Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Path Planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

A Flight Replanning Tool for Terminal Area Urban Air Mobility Operations

In this presentation we describe and evaluate a flight replanning tool, called the trial planner, for terminal area air transport applications. The trial planner employs predefined airspace structures to generate rerouting options between vertiports. In a simplified definition, vertiports are facilities that provide services for managing the take-off and landing of autonomous or manned electric vertical take-off or landing (eVTOL) aircraft. The airspace structures involved in our test cases are arrival routes that consist of predefined entry points to which a transitional path is computed dynamically from the current position of the aircraft. Rerouting options include the transitional path and approach segment along the arrival route; these rerouting options are not vetted for potential conflicts with other operations until a human operator commits to a choice and forwards the flight plan modification for approval from an automated airspace management service. A selected rerouting option is executed by loading a flight plan file to the aircraft ground control station. We conducted a qualitative evaluation of the trial planner using ratings provided by flight crews and air transportation human factors experts with relevant experience from air traffic control. Evaluation criteria included trust in the route recommendations and adequate explanation for the route options. We detail the logic and implementation of the trial planner, as well as report the results of the evaluation of the implementation herein.

Trial planning↗

In Situ Decommissioning (ISD) Concepts and Approaches for Excess Nuclear Facilities Decommissioning End State - 13367

The United States Department of Energy (DOE) currently has numerous radiologically contaminated excess nuclear facilities waiting decommissioning throughout the Complex. The traditional decommissioning end state is complete removal. This commonly involves demolishing the facility, often segregating various components and building materials and disposing of the highly contaminated, massive structures containing tons of highly contaminated equipment and piping in a (controlled and approved) landfill, at times hundreds of miles from the facility location. Traditional demolition is costly, and results in significant risks to workers, as well as risks and costs associated with transporting the materials to a disposal site. In situ decommissioning (ISD or entombment) is a viable alternative to demolition, offering comparable and potentially more protective protection of human health and the environment, but at a significantly reduced cost and worker risk. The Savannah River Site (SRS) has completed the initial ISD deployment for radiologically contaminated facilities. Two reactor (P and R Reactors) facilities were decommissioned in 2011 using the ISD approach through the American Recovery and Reinvestment Act. The SRS ISD approach resolved programmatic, regulatory and technical/engineering issues associated with avoiding the potential hazards and cost associated with generating and disposing of an estimated 124,300 metric tons (153,000 m{sup 3}) of contaminated debris per reactor. The DOE Environmental Management Office of Deactivation and Decommissioning and Facility Engineering, through the Savannah River National Laboratory, is currently investigating potential monitoring techniques and strategies to assess ISD effectiveness. As part of SRS's strategic planning, the site is seeking to leverage in situ decommissioning concepts, approaches and facilities to conduct research, design end states, and assist in regulatory interactions in broad national and international government and private industry decommissioning applications. SRS offers critical services based upon the SRS experience in decommissioning and reactor entombment technology (e.g., grout formulations for varying conditions, structural and material sciences). The SRS ISD approach follows a systems engineering framework to achieve a regulatory acceptable end state based on established protocols, attains the final end state with minimal long stewardship requirements, protects industrial workers, and protects groundwater and the environment. The ISD systems engineering framework addresses key areas of the remedial process planning, technology development and deployment, and assessment to attain the ultimate goal of natural resource stewardship and protecting the public. The development and deployment of the SRS ISD approach has established a path for ISD of other large nuclear facilities in the United States and around the globe as an acceptable remedial alternative for decommissioning nuclear facilities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Approaches for Autonomous Peer to Peer Communication: For Resilient Community Microgrids

The final phase of the Islandable Communications task of the SECURE project consisted of integrating the islandable communications network into a microgrid simulation at NREL. Initially integration was planned for a microgrid implemented as a mix of simulation and physical hardware. As the project evolved, the microgrid became fully simulated. The simulation environment was structured to break out the communication paths that would pass over a communication network in a field demonstration. The Islandable Communication network was integrated into the simulation environment, allowing both a commercial cellular carrier and a Private LTE network to be evaluated. The microgrid simulation showed differences in performance and behavior when operating over the wireless networks (compared to operating over wired Ethernet in the lab). These differences point to further research opportunities to better understand how microgrid communication carried over real-world or impaired networks affects the microgrid system behavior.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Considerations For Waste-to-Base Future Research Paths

Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability leading to innovative approaches to space mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low Technology Readiness Level (TRL) concepts into workable solutions for issues in trash management, CO 2 processing, foam reprocessing, and fecal processing. The results of the crowdsourcing activities are summarized along with a discussion for future technology development work.

Logistics reduction↗

Considerations For Waste-to-Base Future Research Paths

Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability leading to innovative approaches to space mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low Technology Readiness Level (TRL) concepts into workable solutions for issues in trash management, CO2 processing, foam reprocessing, and fecal processing. The results of the crowdsourcing activities are summarized along with a discussion for future technology development work.

Logistics reduction↗

Landsat 8: The Plans, the Reality, and the Legacy

Landsat 8, originally known as the Landsat Data Continuity Mission (LDCM), is a National Aeronautics and Space Administration (NASA)-U.S. Geological Survey (USGS) partnership that continues the legacy of continuous moderate resolution observations started in 1972. The conception of LDCM to the reality of Landsat 8 followed an arduous path extending over nearly 13 years, but the successful launch on February 11, 2013 ensures the continuity of the unparalleled Landsat record. The USGS took over mission operations on May 30, 2013 and renamed LCDM to Landsat 8. Access to Landsat 8 data was opened to users worldwide. Three years following launch we evaluate the science and applications impact of Landsat 8. With a mission objective to enable the detection and characterization of global land changes at a scale where differentiation between natural and human-induced causes of change is possible, LDCM promised incremental technical improvements in capabilities needed for Landsat scientific and applications investigations. Results show that with Landsat 8, we are acquiring more data than ever before, the radiometric and geometric quality of data are generally technically superior to data acquired by past Landsat missions, and the new measurements, e.g., the coastal aerosol and cirrus bands, are opening new opportunities. Collectively, these improvements are sparking the growth of science and applications opportunities. Equally important, with Landsat 7 still operational, we have returned to global imaging on an 8-day cycle, a capability that ended when Landsat 5 ceased operational Earth imaging in November 2011. As a result, the Landsat program is on secure footings and planning is underway to extend the record for another 20 or more years.

Loveland, Thomas R.↗

Techniques for Improving Pilot Recovery from System Failures

This project examined the application of intelligent cockpit systems to aid air transport pilots at the tasks of reacting to in-flight system failures and of planning and then following a safe four dimensional trajectory to the runway threshold during emergencies. Two studies were conducted. The first examined pilot performance with a prototype awareness/alerting system in reacting to on-board system failures. In a full-motion, high-fidelity simulator, Army helicopter pilots were asked to fly a mission during which, without warning or briefing, 14 different failures were triggered at random times. Results suggest that the amount of information pilots require from such diagnostic systems is strongly dependent on their training; for failures they are commonly trained to react to with a procedural response, they needed only an indication of which failure to follow, while for 'un-trained' failures, they benefited from more intelligent and informative systems. Pilots were also found to over-rely on the system in conditions were it provided false or mis-leading information. In the second study, a proof-of-concept system was designed suitable for helping pilots replan their flights in emergency situations for quick, safe trajectory generation. This system is described in this report, including: the use of embedded fast-time simulation to predict the trajectory defined by a series of discrete actions; the models of aircraft and pilot dynamics required by the system; and the pilot interface. Then, results of a flight simulator evaluation with airline pilots are detailed. In 6 of 72 simulator runs, pilots were not able to establish a stable flight path on localizer and glideslope, suggesting a need for cockpit aids. However, results also suggest that, to be operationally feasible, such an aid must be capable of suggesting safe trajectories to the pilot; an aid that only verified plans entered by the pilot was found to have significantly detrimental effects on performance and pilot workload. Results also highlight that the trajectories suggested by the aid must capture the context of the emergency; for example, in some emergencies pilots were willing to violate flight envelope limits to reduce time in flight - in other emergencies the opposite was found.

Pritchett, Amy R.↗

Considerations For Waste-to-Base Future Research Paths

Developing innovative technologies to reprocess low value waste into high value base products will enable a new “Waste-to-Base” (WtB) capability that can spawn a new approach to mission design. Systems engineers and mission architects will work together under a new paradigm in logistics planning. Equipment, components, packaging, storage, and structures will be understood not only by functional requirements, but also in terms of useful lifetimes and materials of construction. The advent of a new technical discipline - reprocess engineering - will grow from the intersection between chemical, mechanical, and systems engineering, mission design, and logistics planning. A crowdsourcing approach was employed to gather low TRL concepts into workable solutions for issues in trash management, CO2 processing, foam re-processing, and fecal processing. The results of the crowdsourcing activities are summarized along with a roadmap for future technology development work.

Logistics reduction↗

TH-C-BRD-08: Reducing the Effect of Respiratory Motion On the Delivered Dose in Proton Therapy Through Proper Field Angle Selection

Purpose: This work investigated a novel planning strategy of selecting radiotherapy beam angles that minimizes the change in water equivalent thickness (dWET) during respiration in order to reduce the effects of respiratory motion in passively scattered proton therapy (PSPT). Methods: In a clinical trial treating locally-advanced lung cancer with proton therapy, 2–4 co-planar beams were previously selected by dosimetrists in the design of physician-approved PSPT treatment plans. The authors identified a cohort of patients in which respiratory motion affected the planned PSPT dose delivery. For this cohort, this work analyzed dWET during respiration over a 360 degree arc of potential treatment angles around the patient: the dWET was defined as the difference in WET between the full-exhale (T50) and full-inhale (T0) phases of the simulation 4DCT. New PSPT plans were redesigned by selecting new beam angles that demonstrated significant reduction in the value of dWET. Between the T50 and T0 phases, the root-mean-square deviation of dose and the change in dose-volume histogram curves (dAUC) for anatomical structures were calculated to compare the original to dWET reduction plans. Results: To date, three plans were retrospectively redesigned based on dWET analysis. In the dWET reduction plan, the root mean square dose (T50-T0) was reduced by 15–35% and the DVH dAUC values were reduced by more than 60%.The PSPT plans redesigned by selecting appropriate field angles to minimize dWET demonstrated less dosimetric variation due to respiration. Conclusion: We have introduced the use of a new metric to quantify respiratory motion in proton therapy: dWET. The use of dWET allows us to minimize the impact of respiratory motion of the entire anatomy in the beam path. This work is a proof of principle that dWET could suggest field angles in proton therapy that are more robust to the effects of respiratory motion.

60 APPLIED LIFE SCIENCES↗

Personnel Certifications for the Design, Installation and Maintenance of Photovoltaic Systems. Final Technical Report

The North American Board of Certified Energy Practitioners (NABCEP) is the most respected, well-established, and widely recognized national certification organization for professionals in the field of renewable energy. NABCEP’s certifications were created to facilitate consumer protection, improve quality assurance, and help employers judge the skills of existing or potential employees. The certifications also allow individuals to differentiate themselves from others in their field and advance their careers while fostering increased recognition of the profession. Since NABCEP’s founding in 2002, all of its certification exams have been administered in paper-and-pencil format twice per year at 30 exam sites around the United States. The biannual test administration and relatively low number of exam sites make it challenging for many qualified renewable energy professionals to take NABCEP’s certification exams. The rigorous nature of the exam, which leads to many candidates failing the exam on their first and sometimes second attempts, combined with the low number of annual test administrations means that anyone who fails will need to wait another six months for the chance to retake the exam. These factors limited the potential growth of NABCEP’s certification programs and the resultant quality assurance within the renewable energy industry. Thanks to a generous grant by the Department of Energy’s Solar Training and Education for Professional (STEP) program, NABCEP recently began updating its Photovoltaic (PV) Installation Professional Exam and developing three new specialty certifications in PV design, PV installation, and PV commissioning & maintenance. One of the primary objectives of this STEP-funded project was to develop the exams using a computer-based testing (CBT) model to increase the number of exam administrations and available exam sites for NABCEP’s certification exams. To successfully complete this project, NABCEP partnered with Castle Worldwide, Inc. With more than 25 years of experience in test development, test administration, analysis of examinations, and has a staff of 70 experienced personnel, NABCEP was confident that Castle’s team was more than qualified to help NABCEP make the transition to CBT examinations. NABCEP and Castle Worldwide jointly developed a project management plan that included key deliverables, scope management, a work breakdown structure, roles and responsibilities, and a project schedule with milestones. The project schedule was carefully monitored to ensure that activities along the critical path were not delayed and, when deemed necessary, the project was crashed to add resources so that activities could occur in parallel. NABCEP and Castle Worldwide staff met weekly to discuss any potential schedule variances and activities which might delay the closing of the project. NABCEP also recruited 46 subject matter experts (SMEs) to work with Castle’s staff on this project. NABCEP staff, SME’s, and Castle staff worked together to develop the Job Task Analyses that form the basis for the certification exams, create new examination forms, conduct passing score studies, and complete a psychometrical analysis of potential exam items. NABCEP’s SMEs utilized Castle’s item development platform during face-to-face meetings, webinars, and remote item authoring to write, review, and approve exam items. Castle also used their software to psychometrically analyze existing exam items to confirm the reliability and validity of the NABCEP’s certification exams. On January 3rd, 2018, NABCEP’s began offering its PV Installation Professional certification exam via CBT. The exam was available at Castle’s nearly 600 exam sites in the United States. A large number of sites will help to ensure better access for solar professionals in rural and remote areas, which drives down the implicit costs of taking the certification exams. Thanks to the STEP grant and the robust partnership between NABCEP and Castle Worldwide, Inc., personnel certifications will be much more accessible and affordable for renewable energy professionals.

14 SOLAR ENERGY↗

Quantifying Uncertainty in PV Energy Estimates Final Report

Uncertainty in PV energy estimates is "one of the most critical areas of lack of understanding" according to independent engineers, financiers, PV model developers, and other industry stakeholders. The primary problem is a lack of rigorous, transparent, widely accepted methods for quantifying uncertainty in energy production estimates. Uncertainty in energy production estimates arises from variability of the solar resource, inexact PV performance models and their parameters, and system reliability considerations. Uncertainty in annual energy production is frequently calculated for larger projects in order to quantify financial risk. Key statistics for energy, such as the P-values "P50" and "P90" (the annual energy values that are exceeded in future years with 50\% and 90\% probability, respectively) are used by financing institutions to calculate the repayment risk for the project. The current methods to estimate these statistics are typically proprietary, specialized, and involve significant post-processing of commercial performance model results. This black-box approach leads to inconsistent P-value estimates from different parties, which reduces investors' confidence in the results. Since the financial community bases its risk assessment on these estimates, reduced confidence increases perceived project risk, and consequently financing costs. The goal of this project was to establish a set of best practices for quantifying uncertainty in energy production estimates, including identifying what sources of uncertainty must be considered with clear definitions and metrics, determining which sources are the biggest drivers of uncertainty, and providing a computationally efficient framework for combining different sources of uncertainty that is flexible enough to accommodate substitutions of data or methods when better information is available. We engaged a wide set of stakeholders to ensure industry endorsement and adoption, and leveraged complementary projects investigating individual sources of uncertainty in great detail, as well as others' work that started down this path.

ENERGY PLANNING, POLICY, AND ECONOMY,SOLAR ENERGY↗

Simulation Of Research And Development Projects

Measures of preference for alternative project plans calculated. Simulation of Research and Development Projects (SIMRAND) program aids in optimal allocation of research and development resources needed to achieve project goals. Models system subsets or project tasks as various network paths to final goal. Each path described in terms of such task variables as cost per hour, cost per unit, and availability of resources. Uncertainty incorporated by treating task variables as probabilistic random variables. Written in Microsoft FORTRAN 77.

Miles, Ralph F.↗

High-Performance Computing for Advanced Smart Grid Applications

The power grid is becoming far more complex as a result of the grid evolution meeting an information revolution. Due to the penetration of smart grid technologies, the grid is evolving as an unprecedented speed and the information infrastructure is fundamentally improved with a large number of smart meters and sensors that produce several orders of magnitude larger amounts of data. How to pull data in, perform analysis, and put information out in a real-time manner is a fundamental challenge in smart grid operation and planning. The future power grid requires high performance computing to be one of the foundational technologies in developing the algorithms and tools for the significantly increased complexity. New techniques and computational capabilities are required to meet the demands for higher reliability and better asset utilization, including advanced algorithms and computing hardware for large-scale modeling, simulation, and analysis. This chapter summarizes the computational challenges in smart grid and the need for high performance computing, and present examples of how high performance computing might be used for future smart grid operation and planning.

computational challenges↗

A Flexible Path for Human and Robotic Space Exploration

During the summer of 2009, a flexible path scenario for human and robotic space exploration was developed that enables frequent, measured, and publicly notable human exploration of space beyond low-Earth orbit (LEO). The formulation of this scenario was in support of the Exploration Beyond LEO subcommittee of the Review of U.S. Human Space Flight Plans Committee that was commissioned by President Obama. Exploration mission sequences that allow humans to visit a wide number of inner solar system destinations were investigated. The scope of destinations included the Earth-Moon and Earth-Sun Lagrange points, near-Earth objects (NEOs), the Moon, and Mars and its moons. The missions examined assumed the use of Constellation Program elements along with existing launch vehicles and proposed augmentations. Additionally, robotic missions were envisioned as complements to human exploration through precursor missions, as crew emplaced scientific investigations, and as sample gathering assistants to the human crews. The focus of the flexible path approach was to gain ever-increasing operational experience through human exploration missions ranging from a few weeks to several years in duration, beginning in deep space beyond LEO and evolving to landings on the Moon and eventually Mars.

Korsmeyer, David J.↗

NASA Standing Review Board Handbook

This handbook provides guidance based on best practices for the planning, preparation, review, reporting, and closeout of Standing Review Board (SRB) activities. Revision C updates the Revision B version of the SRB Handbook published in 2016 to incorporate updates to NASA Procedural Requirements (NPR) 7120.5F, NASA Space Flight Program and Project Management Requirements. These updates include: - Changing the Dissenting Opinion process to the Formal Dissent process, which retains the current process augmented with an expedited escalation path. - Updates to requirements for establishing an Agency Baseline Commitment (ABC) and for performing Joint Cost and Schedule Confidence Level (JCL) analyses for tightly coupled programs. - Additional requirements for performing a JCL analysis for single-project programs and projects over $1B Life-Cycle Cost (LCC). - Use of initial capability cost estimates instead of LCC estimates in specific, identified instances for single-project programs and projects that plan continuing operations and production, including integration of capability upgrades, with an unspecified Phase E end point. These single-project programs and projects define an initial capability during Phase A and develop an initial capability cost that establishes the ABC at Key Decision Point (KDP) C. Initial capability is the first operational mission flight (or as defined in the KDP B Review Plan) and is documented in the KDP B Decision Memorandum. Initial capability cost includes operations cost for the initial capability. The Phase E cost estimate for continuing operations and production is established separately as part of the Operational Readiness Review (ORR) and KDP E for the 5 years after initial capability and subsequently updated and documented annually for the next 5-year period. Upgrades during Phase E that meet the Agency criteria for a major project for external reporting are treated as projects for the purposes of establishing their own development ABC outside the Phase E cost estimate. The Phase E cost estimate is updated to include production and operations costs associated with these upgrades. Development, production, and operations costs of other (i.e., non-major) upgrades are included in the Phase E cost estimate. (See NPR 7120.5, Sections 2.4.1.5 and 2.4.1.6 and the NASA Space Flight Program and Project Management Handbook (PM Handbook), Section 5.5.4 for additional information.) The scope of the SRB’s assessment with respect to initial capability, Phase E cost estimate, and major upgrades for these single-project programs and projects is defined in the Terms of Reference (ToR).

Kevin Michael Gilligan↗

Astro2020 APC White Paper Project: The Simons Observatory

The Simons Observatory (SO) is a ground-based cosmic microwave background (CMB) experiment sited on Cerro Toco in the Atacama Desert in Chile that promises to provide breakthrough discoveries in fundamental physics, cosmology, and astrophysics. Supported by the Simons Foundation, the Heising-Simons Foundation, and with contributions from collaborating institutions, SO will see first light in 2021 and start a five year survey in 2022. SO has 287 collaborators from 12 countries and 53 institutions, including 85 students and 90 postdocs. The SO experiment in its currently funded form (‘SO-Nominal’) consists of three 0.4 m Small Aperture Telescopes (SATs) and one 6 m Large Aperture Telescope (LAT). Optimized for minimizing systematic errors in polarization measurements at large angular scales, the SATs will perform a deep, degree-scale survey of 10% of the sky to search for the signature of primordial gravitational waves. The LAT will survey 40% of the sky with arc-minute resolution. These observations will measure (or limit) the sum of neutrino masses, search for light relics, measure the early behavior of Dark Energy, and refine our understanding of the intergalactic medium, clusters and the role of feedback in galaxy formation. With up to ten times the sensitivity and five times the angular resolution of the Planck satellite, and roughly an order of magnitude increase in mapping speed over currently operating (“Stage 3”) experiments, SO will measure the CMB temperature and polarization fluctuations to exquisite precision in six frequency bands from 27 to 280 GHz. SO will rapidly advance CMB science while informing the design of future observatories such as CMB-S4. Construction of SO-Nominal is fully funded, and operations and data analysis are funded for part of the planned five-year observations. We will seek federal funding to complete the observations and analysis of SO-Nominal, at the $25M level. The SO has a low risk and cost efficient upgrade path – the 6 m LAT can accommodate almost twice the baseline number of detectors and the SATs can be duplicated at low cost. We will seek funding at the $75M level for an expansion of the SO (‘SO-Enhanced’) that fills the remaining focal plane in the LAT, adds three SATs, and extends operations by five years, substantially improving our science return. By this time SO may be operating as part of the larger CMB-S4 project. This white paper summarizes and extends material presented in, which describes the science goals of SO-Nominal, and which describe the instrument design.

Abitbol, Maximilian H.↗

Los Alamos National Laboratory: science and technology update

The update will focus on issues that occurred during the first quarter of FY 2011. These include the Senate Confirmation of the New Start Treaty, the pay freeze for the next two years, impact of the Continuing Resolution for FY 2011 , and the planned retirement of the Laboratory Director. The Laboratory plans to reinvest the 'savings' from the pay freeze in LDRD, sustainability, and infrastructure. The large holdbacks in funds during the Continuing Resolution are causing stop work on many projects and uncertainty in the path forward for MaRIE.

99 GENERAL AND MISCELLANEOUS↗

Reaching during virtual rotation: context specific compensations for expected coriolis forces

Subjects who are in an enclosed chamber rotating at constant velocity feel physically stationary but make errors when pointing to targets. Reaching paths and endpoints are deviated in the direction of the transient inertial Coriolis forces generated by their arm movements. By contrast, reaching movements made during natural, voluntary torso rotation seem to be accurate, and subjects are unaware of the Coriolis forces generated by their movements. This pattern suggests that the motor plan for reaching movements uses a representation of body motion to prepare compensations for impending self-generated accelerative loads on the arm. If so, stationary subjects who are experiencing illusory self-rotation should make reaching errors when pointing to a target. These errors should be in the direction opposite the Coriolis accelerations their arm movements would generate if they were actually rotating. To determine whether such compensations exist, we had subjects in four experiments make visually open-loop reaches to targets while they were experiencing compelling illusory self-rotation and displacement induced by rotation of a complex, natural visual scene. The paths and endpoints of their initial reaching movements were significantly displaced leftward during counterclockwise illusory rotary displacement and rightward during clockwise illusory self-displacement. Subjects reached in a curvilinear path to the wrong place. These reaching errors were opposite in direction to the Coriolis forces that would have been generated by their arm movements during actual torso rotation. The magnitude of path curvature and endpoint errors increased as the speed of illusory self-rotation increased. In successive reaches, movement paths became straighter and endpoints more accurate despite the absence of visual error feedback or tactile feedback about target location. When subjects were again presented a stationary scene, their initial reaches were indistinguishable from pre-exposure baseline, indicating a total absence of aftereffects. These experiments demonstrate that the nervous system automatically compensates in a context-specific fashion for the Coriolis forces associated with reaching movements.

Clinical Trial↗