Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Power distribution network”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Tuning Phase Lock Loop Controller of Grid Following Inverters by Reinforcement Learning to Support Networked Microgrid Operations

The dynamic operation of networked microgrids leads to varying topological configurations and generator commitments and dispatches. These variations correspond to systems with different electrical characteristics. The fixed control gains of high-speed power electronic devices may result in undesirable system performance when the electrical characteristics change significantly. As such, it is necessary to tune the control gains of power electronics devices to adapt to the changing system characteristics. This paper uses observer-based reinforcement learning to automatically tune the proportional-integral (PI) gains of phase lock loop (PLL) controller of grid-following (GFL) inverters to adapt to the changing system strengths, that would be seen in networked microgrid operations. Simulation results using an operational electric distribution system, modeled as networked microgrids, are presented to demonstrate the need and effectiveness of the proposed adaptive controls.

networked microgrids, reinforcement learning, grid↗

Intelligent Hierarchical Resilient Operation of Distribution Systems: Implementation and Validation in a Power Hardware-in-the-Loop Simulation Testbed

This paper reports on the structure of a power hardware-in-the-loop (PHIL) simulation testbed that implements, tests, and validates a novel AI-based hierarchical resilient operation model for distribution systems. The testbed implements the central and distributed controllers of the hierarchical resilient operation model and integrates a Digital Real-Time Simulator (DRTS), protective relays, a Real-Time Automation Controller (RTAC), a Software Defined Network (SDN) switch, and a battery energy storage (BES) system. The testbed provides comprehensive real-time visualization and monitoring capability as an advanced situational awareness and operator interface solution. The IEEE 33-node system is used as a test case to test and validate the operation of the model in normal operation and recovery operation after major outages in a fully automated fashion.

Ganjkhani, Mehdi↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources: Preprint

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS—based on real-time optimal power flow—controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

61 RADIATION PROTECTION AND DOSIMETRY↗

Machine Learning-based Prediction of Departure from Nucleate Boiling Power for the PSBT Benchmark

Machine Learning (ML) has seen an exponential growth in its applications due to its advanced data driven prediction capabilities. The study presents a data-driven approach as a preliminary attempt to predict the power at which departure from nucleate boiling (DNB) occurs in pressurized water reactors (PWRs) by constructing an advanced ML algorithm that takes outlet pressure, inlet temperature and inlet mass flux as the input features. DNB is a critical heat flux (CHF) phenomenon seen in PWRs. The experimental data from the PWR subchannel and bundle tests (PSBT) benchmark is first used to train an artificial neural network (ANN) to predict the DNB power, which produces a root mean square error (RMSE) of 6.89 kW/m when tested on a blind subset of the PSBT data. Since the PSBT dataset is relatively small to train an accurate ANN, a data augmentation methodology based on generative adversarial networks (GANs) is used to expand the training dataset. By assuming that the real data follows a certain distribution, GANs try to learn that underlying distribution to generate similar synthetic data to augment the database and to improve the predictive capabilities of the ANN. The data generated from GANs are validated using 1-nearest neighbor and kernel maximum mean discrepancy. To further ensure data from GAN is similar to PSBT, the data is tested and filtered out using the sub-channel thermal-hydraulic code CTF. The results indicate that with the addition of 120 data points from GAN the RMSE reduces to 4.84 kW/m showing promising results for future developments.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Chapter 32 - Power Grid Resilience

The new energy paradigm is altering the current power grid trend from synchronous generator reliant system toward power-electronics-based distributed energy resources (DERs). The resilient operation of modern power grid is highly dependent upon cyber and physical reliable operation of DERs. Power grid resilience broadly refers to the ability of the grid to be robust to eventualities and singularities that may disrupt the continuity of reliable power flow. This could involve resilience related to the physical system but more recently, the focus on cyber resilience has been evolving rapidly especially given the burgeoning growth of distributed generation and power-electronics-based DERs under smart grid and given that such threats to reliable operation do not have to evolve localized to where the physical asset is. Commonly, in power grids dominated by DERS, control and energy management are structured at a multitime scale multilayer fashion: (i) primary control layer at microseconds time scale, (ii) secondary control layer at millisecond time scale, and (iii) tertiary control layer at seconds to minutes time scale. The cyber-related issues that may affect the power grid resilience can be introduced in through primary, secondary, and tertiary control layers. The failure of each of these control layers may impact the reliable and resilient operation of the overall network and cause widespread failures which leads to unintended blackouts. As such, this chapter focuses on cyber-related resilience issues in primary control layer, secondary control layer, tertiary control layer, wide area/utility control, and anomaly detection and resilient communication.

anomaly detection↗

Envisioning the Future Renewable and Resilient Energy Grids—A Power Grid Revolution Enabled by Renewables, Energy Storage, and Energy Electronics

Today’s power grids are facing tremendous challenges because of the ever-increasing power demand, system complexity, infrastructure cost, knowledge base, and policy and regulatory issues to achieve supply–demand power balance and resiliency with respect to more frequent extreme weather events and cyberattacks. It is particularly challenging when the transition toward 100% intermittent renewable energy sources is considered. Many countries are calling for building up more transmission and distribution lines to increase power delivery capacities. This article is an attempt to answer two urgent questions: Is more transmission and distribution infrastructure really needed to meet the increasing power demand? What kind of future grid infrastructure should we envision and build? This article attempts to answer these questions and proposes the concept of community-centric asynchronous renewable and resilient energy grids. By clearly differentiating the concepts of grid resilience and reliability, the importance of building resilient power electronics’ devices and robust system-level control algorithms to achieve 100% renewable energy integrated resilient grids is presented. To identify the shortcomings and propose advancements, power electronics’ technologies are categorized using the proposed concepts of natural source frequencies (NSf), energy storage, direct energy conversion/control and fault protection (DeCaFp), and high-efficiency energy consumption and buffering (heECaB) technology. The ability of networked microgrids to greatly reduce power outages and power system restoration time is demonstrated by leveraging robust decentralized and centralized control algorithms, identified through a comprehensive literature review. Future research areas are proposed to further enhance grid stability, controllability, cybersecurity, and protection against faults in the presence of 100% renewable sources by leveraging the advanced capabilities of NSf, DeCaFp, and heECaB devices and system-level control algorithms.

14 SOLAR ENERGY↗

Modular Security Apparatus for Managing Distributed Cryptography for Command-and-Control Messages on Operational Technology Networks (Module-OT)

Module-OT is a bump- in- the- wire solution acting as a secure conduit for data between devices or systems across a network. Using the latest in open-source cryptographic libraries, all defined communications undergo authentication, authorization, and encryption. The core system can be easily installed through industry standard processes, and the use of popular open-source packages allows for it to be customizable customized by the developer community or deployed in unique embedded environments.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Peak Load Management in Distribution Systems Using Legacy Utility Equipment and Distributed Energy Resources

The ability to perform peak load management in distribution systems has several benefits for utilities, including reduced demand charges and improved reliability, efficiency, and utilization of the network infrastructure. This paper demonstrates the coordinated operation of an advanced distribution management system (ADMS) and a distributed energy resource management system (DERMS) to achieve peak load management using a realistic laboratory test bed. A commercial ADMS reduces the peak demand by reducing system voltages using a dynamic voltage regulation (DVR) application. A prototype DERMS-based on real-time optimal power flow-controls distributed battery energy storage systems to further reduce the feeder power. Results from the experiments conducted using a model of a real distribution feeder show that the coordinated operation of the ADMS and DERMS is effective in accomplishing peak load management.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Interconnection Cost Analysis in ISO-New England

Electric transmission system operators (ISOs, RTOs, or utilities) require new large generators seeking to connect to the grid to undergo a series of impact studies before they can be built. This process establishes what new transmission equipment or upgrades may be needed before a project can connect to the system and assigns the costs of that equipment. Berkeley Lab has collected interconnection cost data for 194 projects in New England from interconnection studies performed between 2010 and 2021. Project-level cost summary data are available for download on this page. We find: -Interconnection costs have grown over time, especially for projects that withdraw. -Interconnection costs are highest for onshore wind, followed by solar and storage. Natural gas and offshore wind projects tend to cost less to interconnect, in comparison. -Economies of scale exist for solar and possibly storage projects, but not for other resource types. -Wind and solar projects requesting capacity network resource interconnection service have higher interconnection costs, despite being evaluated using the same interconnection standard in the analyzed studies. -Low and high interconnection costs can be found throughout the ISO-NE footprint. -Costs are split fairly evenly between investments at the point of interconnection and within the broader network for active and withdrawn projects, while complete projects incur most costs at the point of interconnection.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Synchronization of Electric Power Networks

Invited contribution to the ITU News Magazine – Special Edition on “Future use and applications of the Coordinated Universal Time (UTC)” a joint ITU-BIPM initiative. The ITU will produce a special edition of its ITU News Magazine that will feature the “Future use and applications of the Coordinated Universal Time (UTC)”, a joint ITU-BIPM initiative, planned for publication in March or April, 2023. The main objective of the magazine is to educate telecommunication society about existing status of UTC applications, objectives, and possible ways to resolve the leap second issues. This article on “Synchronization of electrical distribution networks” for this edition, highlighting some of the key issues that will help the understanding of the important issues that are related to the coordinated universal time (UTC) and its dissemination.

Dagle, Jeffery E.↗

Measurement-informed Dynamic Aggregation of Distribution Systems

This paper proposes a measurement-informed dynamic aggregation methodology in order to create equivalent representations of distribution systems that are compatible with large-scale transmission analysis. By optimizing an equivalent feeder parameters using time-series measurements of active power, reactive power, and voltage at the Point of Interconnection (POI), the approach yields simplified yet dynamically accurate equivalents. Implemented in PSCAD with models of photovoltaic–battery systems, three-phase motors, and static loads, the method employs hybrid differential evolution and bounded least-squares optimization laying the foundation for for real-time state estimation and optimized sensor placement in distribution networks.

Ahmed, Kazi Ishrak [University of Tennessee, Knoxv↗

Integration of a DER Management System in Riverside. Final report

The tasks in this project covered various aspects, including algorithm development, algorithm integration into a commercial Active Network Management (ANM) platform, hardware-in-the-loop (HIL) testing in an industry-standard testing platform, pilot demonstration in Riverside, California, and also cost and benefit analysis. The DERMS platform in this project can host different algorithms developed on different platforms (e.g., MATLAB and Python) and it can interact with different hardware devices (e.g., different PV inverters, battery inverters, and different sensors). The DER control solution are based on an advanced model-free, layered, and clustered DER control paradigm. At the core of the DER control algorithms was the concept of Extremum Seeking (ES), which is a model-free probing-based control technique. The ES-based control algorithms were tested on major real-world inverters; both individually and in a cluster. It was shown that even legacy equipment (or when paired with a few additional advanced equipment) can support such advanced control. The monitoring algorithms utilize a heterogeneous set of legacy and advanced sensor measurements, such as behind-the-meter DER sensors, distribution-level Phase Measurement Units, distribution-substation Supervisory Control and Data Acquisition (SCADA), and line current sensors, with their limited availability; in order to infer practical network conditions. Sensor data are utilized to achieve resource forecasting, phase identification, and distribution system state estimation. The technology that was developed and demonstrated in this project could be transformational to utilities, including the smaller municipal utilities such as in Riverside, which may not have the resources to deploy advanced distribution system and DERMS solutions in order to support high penetration of solar power integration. This project created a real-world prototype to provide utilities with an assessment of smart grid monitoring and control technologies.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Game Theory Approaches for System-level Incentive Design

This report presents a generalized Stackelberg game framework for designing and evaluating financial incentives that enhance power system resilience through strategic deployment of distributed energy resources(DERs) under various contingencies. The proposed approach addresses the challenge of coordinating individual community investment decisions to meet system-wide resilience objectives. The framework is demonstrated in a three-community test system subjected to two transmission contingency scenarios: inter-community line failure (Case 1) and complete main grid disconnection (Case 2). In both cases, three incentive levels are compared: a Base case with no financial incentives, and low and high incentive cases. In Case 1, the Base case (no incentives) results in a total installed DER capacity of 217.2 MW, with no load shedding due to alternative routing, but community costs remain high. Increasing incentives raises DER deployment to 286.9 MW, lowers aggregate community costs by $22M annually, and completely avoids the need for costly new transmission line construction. In Case 2, the Base case results in 24.3 MWh of unserved load; introducing incentives eliminates all load shedding and ensures up to 89 MWh of battery storage is available for emergency reserve. These results demonstrate that targeted incentives can dramatically improve grid resilience and cost-effectiveness. The framework thus offers policymakers and system planners a robust tool to quantify and compare the effectiveness of incentive programs for multi-community transmission networks behavior, system resilience, and economic efficiency.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multi-Fidelity Stochastic Economic Dispatch for Operating Low Carbon Power Grids

Grid operators can address the inherently stochastic nature of renewables by solving a two-stage stochastic programming model that minimizes the cost of dispatch decisions while accounting for the complex grid dynamics. It is common to use a sample average approximation to estimate the expectation of the second stage costs in this model. However, the large sample count needed for numerical accuracy makes effective modeling large-scale electric grids computationally intractable. We introduce a control variate multi-fidelity estimator for the second-stage recourse that enables high quality dispatch decisions in real-time with a reduced computational burden. We obtain a hierarchy of model fidelities by linearizing the AC power flow system representation to DC power flow, and by relaxing transmission and voltage network constraints. We evaluate the performance of our proposed method on a synthetic grid with 73 buses against a deterministic baseline with persistence forecast and a high-fidelity reference. Our analysis shows a computational speed-up of 7.62x with a minimal loss in accuracy. The multi-fidelity method is well suited to fidelity combinations that use a simplified network topology in their lower fidelity model and is an attractive option for applications where accurate grid modeling needed on a limited computational budget.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Northeast Freight Corridor Charging Plan

Medium- and heavy-duty freight rely on service plazas and truck stops to refuel their vehicles and meet their obligations. Creating a reliable fast-charging network across the Northeast is critical to provide security for fleets to electrify.

02 PETROLEUM↗

Role of Inverter-Based Resources (IBRs) in Energizing Remote Generating Stations

The increasing integration of Inverter-Based Resources (IBRs) into the system has brought significant focus on their role in blackstart and restoration procedures. Their advantageous features, such as low startup power requirements, operational flexibility across a wide range of power factors, rapid controllability, and the ability to energize a network at lower voltage levels necessitate a reassessment of existing restoration protocols. This paper seeks to showcase how IBRs can utilize their grid-forming capabilities to provide power to a remote generating station through detailed EMT simulation studies using data collected from an existing portion of a network.

blackstart procedure↗

Impact of Emergency Diesel Generator Reliability on Microgrids and Building-Tied Systems

Microgrids are an emerging alternative as an energy backup system for critical electric loads and have improved performance compared to the traditional architecture where a single emergency diesel generator is tied to an individual building. Both architectures are dependent on the reliability of their individual generators and a quantitative and realistic comparison of the overall system reliability of the two architectures is lacking. Using recently published work on emergency diesel generator finite reliability, a quantitative methodology is presented to compare the reliability of a microgrid architecture based on centralized emergency diesel generators to the traditional approach of generators tied to individual buildings. Three system reliability performance metrics are calculated as a function of outage duration: (1) probability to meet 100% of the critical load; (2) expected fraction of lost load; and (3) probability to meet the highest priority critical loads. It is shown that stand-alone building-tied emergency diesel generators systems, even when two emergency diesel generators are used per building, cannot provide the reliability required to sustain critical loads for a grid outage lasting multiple days. Due to their network configuration and ability to share load, diesel generator-based microgrid configurations are estimated to have = 93% probability of powering all buildings for a 2-week outage there the individual building-tied emergency diesel generator architecture has a =20% probability. Microgrids do present other susceptibilities that are site specific and should be considered including vulnerabilities associated with the on-campus distribution system and cybersecurity.

backup power↗

Cyber‐physical system testbed for power system monitoring and wide‐area control verification

The electric power system is intrinsically a cyber‐physical system (CPS) with power flowing inthe physical system and information flowing in the cyber‐network. Testbeds arecrucial for understanding the cyber‐physical interactions and provideenvironments for prototyping novel applications. This study proposes afour‐layer architecture for CPS testbeds with emphases on communication networkemulation and networked physical components. A configurable software‐definednetwork is employed to bridge physical components with wide‐area applicationsfor closed‐loop control. In order to distribute physically coupled devices intomultiple software simulations, this study proposes a data broker setup based ona distributed messaging environment to achieve low‐latency data streaming. Thedecoupled design with data streaming allows for building testbed components asmodules and running them in a distributed manner. Case studies verify the databroker setup for low‐latency sensing and actuation, as well as the communicationemulation setup for the desired network latency. Also illustrated is a replayattack scenario using synchrophasors in the Western Electricity CoordinatingCouncil (WECC) 181‐bus system for demonstrating the closed‐loop cyber‐physicalsimulation capability of the testbed.

Cui, Hantao↗