Packaging and Transportation Support at LANL CTMA 2012

Operations Support Packaging and Transportation (OS-PT) supports LANL in various functions. Some highlights of the past year have been with the work relating to environmental remediation, type B packaging, non-DOT compliant transfers, and special permit training. The TA-21 remediation project was part of the ARRA funding that LANL received. The $212 million in funding was used to demolish 24 buildings at TA-21, excavate the lab's oldest waste disposal site, and install 16 groundwater monitoring wells. The project was completed ahead of schedule and under budget. More than 300 tons of metal was recycled and all the soil excavated from MDA-B was replaced with clean fill. OS-PT supported this projected by transporting more than 7 million pounds of waste to TA-54 Area G with an addendum to their TSD. Because of the public access on the transfer route, Los Alamos County restricted the transfer to happen from 2:00 AM to 4:00 AM. OS-PT conducted 8 transfers in support of this project. Some concerns included the contaminated trailers at receipt facilities when transferring filled Super Sacks. Future Super Sacks were over packed into new IP-2 Super Sacks before shipping. OS-PT is also supporting the remediation of TA-54 Area G. LANL has an agreement with the State of New Mexico to remove all TRU waste currently stored above ground from at Area G. OS-PT supports this initiative with transfers of TRU waste under LANL's TSD and support of TRU shipments to WIPP. Another project supported by our organization is gas cylinder/dewar recycling and remediation. We are focusing on reducing risk associated with unneeded gasses at LANL. To minimized excessive ordering, to save money and time, and to minimize hazards OS-PT is supporting a gas recycling program. This program will allow programmatic organization across LANL to share unused/unneeded gasses. Instead of old dewars being disposed of, OS-PT has began identifying these dewars and sending them for refurbishment. To date, this effort has saved LANL $450K and estimated saving for future efforts will be more than $1.5 million. Some Projects that are happening here at LANL are offsite source recovery, weapon component transfers, and isotope science production. There are specific packages that help support these projects for the shipment of related materials. OS-PT provides support to these packages to ensure they are and will be available to continue this support. The Areva 435-B Overpack will help the Offsite Source Recovery Project recover high activity gamma sources from various locations across the globe. The Safety Analysis for Packaging is scheduled for initial completion June of 2012. The DPP-1 package is designed to replace the Model FL, which was designed by Rocky Flats and began service in 1990. LANL has collaborated on package design with LLNL, Pantex, Y-12, and KCP. LANL is supporting LLNL on component fixture development. Testing to 10 CFR 71 is to be completed in the Fall of 2012 and scheduled for NA-174 approval in 2014. The SAFESHIELD package helps supports LANL's Isotope production projects. This package can transfer highly irradiated materials from LANL's accelerator to material processing facilities. LANL worked to renew the SAFESHEILD's Certification for 5 more years.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Argonne National Laboratory Annual Report of Laboratory Directed Research and Development Program Activities FY 2012

Our plans to upgrade the Advanced Photon Source are proceeding on schedule, and we hope to receive CD-2 approval sometime in spring 2013. When complete, the APS Upgrade will equip this vital facility for continued scientific leadership in the 21st century, providing the 5,000-plus members of our user community with greatly increased time, energy and spatial resolution. We also have successfully installed “Mira,” the new IBM Blue Gene/Q system at the Argonne Leadership Computing Facility. The world’s fourth-fastest supercomputer, Mira is now providing leading-edge computational power across all scientific disciplines. I am also pleased to report that Argonne’s new Energy Sciences Building is proceeding on schedule; we expect it to be finished and ready for occupancy by June 30, 2013. When complete, the ESB will be one of the most modern and most flexible energy labs in the world, creating a new home for researchers focused on a wide range of energy science challenges. Research is under way at the new multidisciplinary Institute for Molecular Engineering (IME), a joint program of the University of Chicago and Argonne. Over the past year, four new faculty members, including IME’s director, – all pre-eminent researchers who hold joint appointments at Argonne – have joined the IME. We look forward to working in collaboration with the IME to find new ways to address the interfaces between molecular-level science and powerful new technologies. In FY 2012, we continued support for the final year of the “Beyond Lithium-Ion” Director’s Grand Challenge LDRD project. That project enabled significant work on the performance of lithium-based energy storage systems, pointing the way to new high-energy-density lithium-air batteries. I believe this Grand Challenge contributed significantly to our successful bid to win designation of the Argonne-based Joint Center for Energy Storage Research (JCESR) as the DOE’s new Batteries and Energy Storage Hub. JCESR, which brings together a world-class “dream team” of national laboratories, universities and private sector partners, strongly benefited from LDRD program investments, both in FY2012 and in previous years. As we move forward in FY2013, the Director’s Grand Challenge is now focused on new ways to address the challenges of “big data” – the acquisition, storage, transfer, and analysis of both experimental and simulated data at scales approaching the limits of our current computational capacities. In managing Argonne’s LDRD program, we have adhered to the requirements of DOE Order 413.2b and associated guidelines. Our program management continually strives for increased efficiency. In addition to meeting all reporting requirements during FY 2012, our LDRD Program Office continues to implement intranet-based process enhancements to better serve all LDRD stakeholders, including our DOE Site Office colleagues. As the following individual project reports demonstrate, Argonne’s researchers are pursuing projects at the leading edge of science and engineering, and making significant contributions to the advancement of our laboratory’s major strategic initiatives. Evidence of the continuing strength of this program is found in the follow-on sponsorship won by many of these research projects, as well as in the numbers of publications, invited presentations, inventions, and new staff hires that are direct results of LDRD. LDRD enables exploration of new scientific directions and makes it possible to adapt quickly to a changing landscape with unexpected opportunities, while enhancing the capabilities of our researchers and our scientific facilities. For these reasons, LDRD remains an invaluable resource to address the future science and technology needs of DOE, and of our nation.

96 KNOWLEDGE MANAGEMENT AND PRESERVATION↗

Multi-Unit Dwelling Plug-in EV Charging Innovation Pilots (Final Report)

Nearly one-third of residences in the U.S. are multi-unit dwellings (MUDs), e.g., apartments and condominiums, and MUDs with five or more units account for approximately 45% of rental households. While 80% of EV charging takes place at home, less than 5% of home charging takes place at MUDs. With public electric vehicle (EV) charging still underdeveloped, lack of access to reliable home charging is a major barrier to EV adoption for MUD residents. Challenges to siting electric vehicle supply equipment (EVSE) at MUDs include the high upfront cost of EVSE installation, physical and/or electrical infrastructure constraints, a lack of clear incentives for property managers to invest in installing EV charging for tenants, and a limited number of EV charging service providers that offer solutions adapted to the unique needs of MUDs. Through award DE-EE0008473 from the U.S. Department of Energy’s Office of Energy Efficiency and Renewable Energy (EERE), Center for Sustainable Energy (CSE), Energetics, and Forth, along with a diverse team of partners, led a three-year project to address barriers to EV charging at MUDs by developing an online toolkit geared toward residents, homeowner associations (HOAs), and property managers. The project, referred to as Vehicle Charging Innovations – Multi-Unit Dwellings (VCI-MUD project), engaged stakeholders across the country to identify real and perceived barriers to EV charging at MUDs and explored innovative technologies that attempt to alleviate the identified barriers. Over the course of three and a half years, the project conducted 60 interviews with industry stakeholders, compiled findings in an easy-to-use toolkit, and disseminated the toolkit across national, regional, state, and local channels. Key findings and outcomes of the VCI-MUD project include: Identifying six primary barriers to the installation of EV charging at MUDs; Developing five fact sheets and eight case studies highlighting innovative charging solutions to address barriers, including real-world operational and financial data; Developing a user-friendly, online empowerment toolkit with five important points for “making your pitch” to support EV charging to assist residents, property managers, building managers, and HOAs explore options for MUD charging. The VCI-MUD online toolkit was designed with replicability in mind. It includes general tools and guides to evaluate EV charging demand, gauge readiness for EV charging installation, and develop actionable plans. The fact sheets and case studies highlight the diversity of emerging MUD EV charging solutions, featuring different geographic and structural installation scenarios and providing interested parties with a menu of options, rather than prescribing a one-size-fits-all solution. The following resources are included in the toolkit to provide MUD stakeholders with all the information needed to navigate EV charging installation at their MUD location: Empowerment Toolkit – Easy-to-read FAQ overview, stakeholder roles and responsibilities, and additional resources for MUD EV charging installations; Charging Basics – Glossary of terms and descriptions of charging features, installation and operating expenses; EV Charging Survey Templates – Resident-to-Resident, Property Manager-to-Resident and HOA-to-Resident template letters with pre-populated template questions; Technology Selection Tool – Charging barrier fact sheets and case study examples; Installation Checklist – Submittal document requirements for EVSE installations; MUD Building Self-Evaluation Survey – Self-guided evaluation of potential barriers to EV charging installation at MUD locations; Curbside Resources – Case studies and fact sheets for curbside charging options; Find a Certified Electrician – Approved list of certified EV charging installers; “Right-to-Charge” State Legal References – Legal requirements for charging equipment at MUD locations. The online toolkit was promoted extensively in the final six months of the project and will continue to be disseminated by the Clean Cities Coalitions and other partners after the end of the VCI-MUD project to encourage, support, and demonstrate viable solutions for vehicle charging infrastructure in MUDs.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

RIVER PROTECTION PROJECT SYSTEM PLAN

The U.S. Department of Energy (DOE), Office of River Protection (ORP) manages the River Protection Project (RPP). The RPP mission is to retrieve and treat Hanford's tank waste and close the tank farms to protect the Columbia River. As a result, ORP is responsible for the retrieval, treatment, and disposal of approximately 57 million gallons 1 of radioactive waste contained in the Hanford Site waste tanks and closure2 of all the tanks and associated facilities. The previous revision of the System Plan was issued in May 2008. ORP has made a number of changes to the tank waste treatment strategy and plans since the last revision of this document, and additional changes are under consideration. ORP has contracts in place to implement the strategy for completion of the mission and establish the capability to complete the overall mission. The current strategl involves a number of interrelated activities. ORP will reduce risk to the environment posed by tank wastes by the following: (1) Retrieving the waste from the single-shell tanks (SST) to double-shell tanks (DST) and delivering the waste to the Waste Treatment and Immobilization Plant (WTP). (2) Constructing and operating the WTP, which will safely treat all of the high-level waste (HLW) fraction contained in the tank farms. About one-third of the low-activity waste (LAW) fraction separated from the HLW fraction in the WTP will be immobilized in the WTP LAW Vitrification Facility. (3) Developing and deploying supplemental treatment capability assumed to be a second LAW vitrification facility that can safely treat about two-thirds of the LAW contained in the tank farms. (4) Developing and deploying supplemental pretreatment capability currently assumed to be an Aluminum Removal Facility (ARF) using a lithium hydrotalcite process to mitigate sodium management issues. (5) Developing and deploying treatment and packaging capability for contact-handled transuranic (CH-TRU) tank waste for possible shipment to and disposal at the Waste Isolation Pilot Plant (WIPP) in New Mexico. (6) Deploying interim storage capacity for the immobilized high-level waste (IHLW) pending determination of the final disposal pathway. (7) Closing the SST and DST tank farms, ancillary facilities, and all associated waste management and treatment facilities. (8) Optimizing the overall mission by resolution of technical and programmatic uncertainties, configuring the tank farms to provide a steady, well-balanced feed to the WTP, and performing trade-offs of the required amount and type of supplemental treatment and of the amount of HLW glass versus LAW glass. ORP has made and continues to make modifications to the WTP contract as needed to improve projected plant performance and address known or emerging risks. Key elements needed to implement the strategy described above are included within the scope of the Tank Operations Contract (TOC). Interim stabilization of the SSTs was completed in March 2004. As of April 2009, retrieval of seven SSTs has been completed and retrieval of four additional SSTs has been completed to the limits of technology. Demonstration of supplemental LAW treatment technologies has stopped temporarily pending revision of mission need requirements. Award of a new contract for tank operations (TOC), the ongoing tank waste retrieval experience, HLW disposal issues, and uncertainties in waste feed delivery and waste treatment led to the revision of the Performance Measurement Baseline (PM B), which is currently under review prior to approval. 6 This System Plan is aligned with the current WTP schedule, with hot commissioning beginning in 2018, and full operations beginning in late 2019. Major decisions regarding the use of supplemental treatment and the associated technology, the ultimate needed capacity, and its relationship to the WTP have not yet been finalized. This System Plan assumes that the outcome of these decisions will be to provide a second LAW vitrification facility. No final implementation decisions regarding supplemental technology can be made until the Tank Closure and Waste Management Environmental Impact Statement is completed and a Record of Decision is issued by DOE. Technical solutions are being developed to mitigate the impact from substantially increased estimates of sodium to be added during pretreatment of the tank waste solids. This may involve one or more of the following options: (1) refining or modifying the flowsheet to reduce the required amount of additional sodium, (2) increasing the overall LAW vitrification capacity, (3) increasing the incorporation of sodium into the LAW glass, (4) increasing the incorporation of aluminum in the HLW glass to reduce caustic leaching requirements, or (5) implementing other technical solutions. For planning purposes, the PMB assumes that option (5) above, in the form of an ARF, will be successful in reducing the sodium required to be added during pretreatment of the tank waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Procurement of 100 kg of Enriched Xenon for the EXO Prototype and for its Installation at WIPP

This grant supported the enriched xenon procurement, detector construction and initial operation of the EXO-200 double beta decay experiment at the Waste Isolation Pilot Plant (WIPP). The period of performance was Aug 15, 2002 to Dec 31, 2014. The primary goal of the experiment is to search for the very rare (and to date not observed) neutrino-less double beta decay. Such decay, if observed, would shed the light of the quantum-mechanical structure of neutrinos, and the origins of elementary particle masses. Another goal of the detector is to serve as prototype of a larger neutrino-less double beta decay experiment, currently being considered by DOE-OS. EXO-200 has already been extremely successful in both areas and is, in fact, leading the way world-wide in this area of fundamental physics. In the initial part of the grant the EXO-200 collaboration acquired 200kg of xenon enriched to 80% in the isotope 136 that is a candidate for double beta decay. At the time this was the largest isotope separation program carried out for fundamental science. The enrichment was done in Russia, providing a rare and valuable opportunity for US scientists to work alongside Russian colleagues, in some cases from the former closed cities of their military complex. By now the EXO-200 collaboration include institutions from the US, Canada, South Korea, China, Germany, Switzerland and Russia. Many collaborating scientists from these countries have taken shifts at WIPP or at the various remote monitoring sites world-wide. EXO-200 detector construction was completed in early 2010, with the time projection chamber (TPC) installation in the cleanrooms already placed in NeXA. Detector commissioning at WIPP followed, with the last phase, the filling of the TPC with liquid Xenon, occurring in the spring 2011. EXO-200 is described in [1]. Low background data taking started on Jun 1, 2011 and within the first month of data the 2-neutrino double beta decay of 136Xe was discovered, as reported in [2]. More data provided the best half-life measurement of any 2-neutrino double-beta decay modes [3]. Until Feb 2014 the detector ran continuously producing some of the world leading results in the field and, in particular, two of the most sensitive searches for neutrinoless double beta decay [4,5]. These measurements show that the half life of this decay is longer than 1015 times the age of the universe. This is one of the leading results in this field world-wide and succeeded to put the DOE-funded research on the world stage in a very cost-effective way. Other results from EXO-200 include a search for exotic double-beta decay modes [6], a detailed report on the state of the art background levels achieved in the detector [7], the study of rare ion and neutral atom motion and neutralization rates in liquid Xenon [8], a study of the cosmogenic backgrounds in the detector at WIPP’s depth [9], a search for Lorentz and CPT symmetries violation [10] and a search for double-beta decay to excited states [11]. In Feb 2014 the EXO-200 detector was severely disrupted by the accidents in the WIPP underground (unrelated to EXO-200). The EXO-200 operations team was able to recover the unique stockpile of enriched Xenon to high pressure cylinders and warm-up the detector to room temperature without damaging the very delicate equipment. This was a very impressive achievement as no plan had been made to complete these operations entirely from remote. This validates the robustness of well-designed liquid xenon detectors for this and other measurements in particle and nuclear astrophysics. The operations team re-gained almost regular access to the WIPP underground and the EXO-200 detector in Jan 2015 and spent calendar 2015 cleaning up the soot from the WIPP fire, assessing the damage to the EXO-200 infrastructure, correcting such damage and restarting the detector. This process was successfully carried out and culminated in the re-filling of the detector with liquid xenon, in Jan 2016. As of late Jan 2016 EXO-200 is taking data again. The collaboration is in the process of upgrading the readout electronics and restarting a radon abatement system that had been commissioned just before the Feb 2014 events. The upgraded electronics will provide lower readout noise and, in turn, better signal to background discrimination. The radon abatement system will further reduce the radon in a small air-gap between the EXO-200 cryostat and the lead shielding. In a review in Jun 2015 DOE-OS approved EXO-200 for 2.5 more years of running at the end of which we expect to improve the sensitivity to the neutrino-less double-beta decay by a factor two or three. For the last 5 years the EXO-200 detector, located in the WIPP underground, has been at the center of the hunt for new physics beyond the Standard Model of particle physics!

72 PHYSICS OF ELEMENTARY PARTICLES AND FIELDS↗

High Energy Storage Capacity Low Cost Iron Flow Battery

A new flow battery was proposed that utilizes low cost materials: iron as the only active element, cheap aqueous electrolytes, and inexpensive separators. During charging, ferrous iron (Fe 2+ ) is oxidized to ferric iron (Fe 3+ ) at the positive electrode while it (Fe 2+ ) is reduced to form iron metal (Fe 0 ) at the negative electrode. Because iron is plated at the negative electrode during charging, conventional electrode structures couple the energy storage capacity and the power rating of the battery. In order to decouple the energy and power ratings and regain the economic advantages of a flow battery, a slurry electrode design was proposed for use as the negative electrode. The slurry electrode is made by flowing electrically conductive particles in an electrolyte containing the dissolved iron species. On charging, iron is plated onto the particles. The particles can then carry the iron metal out of the cell to be stored in external reservoirs. This project looked to develop a slurry for the negative electrode of the all-iron flow battery that can operate at 200 mA/cm 2 with <100 mV overpotential, be pumped with parasitic energy costs < 10%, and promote plating on the particles. A scalable and stackable cell design of 1100 cm 2 was developed. The project was initially under contract in mid-January 2013. The project was converted from a one-year proof of concept seedling to an additional two-year program, then extended with an 18-month plus-up, and finally with an additional 6-month approved cost-overrun. During the seeding project, the concept of plating on carbon particles in a slurry was demonstrated. However, this was accomplished with high-cost multi-walled carbon nanotubes as the slurry material. The following two-year program discovered several low-cost carbon blacks that could also be used in this application. These findings were supported by an analysis that demonstrated the effectiveness of the carbon that takes into account not just the effective electronic conductivity of the slurry, but also the surface area per volume of the slurry. It was demonstrated that stable, flowable slurries could be created with these carbons, even when the carbons where fully loaded with iron during charging. During the two-year program, laboratory-scale 50 cm 2 single-cells demonstrated charge-discharge cycling at current densities of 150 mA/cm 2 and energy efficiencies of >50%. Meanwhile, cost modeling continued to show promise for this energy storage approach. Following the conversion period, the overall objective of the nominally 18-month plus up period was to close the technical gap of a 25X scale-up and reduce risk to enable commercial investment required to develop a slurry iron flow battery product. A specific objective was to demonstrate 150 cycles of performance exceeding 70% energy efficiency with a 10-cell stack of 1156 cm 2 cells operating at 100 mA/cm 2 . The 10-cell short stack was designed to have a power delivery rating of approximately 1 kW, which represents a size commensurate with the requirements of our commercialization partner at that time. A complete battery support system for the full-size cell was designed, fabricated, and tested. This includes pumps (multiple types were considered, and constant volume hose pumps were found to be acceptable for performance and cost), electrolyte rebalance reactor, and sensors and control systems. The support system proved to be well-behaved and worked well. A new low-cost membrane was developed for this system based on a microporous polymer support with a layer of hydrogel polymer. The membrane had low resistivity, and significantly reduced pressure driven fluid flow across the membrane (as compared to the un-coated microporous support). This membrane approach was scaled-up in conjunction with a commercial toll coating company, and a large amount of membrane was manufactured to support large cell and stack testing. A new concept for an electrolyte rebalance reactor to react hydrogen gas from the negative electrolyte (from plating inefficiency) with excess ferric ion in the positive electrolyte was developed. This design was very simple, low cost, and effective. The full scale 1156 cm 2 single-cell was designed, modeled, fabricated and tested. Modeling showed that uniform flow-distribution should be obtained with the designed flow distributor. The design took into consideration the need to stack the cells, and components were fabricated for a ten-cell stack. Testing of the cell for charge and discharge demonstrated current densities of 50 mA/cm 2 with efficiencies of 50%. However, optimization and long cycling could not be accomplished because the slurry electrode would plug within the cell and block the flow. This would shut down the cell after several charge-discharge cycles. Various approaches were pursued to address this problem with some progress. However, there was not adequate time to find solutions to the problem although several promising approaches were identified for future work. The final deliverable for this proposed 18-month effort was to be a 1 kW, 6 kWh slurry flow battery, with complete balance of plant, ready for testing at an ARPA-E ‘Charges’ site with an estimated capital cost less than $\$ $45/kWh for a six-hour system (excluding power electronics). The deliverable milestone was not achieved for reasons mentioned above related to the slurry plugging. At the completion of this project, it was determined that the cost targets are achievable. The cost estimate for a 1 MW system with a one-hour capacity was estimated at $\$ $140/kWh (including power electronics) and for a six-hour system was estimated at $\$ $40/kWh (including power electronics). These costs include the battery, the balance of plant, the power conditioning and a concrete pad. This program resulted in three patents including the slurry-based iron flow battery, the rebalance reactor, and the membrane separator. At the time of this report, slurry-based iron flow battery patents have been issued in the US, China, Japan, Korea, and Europe. The other patent applications were under various stages of examination. A licensee was identified and the company initiated a scale-up and development program to take this technology to the marketplace, and CWRU staff have transferred their know-how and knowledge base to the company. This technology will enhance the economic and energy security of the United States by enabling the use of intermittent renewable energy technology, such as wind and solar power, as dispatchable resources. This report summarizes the results of this research and development program.

25 ENERGY STORAGE↗

Novel Radiometry for In-Pipe Robotic Inspection of Holdup Deposits in Gaseous Diffusion Piping - 19503

This paper details the first complete, DOE approved, deployed and operational radiometry for robotic nondestructive assay (NDA) of holdup deposits in gaseous diffusion piping. Some features, like peak-finding, Compton correction, detector efficiency, and material properties are characteristic of typical manual methods. Most features are specific to in-pipe robotic deployment. These include in-motion radiometry, self-determined location, geometric modeling of thick deposits, bounding of self-attenuation thickness and auto-checking of replicate measurements. Significant are the means for determining all the properties, equations, and constants for automatically computing and displaying all the quantities, uncertainties and information needed for NDA reporting, analysis, and review. Earlier work by this team demonstrated rudimentary but convincing robotic in-pipe NDA of holdup deposits in pipes. Cold testing with high-enrichment mat sources and hot tests with low U-235 loadings together succeeded to exhibit convincing proof-of-principle. This research-grade radiometry implementation lacked accurate odometry, efficiency calibration, high-fidelity detector modeling, attenuation modeling, forward geometric modeling, auto-segmenting, uncertainty modeling, replicate checking, deconvolution and much more. This work explains the technical basis behind robotic in-pipe NDA. It includes discussion of a new method for modeling of self-attenuation using in-pipe deposit geometry information, detail of the method's total measurement uncertainty, and explanation of calibration methods and results. Beyond development of automation-specific radiometric elements, the paper highlights analyses, testing, and technical bases specific to and supportive of the methodology. Examples include collimation characterization, detector efficiency determination, auto-calibration methodology, and odometric replicate-checking. Results of this methodology are formalized in a DOE EM Technical Basis Document, implemented in software, formally verified in review and acceptance testing and proceduralized as a means for D and D NDA at the Portsmouth enrichment facility. Measurement of U-235 quantity is a well-known cost and schedule driver in D and D of every defunct gaseous diffusion enrichment facility in the world. The radiometry methodologies and results detailed in this paper were the high hurdles. Having established the technical basis for this automated NDA, the opportunity is to apply this to many sizes and robot forms for addressing holdup deposit NDA throughout the D and D community. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Graham Community Building Biomass Heating Design Project

Native Village of Port Graham completed preconstruction activities to prepare for construction and operations of a cord wood biomass heating system to five or more community buildings in Port Graham, Alaska. Project Description Native Village of Port Graham (NVPG) completed preconstruction activities that pave the way towards reduced local energy costs through the construction and operations of a cord wood biomass heating system. NVPG plans include installation of a GARN WHS 3200 Boiler that uses cord wood as fuel source. Implementation of the 700,000 Btu per hour output biomass community building heat utility would heat 5-community buildings in Port Graham, Alaska. Heating system is estimated to displace 85% of the heating fuel oil or 5365 gallons of fuel on an annual basis with an estimated peak output of 600,000 Btu per hour. Estimated savings is $15,112.00 per year. The construction cost estimate made to install the new biomass boiler system is estimated $251,693.47 with an additional Boiler Building expansion cost estimated at $97,828.40. Total installed cost is estimated $349,521.87. The WHS 3200 Boiler would be placed inside a new structure at the old community Water Plant Building site that is controlled by NVPG. Design of the new biomass heat plant and hot water loop system was completed by Richmond Engineering, NVPG contractor for the project. A hot water heat loop system running off the boiler is designed to be placed underground on lands controlled by NVPG and stubbed to feed hot water to existing base board heating system in the following community buildings: 1. Anesia Anahonak Moonin Health and Dental Clinic 2. Native Village of Port Graham offices 3. Port Graham Public Safety Building/Fire Department 4. Port Graham Corporation Office Building which also houses the Port Graham Museum and Head Start Center 5. North Pacific Rim Housing Authority Workshop/Old Fire Hall Existing community buildings fuel oil heating systems are to be retro-fitted to accommodate hot water from the proposed wood-burning GARN Boiler, once installed, and rely on the existing fuel oil-fired hot water heating equipment for backup. The boiler would use an estimated 125 bone dry tons, equivalent to 100 cords, woody biomass feedstock obtained from local lands per year. Project would use local labor as described in the Port Graham Biomass Project, report completed by Chena Power, Inc. and Winters and Associates as part of the in-kind support to the U. S. Department of Energy (DOE) project for work on a project for State of Alaska’s Alaska Energy Authority (AEA). NVPG will likely initiate operations of the biomass boiler system even though several operational variations were studied. Obtaining the fuel source could be done by contractors, PGVC employees, or NVPG employees. Feeding the system would likely be done by NVPG employees. A majority of the buildings heated would be owned by NVPG. The PGVC office would be heated as well as the Old Fire Hall used as a workshop and storage area for North Pacific Rim Housing Authority. One methodology studied to charge for cost of utilizing the community building biomass system would use a percentage of use of hot water generated by the biomass hot water system based on past heating oil usage in relation to all buildings heated by biomass hot water. The method is better described in the Port Graham Biomass Project report. Fuel source agreements have been drafted to enter into agreements with area landowners. One Native allotment owner has asked Chugachmiut Forestry to begin a timber sale process to sell timber off her lands, specifically wind thrown timber that was determined to be of sufficient quantity to supply to the proposed biomass heating system for approximately 5-years. On NVPG’s behalf, Chugachmiut has presented to PGVC three different documents, attached, that could lead to a sale of woody biomass fuel for the project for up to 25-years, the expected life of the project. PGVC has signed a letter of intent to negotiate a sale of woody biomass material April 30, 2015. Chugachmiut Forestry has conducted two different field forest measurements of Native allotment lands and PGVC forest and timber lands. Lands deemed road accessible for biomass harvest were analyzed for this project. Forestry then conducted three different analyses and developed two reports to determine forest biomass on a tons per acre basis in addition to timber volume measurements taken for forest management purposes. Permits required were limited. For the biomass building, the Kenai Peninsula Borough did not require a permit. State of Alaska, Department of Public Safety, Division of Fire and Life Safety requires a plan review for fire and life safety requirements called an application for Fire and Life Safety Plan Review that would require a registered design professional to sign the document. State of Alaska State Forest Practices Act is required to be followed for any timber sale or harvest. This Act also requires consultation with Alaska Department of Fish and Game when operations are in close proximity or cross anadromous waters. Native allotment lands require following U. S. Bureau of Indian Affairs timber sale contracting process and approval.

09 BIOMASS FUELS↗