Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DOE.”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 955 records · Page 53

Performance Assessment Maintenance Plan for the Active Low-Level Burial Ground Trenches 31, 34, and 94 at the Hanford Site

This report documents the maintenance plan for the Hanford Site 200 West Area Active Low-Level Burial Ground Trenches 31 and 34 and 200 East Area Active Trench 94 performance assessment (PA). The PA maintenance plan is one of several supporting documents that are compendiums to the active trenches (Trenches 31, 34, and 94) PA as required in DOE O 435.1, Radioactive Waste Management . The PA is documented in DOE/RL-2021-26, Performance Assessment of Active Trenches in 200 East and West Low-Level Burial Grounds at the Hanford Site . This plan follows the requirements and outline specified in the applicable U.S. Department of Energy (DOE) standard used for developing documents supporting DOE-STD-5002-2017, Disposal Authorization Statement and Tank Closure Documentation . This maintenance plan summarizes the following major activities DOE plans to conduct to maintain the Trenches 31, 34, and 94 PA: Monitoring; Research and development; Planned reviews and analyses; Revisions of Trenches 31, 34, and 94 PA. The planned research and development activities relate to evaluating the key assumptions, including evaluating conceptual model assumptions and parameter value assumptions used in the PA. The planned research and development activities include those that are designed to track the release mechanisms for Category 1, Category 3, and uranium billet waste sources, as well as continued characterization and related modeling of the natural environment in the Central Plateau of the Hanford Site. In addition, the planned research and development activities include focused testing and evaluation of engineered and natural materials to reduce the uncertainty in the conceptual models and parameter values used in the PA. All key and secondary issues identified during the review of the PA by the Low-Level Waste Disposal Facility Federal Review Group have been resolved prior to finalization of the PA. There are no outstanding issues.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

MARSAME Radiological Release Report for Metal Items from Technical Area 53, Set 26

Environmental Protection and Compliance, Environmental Stewardship Group (EPC-ES) has evaluated the survey results for metal items from the Los Alamos Neutron Science Center (LANSCE) at Technical Area 53 (TA-53) and found that the metal items described in Table 1 of this report (identified by Radiation Protection [RP] Tracking Numbers) meet the criteria for unrestricted release under Department of Energy (DOE) Order 458.1 Chg 4, Radiation Protection of the Public and the Environment (DOE 2020) and can be recycled. This conclusion is based on the known history of the metal items and radiation survey data. None of the items in this report are located within radiological areas. Therefore, the items are considered unencumbered and are not subject to the moratorium suspension on metal recycling from DOE facilities. Additionally, Los Alamos National Laboratory (LANL) has determined that there is no practical opportunity for internal DOE reuse of this metal. Process knowledge indicates that these metal items were unlikely to ever be in direct contact with the beam and thus are unlikely to have become activated. Surface contamination measurements (both total and removable) showed either no detectable radioactivity or activity levels within the range of background. All measurements for volumetric contamination were indistinguishable from background based on calculated decision limits. Additionally, all gamma isotopic surveys conducted for defense-in depth showed no identifiable gamma radiation from beam activation.

54 ENVIRONMENTAL SCIENCES↗

Advanced Turbulence Models for Large-Scale Atmospheric Boundary Layer Flows

We present high-fidelity large-eddy-simulation (LES) modeling approaches for the turbulent atmospheric boundary layer (ABL) flows. Wind energy is a prime example of an application driven by ABL. Generation of electrical energy from farms of wind turbines at night in the stable ABL is a particularly interesting situation. In this report, we consider the well-known GEWEX (Global Energy and Water Cycle Experiment) Atmospheric Boundary Layer Study (GABLS) stably stratified benchmark LES case. We use a high-order spectral element code Nek5000/RS, which is supported under the DOE's Exascale Computing Project (ECP) Center for Efficient Exascale Discretizations (CEED) project, targeting application simulations on various acceleration-device based exascale computing platforms. In our earlier ANL report, we demonstrated our newly developed subgrid-scale (SGS) models based on high-pass filter (HPF), mean-field eddy viscosity (MFEV), and Smagorinsky (SMG) with no-slip and traction boundary conditions, provided with low-order statistics, convergence and turbulent structure analysis. In this report, we extend the range of our SGS modeling approaches in the context of the mean-field eddy viscosity (MFEV), to include the solution of an SGS turbulent kinetic energy equation (TKE). We demonstrate the model fidelity of Nek5000/RS in comparison to that of AMR-Wind, a block-structured second-order finite-volume code with adaptive-mesh-refinement capabilities, with which we studied scaling performance for both codes in comparison on DOE's leadership computing platforms.

17 WIND ENERGY↗

Closure Report for the Project Shoal Area: Subsurface Corrective Action Unit 447 Shoal,Nevada, Site

The U.S. Department of Energy (DOE) Office of Legacy Management (LM) has prepared this Closure Report for subsurface Corrective Action Unit (CAU) 447 at the Shoal, Nevada, Site, which was formerly called the Project Shoal Area. The Shoal site was the location of an underground nuclear test in 1963 that resulted in residual radionuclide contamination at the detonation depth of 1211 feet (ft) (DOE 2015a). The environmental restoration process and Corrective Action strategy are conducted in accordance with the Federal Facility Agreement and Consent Order (FFACO) (FFACO 1996, as amended) and all applicable Nevada Division of Environmental Protection (NDEP) statues and regulations. Responsibility for the environmental site restoration was transferred from the DOE, National Nuclear Security Administration, Nevada Field Office, to LM on October 1, 2006. The Shoal site is south of U.S. Highway 50, approximately 30 miles southeast of Fallon, in Churchill County, Nevada (Figure 1). The site was selected for underground nuclear testing in 1961, as part of the Vela Uniform Program. Vela was a research and development program directed toward locating, detecting, and identifying underground and high-altitude nuclear detonations. The Vela Uniform program was specific to underground detonations (AEC 1964). The objective of Project Shoal was to detonate a nuclear device underground in an active seismic area to improve the United States’ ability to detect, identify, and locate underground nuclear detonations. The underground nuclear test at Shoal was a joint effort between the U.S. Department of Defense (DOD) and the U.S. Atomic Energy Commission (AEC), which was the predecessor agency to DOE. Figure 1 is a map showing the site location.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

MARSAME Radiological Release Report for Metal Items from Technical Area 53, Set 28

Environmental Protection and Compliance, Environmental Stewardship Group (EPC-ES) has evaluated the survey results for metal items from the Los Alamos Neutron Science Center (LANSCE) at Technical Area 53 (TA-53) and found that the metal items described in Table 1 of this report (identified by Radiation Protection [RP] Tracking Numbers) meet the criteria for unrestricted release under Department of Energy (DOE) Order 458.1 Chg 4, Radiation Protection of the Public and the Environment (DOE 2020) and can be recycled. This conclusion is based on the known history of the metal items and radiation survey data (see the completed RP-Form-031 LANSCE Metals Clearance Log [LANL 2021a] for each item in Attachment 1). Process knowledge indicates that items were released from radiological areas, including radiation areas, prior to the implementation of the 2000 metals moratorium. Therefore, the items are considered unencumbered and are not subject to the moratorium suspension on metal recycling from DOE facilities. Additionally, Los Alamos National Laboratory (LANL) has determined that there is no practical opportunity for internal DOE reuse of this metal. Process knowledge indicates that these metal items were unlikely to ever be in direct contact with the beam and thus are unlikely to have become activated. Surface contamination measurements (both total and removable) showed either no detectable radioactivity or activity levels within the range of background. All measurements for volumetric contamination were indistinguishable from background based on calculated decision limits. Additionally, all gamma isotopic surveys conducted for defense-in depth showed no identifiable gamma radiation from beam activation.

61 RADIATION PROTECTION AND DOSIMETRY↗

Marine carbon dioxide removal (mCDR) test site needs: A joint PNNL-PMEL workshop report

This workshop report summarizes testing and capability needs for marine Carbon Dioxide Removal (mCDR) research identified by researchers from DOE’s Pacific Northwest National Laboratory (PNNL) and NOAA’s Pacific Marine Environmental Laboratory (PMEL) as essential to advancing the state of the science and technology. A one-day workshop was held for 36 hybrid participants on June 2, 2023 at PNNL’s Marine and Coastal Sciences Laboratory in Sequim, WA. The workshop began with DOE and NOAA leadership offering perspectives on the mission alignment and long-term implementation of mCDR research within NOAA’s Office of Ocean and Atmospheric Research (OAR), DOE’s Water Power Technologies Office (WPTO), and DOE’s Office of Fossil Energy and Carbon Management (FECM). As identified by the participants and by program leadership at both agencies, many mCDR strategies are in early stages of development making it difficult to reliably estimate their impact. The essential next step in proving the efficacy, safety, and sustainability of these solutions and identifying market potential requires studies under field-relevant conditions.

13 HYDRO ENERGY↗

Inclusive Innovation and Entrepreneurship Roundtable

On June 22, 2021, Pacific Northwest National Laboratory hosted a roundtable to discuss the role that the U.S. Department of Energy (DOE) can play in supporting inclusive and just innovation and entrepreneurship. This roundtable convened individuals from DOE, as well as experts in climate and energy justice, entrepreneurship and innovation, and incubation and acceleration services to understand barriers to entry for communities who have been historically underserved by DOE funding instruments. With the intention of cultivating active discussions among participants, the roundtable was anchored by two rounds of breakout sessions that complemented the RFI addressing inclusive innovation and entrepreneurship in climate technologies that DOE released on June 9, 2021. This report synthesizes the breakout room discussions during the roundtable before presenting overarching themes that were identified from the event.

99 GENERAL AND MISCELLANEOUS↗

Postclosure Criticality Analysis Results

The United States Department of Energy’s (DOE) Office of Nuclear Energy’s Spent Fuel and Waste Science and Technology Campaign seeks to better understand the technical basis, risks, and uncertainty associated with the safe and secure disposition of spent nuclear fuel (SNF) and high-level radioactive waste. Commercial nuclear power generation in the United States has resulted in thousands of metric tons of SNF, the disposal of which is the responsibility of DOE (Nuclear Waste Policy Act of 1982, as amended). Any repository licensed to dispose of SNF must meet requirements regarding the long-term performance of that repository. The evaluation of long-term performance of the repository may need to consider the SNF achieving a critical configuration during the postclosure period. Of particular interest is the potential for this situation to occur in dual-purpose canisters (DPCs), which are currently licensed and being used to store and transport SNF but were not designed for permanent geologic disposal. DOE has been considering disposing of SNF in DPCs to avoid the costs and worker dose associated with repackaging the SNF currently stored in DPCs into repository-specific canisters. This report examines the consequences of postclosure criticality to provide technical support to DOE in developing a disposal plan.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Nuclear Physics Network Requirements Review (Final Report)

The Energy Sciences Network (ESnet) is the high-performance network user facility for the US Department of Energy (DOE) Office of Science (SC) and delivers highly reliable data transport capabilities optimized for the requirements of data-intensive science. In essence, ESnet is the circulatory system that enables the DOE science mission by connecting all its laboratories and facilities in the US and abroad. ESnet is funded and stewarded by the Advanced Scientific Computing Research (ASCR) program and managed and operated by the Scientific Networking Division at Lawrence Berkeley National Laboratory (LBNL). ESnet is widely regarded as a global leader in the research and education networking community. ESnet interconnects DOE national laboratories, user facilities, and major experiments so that scientists can use remote instruments and computing resources as well as share data with collaborators, transfer large datasets, and access distributed data repositories. ESnet is specifically built to provide Between July 2023 and October 2023, ESnet and the Nuclear Physics program (NP) of the DOE SC organized an ESnet requirements review of NP-supported activities. Preparation for these events included identification of key stakeholders: program and facility management, research groups, and technology providers. Each stakeholder group was asked to prepare formal case study documents about its relationship to the NP program to build a complete understanding of the current, near-term, and long-term status, expectations, and processes that will support the science going forward.

97 MATHEMATICS AND COMPUTING↗

Model Guidance to Address Barriers to Combined Heat and Power and Waste Heat to Power

Congress directed that the US Department of Energy (DOE) initiate a review of interconnection rules to identify barriers to interconnection and ways to better integrate combined heat and power (CHP) and waste heat to power (WHP) in the electric grid. Oak Ridge National Laboratory (ORNL) supports DOE by providing technical assistance for CHP. DOE tasked ORNL with the interconnection review and development of model guidance to enable developers and CHP owners to interconnect more CHP. This report summarizes the work that DOE initiated in response to the congressional request.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Multigrid Reduction in Time for Chaotic and Hyperbolic Problems (Final Report)

The coming massive parallelism of exascale computing presents a pressing challenge for the many DOE simulations of time-dependent partial differential equations (PDEs), which typically use traditional sequential time stepping methods. Since this traditional approach is inherently serial, it presents a sequential bottleneck when moving to exascale computing, because future performance gains will come through greater concurrency, not faster clock speeds. Thus, the goal of this work is to research parallelism in time, i.e., methods that compute multiple time values simultaneously, not sequentially. The focus will be on hyperbolic and chaotic problems of interest to DOE, with the goal of enabling scalable simulations of time-dependent hyperbolic and chaotic problems on future architectures. The chosen methodology for solving these problems parallel-in-time is multigrid, because multigrid (when it works) is a powerful, optimal, and scalable solver for discretized PDEs. Multigrid is already commonly used in many DOE simulations for scalably and optimally solving space-only PDE problems. The areas of hyperbolic and chaotic problems are chosen because of their relevance to problems of programmatic interest to DOE. However, these problems are also well-known to be difficult for parallel-in-time methods, with the most common method, parareal, diverging in many cases. The current state of-the-art for parallel-in-time at LLNL is the multigrid reduction in time (MGRIT) XBraid package, which also struggles for such problems, while still showing some improvement over parareal. In summary, new methods are needed for an efficient parallel-in-time scheme for hyperbolic and chaotic problems, and this work shall research promising new multigrid methods in this area. In particular, this work shall continue researching the directions from the current collaboration with Dr. Falgout, which are laid out in the work Toward Parallel in Time for Chaotic Dynamical Systems and showed the first known results of a parallel-in-time speedup for a chaotic problem. This work outlines two key improvements to XBraid for chaotic problems, the so-called “theta” and “delta-correction” methods. Here, these two improvements will be further researched and improved (including with a new relaxation method inspired by on Least Squares Shadowing (LSS)) and explored for more complicated problems.

97 MATHEMATICS AND COMPUTING↗

Environmental Performance Report 2023: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2023, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Annual Site Environment Report for Calendar Year 2023 - Princeton Plasma Physics Laboratory

This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. This report provides the US Department of Energy (DOE) and the public with information on the level of radioactive and non-radioactive pollutants (if any) that are added to the environment as a result of Princeton Plasma Physics Laboratory’s (PPPL) operations. This report fulfills the annual public reporting requirements of DOE Order 231.1B. The results of PPPL’s 2023 environmental surveillance and monitoring program are presented and discussed. The report also summarizes environmental initiatives, assessments, and community involvement programs that were undertaken in 2023. In 2023, PPPL’s radiological environmental monitoring program measured tritium in the air at onsite sampling stations. Using highly sensitive air monitors, PPPL is capable of detecting small changes in the ambient levels of tritium. The operation of monitors located on D-site is used to demonstrate compliance with the National Emission Standard for Hazardous Air Pollutants (NESHAPs) regulations. Also included in PPPL’s radiological environmental monitoring program, are water monitoring – ground, surface, and waste waters. PPPL’s radiological monitoring program characterized the background levels of tritium in the environment and those data are presented in this report. Ground water monitoring continued under New Jersey Department of Environmental Protection’s (NJDEP) Site Remediation Program regulations. PPPL monitored for non-radiological contaminants, mainly volatile organic compounds (components of common degreasing solvents). In 2023, PPPL complied with permit limits for surface water and sanitary wastewater discharges. PPPL was honored with an award for EPEAT-certified electronics purchasing from the Global Electronics Council on July 27, 2023.

70 PLASMA PHYSICS AND FUSION TECHNOLOGY↗

Annual Site Environmental Report for Pantex Plant, Calendar Year 2023

The 2023 Annual Site Environmental Report (ASER) summarizes Pantex’s status, data, and efforts for the environmental compliance, protection, and restoration programs. It has been prepared in accordance with DOE O 231.1B, Environment, Safety and Health Reporting, and DOE O 458.1, Radiation Protection of the Public and the Environment. These orders outline the requirements for environmental protection programs at DOE facilities to ensure that programs fully comply with applicable federal, state, and local environmental laws and regulations, executive orders, and DOE policies.

54 ENVIRONMENTAL SCIENCES↗

NORTH DAKOTA CARBONSAFE PHASE III: SITE CHARACTERIZATION AND PERMITTING OF GEOLOGIC STORAGE OF CARBON DIOXIDE

The Energy & Environmental Research Center (EERC), in partnership with Minnkota Power Cooperative Inc. (Minnkota), SLB, and Computer Modelling Group Ltd. (CMG), supported wide-scale deployment of carbon capture and storage (CCS) as part of the U.S. Department of Energy (DOE) National Energy Technology Laboratory Carbon Storage Assurance Facility Enterprise (CarbonSAFE) Initiative Phase III. This phase included the acquisition, analysis, and development of information to fully characterize two storage complexes to demonstrate viable storage resources for commercial volumes of CO2 (defined by DOE as a minimum of 50 million tonnes [MMt] of CO2 within a 30-year period) (National Energy Technology Laboratory, 2024). Phase III also involved the preparation, submission, and approval of North Dakota underground injection control (UIC) Class VI storage facility permits (SFPs)—required precursors to applications for Class VI injection well permits. The presumed viability of commercial-scale CCS, situated adjacent to Minnkota’s Milton R. Young Station (MRYS), is validated by Minnkota’s continued pursuit of Project Tundra—an initiative to build the world’s largest lignite-based CCS project in central North Dakota (www.projecttundrand.com). Project Tundra comprises two scopes of work, Tundra Capture (installation of postcombustion CO2 capture at MRYS) and Tundra SGS (secure geologic storage). The efforts of North Dakota CarbonSAFE Phase III, Site Characterization and Permitting, supported Tundra SGS. Extensive site-specific characterization activities included a successful multimeasurement geophysical approach and drilling a stratigraphic test well (J-ROC 1, subsequently renamed Liberty-1) adjacent to MRYS. Core collection and analyses, downhole testing and fluid sampling, and geophysical logging were performed on J-ROC 1 and on a nearby stratigraphic test well (known as J-LOC 1), which was drilled, cored, and tested under a complementary project funded by the North Dakota Lignite Research Program. The injection tests performed on J-LOC 1 positively impacted the CarbonSAFE project, resulting in fewer proposed injection wells and significant construction, operations, and monitoring cost savings. The characterization data collected and analyses performed were integrated into geologic models, and successive numerical simulations were run to determine CO2 plume extent and subsurface pressure buildup associated with the planned CO2 injection rate of nearly 4 MMt per year. The latter doubles the CarbonSAFE Initiative goal with an estimated 100 MMt of CO2 stored in 20 years. Application of the U.S. Environmental Protection Agency’s (EPA’s) method for estimating the Class VI Rule area of review (AOR) to the overpressurized Broom Creek Formation inspired an alternative method of calculation, called risk-based AOR delineation. This peer-reviewed method was applied for the first time during the storage facility-permitting process. The two SFP applications submitted in 2021 successfully resulted in North Dakota Industrial Commission (NDIC) orders in 2022 authorizing the creation of the storage facility areas and amalgamation of pore space as well as establishing financial responsibility requirements. After approval of the SFPs, Minnkota filed in 2022 applications for permits to reenter the J-ROC 1 well and to drill two new wells—all with the intended purpose to become Class VI injection wells. To establish eligibility under the Internal Revenue Code for Section 45Q tax incentives, a monitoring, reporting, and verification (MRV) plan was prepared and submitted by Minnkota to EPA in 2022, resulting in the first such plan approved in North Dakota. Also in 2022, under the National Environmental Policy Act (NEPA), Minnkota prepared and submitted an environmental information volume (EIV) describing the proposed CCS project and associated potential environmental impacts. Based on the EIV, DOE determined that the proposed construction project required an environmental assessment, and Minnkota submitted the first draft in 2023 and a revised draft in 2024. Both submissions were followed by a public comment period. Subsequently, DOE issued a finding of no significant impact (FONSI) on September 13, 2024. A successful outreach program, strongly based in the production, presentation, and dissemination of informational material, fostered an environment to aid stakeholders in making informed decisions regarding the planned project. Opportunities for public input were provided at various steps along the way, including at county planning and zoning meetings, before and during the SFP administrative hearing, and during environmental assessment public comment periods. In addition, land/pore space owners and mineral owners had various points of contact, including granting access rights, securing pore space leasing, and mineral owner notifications. Based upon the successful storage facility permitting issued by NDIC, approval of the MRV plan by EPA, and receipt of a FONSI under the NEPA, Minnkota is continuing its pursuit of Project Tundra. In December 2023, the Office of Clean Energy Demonstrations under its Carbon Capture Demonstrations Projects Program announced funding for the capture system (Office of Clean Energy Demonstrations, 2023) and a proposal for CarbonSAFE Phase IV: Construction funding was submitted in March 2024 for the storage project. A go/no-go decision to proceed with construction and operations in the Broom Creek Formation is anticipated in 2024. References National Energy Technology Laboratory, CarbonSafe Initiative, https://netl.doe.gov/carbon-management/carbon-storage/carbonsafe (accessed August 2024). Office of Clean Energy Demonstrations, 2023, OCED selects three projects in CA, ND, and TX to reduce harmful carbon pollution, create new economic opportunities, and advance carbon reducing technologies, December, www.energy.gov/oced/articles/oced-selects-three-projects-ca-nd-and-tx-reduce-harmful-carbon-pollution-create-new (accessed August 2024).

Peck, Wesley↗

Kansas City, Missouri, Streetlight Electric Vehicle Charging: Strategies and challenges for site selection of streetlight electric vehicle infrastructure in Kansas City, Missouri (Final Report)

Public streetlight charging, whether on streets in central business districts or residential areas, provides easy charging access for apartment residents and homeowners alike. While most electric vehicle (EV) drivers charge at home, they do so in garages or on driveways they own. For renters and residents of multifamily housing (MFH), however, this may not be an option. EVs have a lower cost of ownership compared to conventional vehicles, and a used EV may be an affordable option for a lower-income household. But without easy access to charging, even a low-cost used EV may not be an option for a prospective buyer. An affordable curbside charging network has the potential to expand EV adoption into neighborhoods that have to date seen minimal interest and uptake of the technology and associated charging infrastructure. Streetlight charging networks can provide an economical, scalable, and effective approach to providing equitable and convenient charging. Metropolitan Energy Center (MEC) is dedicated to the mission of creating resource efficiency, environmental health, and economic vitality in the Kansas City region and beyond. Since 1983, MEC has provided resources, outreach, and training to make alternative fuels and energy efficiency commonplace. MEC led a streetlight charging pilot project that installed limited EV charging infrastructure on the streetlight system in Kansas City, Missouri, to demonstrate and test the benefits of curbside charging for EVs at existing on-street parking locations. The project aimed to cost-effectively expand the charging network in Kansas City to support residential charging and provide infrastructure in one or more charging deserts throughout the city. This pilot evaluates the impact and overall success of streetlight charging based on community feedback, utilization of charging infrastructure, technical feasibility, and cost. The project has pursued a data- and community-driven site selection process designed to identify sites with high demand and high opportunity for EV charging. This project was funded by the U.S. Department of Energy (DOE) and awarded to MEC through a competitive proposal process. The novelty and complexity of this project required an organization that could facilitate collaboration across levels of government, community members, and industry partners. For the past 25 years, through Kansas City Regional Clean Cities, MEC has worked with numerous public and private fleets on a variety of projects to improve the environmental performance and efficiency of the regional vehicle fleet. To advance affordable, efficient, and clean transportation efforts, DOE Clean Cities and Communities coalitions create local networks of public and private sector stakeholders and engage communities. Rooted within their local communities, the coalitions serve as experts and ambassadors, bringing to bear the collective knowledge, experience, and practical know-how of the entire network from within DOE, its national laboratories, and diverse stakeholders in the field. MEC and its project partners made in-kind contributions to leverage federal dollars for the benefit of the Kansas City community. Findings from this project will help determine the best applications for streetlight charging technologies to maximize funding impact and serve community needs. The team evaluated locations based on expected charging demand, technical feasibility, safety considerations, and enhanced charging network siting needs. Throughout the project, the team gathered feedback and evaluated ways to make public charging for EVs available to all community members. The insights will help Kansas City and other communities streamline future efforts to support EV drivers through public charging in the city right-of-way. Furthermore, this project will inform citywide guidance for future installations. MEC is committed to a transparent and publicly accessible approach that encourages the collaborative evaluation of streetlight charging. The project has engaged the community to proactively identify and evaluate the benefits and impacts of streetlight charging. It was a priority for the project to ensure the benefits of this pilot are distributed equitably to all members of the Kansas City community and that new charging opportunities and associated resources are available in diverse neighborhoods across the city. The charging infrastructure supports an affordable curbside charging network that will enable more drivers to choose EVs and provide easy charging access for all community members interested in driving an EV. The community feedback received through this project informed future resources and opportunities to make EVs more accessible to all members of the Kansas City community. MEC worked with several community partners on this project, including Missouri University of Science and Technology (MST), Pennsylvania State University (Penn State), the National Renewable Energy Laboratory (NREL); the city of Kansas City, Missouri; Evergy; Black and McDonald (B&M); LilyPad EV; EVNoire; and Westside Housing Organization (WHO). Project partners contributed to the cost match required for DOE grants through capital expenditures, personnel, and other in-kind contributions. Detailed descriptions of project team organizations can be found in Appendix A. Project Partners. Analysts at NREL and MST/PennState developed site maps based on demand and equity considerations. MEC conducted outreach to community members to garner input on project design and site selection, and received approval from the Missouri Public Service Commission (PSC) for Evergy’s EV charging station ownership. MEC worked with all partners to gather additional siting criteria and developed a site selection evaluation checklist, and partners conducted site visits to proposed installation sites. Next, B&M, Evergy, and the city executed all site agreements, conducted site-specific engineering design, acquired associated permits, and issued notices to proceed site by site or in small batches. Finally, from January to April 2023, the project team installed 23 EV charging stations built on Kansas City’s streetlight system in six council districts. Evergy will own, operate, and monitor the stations for 10 years, sharing charging data with MEC for at least 1 year.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Molten Salt Loop Operational Experience and Test Campaigns in FY24

The Facility to Alleviate Salt Technology Risks (FASTR) at the US Department of Energy (DOE) Oak Ridge National Laboratory (ORNL) was developed to demonstrate technology for high-temperature chloride salt systems (Figure 1). FASTR is primarily constructed using alloy C-276 and is designed to operate at temperatures of up to 725°C. The facility is loaded with 250 kg of NaCl-KCl-MgCl 2 salt. This salt provides a relevant test environment for de-risking technology while avoiding the costs and hazards associated with beryllium-based or uranium-bearing salts. The facility’s major components include a centrifugal pump for salt circulation, an air-based heat exchanger to reject heat, a suite of instrumentation, and trace heating to prevent salt freezing. The salt was purified in 2020 and 2022, and the pumped loop first operated in December 2022. FASTR is a unique US capability for high-temperature molten halide salt testing. FASTR’s scale, co located purification system, and relatively large power (465 kW) differentiates it from other testing systems. Furthermore, access to the DOE-supported facility and efficient communication of results— which are generally disseminated publicly—distinguish FASTR as being broadly significant throughout the molten salt reactor community. FASTR is similar to ORNL’s Liquid Salt Test Loop (LSTL), although FASTR contains chloride-based salt instead of the fluoride-based salt (LiF-NaF-KF) found in LSTL. Furthermore, FASTR is approximately 2× larger than LSTL in terms of pipe size and length, power, salt volume, flow rate, and number of thermocouples. The LSTL first operated in 2016. At the end of FY23, there was a suspected gas leak in the LSTL that halted operation. At the start of FY24, a leak in the LSTL pump’s tank gas space was confirmed. Because the gas-space leak prevented operation of LSTL, FY24 efforts were focused on operation of FASTR. This report summarizes the progress made during FY24 in support of the DOE Office of Nuclear Energy (DOE-NE) work package, AT-24OR070202 Salt Loop and Capability for Testing Sensors and Off Gas Components.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Annual Status Report (FY 2024): Performance Assessment for the Integrated Disposal Facility

The purpose of this Annual Summary Report (ASR) for Fiscal Year (FY) 2024 is to evaluate the continued adequacy of the Integrated Disposal Facility (IDF) Performance Assessment (PA) and Disposal Authorization Statement (DAS). This report consolidates relevant monitoring data, modeling analyses, and regulatory reviews to demonstrate a reasonable expectation that the PA objectives and performance measures will be met, as required under DOE O 435.1. The ASR follows the guidance in DOE-STD-5002-2017, which provides a framework for maintaining the validity of the DAS through periodic assessment of facility performance and compliance with waste disposal requirements. The IDF is a near-surface disposal facility designed to receive and permanently dispose of low-level waste (LLW) and mixed low-level waste (MLLW) generated from Hanford Site operations. The facility consists of two double-lined disposal cells equipped with leak detection and leachates recovery systems to ensure environmental protection. Waste planned for disposal includes vitrified low-activity waste (LAW) and solid secondary waste (SSW) from the Hanford Waste Treatment and Immobilization Plant (WTP). At the end of FY 2024, the IDF had not yet received any waste, as it remains in a pre-operational state. Disposal activities will begin with the hot commissioning of the WTP LAW Vitrification Facility using the Direct-Feed Low-Activity Waste (DFLAW) approach in Calendar Year (CY) 2025. This ASR justifies the continued adequacy of the PA and DAS by reviewing key documents and data sources. these sources are listed in Table A-2 in Appendix A.4): The Operating Disposal Authorization Statement (ODAS) for the IDF (DOE-EM, 2021) remains in effect, with no outstanding conditions or key issues affecting its implementation. Based on the comprehensive review of PA analyses, monitoring data, and regulatory compliance activities, this ASR concludes that the IDF remains in compliance with DOE O 435.1, and there is reasonable assurance that the PA performance objectives will be met once disposal operations commence in CY 2025.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗