The Status of the Construction of MICE Step IV
The International Muon Ionization Cooling Experiment will provide the demononstration ionization cooling. The experiment is being built in a series of Steps. Step IV, which consists of a tracking spectrometer upstream and downstream of an absorber/focus-coil module will be completed in early in 2015. In this configuration, the emittance of the muon beam upstream and downstream of the absorbed will be measured precisely allowing the emittance reduction and the factors that determine the ionization-cooling effect to be studied in detail. Each tracking spectrometer consists of a scintillating-fibre tracker placed within a 4 T field provided by the superconducting spectrometer solenoid. The muon beam is transported to the absorber/focus-coil module: a 22 liter volume of liquid hydrogen placed inside a superconducting focusing coil. The properties of lithium hydride, and possibly other absorber materials, will also be studied. All the components of Step IV have been manufactured and integration of the experiment in the MICE Hall at the Rutherford Appleton Laboratory is underway. The construction and performance of Step IV will be described. A full study of ionization cooling will be carried out with Step V of the experiment which will include a short 201 MHz linac module in which beam transport is achieved with a superconducting “coupling-coil”. The status of the preparation of the components of Step V of the experiment will be described briefly.