Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “terminal operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Ares I and Ares V First Stage - Powering Exploration

The National Aeronautics and Space Administration (NASA) Ares Projects Office (APO) is continuing to make progress toward the final design of the first stage propulsion system for the Ares I crew launch vehicle and the Ares V cargo launch vehicle. Ares I and Ares V will provide the space launch capabilities needed to fulfill NASA' s exploration strategy of sending human beings to the Moon, Mars, and beyond. As primary propulsion for the Ares launch vehicles, the Space Shuttle-derived Reusable Solid Rocket Motor (RSRM) is one of the first and most important components to be tested. The first flight of Ares I, called Ares I-X, will occur in April 2009, with booster integration to begin at Kennedy Space Center (KSC) by autumn 2008. The Ares I-X flight will use a combination of flight and simulation hardware to obtain data on controlling the long and narrow crew launch vehicle configuration. The test will use a four-segment RSRM from the Shuttle inventory and a fifth spacer segment to simulate the size and weight of the operational five-segment motor to be used on later flights. The upper stage, Orion crew exploration vehicle, and launch abort system will all be replaced with simulator hardware. Manufacturing work has begun on the spacer segment, as well as the new forward hardware for the booster. Atlas V avionics will be adapted to control Ares I-X' s first stage. That hardware is undergoing hardware-in-the-loop testing in a contractor-provided systems integration laboratory (SIL); a critical design review (CDR) was completed in December 2007. Drogue and main parachute drop tests have also been conducted successfully at Yuma Proving Grounds, allowing the First Stage team to begin fabricating parachutes for Ares I-X. The Ares I-X flight test will be the first flight test for the parachutes. A series of preliminary design technical interchange meetings is being conducted prior to the Ares I-X CDR in January 2007 to ensure readiness for the flight. Much of the First Stage activity in 2007 has focused on a series of preliminary design (PDR) activities associated with each booster subsystem. These events will culminate in a formal preliminary design review in 2008, where subsystems and component specifications will be developed and associated analyses and drawings will be evaluated for technical adequacy. The first stage also has been undergoing a series of trade studies to determine means for upgrading booster performance and reducing operational costs. Performance improvement studies have included changing from polybutadiene acrylonitrile (PBAN) propellant to hydroxyl-terminated polybutadiene (HTPB); replacing aluminum with composite motor casings; and optimizing or upgrading the propellant grain and nozzle structures. Some or all of these changes could result in a block upgrade to the Ares I first stage, after becoming the standard configuration for the Ares V. The cost reduction studies included a change from reusable or recoverable boosters to completely expendable boosters; changing from hydrazine-powered to more environmentally friendly electrohydrostatic actuators (EHAs) on the thrust vector control (TVC) system; and changing the location of the separation plane to reduce the likelihood of recontact upon booster separation. The expendability trade study resulted in a decision to keep the recoverable boosters, as the new hardware costs significantly outweighed the potential operational cost savings due to reduced ground operations. Likewise, due to cost considerations, the team continued using existing hydrazine-powered actuators for the TVC system. The separation plane location for Ares I is still being studied, with results to be announced in 2008. In short, the Ares launch vehicles' first stage is building upon NASA's close familiarity with this Shuttle-derived system, while continuing to seek out improvements for long-term exploration.

Priskos, Alex S.↗

Electrical termination techniques

A technical review of high reliability electrical terminations for electronic equipment was made. Seven techniques were selected from this review for further investigation, experimental work, and preliminary testing. From the preliminary test results, four techniques were selected for final testing and evaluation. These four were: (1) induction soldering, (2) wire wrap, (3) percussive arc welding, and (4) resistance welding. Of these four, induction soldering was selected as the best technique in terms of minimizing operator errors, controlling temperature and time, minimizing joint contamination, and ultimately producing a reliable, uniform, and reusable electrical termination.

Oakey, W. E.↗

Advanced transport operation effects on pilot scan patterns

Long straight-in and close-in, curved, descending instrument approaches were made in NASA's fixed-base Terminal Configured Vehicle simulator. The pilot either manually controlled the simulator or monitored the automatic system control of the simulated aircraft during the approach. Tests were performed with or without the display of traffic. The results indicate that the pilots' use of the Electronic Horizontal Situation Indicator (EHSI) increased appreciably for the close-in, curved, descending approach compared to the conventional straight-in approach. When operating as a monitor of the autopilot system, the pilot scanned around more with less attention devoted to the Electronic Attitude Direction Indicator (EADI). The pilots preferred the manual mode because it kept them in the control loop. The addition of displayed traffic to the EHSI increased the pilots' use of the EHSI with a corresponding reduction in his use of the EADI. Also, the pilot's pupil diameter increased during the landing flare indicating a higher stress level even though the tests were conducted in a fixed-base simulator.

Harris, R. L., Sr.↗

Effects of insulator ablation on the operation of a quasi-steady MPD arc

Multimegawatt operation of quasi-steady MPD arcjets can involve serious ablation of the insulator surfaces within the arc discharge chamber. Various degrees of insulator ablation manifest themselves by significantly perturbing the voltage-current characteristics and the exhaust velocity profiles. Voltage-current characteristics for two different insulator materials, Plexiglas and boron nitride, are interpreted in terms of an empirical Ohm's law. Use of the refractory insulator material eliminates the ablation-dominated nature of the terminal voltage, but the exhaust stream is still disturbed by insulator material. An Alfven critical velocity model can be applied to this influence of insulator ablation on exhaust velocity. Appropriate changes in the propellant injection geometry eliminate this influence and result in arcjet operation which is independent of insulator material. A particular combination of propellant injection geometries reduces the terminal voltage for a given current and mass flow while maintaining insulator-independent operation, thus implying an improvement in the overall efficiency of the device.

Boyle, M. J.↗

The Future of Air Traffic Management

A system for the control of terminal area traffic to improve productivity, referred to as the Center-TRACON Automation System (CTAS), is being developed at NASA's Ames Research Center under a joint program with the FAA. CTAS consists of a set of integrated tools that provide computer-generated advisories for en-route and terminal area controllers. The premise behind the design of CTAS has been that successful planning of traffic requires accurate trajectory prediction. Data bases consisting of representative aircraft performance models, airline preferred operational procedures and a three dimensional wind model support the trajectory prediction. The research effort has been the design of a set of automation tools that make use of this trajectory prediction capability to assist controllers in overall management of traffic. The first tool, the Traffic Management Advisor (TMA), provides the overall flow management between the en route and terminal areas. A second tool, the Final Approach Spacing Tool (FAST) provides terminal area controllers with sequence and runway advisories to allow optimal use of the runways. The TMA and FAST are now being used in daily operations at Dallas/Ft. Worth airport. Additional activities include the development of several other tools. These include: 1) the En Route Descent Advisor that assist the en route controller in issuing conflict free descents and ascents; 2) the extension of FAST to include speed and heading advisories and the Expedite Departure Path (EDP) that assists the terminal controller in management of departures; and 3) the Collaborative Arrival Planner (CAP) that will assist the airlines in operational decision making. The purpose of this presentation is to review the CTAS concept and to present the results of recent field tests. The paper will first discuss the overall concept and then discuss the status of the individual tools.

Denery, Dallas G.↗

Airborne visible laser optical communication experiment.

A series of optical communication experiments between a high altitude aircraft at 18.3 km (60,000 ft) and a ground station are planned by NASA in the summer of 1972. The basic concept is that an optical tracker and transmitter will be located in each terminal. The aircraft transceiver consists of a 5-mW HeNe laser transmitter with a 30-megabit modulator. The ground station beacon is an argon laser operating at 488 nm. A separate pulsed laser radar is used for initial acquisition. The objective of the experiment is to obtain engineering data on the precision tracking and communication system performance at both terminals. Atmospheric effects on the system performance are of prime importance.

Randall, J. L.↗

Airborne Visible Laser Optical Communications (AVLOC) experiment

A series of optical communication experiments between a high altitude aircraft at 18.3 km (60,000 ft) and a ground station were conducted by NASA from summer 1972 through winter 1973. The basic system was an optical tracker and transmitter located in each terminal. The aircraft transceiver consisted of a 5-mW HeNe laser transmitter with a 30-megabit modulator. The ground station beacon was an argon laser operating at 488 nm. A separate pulsed laser radar was used for initial acquisition. The objective of the experiment was to obtain engineering data on the precision tracking and communication system performance at both terminals. Atmospheric effects on the system performance was also an experiment objective. The system description, engineering analysis, testing, and flight results are discussed.

Source record↗

Flight-Deck Interval Management in Near-Term Arrival Operations

A simulation investigated NASA Air Traffic Management Technology Demonstration 1 (ATD-1) procedures and prototype technologies, including the Traffic Management Advisor for Terminal Metering, Controller-Managed Spacing tools, and Flight Deck Interval Management (FIM) equipment. The ATD-1 procedures and technologies comprise an integrated solution for managing high-density arrivals that NASA is developing and transferring to government and industry stakeholders for NextGen. During each of eighteen simulation trials, experienced controllers managed approximately two hundred departures and over-flights together with seventy-five arrivals to Phoenix Sky Harbor International Airport in a realistic near-term environment. Eight of the arrivals were desktop-based flight simulators flown by airline pilots, which were equipped with prototype FIM equipment in two-thirds of the trials. The simulation provided system-level measures of performance of the ATD-1 integrated arrival solution, demonstrating high conformance with Performance-Based Navigation procedures and a low rate of FIM interruptions. FIM operations provided benefits under specific conditions when FIM aircraft flew connected routes to the runway. This paper focuses on the integration of FIM with the ATD-1 ground-based technologies, discusses outstanding issues, and describes avenues for further research.

Callantine, Todd J.↗

Life characteristics assessment of the communications technology satellite transmitter experiment package

The performance characteristics of the transmitter experiment package (TEP) aboard the Communications Technology Satellite (CTS) measured during its first 2 years in orbit are presented. The TEP consists of a nominal 200 watt output stage tube (OST), a supporting power processing system (PPS), and a variable conductance heat pipe system (VCHPS). The OST, a traveling wave tube augmented with a 10 stage depressed collector has an overall saturated average efficiency of 51.5 percent and an average saturated radio frequency (rf) output power at center band frequency of 240 watts. The PPS operated with a measured efficiency of 86.5 to 88.5 percent. The VCHPS, using three pipes to conduct heat from the PPS and the OST to a 52 by 124 centimeter radiator fin, maintained the PPS baseplate temperature below 50 C for all operating conditions. The TEP performance characteristics presented include frequency response, rf output power, thermal performance, and efficiency. Communications characteristics were evaluated by using both video and audio modulated signals. On four occasions, the TEP experienced temporary thermal control system malfunctions. The anomalies were terminated safely, and the problem was investigated because of the potential for TEP damage due to the signficant temperature increases. Safe TEP operating procedures were established.

Smetana, J.↗

The possibilities for mobile and fixed services in the 20/30 GHz frequency bands

With the wide range of services now offered by satellite communications and broadcasting and the increasing trend towards small terminal systems, the traditional distinctions between fixed and mobile services are becoming less important. In the future mobile, portable, and fixed services may well operate side by side in a hybrid manner. This trend is already apparent in Europe where extensive use is being made of the fixed service frequency allocations for broadcasting and for mobile services. Similarly many ostensibly mobile terminals are serving fixed installations. Although the immediate future of mobile satellite communications continues to lie in the L-band frequency allocations, in the longer term the 20/30 GHz frequency allocations, offer the possibility of a new beginning where the advantages of hybrid systems can be included in the overall system designs at the outset. The experience gained using 20/30 GHz within the Olympus Utilization program and the likely demands for future services to highlight the most promising avenues for future system development are addressed.

Hughes, C. D.↗

Human Factors Evaluation of Conflict Detection Tool for Terminal Area

A conflict detection and resolution tool, Terminal-area Tactical Separation-Assured Flight Environment (T-TSAFE), is being developed to improve the timeliness and accuracy of alerts and reduce the false alert rate observed with the currently deployed technology. The legacy system in use today, Conflict Alert, relies primarily on a dead reckoning algorithm, whereas T-TSAFE uses intent information to augment dead reckoning. In previous experiments, T-TSAFE was found to reduce the rate of false alerts and increase time between the alert to the controller and a loss of separation over the legacy system. In the present study, T-TSAFE was tested under two meteorological conditions, 1) all aircraft operated under instrument flight regimen, and 2) some aircraft operated under mixed operating conditions. The tool was used to visually alert controllers to predicted Losses of separation throughout the terminal airspace, and show compression errors, on final approach. The performance of T-TSAFE on final approach was compared with Automated Terminal Proximity Alert (ATPA), a tool recently deployed by the FAA. Results show that controllers did not report differences in workload or situational awareness between the T-TSAFE and ATPA cones but did prefer T-TSAFE features over ATPA functionality. T-TSAFE will provide one tool that shows alerts in the data blocks and compression errors via cones on the final approach, implementing all tactical conflict detection and alerting via one tool in TRACON airspace.

Verma, Savita Arora↗

Prediction of Weather Impacts on Airport Arrival Meter Fix Capacity

This paper introduces a data driven model for predicting airport arrival capacity with a look-ahead time 2-8 hour forecast. The model is suitable for air traffic flow management by explicitly investigating the impact of convective weather on airport arrival meter fix throughput. Estimation of the arrival airport capacity under arrival meter fix flow constraints due to severe weather is an important part of Air Traffic Management (ATM). Airport arrival capacity can be reduced if one or more airport arrival meter fixes are partially or completely blocked by convective weather. When the predicted airport arrival demands exceed the predicted available airport's arrival capacity for a sustained period, Ground Delay Program (GDP) operations will be triggered by ATM system. Serious imbalances between demand and capacity occur most frequently when the airport capacity is severely degraded due to either bad airport terminal surface weather or inclement convective weather around airport arrival fixes. A model that predicts the weather-impacted airport arrival meter fix throughput may help ATM personnel to plan GDP operations more efficiently. This paper identifies the characteristics of air traffic flow across arrival meter fixes at Newark Liberty International Airport (EWR). The proposed approach, based on machine-learning methods, is developed to predict the weather impacted EWR arrival Meter Fix (MF) throughput. Sector forecast coverage is used to envision the weather impact on airport arrival MF flow, and the validation is accomplished by using Convective Weather Avoidance Model (CWAM) 0.5 to 2-hour and Collaborative Convective Forecast Product (CCFP) 4 to 8-hour look-ahead forecast data for the period of April-September in 2014. Furthermore, the regression tree ensemble learning of random forests approach for translating a sector forecast coverage model to an EWR arrival meter fix throughput model is examined. The results suggest that ATM decision makers in charge of MF flow control and GDP planning may benefit from adopting the airport arrival meter capacity prediction models to estimate the inclement weather impacts.

Wang, Yao X.↗

Intrinsic two-dimensional features as textons

We suggest that intrinsic two-dimensional (i2D) features, computationally defined as the outputs of nonlinear operators that model the activity of end-stopped neurons, play a role in preattentive texture discrimination. We first show that for discriminable textures with identical power spectra the predictions of traditional models depend on the type of nonlinearity and fail for energy measures. We then argue that the concept of intrinsic dimensionality, and the existence of end-stopped neurons, can help us to understand the role of the nonlinearities. Furthermore, we show examples in which models without strong i2D selectivity fail to predict the correct ranking order of perceptual segregation. Our arguments regarding the importance of i2D features resemble the arguments of Julesz and co-workers regarding textons such as terminators and crossings. However, we provide a computational framework that identifies textons with the outputs of nonlinear operators that are selective to i2D features.

Discrimination (Psychology)/physiology↗

A performance comparison between GaInP-on-Si and GaAs-on-Si 3-terminal tandem solar cells

The pursuit of ever-higher solar cell efficiencies has focused heavily on multijunction technologies. In tandem cells, subcells are typically either contacted via two terminals (2T) or four terminals (4T). Simulations show that the less-common three-terminal (3T) design may be comparable to 4T tandem cells in its compatibility with a range of materials, operating conditions, and methods for subcell integration, yet the 3T design circumvents shading losses of the 4T intermediate conductive layers. This study analyzes the performance of two superstrate 3T III-V-on-Si (III-V//Si) tandem cells: One has slightly greater current contribution from the Si bottom cell (GaInP//Si) and the other has substantially greater current contribution from the GaAs top cell (GaAs//Si). Our results show that both tandem cells exhibit the same efficiency (21.3%), thereby demonstrating that the third terminal allows for flexibility in the selection of the top cell material, similar to the 4T design.

14 SOLAR ENERGY↗

Low-Field Regime of Magnon Transport in PLD-Grown YIG Films

The diffusive propagation of magnons in the archetypal magnetic insulator yttrium iron garnet (YIG) is being actively explored for low-power and low-loss data communication. However, operation under external magnetic fields reduces the magnon diffusion length and attenuates the voltage amplitude at measurement terminals of magnonic devices. Here, we explore the low-field and field-free regime of diffusive magnon transport in YIG films, demonstrating that the field-induced suppression of magnon diffusion length can be fully inhibited only at the zero-field limit. Even a modest field of 10 mT attenuates the nonlocal spin voltage by ~20% in an ~1 μm long transport channel. We further identify the often overlooked in-plane uniaxial magnetic anisotropy as the dominant factor governing magnon transport in the low-field regime. Using Stoner-Wohlfarth macrospin simulations, we quantify the anisotropy parameters and reveal a 10-fold enhancement at low temperatures, a key finding for field-free operation of magnonic devices under cryogenic conditions.

36 MATERIALS SCIENCE↗

Scaling characteristics of MPD propulsion

Experiments in which a high-power, quasi-steady MPD thruster is scaled down by a factor of two indicate that the key features of MPD thruster operation are replicated in the smaller version. Voltage-current data over a 24:1 mass flow range show that the ablation onset parameter is constant for each thruster, although the constant is not the same. Time-integrated photographs of the discharge radiance reveal strikingly similar features at scaled values of current and mass flow. The measured terminal properties of the half-scale thruster are similar to the full-scale thruster, but the regime of operation is smaller and generally less efficient, except within a restricted range of arc current and mass flow.

Mead, F. B., Jr.↗

Noise Considerations for V/STOL Transports

Noise consideration may well be as important a factor in future aircraft concept selection as such economic factors as operating cost and profitability. The impact of noise on some of the design and operational aspects of future V/STOL transports is examined in detail, including consideration of configuration, attitude-control system, lift system, and terminal flight pattern. Extended vertical rise of VTOL aircraft as a method of limiting the intense noise exposure to the terminal area is shown to be only partially effective as well as costly. Comparisons are made of noise contours for conceptual V/STOL transports for several PNdB criteria. The variation in extent of affected area with configuration and criterion emphasizes the importance of establishing an "acceptable" noise level for "city-center" operation.

Kenyon, George C.↗

A novel method for co-optimizing battery sizing and charging strategy of battery electric bus fleets: An application to the city of Paris

Battery-electric buses (BEBs) are a promising technology for replacing diesel buses and reducing their environmental burden. However, their charging process can take several hours, depending on the charging technique and strategy, making them susceptible to schedule disruptions. Furthermore, the selection of the charging strategy and battery size can increase the total capital investment and operational expenses of a BEB fleet, which is a major obstacle to its adoption. Therefore, to minimize the total cost of ownership (TCO) and prevent schedule disruptions, it is essential to establish a well-defined approach to determine an appropriate battery size and charging strategy for BEB fleets. This paper presents a method for reducing the TCO of BEB by determining the optimal battery size and charging strategy for each bus while satisfying operating constraints. The method involves a two-step optimization algorithm that uses Dynamic Programming and Genetic Algorithm. Further, the study applies this approach to the bus fleet serving line 21 in Paris and generates the optimal battery sizing, charging strategy, and required charging infrastructure. The results indicate that 100 kWh batteries offer the best trade-off between capital and operational expenditure for the fleet deployment if used with 65–85 kW chargers at bus terminals.

33 ADVANCED PROPULSION SYSTEMS↗