URGSiM Analysis of Climate Risk in the Upper Rio Grande Basin.
Abstract Not Provided
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Abstract Not Provided
Abstract not provided.
Abstract not provided.
Abstract is contained in the attached document.
Abstract not provided.
Abstract not provided.
Abstract not provided.
Abstract not provided.
This set of slides has been prepared for a talk at the INL AI/ML Symposium held on September 8, 2022. Presentation outline: Background - Nuclear power plant operating experience data sources • Research focus and motivation - Analyzing free-text operating experience data: present and future • Research method - Input - Methodological steps - Output • Conclusions and next steps
This paper describes a cognitively based human reliability analysis (HRA) quantification technique for estimating the human error probabilities (HEPs) associated with operator and crew actions at nuclear power plants. The method described here, Standardized Plant Analysis Risk-Human Reliability Analysis (SPAR-H) method, was developed to aid in characterizing and quantifying human performance at nuclear power plants. The intent was to develop a defensible method that would consider all factors that may influence performance. In the SPAR-H approach, calculation of HEP rates is especially straightforward, starting with pre-defined nominal error rates for cognitive vs. action-oriented tasks, and incorporating performance shaping factor multipliers upon those nominal error rates.
As part of an analysis of the loss of crew risk associated with an ascent abort system for a manned launch vehicle, a model was developed to predict the impact risk of the debris resulting from an explosion of the launch vehicle on the crew module. The model consisted of a debris catalog describing the number, size and imparted velocity of each piece of debris, a method to compute the trajectories of the debris and a method to calculate the impact risk given the abort trajectory of the crew module. The model provided a point estimate of the strike probability as a function of the debris catalog, the time of abort and the delay time between the abort and destruction of the launch vehicle. A study was conducted to determine the sensitivity of the strike probability to the various model input parameters and to develop a response surface model for use in the sensitivity analysis of the overall ascent abort risk model. The results of the sensitivity analysis and the response surface model are presented in this paper.
This paper presents a risk-based dynamic contingency analysis framework that was used to evaluate the hurricane impact to electrical infrastructure in Puerto Rico. PNNL developed a scalable risk-based framework for identifying high-voltage transmission resilience improvements by classifying and prioritizing high-risk power grid contingencies (system failures) under hurricane impact. The risk-based framework is founded on grid outage definitions with their associated probabilities of occurrence from hurricane events, in combination with an impact assessment derived from detailed dynamic cascading failure analysis. This paper focuses on a discussion around data requirements for transmission resilience planning for hurricane events, derived from the development of the risk-based framework and its application to Puerto Rico. This paper launches an important first step in encouraging the engineering community and power system industry to move towards establishing resilience planning as a routine practice. Since actual results for Puerto Rico contain sensitive information, sample simulation results will be used to illustrate the data requirements and risk-based dynamic cascading framework on the Puerto Rico power grid, as well as demonstrate the potential for such a simulation framework. The paper includes a discussion on the lessons learned, importance and need for improved datasets that are not usually considered in traditional power system planning. The paper will also elaborate on how the scalable simulation framework and datasets might be expanded to larger footprints and leveraged for modelling other types of natural disasters.
A Risk Management Process has been tailored for Cassini that not only satisfies the requirements of NASA and JPL, but also allows the Program to proactively identify and assess risks that threaten mission objectives. Cassini Risk Management is a team effort that involves both management and engineering staff. The process is managed and facilitated by the Mission Assurance Manager (MAM), but requires regular interactions with Program Staff and team members to instill the risk management philosophy into the day to day mission operations. While Risk Management is well defined for projects in the development phase, it is a relatively new concept for Mission Operations. The Cassini team has embraced this process and has begun using it in an effective, proactive manner, to ensure mission success. It is hoped that the Cassini Risk Management Process will form the basis by which risk management is conducted during MO&DA on future projects. proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working proactive in identifying, assessing and mitigating risks before they become problems. Cost ehtiveness is achieved by: Comprehensively identifying risks Rapidly assessing which risks require the expenditure of pruject cewums Taking early actions to mitigate these risks Iterating the process frequently, to be responsive to the dynamic internal and external environments The Cassini Program has successfully implemented a Risk Management Process for mission operations, The initial SRL has been developed and input into he online tool. The Risk Management webbased system has been rolled out for use by the flight team and risk owners we working put into place will become visible and will be illusmted in future papers.
Purpose: To introduce a version of the Lyman normal-tissue complication probability (NTCP) model adapted to incorporate censored time-to-toxicity data and clinical risk factors and to apply the generalized model to analysis of radiation pneumonitis (RP) risk. Methods and Materials: Medical records and radiation treatment plans were reviewed retrospectively for 576 patients with non-small cell lung cancer treated with radiotherapy. The time to severe (Grade {>=}3) RP was computed, with event times censored at last follow-up for patients not experiencing this endpoint. The censored time-to-toxicity data were analyzed using the standard and generalized Lyman models with patient smoking status taken into account. Results: The generalized Lyman model with patient smoking status taken into account produced NTCP estimates up to 27 percentage points different from the model based on dose-volume factors alone. The generalized model also predicted that 8% of the expected cases of severe RP were unobserved because of censoring. The estimated volume parameter for lung was not significantly different from n = 1, corresponding to mean lung dose. Conclusions: NTCP models historically have been based solely on dose-volume effects and binary (yes/no) toxicity data. Our results demonstrate that inclusion of nondosimetric risk factors and censored time-to-event data can markedly affect outcome predictions made using NTCP models.
The purpose of the burden versus capability analysis is to analyze the ability of components to withstand the loads that they are subjected to. When designing a launch vehicle, there is always a trade-off for the strength of the components versus the weight of the vehicle. The vehicle needs to have some margin built in to the design, but this added margin should not add a significant amount of weight to the vehicle. When the material properties and limits are known, estimated loads can be used to ensure that the vehicle will survive launch loads. If the variation in the distributions can be quantified, the probability of failure can be estimated more accurately.