Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Probabilistic Risk”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Architecture and design of third Qinshan nuclear power plant risk monitor

Risk monitor is a real-time analysis tool to determine the point-in-time risk based on actual plant configuration, which is an important application of PSA (Probabilistic Safety Assessment). In this study the status and development trend of risk monitor were investigated and a risk monitor named TQRM (Third Qinshan nuclear power plant Risk Monitor) was developed. The B/S architecture and the two key computing methods pre-solved and resolving PSA model method adopted in TQRM were introduced. The functions and technical features were also presented. Now TQRM has been on-line for more than one year and used in the operation and maintenance of TQNPP. The experience demonstrates that TQRM's results are accurate and real-time, the architecture is stable, and it could be extended and maintained conveniently for any other Risk-Informed Application. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Addressing the Hard Factors for Command File Errors by Probabilistic Reasoning

Command File Errors (CFE) are managed using standard risk management approaches at the Jet Propulsion Laboratory. Over the last few years, more emphasis has been made on the collection, organization, and analysis of these errors for the purpose of reducing the CFE rates. More recently, probabilistic modeling techniques have been used for more in depth analysis of the perceived error rates of the DAWN mission and for managing the soft factors in the upcoming phases of the mission. We broadly classify the factors that can lead to CFE's as soft factors, which relate to the cognition of the operators and hard factors which relate to the Mission System which is composed of the hardware, software and procedures used for the generation, verification & validation and execution of commands. The focus of this paper is to use probabilistic models that represent multiple missions at JPL to determine the root cause and sensitivities of the various components of the mission system and develop recommendations and techniques for addressing them. The customization of these multi-mission models to a sample interplanetary spacecraft is done for this purpose.

Meshkat, Leila↗

Probabilistic Diffusion Models Advance Extreme Flood Forecasting

Extreme floods pose escalating risks in a changing climate, yet forecasting remains challenging due to peak flow underestimation and high uncertainty. We introduce diffusion-based runoff model (DRUM), a probabilistic deep learning (DL) approach that advances extreme flood forecasting across representative basins in the contiguous United States. DRUM outperforms state-of-the-art benchmarks, enhancing nowcasting skill for the top 1‰ of flows in 72.3% of studied basins. Under operational scenarios, DRUM extends reliable lead times by nearly a full day for 20- and 50-year floods. When evaluated with measured precipitation, an ideal condition, recall improves by 0.3–0.4 and the early warning window extends by 2.3 days for 50-year floods. The enhancement potential varies regionally, with precipitation-driven flood zones in the eastern and northwestern US benefiting most, gaining 3–7 days in lead time. These findings highlight the transformative potential of diffusion models as a cutting-edge generative AI technique for advancing hydrology and broader Earth system sciences.

54 ENVIRONMENTAL SCIENCES↗

Operating Experiences from Existing Fusion Facilities in View of ITER Safety and Reliability

The objective of this ongoing activity is to develop a fusion specific component failure rate database useful to quantify probabilistic safety assessment, support traditional safety analysis, quantify reliability, availability, maintainability, and inspectability (RAMI) analyses, and support any other uses where field experience can provide feedback to fusion facility design and operation. The activity supported by European, American, and Japanese programs is established in the context of the International Energy Agency Agreement on the Environmental, Safety and Economic Aspects of Fusion Power (IEA ESE). The data collection began in 1989. At first, it was to "harvest" already-published data from high-technology industries that can be readily applied to fusion components. Several years later, attention was also directed to collecting and analyzing operating experience data from existing tokamaks and other fusion experiments. For some fusion facilities, the investigations on causes and effects of failures of components and systems have also interested worker exposures and radiological releases induced by maintenance activities on failed components.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Optimization problems governed by systems of PDEs with uncertainties

This paper reviews current theoretical and numerical approaches to optimization problems governed by partial differential equations (PDEs) that depend on random variables or random fields. Such problems arise in many engineering, science, economics and societal decision-making tasks. This paper focuses on problems in which the governing PDEs are parametrized by the random variables/fields, and the decisions are made at the beginning and are not revised once uncertainty is revealed. Examples of such problems are presented to motivate the topic of this paper, and to illustrate the impact of different ways to model uncertainty in the formulations of the optimization problem and their impact on the solution. A linear–quadratic elliptic optimal control problem is used to provide a detailed discussion of the set-up for the risk-neutral optimization problem formulation, study the existence and characterization of its solution, and survey numerical methods for computing it. Different ways to model uncertainty in the PDE-constrained optimization problem are surveyed in an abstract setting, including risk measures, distributionally robust optimization formulations, probabilistic functions and chance constraints, and stochastic orders. Furthermore, approximation-based optimization approaches and stochastic methods for the solution of the large-scale PDE-constrained optimization problems under uncertainty are described. Some possible future research directions are outlined.

Heinkenschloss, Matthias [Rice Univ., Houston, TX ↗

Probabilistic safety assessment of the design of a tall buildings under the extreme load

The paper describes some experiences from the deterministic and probabilistic analysis of the safety of the tall building structure. There are presented the methods and requirements of Eurocode EN 1990, standard ISO 2394 and JCSS. The uncertainties of the model and resistance of the structures are considered using the simulation methods. The MONTE CARLO, LHS and RSM probabilistic methods are compared with the deterministic results. On the example of the probability analysis of the safety of the tall buildings is demonstrated the effectiveness of the probability design of structures using Finite Element Methods.

97 MATHEMATICS AND COMPUTING↗

Development of a First-of-a-Kind Deterministic Decision-Making Tool for Supervisory Control System

Decision-making is the process of identifying and choosing alternatives where each alternative offers a different approach or path to move from a given state or condition to a desired state or condition. The generation of consistent decisions requires that a structured, coherent process be defined, immediately leading to a decision-making framework. The overall objective of the generalized framework is for it to be adopted into an autonomous decision-making framework and tailored to specific requirements for various applications. In this context, automation is the use of computing resources to make decisions and implement a structured decision-making process with limited or no human intervention. The overriding goal of automation is to replace or supplement human decision makers with reconfigurable decision- making modules that can perform a given set of tasks reliably. Risk-informed decision making requires a probabilistic assessment of the likelihood of success given the status of the plant/systems and component health, and a deterministic assessment between plant operating parameters and reactor protection parameters to prevent unnecessary trips and challenges to plant safety systems. The implementation of the probabilistic portion of the decision-making engine of the proposed supervisory control system was detailed in previous milestone reports. Once the control options are identified and ranked based on the likelihood of success, the supervisory control system transmits the options to the deterministic portion of the platform. The deterministic multi-attribute decision-making framework uses variable sensor data (e.g., outlet temperature) and calculates where it is within the challenge state, its trajectory, and margin within the controllable domain using utility functions to evaluate current and projected plant state space for different control decisions. Metrics to be evaluated include stability, cost, time to complete (action), power level, etc. The integration of deterministic calculations using multi-physics analyses (i.e., neutronics, thermal, and thermal-hydraulics) and probabilistic safety calculations allows for the examination and quantification of margin recovery strategies. This also provides validation of the control options identified from the probabilistic assessment. Thus, the thermal-hydraulics analyses are used to validate the control options identified from the probabilistic assessment. Future work includes evaluating other possible metrics and computational efficiencies.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Lessons Learned on Benchmarking from the International Human Reliability Analysis Empirical Study

The International Human Reliability Analysis (HRA) Empirical Study is a comparative benchmark of the prediction of HRA methods to the performance of nuclear power plant crews in a control room simulator. There are a number of unique aspects to the present study that distinguish it from previous HRA benchmarks, most notably the emphasis on a method-to-data comparison instead of a method-to-method comparison. This paper reviews seven lessons learned about HRA benchmarking from conducting the study: (1) the dual purposes of the study afforded by joining another HRA study; (2) the importance of comparing not only quantitative but also qualitative aspects of HRA; (3) consideration of both negative and positive drivers on crew performance; (4) a relatively large sample size of crews; (5) the use of multiple methods and scenarios to provide a well-rounded view of HRA performance; (6) the importance of clearly defined human failure events; and (7) the use of a common comparison language to “translate” the results of different HRA methods. These seven lessons learned highlight how the present study can serve as a useful template for future benchmarking studies.

99 GENERAL AND MISCELLANEOUS↗

A mid-layer model for human reliability analysis : understanding the cognitive causes of human failure events.

The Office of Nuclear Regulatory Research (RES) at the US Nuclear Regulatory Commission (USNRC) is sponsoring work in response to a Staff Requirements Memorandum (SRM) directing an effort to establish a single human reliability analysis (HRA) method for the agency or guidance for the use of multiple methods. As part of this effort an attempt to develop a comprehensive HRA qualitative approach is being pursued. This paper presents a draft of the method's middle layer, a part of the qualitative analysis phase that links failure mechanisms to performance shaping factors. Starting with a Crew Response Tree (CRT) that has identified human failure events, analysts identify potential failure mechanisms using the mid-layer model. The mid-layer model presented in this paper traces the identification of the failure mechanisms using the Information-Diagnosis/Decision-Action (IDA) model and cognitive models from the psychological literature. Each failure mechanism is grouped according to a phase of IDA. Under each phase of IDA, the cognitive models help identify the relevant performance shaping factors for the failure mechanism. The use of IDA and cognitive models can be traced through fault trees, which provide a detailed complement to the CRT.

42 ENGINEERING↗

Distribution Development for Residual Inventory at the New York West Valley Site - 20400

The New York State Energy Research and Development Authority (NYSERDA) is the owner of the Western New York Nuclear Service Center (WNYNSC), a 1,351 ha site located approximately 48 km south of Buffalo, New York. In 1962, Nuclear Fuel Services, Inc. (NFS) entered into Agreements with the Atomic Energy Commission and New York State to construct the first commercial reprocessing plant of nuclear fuel in the United States. NFS, a private company, built and operated the spent fuel reprocessing plant and waste disposal facilities, processing 640 Mg of spent nuclear fuel from 1966 to 1972 under an Atomic Energy Commission license. Nuclear fuel reprocessing operations ended in 1972 and never reopened, leaving behind radioactive and chemical wastes. Operations led to contamination in a number of facilities and locations. Some of that contamination has migrated from waste disposal zones to other layers, formations, and features on and off the WNYNSC. Phase I decommissioning activities are ongoing and involve the removal of a number of areas and structures that have been associated with contamination. The purpose of this work is to outline the approach for characterizing contamination not associated with disposed wastes, contaminated structures, or specific releases. In this work, the term, residual radiological activity, is used to describe environmental contamination that exists subsequent to the completion of Phase I decommissioning activities, that is not associated with disposed wastes, contaminated structures, or specific releases. Contamination from the Site was quantified relative to data that characterize the concentrations of radionuclides that exist in background. Background concentrations are those present in the area but having no influence from Site related activities. The existence of residual radiological activity that is elevated relative to background has the potential to contribute to future risks to human health and the environment. As a consequence, the residual inventory information is used to inform the West Valley Probabilistic Performance Assessment (PPA) model to characterize potential future risks to human health and the environment. The centralized West Valley Data Management System (DMS) was the source of information for the data assembled in this analysis. The DMS is a fairly large compilation consisting of thousands of records from investigation studies, with sample dates ranging from 1990 to present. Samples from monitoring wells, boreholes, geoprobe studies, surface water, surface soils, storm water outfalls, ventilation stack filters, plant and animal tissues, and more are included in the DMS. Results are typically reported in units of activity per unit volume. For the purpose of the analyses presented here, all results were converted into consistent units of pCi per unit volume. Since 1990, data have been collected from various locations across the WNYNSC at different times with varying frequency over the course of several decades. As a consequence, a number of potential issues can arise with respect to the assembly of a dataset that is deemed adequate for the characterization of residual radiological activity. These issues were assessed and resolved to the extent possible through careful consideration of the properties of the distributions. The intent was to use data which characterize the current state of the Site. Radionuclides can be designated to one of several groups depending on their origin. In this work the groups considered were 1) Naturally Occurring Radioactive Material (NORM), 2) fallout, and 3) Other (including power plant, medical research, etc). This grouping is a useful construct with respect to the interpretation of fixed laboratory results. For example, NORM radionuclides that exist within a decay chain should have approximately equivalent distributions of concentrations if they are representative of background conditions. Insights such as these can be used as a check to identify sample results that need to be further investigated or omitted due to issues associated with reported results from fixed laboratory analyses. This type of analysis provided a foundation for the assessment of the adequacy of sample results for use in subsequent components of an assessment. The general process for the assessment of residual radiological contamination at the Site consists of a sequence of several steps. First, for each analyte, several statistical tests were performed to assess the weight of evidence against the null hypothesis that the mean of the distribution of concentrations was equal to zero. If the mean of the distribution of concentrations for a given radionuclide was not found to be greater than zero, then it was removed from consideration as a component of the residual radiological contamination. If there was significant evidence to reject the hypothesis of the mean being equal to zero, the second step was to compare the distribution of the data from the Site to that of the corresponding background. A suite of tests was used to compare the distributions of the site and background data. The results of these tests were collectively used to determine if site data are elevated relative to background. The third step was to develop distributions using a Bayesian framework to characterize the distribution of mean of the increment present above background for each of the radionuclides. The Bayesian model implemented allowed for the comparison of site-specific records to background concentrations to better approximate contamination attributed to the Site. A final screening step was employed for radionuclides that exceed background. This screening step compared 95% upper confidence limits (UCLs) from the increment distribution developed in the previous step to the risk screening levels. This approach yields a list of analytes that were determined to be elevated relative to background.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Space Shuttle Rudder Speed Brake Actuator-A Case Study Probabilistic Fatigue Life and Reliability Analysis

The U.S. Space Shuttle fleet was originally intended to have a life of 100 flights for each vehicle, lasting over a 10-year period, with minimal scheduled maintenance or inspection. The first space shuttle flight was that of the Space Shuttle Columbia (OV-102), launched April 12, 1981. The disaster that destroyed Columbia occurred on its 28th flight, February 1, 2003, nearly 22 years after its first launch. In order to minimize risk of losing another Space Shuttle, a probabilistic life and reliability analysis was conducted for the Space Shuttle rudder/speed brake actuators to determine the number of flights the actuators could sustain. A life and reliability assessment of the actuator gears was performed in two stages: a contact stress fatigue model and a gear tooth bending fatigue model. For the contact stress analysis, the Lundberg-Palmgren bearing life theory was expanded to include gear-surface pitting for the actuator as a system. The mission spectrum of the Space Shuttle rudder/speed brake actuator was combined into equivalent effective hinge moment loads including an actuator input preload for the contact stress fatigue and tooth bending fatigue models. Gear system reliabilities are reported for both models and their combination. Reliability of the actuator bearings was analyzed separately, based on data provided by the actuator manufacturer. As a result of the analysis, the reliability of one half of a single actuator was calculated to be 98.6 percent for 12 flights. Accordingly, each actuator was subsequently limited to 12 flights before removal from service in the Space Shuttle.

Rudder↗