Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Nuclear waste management program*”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Performance Confirmation Strategies for the Waste Isolation Pilot Plant - A Historical Perspective from an Operating Disposal Facility - 12248

Performance confirmation is an important element of the Waste Isolation Pilot Plant (WIPP) program. Performance confirmation was first used during the early WIPP site characterization phase to focus experimental activities that address the development of probabilistic repository performance models and to address stakeholder assurance needs. The program is currently used to analyze the conditions of the repository and its surroundings to ensure that the basis for the repository's long-term radioactive waste containment predictions is valid. This basis is related to the parameters, assumptions, conceptual and numerical models that are used to predict or validate the potential radioactive waste containment performance of the system. The concept of performance confirmation for the WIPP is one that has evolved since the first repository work was initiated decades ago and plays an important role in assuring adequate repository performance both now and in the long-term. The WIPP mission has progressed from a pilot project to an operational disposal facility and will progress to eventual site closure when disposal operations are completed. Performance confirmation is an important part of each of these progressions. The concept of disposing radioactive waste in a geologic repository today involves a complete understanding of many technical, political, regulatory, societal and economic elements. Many of these elements overlap and solving all relevant issues necessary to site, operate and decommission a disposal facility should be done with knowledge of each element's requirements and impacts. Performance confirmation is one tool that can help to coordinate many of these elements into a program that actively investigates what is thought to be adequately understood about the system and what information is lacking. A performance confirmation program is used to determine ways to challenge and verify those areas that are thought to be understood and to find ways to understand those areas that are not well understood. Performance confirmation programs have been used twice at WIPP, first during site characterization and PA development and later in a Compliance Monitoring program. At first, only certain technical aspects of the system were deemed important because it was a scientifically-based, government project. Early site characterization work was design to gather information about the geology and hydrology of the area and the mechanical properties of the natural barrier. The information would be used in a PA to determine the long-term containment performance of the disposal system. A performance confirmation element was used to identify the sensitive elements of the system that were certain, well understood or justified and those that were not. It identified experimental and analytical programs that could be used to reduce uncertainty, confirm sensitive assumptions and provide useful data. This performance confirmation program provided data to justify the adequacy of the information used in PA to demonstrate compliance with EPA's containment requirements. Performance confirmation will continue to be used in the post-closure period for at least 30 years and likely up to the end of the 100-year institutional controls period. As the technical basis for the repository matures throughout the operational period, the currently planned post-closure monitoring program will need to be reassessed prior to implementation. However, the intent of the program will be the same as it was for the previous programs, to ensure the ultimate goal of the repository. This goal is to safely isolate waste from the accessible environment and ensure public and environmental safety. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

THE MISSION AND ACCOMPLISHMENTS FROM DOE’S FUEL CYCLE RESEARCH AND DEVELOPMENT (FCRD) ADVANCED FUELS CAMPAIGN

The mission of the Advanced Fuels Campaign (AFC) is to perform Research, Development, and Demonstration (RD&D) activities for advanced fuel forms (including cladding) to enhance the performance and safety of the nation’s current and future reactors, enhance proliferation resistance of nuclear fuel, effectively utilize nuclear energy resources, and address the longer-term waste management challenges. This includes development of a state of the art Research and Development (R&D) infrastructure to support the use of a “goal oriented science based approach.” AFC uses a “goal oriented, science based approach” aimed at a fundamental understanding of fuel and cladding fabrication methods and performance under irradiation, enabling the pursuit of multiple fuel forms for future fuel cycle options. This approach includes fundamental experiments, theory, and advanced modeling and simulation. One of the most challenging aspects of AFC is the management, integration, and coordination of major R&D activities across multiple organizations. AFC interfaces and collaborates with Fuel Cycle Technologies (FCT) campaigns, universities, industry, various DOE programs and laboratories, federal agencies (e.g., Nuclear Regulatory Commission [NRC]), and international organizations. Key challenges are the development of fuel technologies to enable major increases in fuel performance (safety, reliability, power and burnup) beyond current technologies, and development of characterization methods and predictive fuel performance models to enable more efficient development and licensing of advanced fuels. Challenged with the research and development of fuels for two different reactor technology platforms, AFC targeted transmutation fuel development and focused ceramic fuel development for Advanced LWR Fuels.

AFC Mission↗

Maintenance Plan for the Performance Assessments and Composite Analyses for the Area 3 and Area 5 Radioactive Waste Management Sites at the Nevada National Security Site (Rev.3)

U.S. Department of Energy (DOE) Order 435.1, Radioactive Waste Management, requires that performance assessments (PAs) and composite analyses (CAs) for low-level radioactive waste (LLW) disposal facilities be maintained by the responsible field office. This plan describes the activities performed to maintain the PA and the CA for the Area 3 and Area 5 Radioactive Waste Management Sites (RWMSs) at the Nevada National Security Site (NNSS). The plan is based on DOE Order 435.1 Radioactive Waste Management (DOE 2007), DOE Manual 435.1-1, Radioactive Waste Management Manual (DOE 2011), and DOE Standard DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation (DOE 2017). The facility’s Disposal Authorization Statement (DAS) specifies conditions for the continuing operation of a LLW facility. The DAS is issued based on a review of the facility's PA, CA, the maintenance plan, preliminary closure plan, and preliminary monitoring plan. The DAS specifies the limits and conditions on construction, design, operations, and closure of the low-level waste facility based on these reviews. The Maintenance Plan uses an Unreviewed Disposal Question (UDQ)/Unreviewed Composite Analysis Question (UCAQ) change control process to identify, evaluate, and control planned or discovered changes affecting the PA, CA, DAS, or other documents composing the Radioactive Waste Management Basis (RWMB). The UDQ/UCAQ process uses the PA and CA GoldSim models to calculate updated results, assess the significance of changes, and to assess the need to revise the PA, CA, or DAS. In addition to the change control process, the Maintenance Plan requires an annual review of all changes and an annual assessment of the need to revise RWMB documents, plans, and programs. The cumulative effect of all changes is assessed annually by preparing a revised PA and CA baseline model that is used to update PA and CA results. The updated results are used to assess compliance with the PA performance objectives and the CA dose constraint, and to assess the need to revise the PAs, CAs, and other documents, plans, and programs supporting the RWMB. An Annual Summary Report documenting the results and conclusions of the annual review is prepared and submitted to DOE.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Analytical Functions for 200 West Pump-and-Treat SCADA Sensor Data

Historical operations at the U.S. Department of Energy’s Hanford Site included disposal of waste fluids to the subsurface in the 200 West Area on the Hanford Central Plateau. Subsequent infiltration of fluids has resulted in groundwater contamination with carbon tetrachloride, nitrate, uranium, technetium-99, and other contaminants. A pump-and-treat (P&T) system, with an extraction/injection well network and an aboveground treatment plant, was implemented as part of interim and final remedies in the 200 West area. The HYPATIA single-page web application (part of the SOCRATES suite) is being developed to provide access to and analysis of chemistry and treatment facility sensor data for this 200 West P&T system. For the web application, analytical algorithms were developed to perform summing, differencing, smoothing, outlier detection, change-point detection, mass flow rate, and injectivity calculations on the data. Candidate algorithms were identified and tested, with the best-performing algorithms then assembled for implementation in HYPATIA. Because HYPATIA is hosted on the Amazon Web Services (AWS) cloud computing platform, algorithms were implemented in a back-end AWS Lambda function that can be called by the HYPATIA front end. The Lambda function applies the requested data processing to specified data via functions written in R, Python, and JavaScript. Development, testing, and review of the data analysis algorithms was completed under an NQA-1 quality program. This new HYPATIA functionality will provide information to support site decisions regarding P&T system performance and optimization.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Composite Analysis for Low Level Waste Disposal in the Central Plateau of the Hanford Site (FY20 Annual Status Report)

In accordance with DOE M 435.1-1 requirements and as implemented by DOE/RL-2000-29, the U.S. Department of Energy (DOE), Richland Operations Office has prepared this annual summary for fiscal year (FY) 2020. Originally reported in PNNL-118003 and PNNL-11800, Addendum 1 (hereinafter collectively referred to as the Hanford Site Composite Analysis), the Hanford Site Composite Analysis was approved through issuance of a 2002 memorandum. As required by DOE/RL-2000-29, an annual evaluation of new information and data developed by a number of onsite programs was completed. The reporting period for this annual evaluation is FY 2020 (October 1, 2019 through September 30, 2020).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sister Rod Destructive Examinations (FY22) Appendix E: Mechanical Testing

As a part of the DOE NE High Burnup Spent Fuel Data Project, Oak Ridge National Laboratory (ORNL) is performing destructive examinations (DEs) of high burnup (HBU) (>45 GWd/MTU) spent nuclear fuel (SNF) rods from the North Anna Nuclear Power Station operated by Dominion Energy. The SNF rods, called sister rods or sibling rods, are all HBU and include four different kinds of fuel rod cladding: standard Zircaloy-4 (Zirc-4), low-tin Zirc-4, ZIRLO, and M5. The DEs are being conducted to obtain a baseline of the HBU rod’s condition before dry storage and are focused on understanding overall SNF rod strength and durability. Composite fuel and defueled cladding will be tested to derive material properties. Although the data generated can be used for multiple purposes, one primary goal for obtaining the post-irradiation examination data and the associated measured mechanical properties is to support SNF dry storage licensing and relicensing activities by (1) addressing identified knowledge gaps and (2) enhancing the technical basis for post-storage transportation, handling, and subsequent disposition.This appendix documents the status of the ORNL Phase 1 DE activities related to the mechanical testing of selected sister rods in Phase 1 of the sister rod test program.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Characterization of Precipitate Reactor Feed Tank (PRFT) Batches 44 and 49 from the Defense Waste Processing Facility (DWPF)

The Savannah River Site (SRS) Defense Waste Processing Facility (DWPF) processes a Monosodium Titanate/Sludge Solids (MST/SS) waste stream received from the Salt Waste Processing Facility (SWPF) via the Precipitate Reactor Feed Tank (PRFT). During processing, DWPF is required to provide evidence of compliance with the Waste Acceptance Product Specifications (WAPS). Savannah River Mission Completion (SRMC) has requested Savannah River National Laboratory (SRNL) to analyze PRFT samples representing each SWPF salt batch for thirty-two radionuclides. Additionally, elemental analysis of PRFT slurry and MST/SS solids was performed to aid SRMC in further refinement of the inputs and assumptions used in future frit development and Material Tracking Program calculations. The analyses of PRFT Batches 44 and 49, which correspond to material from the processing of Salt Batches (StB) 12 and 11, respectively, are reported herein. The unwashed dried solids of the PRFT Batches 44 and 49 are predominately MST, ~63-59% MST. The two batches have a much higher amount of Fe, Mn, and Ni compared to all previous batches. For Batch 44 this appears to be due to the use of a sludge simulant filter aid during processing of StB 12 and for Batch 49, it is possibly due to the larger amount of insoluble solids for StB 11 in comparison to all previous salt batches. Like previous PRFT batches, a significant amount of the unwashed dried solids are alkaline earth metals. The total sulfate, in mg/kg of slurry, for PRFT Batches 44 and 49 is 119 and 139, respectively, which is well below the current sulfate concentration used in Material Tracking Program calculations and is in agreement with DWPF laboratory sulfate measurements.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The 'People Plan' Concept for Contract Closure - 12432

The U.S. Department of Energy's (DOE) first-of-a-kind closure project at the Hanford Site in Richland, Washington, still has more than 3 years to run, but its contractor, Washington Closure Hanford (WCH), has already started its plans for going out of business. It will be the first contract that closes in increments and, paramount to its success, will be its ability to provide a disciplined and positive approach to release personnel while at the same time retaining personnel critical to timely and safe completion of the work scope. In May 2011, WCH produced the people plan, a program that maximizes communication and support for employees being released, provides an incentivization strategy to retain personnel to the end of their assignments, and reflects a sensitivity to the long-term goals of the contract and WCH's parent companies. The combination of all of these efforts equal one thing: treating employees with respect by providing specific information in a timely manner; respecting employees by sharing as much information as possible, as soon as possible, with as much detail as possible; and respecting each individual's ability to be in control of their next step in their life or career. The project is only in the second ORW and has 13 more before the end of the contract. That time remaining will continue to bring new challenges and unknowns, but the confidence and trust of the employees is proving to be solid. This is largely as a result of the stability provided by the people plan program. A success that can only truly be measured by the continued positive response it has already received from WCH's employees. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Robust and High-Waste Loaded Glass Formulations for Hanford Low-Activity Waste - 19050

The Hanford Low-Activity Waste (LAW) vitrification facility will receive LAW batches with abruptly changing compositions that span relatively broad ranges. In particular, the concentration ratios of sodium-to-sulfate, -chloride, -chromate, -phosphate, -potassium, and -aluminate create challenges in glass formulation. Glass compositions that simultaneously satisfy several processability, product quality, and composition constraints with sufficient confidence must be formulated for each LAW batch in near-realtime to enable desired throughput. A method for developing glass compositions while maximizing the waste loading and the process robustness was developed. This method compiled the glass composition-property data collected over nearly two decades, primarily by Pacific Northwest National Laboratory, The Catholic University of America, and Savannah River National Laboratory, in support of both the Hanford Tank Waste Treatment and Immobilization Plant project and the U.S. Department of Energy Office of River Protection Enhanced Waste Glass project. These data were used to develop models that link the melter feed composition to the resulting glass properties. Mathematical constructs were developed to optimize glass compositions for each waste batch in real-time that will simultaneously satisfy processability, product quality, and composition constraints with sufficient statistical confidence. Property prediction and various process uncertainties were reflected in the formulation. The formulation approach directly lends itself to adjustment of glass formulation to achieve program goals. This presentation will summarize the formulation approach and supporting data. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Considerations for Using FGE Conversion Factors in Type A Shipping Packages at the Savannah River Site

Contact Handled-Transuranic Waste Authorized Methods for Payload Control (CH-TRAMPAC) conversion factors are typically used as fissile gram equivalent (FGE) values in systems such as transuranic waste at the Savannah River Site (SRS). Publicly available technical justifications for CH-TRAMPAC conversion factors are lacking. Special considerations are needed to justify the use of the CH-TRAMPAC conversion factor for 235 U to 239 Pu, over the full range of Pu and U densities for Type A shipping packages in the K-Area Complex (KAC) at SRS. It is important to understand the limitations and the area of applicability for using these conversion factors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Corrective Action Units 101 and 102: Central and Western Pahute Mesa

Well ER-EC-14 was drilled for the U.S. Department of Energy, National Nuclear Security Administration Nevada Site Office in support of the Nevada Environmental Management Operations Underground Test Area (UGTA) Activity at the Nevada National Security Site (NNSS; formerly Nevada Test Site), Nye County, Nevada. The well was drilled in September and October 2012, as part of the Central and Western Pahute Mesa Corrective Action Unit Phase II drilling program. The primary purpose of the well was to provide detailed hydrogeologic information for the Fortymile Canyon composite hydrostratigraphic unit in the Timber Mountain moat area, within the Timber Mountain caldera complex, that will help address uncertainties within the Pahute Mesa–Oasis Valley hydrostratigraphic framework model.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Used Fuel Dry Storage Systems and Components for Shutdown Plants to Expedite Defueling of Spent Fuel Pool - 18378

For plants that have announced plans to shut down, their main priority is to off-load the Used Nuclear Fuel from the spent fuel pool to dry storage at an ISFSI so that they can proceed to 'Safe store' or other storage options, and start their decommissioning process as soon as possible. One of the major expenses for a decommissioned plant is the cost of maintenance of the spent fuel pool. Therefore, the ability of the dry storage system to store short cooled fuel is an important aspect of dry storage system for shutdown plants. When a shutdown plant evaluates the dry storage options, total cost of the transferring the fuel from the pool to ISFSI site needs to be evaluated. One of the major costs to the utility for dry storage is the cost of ISFSI pad (basemat) along with the cost of dry storage system hardware. Smaller ISFSI footprint saves utility for the cost of ISFSI site excavation, cost of engineered backfill and cost of ISFSI pad. In order to minimize the cost of dry storage systems, besides the size of the ISFSI pad as described above, other important considerations is to use high capacity systems. The highest capacity systems available in the dry storage market today are with 37 PWR or 89 BWR used fuel assemblies per canister. These dry storage systems are expected to be at the plant sites for extended duration due to the unavailability of Interim Storage Facilities or a permanent disposal sites like Yucca Mountain. Maintaining the integrity of the dry storage systems canisters and storage overpack so that they can safely protect the fuel and integrity of used nuclear fuel is maintained during storage period is of utmost importance. Robust Aging Management Program is an important aspect for dry storage systems not only at the shutdown plants but also at the operating plants. This paper will provide the update of a reduced footprint version of TN Americas NUHOMS{sup R} System with MATRIX HSM and NUHOMS{sup R} EOS Canisters that addresses the need for maximizing safety, ISFSI capacity while optimizing cost. It will provide an update on the current capabilities, design features and current status of the licensing and deployment of NUHOMS{sup R} EOS System. It will provide the current status of the MATRIX HSM along with the significant enhancement included for a robust Canister Evolved Safety Program for Aging Management. It will also describe the construction sequence; loading operations, and inspections during extended storage as a part of aging management program. The compact version of TN Americas NUHOMS{sup R} System with MATRIX HSM offers a 'Universal' Storage Overpack which is designed to accept all different designs dry storage canisters available in the industry. As UNF storage continues to drives the industry towards innovations that address the need for optimized dry storage systems, compact ISFSIs and prudent aging management programs, this new evolution of the TN Americas NUHOMS{sup R} system with MATRIX HSM and EOS Canisters offers a significant leap forward in addressing all of these challenges. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The DOE Office of Environmental Management International Cooperative Program: Current Status and Plans for Expansion

The DOE-EM Office of Engineering and Technology is responsible for implementing EM’s international cooperative program. The Office of Engineering and Technology’s international efforts are aimed at supporting EM’s mission of risk reduction and accelerated cleanup of the environmental legacy of the nation's nuclear weapons program and government-sponsored nuclear energy research. To do this, EM pursues collaborations with government organizations, educational institutions, and private industry to identify and develop technologies that can address the site cleanup needs of DOE. Currently, DOE-EM is performing collaborative work with researchers at the Khlopin Radium Institute (KRI) and the SIA Radon Institute in Russia and the Ukraine’s International Radioecology Laboratory (IRL). Additionally, a task was recently completed with the Nuclear Engineering Technology Institute (NETEC) in South Korea. The objectives of these collaborations were to explore issues relating to high-level waste and to investigate technologies that could be leveraged to support EM site cleanup needs. In FY09, continued collaboration with the current partners is planned. Additionally, new research projects are being planned to expand the International Program. A collaborative project with Russian Electrotechnical University is underway to evaluate CCIM control and monitoring technologies. A Statement of Intent was recently signed between DOE-EM and the U.K. Nuclear Decommissioning Authority (NDA) to work cooperatively on areas of mutual interest. Under this umbrella, discussions were held with NDA representatives to identify potential areas for collaboration. Information and technical exchanges were identified as near-term actions to help meet the objectives of the Statement of Intent. Technical exchanges in identified areas are being pursued in FY09

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Cold Crucible Induction Melter (CCIM) Testing on Glass Ceramic and Ceramic Waste Forms

The U.S. Department of Energy Office of Nuclear Energy’s Fuel Cycle Research and Development (FCR&D) program is developing advanced high level waste (HLW) forms for the immobilization of the long-lived radionuclides resulting from future potential reprocessing of the used nuclear fuel from commercial reactors. One of the program’s goals is to have orders of magnitude improvements in durability (compared to the reference borosilicate glass waste form for HLW), to facilitate lower costs including less expensive and complex processing, to lower storage costs and to provide for final disposal of the waste in a deep geological repository. Both glass ceramic and ceramic waste forms are being developed and evaluated as possible improvements to borosilicate glass to achieve these objectives.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Addressing an aging facility: improving reliability of the defense waste processing facility at the Savannah River Site - 15539

The High Level Waste program at the Savannah River Site significantly reduces environmental risks associated with the storage of radioactive waste from legacy efforts to separate fissionable nuclear material from irradiated targets and fuels. The Defense Waste Processing Facility treats and immobilizes High Level Waste into a durable borosilicate glass for safe, permanent storage. Construction of the facility began in 1983 and radioactive operations commenced in 1996. In an effort to support the disposition of radioactive waste and accelerate tank closure for the balance of the Savannah River Site mission, the Defense Waste Processing Facility recently underwent an extensive reliability review in 2013 to understand future needs as well as to address aging infrastructure. As a product of this review, a Performance Improvement Plan was developed to systematically address three major focus areas including, a) asset preservation, b) facility housekeeping, and 3) process improvements. Since issuance of the plan, significant progress has been made in each of these areas to improve the reliability and predictability of the Defense Waste Processing Facility. Providing consistent, constructive, and concise communications is vital in the face of a changing budgetary environment. The Savannah River Site case study provides an example of the U.S. Department of Energy - Savannah River (DOE-SR) and SRR partnering to inform stakeholders about cleanup progress at the site. DOE-SR and SRR periodically and consistently provide both annual written progress reports under the Federal Facility Agreement and quarterly written progress reports under the landfill permit to the government regulators. Through the Liquid Waste System Plans, DOE-SR and SRR constructively and concisely summarize both the significant progress made and explain how a changed budget can impact the goals moving forward. Furthermore, DOE-SR and SRR informs the community and general public about the Site's progress and future during Citizens Advisory Board meetings. In addition, through the new proposed model for complex-wide communications, stakeholders can better understand how budget constraints will affect them. The set-aside program would also encourage stakeholder participation and involvement in helping each state and site obtain extra funding through performance evaluations. Waste management organizations can benefit in a number of ways from an effective partnership approach to communicate with stakeholders about available funding. Keeping an open and honest dialogue with regulatory agencies can help preserve confidence, thus mitigating or completely avoiding costly and distracting fines and penalties. Informing the public not only promotes trust, but also spurs the public to exercise its right to demand more information and voice any concerns to elected or DOE officials. With this approach, DOE can receive better understanding and cooperation from stakeholders in a changing budgetary landscape. Furthermore, a set-aside competitive program would encourage efficiency and innovation that could lead to further cost savings for the government while providing extra funding for cleanup efforts. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Remote Handled Hot Cell Facility and Other Research Transuranic Waste (Debris)

This acceptable knowledge (AK) Summary Report has been prepared for the Central Characterization Program (CCP) for remote-handled (RH) transuranic (TRU) waste generated and managed by Sandia National Laboratories/New Mexico (SNL/NM) in Albuquerque, New Mexico. The waste described in this report was predominately generated in the SNL/NM Hot Cell Facility (HCF) during the removal and packaging of experimental material and decontamination operations in Building 6580 at Technical Area (TA)-V. The waste stream also includes a very small amount of waste (estimated at less than 1 gram of fuel similar to that used for research at the HCF) originating from classified research at TA-I. In addition, the waste also includes secondary waste termed by SNL/NM as process generated waste (PGW), created during repackaging operations for this waste at the Auxiliary Hot Cell Facility (AHCF). The waste has been stored at the Sandia Pulsed Reactor (SPR) Dense Pack Storage Facility within TA-V or the Manzano Bunkers located at Manzano Base within Kirtland Air Force Base. All of the waste is being repackaged at the AHCF. This report was prepared in accordance with CCP-TP-005, CCP Acceptable Knowledge Documentation (Reference 1), to implement the AK requirements of DOE/WIPP-02-3214, Remote-Handled TRU Waste Characterization Program Implementation Plan (WCPIP) (Reference 2); Waste Isolation Pilot Plant Hazardous Waste Facility Permit, Waste Analysis Plan (WIPP-WAP) (Reference 3); and DOE/WIPP-02-3122, Transuranic Waste Acceptance Criteria for the Waste Isolation Pilot Plant (WIPP-WAC) (Reference 4).

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing Spent Nuclear Fuel from Shutdown Nuclear Power Plant Sites - 2018 - 19101

This is a technical paper that does not take into account the contractual limitations under the Standard Contract for Disposal of Spent Nuclear Fuel and/or High-Level Radioactive Waste (Standard Contract) (10 CFR Part 961). Under the provisions of the Standard Contract, DOE does not consider spent nuclear fuel in multi-assembly canisters to be an acceptable waste form, absent a mutually agreed to contract amendment. To the extent discussions or recommendations in this paper conflict with the provisions of the Standard Contract, the Standard Contract provisions prevail. The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM) continues to conduct evaluations of removing spent nuclear fuel (SNF) from shutdown nuclear power plant sites. The 14 shutdown sites included in the evaluation to date have nuclear power reactors that have been permanently shut down and the sites have been decommissioned or are undergoing decommissioning. The 14 shutdown sites are Maine Yankee, Yankee Rowe, Connecticut Yankee, Humboldt Bay, Big Rock Point, Rancho Seco, Trojan, La Crosse, Zion, Crystal River, Kewaunee, San Onofre, Vermont Yankee, and Fort Calhoun. The Oyster Creek Nuclear Generating Station ceased operations in September 2018 and will be included in future evaluations. The evaluations of the shutdown sites contain four components: - A characterization of the SNF and greater-than-Class C low-level radioactive waste (GTCC waste) inventory; - A description of the on-site infrastructure at the shutdown sites; - An evaluation of the near-site transportation infrastructure and experience at the shutdown sites - An evaluation of the actions necessary to prepare for and remove SNF and GTCC waste. The primary sources for the inventory of SNF were the DOE GC-859 and RW-859 spent nuclear fuel inventory databases. This inventory has been augmented with data obtained from the shutdown sites for SNF discharges that occurred after June 2013. The primary sources for information on the conditions of site and near-site transportation infrastructure and experience included field observations and information collected during visits to the 14 shutdown sites, information provided by managers and staff at the shutdown sites, and Google Earth imagery. Extensive photographs taken during the shutdown site visits have proven to be particularly useful in documenting the current conditions at and near the shutdown sites. Tribal and state representatives, State and Regional Group representatives, and Federal Railroad Administration representatives have participated in 11 of the shutdown site visits. In addition to visiting the shutdown site, site visits often include activities such as meeting with local railroads to discuss the near-site railroad infrastructure and meeting with community engagement panels. Oyster Creek permanently ceased power operations on September 17, 2018 and fuel was removed from the reactor vessel on September 25, 2018. Planning for the Oyster Creek site visit has begun and is conducted in three stages. In the first stage, data and documents that are applicable to Oyster Creek are collected. In the second stage, questions are developed based on the data and documents collected during the first stage. These questions are submitted to the Oyster Creek site approximately one month before the site visit. The third stage involves establishing specific schedules and participants. Participants will likely include tribal and state representatives, the Council of State Governments - Eastern Regional Conference, and the Federal Railroad Administration. State participation will likely include a representative of the State Rail Safety Participation Program, the New Jersey Department of Transportation, and the New Jersey Bureau of Nuclear Engineering. The site visit is tentatively expected to occur in April or May of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SYSTEM PLANNING WITH THE HANFORD WASTE OPERATIONS SIMULATOR

At the U. S. Department of Energy's Hanford Site in southeastern Washington State, 216 million liters (57 million gallons) of nuclear waste is currently stored in aging underground tanks, threatening the Columbia River. The River Protection Project (RPP), a fully integrated system of waste storage, retrieval, treatment, and disposal facilities, is in varying stages of design, construction, operation, and future planning. These facilities face many overlapping technical, regulatory, and financial hurdles to achieve site cleanup and closure. Program execution is ongoing, but completion is currently expected to take approximately 40 more years. Strategic planning for the treatment of Hanford tank waste is by nature a multi-faceted, complex and iterative process. To help manage the planning, a report referred to as the RPP System Plan is prepared to provide a basis for aligning the program scope with the cost and schedule, from upper-tier contracts to individual facility operating plans. The Hanford Tank Waste Operations Simulator (HTWOS), a dynamic flowsheet simulation and mass balance computer model, is used to simulate the current planned RPP mission, evaluate the impacts of changes to the mission, and assist in planning near-term facility operations. Development of additional modeling tools, including an operations research model and a cost model, will further improve long-term planning confidence. The most recent RPP System Plan, Revision 4, was published in September 2009.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗