouse personnel, property owners, and managers with storage and inventory information. This paper will describe that PC-based system and address how it will improve GSFC warehouse and storage management.

Kubicko, Richard M.↗

STS-111 Flight Day 3 Highlights

On Flight Day 3 of STS-111, the crew of Endeavour (Kenneth Cockrell, Commander; Paul Lockhart, Pilot; Franklin Chang-Diaz, Mission Specialist; Philippe Perrin, Mission Specialist) and the Expedition 5 crew (Valery Korzun, Commander; Peggy Whitson, Flight Engineer; Sergei Treschev, Flight Engineer), begin their final approach towards the International Space Station (ISS). From cameras aboard the ISS, live video of Endeavour is shown as it approaches the station. The Orbiter is maneuvered slowly to a position for docking, and cameras from multiple angles show this process. As it is maneuvered, there are clear views of its payload bay, which includes the Leonardo MultiPurpose Logistics Module (MPLM) and the Mobile Base System (MBS), both of which will be installed on the ISS during this mission. In the final stages of the docking procedure there is close-up footage of Endeavour meeting the ISS's Pressurized Mating Adapter 2 on the Destiny Laboratory Module. Inside the ISS, the Expedition 4 crew (Yury Onufrienko, Commander; Daniel Bursch, Flight Engineer; Carl Walz, Flight Engineer), which will be replaced by the Expedition 5 crew, prepares for final docking. Crew members are shown transferring equipment from the Endeavour to the ISS, prior to a replay of the mating of the two crafts. In the replay, the hatch is shown being opened and the two newly arrived crews are greeted with excitement by Expedition 4 crewmembers. The video closes with footage of the Quest airlock used for EVA (extravehicular activity) egress, and the Canadarm 2 robotic arm.

Source record↗

Evaluation and Characterization Study of Dual Pulse Laser-Induced Spark (DPLIS) for Rocket Engine Ignition System Application

This paper addresses the progress of technology development of a laser ignition system at NASA Marshall Space Flight Center (MSFC). Laser ignition has been used at MSFC in recent test series to successfully ignite RP1/GOX propellants in a subscale rocket chamber, and other past studies by NASA GRC have demonstrated the use of laser ignition for rocket engines. Despite the progress made in the study of this ignition method, the logistics of depositing laser sparks inside a rocket chamber have prohibited its use. However, recent advances in laser designs, the use of fiber optics, and studies of multi-pulse laser formats3 have renewed the interest of rocket designers in this state-of the-art technology which offers the potential elimination of torch igniter systems and their associated mechanical parts, as well as toxic hypergolic ignition systems. In support of this interest to develop an alternative ignition system that meets the risk-reduction demands of Next Generation Launch Technology (NGLT), characterization studies of a dual pulse laser format for laser-induced spark ignition are underway at MSFC. Results obtained at MSFC indicate that a dual pulse format can produce plasmas that absorb the laser energy as efficiently as a single pulse format, yet provide a longer plasma lifetime. In an experiments with lean H2/air propellants, the dual pulse laser format, containing the same total energy of a single laser pulse, produced a spark that was superior in its ability to provide sustained ignition of fuel-lean H2/air propellants. The results from these experiments are being used to optimize a dual pulse laser format for future subscale rocket chamber tests. Besides the ignition enhancement, the dual pulse technique provides a practical way to distribute and deliver laser light to the combustion chamber, an important consideration given the limitation of peak power that can be delivered through optical fibers. With this knowledge, scientists and engineers at Los Alamos National Laboratory and CFD Research Corporation have designed and fabricated a miniaturized, first-generation optical prototype of a laser ignition system that could be the basis for a laser ignition system for rocket applications. This prototype will be tested at MSFC in future subscale rocket ignition tests.

Osborne, Robin↗

Transit Habitat Concept and Mars Analog in Cislunar Orbit

- Transit Habitat Overview - Supports 4-crew during Lunar-Mars Analog missions leading up to a 700-1110-day Mars mission - Hybrid inflatable-metallic habitat structure - Launched commercially and outfitted with logistics in cis-lunar orbit (NRHO) - Docks w/ an interim propulsion bus or Gateway for first ~5 years until Mars Propulsion System (MPS) elements available - Extends Gateway operations beyond 60 days - Contingency Airlock and EVA capability - Planned reuse for multiple missions over 15-year lifetime - Builds on ISS and commercial investment in deep space habitation - Mid-2030s launch with late 2030s Mars Departure

Mars↗

Constant Rate Production: DOE Approach to Meeting NASA Needs for Radioisotope Power Systems for Nuclear-Enabled Launches

The use of radioisotope power systems (RPSs) for nuclear-enabled National Aeronautics and Space Administration (NASA) missions is made possible through a long-standing arrangement between the Department of Energy (DOE) and NASA. The requirements for the power system come from NASA, but DOE performs the procurement, fueling, testing, and delivery. A challenge has been interplay between the schedule for RPS availability from DOE versus the schedule for competitively selected missions. By mutual agreement, the actual operations to procure an RPS and prepare it for fueling have always been delayed until the final selection of a mission. The timeline for a New Frontiers–class mission leaves approximately 5 to 6 years from the time of final mission selection to the actual launch date. The number of RPSs used for a New Frontiers–class mission can be one to three units. If one or two units are needed, the timeline from the decision point to the launch date is a challenge, but it is achievable. The activities taking place include manufacturing the power system, producing the fuel, and performing the assembly/testing and delivery operations. If the mission selected requires three RPSs, the logistics of accomplishing all activities during the 5–6 years is problematic. The challenge involves obtaining the necessary resources for plutonium production, heat source production, and assembly/testing operations. Typically, the time between RPS-enabled missions requires staffing reduction down to 65%–75% of peak staffing levels to reduce costs. Coupling the ~2 year duration needed for hiring, training, and obtaining the appropriate security clearances for the required staff with the requirement for the RPS to arrive at Kennedy Space Center 6 months before the launch erodes much of the 5–6 years available to comfortably support the use of three RPSs. To provide better support for NASA RPS missions, a different approach for the production of heat sources was devised—constant rate production. This involves a higher level of base capability at DOE national laboratories to provide a stabilized workforce. This will enable 10–15 heat sources to be produced annually and placed into a stable intermediate form to enable storage for up to several years leading to quick production of general purpose heat source modules when a mission is selected. The upfront production of 238 Pu is maintained so material is constantly in the pipeline. Production of key specialized components is also maintained using this model.

42 ENGINEERING↗

Space Station ground processing

The architecture of the Station, the system requirements, and the operational capabilities for ground and flight operations are described. The proposed Space Station design is dual keel and the components of the Station are listed. The initial ground processing activities are to reflect the on-orbit assembly sequence; the four phases of the assembly are examined. The planning and analysis for the ground processing of the Station with an emphasis on cost are discussed. The logistics resupply elements aspect of the ground processing sequence is considered. An example testing the capabilities of the ground processing sequence is presented. Diagrams of the Shuttle, its modules, and ground facilities and equipment are provided.

Scully, E. J.↗

Materials processing in low gravity

Activities of the Materials Processing in Low Gravity Program in which the University of Alabama in Huntsville (UAH) designed, fabricated, and performed various low gravity experiments in materials processing between October 26, 1988 through October 25, 1989 are discussed. Details of low gravity experiments using the Drop Facilities at the Marshall Space Flight Center (MSFC) and the KC-135 aircraft at Ellington Field are discussed. This effort included the defining of experimental requirements and equipment, experiment-facility integration requirements, building/assembling the necessary experiment apparatus, and conducting experiments which will contribute to the knowledge base for commercialization of materials processing in low gravity. UAH also performed logistical support needed to execute the experimentation, the necessary sample preparation, metallography analysis, and physical properties measurements of the processed samples.

Workman, Gary L.↗

Constellation Architecture Team-Lunar: Lunar Habitat Concepts

This paper will describe lunar habitat concepts that were defined as part of the Constellation Architecture Team-Lunar (CxAT-Lunar) in support of the Vision for Space Exploration. There are many challenges to designing lunar habitats such as mission objectives, launch packaging, lander capability, and risks. Surface habitats are required in support of sustaining human life to meet the mission objectives of lunar exploration, operations, and sustainability. Lunar surface operations consist of crew operations, mission operations, EVA operations, science operations, and logistics operations. Habitats are crewed pressurized vessels that include surface mission operations, science laboratories, living support capabilities, EVA support, logistics, and maintenance facilities. The challenge is to deliver, unload, and deploy self-contained habitats and laboratories to the lunar surface. The CxAT-Lunar surface campaign analysis focused on three primary trade sets of analysis. Trade set one (TS1) investigated sustaining a crew of four for six months with full outpost capability and the ability to perform long surface mission excursions using large mobility systems. Two basic habitat concepts of a hard metallic horizontal cylinder and a larger inflatable torus concept were investigated as options in response to the surface exploration architecture campaign analysis. Figure 1 and 2 depicts the notional outpost configurations for this trade set. Trade set two (TS2) investigated a mobile architecture approach with the campaign focused on early exploration using two small pressurized rovers and a mobile logistics support capability. This exploration concept will not be described in this paper. Trade set three (TS3) investigated delivery of a "core' habitation capability in support of an early outpost that would mature into the TS1 full outpost capability. Three core habitat concepts were defined for this campaign analysis. One with a four port core habitat, another with a 2 port core habitat, and the third investigated leveraging commonality of the lander ascent module and airlock pressure vessel hard shell. The paper will describe an overview of the various habitat concepts and their functionality. The Crew Operations area includes basic crew accommodations such as sleeping, eating, hygiene and stowage. The EVA Operations area includes additional EVA capability beyond the suit-port airlock function such as redundant airlock(s), suit maintenance, spares stowage, and suit stowage. The Logistics Operations area includes the enhanced accommodations for 180 days such as closed loop life support systems hardware, consumable stowage, spares stowage, interconnection to the other Hab units, and a common interface mechanism for future growth and mating to a pressurized rover. The Mission & Science Operations area includes enhanced outpost autonomy such as an IVA glove box, life support, and medical operations.

Toups, Larry↗