Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “technology plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

DOE Hanford Tank Side Cesium Removal System (TSCR) Update: Fabrication and Factory Acceptance Testing - 20300

The Tank Side Cesium Removal (TSCR) System is a modular, quickly-deployable, and passively safe system for efficiently removing solids and cesium from alkaline liquid waste raffinate created by fuel processing on the Hanford site. This paper provides an overview of the project with particular emphasis on completion of fabrication and factory acceptance testing (FAT). All TSCR System components are inside three enclosures known as the Process Enclosure, Ancillary Enclosure, and Control Enclosure. The Process Enclosure is seismic design category II (SDC-II) and built to withstand the rigors of transportation and lifting, high winds, volcanic ash fall, and heavy precipitation (snow) over a temperature range of -25 to 115 deg. F. The Process Enclosure and Control Enclosure were fabricated in AVANTech's Columbia, SC facility, while the Ancillary Enclosure was fabricated in AVANTech's Richland, WA facility. The design and preliminary documented safety analysis were completed in December 2019, with all work being performed in accordance with ASME NQA-1 quality assurance requirements. The Process Enclosure, Ion Exchange Columns (IXCs), and several other TSCR components have a nuclear safety function and are designated as safety significant structures, systems, and components (SS-SSCs). The NQA-1 Commercial Grade Dedication (CGD) process was used to identify critical characteristics in order to accept materials and items used for fabrication of several safety significant TSCR components. This paper also addresses unique aspects and challenges of implementing CGD in DOE facilities and systems. After fabrication and preliminary testing, the Process and Control Enclosures were shipped to AVANTech's Richland facility where the complete TSCR System was setup and connected in a represented layout and configuration that will be used on the Hanford site. Test tanks and pumps were put in place and connected to the TSCR Process Enclosure in a manner that mimicked interfacing Double Shell Tanks in the 241-AP Tank Farm. The TSCR System was then tested/operated under conditions equivalent to those planned for onsite operation. Testing was separated into five separate phases as defined below: - Phase 1: Confirmation of TSCR System readiness for the FAT; - Phase 2: Verification of TSCR System operation under standard conditions; - Phase 3: Demonstration of TSCR System operation under non-standard conditions; - Phase 4: Demonstration of ion exchange media removal from an IXC; and - Phase 5: Completion of TSCR System lift plans and site mobilization. The Hanford Tank Operations Contractor, Washington River Protection Solutions (WRPS), participated in all phases of testing. Testing at AVANTech's Richland Facility allowed WRPS personnel to familiarize themselves with TSCR operations in a radiologically clean facility prior to onsite mobilization. Engineering and operations personnel gained valuable experience that allowed them to better refine onsite operational protocols and procedures - including handling and movement of IXCs with a forklift. This paper describes the technologies used by the TSCR System as well as how these technologies are deployed and operated to advance the Hanford mission of safely, efficiently, and effectively treating tank waste. It also provides detailed information on fabrication and FAT, including operational data from simulated tank waste runs. A project schedule for WRPS' planned construction acceptance testing, operational acceptance testing, and actual tank waste treatment is provided. This presentation should be of great interest to parties responsible for the design, testing, and mobilization of modular NQA-1 technologies for the treatment of raffinate and similar liquid wastes containing high concentrations of radioactive cesium. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Conceptual Design of Neutron Sensor Qualification Device

The Advanced Sensors and Instrumentation Program at Idaho National Laboratory has been formulating strategies to qualify sensors for use in nuclear environments, particularly in irradiation experiments and advanced reactors. When qualifying neutron sensors for use in high-temperature environments, the wide range of neutron flux levels and representative energy spectra presents significant challenges. This paper discusses the development of the Neutron Sensor Qualification Device (NQD), which is designed to test neutron sensors in high temperature controlled environments with known neutron spectra, addressing the spatial and spectral complexities of neutron fluxes in reactor cores. The proposed NQD will be situated in the exposure room at the Armed Forces Radiobiology Research Institute, thus affording a unique capability to expose sensors to high neutron and gamma fluxes. To achieve thermal control, the device will utilize a radiation-hardened tube furnace, accommodating multiple sensors and neutron activation dosimetry wires. Titanium, iron, and cobalt dosimeter wires are chosen from the American Society for Testing and Materials and International Reactor Dosimetry and Fusion File libraries as references for providing energy-dependent fluence measurements. The design ensures precise sensor positioning to minimize mutual shielding and flux perturbation, which are evaluated via Monte Carlo N particle Transport Code (MCNP) simulations. These simulations have informed the development of guidelines on sensor placement within the NQD. The NQD is essential to the qualification of neutron sensors for advanced reactor technologies. It enables controlled testing of a statistically significant number of sensors, thereby supporting assessments of sensor performance across various neutron flux levels and temperatures. This paper highlights the detailed planning for the NQD prototype, along with its inaugural irradiation (scheduled for fiscal year [FY] 2025). The results from this initial testing will be fundamental in evaluating the device’s performance and establishing measurement uncertainty for in-pile neutron sensor measurements.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Ontario International Airport Fleet Electrification Blueprint: Zero-Emission Vehicle Technology Assessment for Energy Optimization [Slides]

Ontario International Airport Authority (OIAA)'s Electric Vehicle (EV) Blueprint project presentation focuses on the possibilities for fleet electrification, including medium heavy duty charging and hydrogen refueling and their associated planning, infrastructure, operation, and maintenance options. This report includes detailed list of available electric ground support equipment (GSE), description of NREL tools for EV infrastructure design and optimization, and analyses of the current fleet and the potential grid impacts of electrification. Key recommendations are made in regard to simulation-based and in-depth system analyses to identify optimal charging infrastructure and long-term grid stability, and to ensure that the selected station architecture will provide enough space and capacity for future expansion and resiliency.

30 DIRECT ENERGY CONVERSION↗

Methods and system for siting advanced nuclear reactors and evaluating energy policy concerns

There is a growing sociopolitical desire to develop cleaner energy sources in the United States and maintain energy security. Regardless of politics, many coal-fired electric plants have already been shut down and many utilities are vowing to retire their current coal-fired assets within the next two decades. Replacement power assets require consideration of appropriate siting. A geographic information system (GIS)-based multicriteria decision analysis approach is useful to assist utility and energy companies, as well as policymakers, to evaluate potential areas for siting new plants in the contiguous United States. A GIS-based framework is simply a database of location information that allows for mapping, querying, modeling, and analyzing data based on location. The spatial output can be structured to be visual, allowing for easier analysis of location data. The need to site additional power assets, including renewable resources and clean power sources, such as nuclear, led to the development of the Oak Ridge Siting Analysis for power Generation Expansion (OR-SAGE) tool discussed in this paper. The tool takes inputs such as population growth, water availability, environmental indicators, and tectonic and geological hazards to provide an in-depth visual analysis for siting options. Energy companies and other stakeholders can use OR-SAGE to procure feedback quickly and effectively on land suitability based on technology specific inputs. Policymakers can use OR-SAGE to analyze the impacts of future energy technology decisions, while balancing competing resource use. Overall, this paper discusses the recent use of OR-SAGE for these purposes and plans for future development.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Web Based Beamline Control System (Bluesky Web) v0.1.0

Bluesky Web is a web based interface that provides beam line controls to the end user. It allows users to issue commands to various physical devices at a beam line end station like motors and cameras. It utilizes an open source Python library (Bluesky) as the controller. It uses Bluesky to also allow for running "plans" or a sequence of device operations that can be used when running an experiment. This program is different from other controls technologies because it is intended to be open source and can be accessed from a web browser, as opposed to other paid software that is run as a stand-alone application on a computer.

De Leon, Seij↗

Scaling trends for balance-of-system costs at land-based wind power plants: Opportunities for innovations in foundation and erection

Wind power plant sizes, hub heights, and turbine ratings have increased since 2008 to optimize the cost and performance of wind power; however, the limits of these economies of scale remain unclear. Here, we explore how the costs incurred to install turbines at a wind power plant—the balance-of-system (BOS) costs—scale with turbine rating, hub height, and plant size. We also investigate how these changes in BOS costs influence the levelized cost of energy (LCOE). We show that increasing the plant size from 150 to 400 MW could reduce the BOS costs by 21%. We also show that if the foundation costs decreased by 50%, building a wind power plant with 5-MW turbines (having rotor diameters of 166 m and hub heights of 120 m) could decrease the LCOE by 5%. These results could help inform future BOS cost-reduction opportunities and thereby reduce future capital costs for land-based wind power.

17 WIND ENERGY↗

Prototyping of N95 Respirators Using Additive Manufacturing NETL NLVB (Final Report)

Final report for National Energy Technology Laboratory (NETL) project involving the use of advanced manufacturing and 3D printing technologies to help address personal protective equipment (PPE) shortages due to COVID-19. Work was performed in support of Joint DOE Laboratory Plan for Manufacturing Medical Supplies and funded through the DOE Office of Science.

3D Printing↗

GMLC Survey of Distributed Energy Resource Interconnection and Interoperability Standards

This document reports on the Grid Modernization Laboratory Consortium effort to identify gaps in standards for the interconnection and interoperability of distributed energy resources (DERs). The project extended a 3-year period from 2017 to 2019. Under the work plan, the team identified standards and test procedures related to interconnection and interoperability, grouped under the broad headings of their primary applicable technology domain: automotive, responsive loads, photovoltaic inverters, inverter-based energy storage, machine-based DERs, and microgrids. The team then conducted a gap analysis by comparing the current standards to the expected future requirements needed for specific grid services. Overall, gaps could be any activity needed to harmonize requirements among standards development organizations, minimize conflicting requirements among technology domains, or streamline conformance test procedures.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Mercury Remediation Technology Development for Lower East Fork Poplar Creek—FY 2021 Update

Mercury remediation is a high priority for the US Department of Energy (DOE) Oak Ridge Office of Environmental Management. Mercury contamination in the environment can be found at all three DOE facilities in Oak Ridge, Tennessee, but the greatest environmental risk concern relative to Hg on the Oak Ridge Reservation is likely associated with historical Hg losses at and near the Y-12 National Security Complex (Y-12). Mercury in water and fish from East Fork Poplar Creek (EFPC) downstream of Y-12 exceeds regulatory thresholds. Because of the complexities of Hg transport and fate in the aquatic environment, conventional remedial options for EFPC are highly uncertain. DOE is using a phased adaptive management approach to Hg remediation at Y-12, with a focus in the next few years on construction of the Mercury Treatment Facility (MTF) to treat the most contaminated Y-12 outfall entering EFPC (DOE 2017a; DOE 2017b). Once operational, the MTF will provide additional protection against inadvertent releases of Hg into the stream from decontamination and decommissioning of Y-12 Hg-use buildings. Although the MTF is anticipated to substantially decrease Hg water concentrations and flux in upper EFPC (UEFPC), research and technology development are needed to develop appropriate and longer-term remedial solutions for the downstream environment. Since late 2014, the Oak Ridge Office of Environmental Management and URS | CH2M Oak Ridge LLC/Restoration Services Inc. have supported DOE’s Oak Ridge National Laboratory (ORNL) Environmental Sciences Division staff in conducting field and laboratory studies to develop Hg remedial technology solutions for lower EFPC (LEFPC). Whereas previous annual reporting updates for Hg remediation technology development for LEFPC have focused on presenting detailed results from the previous fiscal year, this FY 2021 update takes a comprehensive, higher-level approach to the research and technology development activities conducted since 2014. The report is organized to be consistent with the three tasks defined in the LEFPC strategic plan

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Advanced Reactor Safeguards: 2022 Program Roadmap

The Advanced Reactor Safeguards (ARS) program was established in 2020 as part of appropriations for the Advanced Reactor Demonstration Program (ARDP) through the Office of Nuclear Energy in the Department of Energy. The goal of this program is to help address near term challenges that advanced nuclear reactor vendors face in meeting domestic Material Control and Accountancy (MC&A) and Physical Protection System (PPS) requirements for U.S. construction. The technical work in the program is meant to (1) support nuclear reactor vendors with advanced MC&A and PPS designs for next generation reactors, (2) provide technical bases for the regulator, and (3) promote the integration of Safeguards and Security by Design early in the design process. Existing domestic regulations for safeguards and security, as outlined in the Code of Federal Regulations, were written for large light water reactors, and rule-making efforts are underway to develop regulations more suited to different reactor designs. The ARS program seeks to remove roadblocks in the deployment of new and advanced reactors by solving regulatory challenges, reducing safeguards and security costs, and utilizing the latest technologies and approaches for robust plant monitoring and protection. This roadmap discusses the goals of the ARS program, current research, and program plan for the next five years.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Second Target Station Instrument Systems Research and Development Plan

This document describes the research and development (R&D) plan for Second Target Station (STS) instruments and bunker. The R&D program at STS seeks to mitigate risk and develop new technologies that will enhance performance for deployment on the eight instruments that are part of the STS project. Currently, STS is actively developing six of the eight instruments. This document is expected to be revised as the R&D program progresses and activities begin on the remaining two instruments (VERDI and EXPANSE).

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Quality Guidelines for Energy System Studies: Capital Cost Scaling Methodology: Revision 4b Report

The National Energy Technology Laboratory (NETL) regularly updates legacy analysis with new studies and cases as the Department of Energy objectives change, technology performance improves, costs are reduced, regulations change, market drivers are established, fuel prices fluctuate, and any number of other relevant factors vary in the market. As legacy studies are updated by NETL, the underlying performance and cost of the cases presented changes, and as such, the methods for interpreting and scaling the cost estimates change. Therefore, it is important that NETL maintain public guidance documents associated with different sets of cost estimates that delineate how a specific set, based on report vintage and/or year published, should be scaled. This Quality Guidelines for Energy System Studies report, providing guidance on capital cost scaling, should generally be applied to NETL case costs included in the report “Cost and Performance Baseline for Fossil Energy Plants Volume 1: Bituminous Coal and Natural Gas to Electricity Revision 4b,” (NETL, 2025) or any cases derived from the cases presented in the referenced report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Baseline Cost Analysis of Energy Wastewater Treatment with Preliminary Feasibility Analysis of Critical Mineral Recovery

Critical mineral recovery from wastewater is an enhancement of conventional mining that can help meet growing demand. This work investigates two energy wastewaters that have previously been shown to be enriched in critical minerals, oil and gas produced water in the Permian Basin and combustion residual leachate. Treatment of these two wastewaters using reverse osmosis or thermal-based methods concentrates critical minerals, which improves the economic viability of critical mineral recovery. Revenue from mineral recovery could also offset treatment costs for operators. This work evaluates the cost of treatment for each wastewater and evaluates the potential revenue from critical minerals concentrated in the brine. The levelized cost of water for combustion residual leachate ranges from USD 1.90 to USD 16.20 (USD 2023/m 3 permeate) and for produced water ranges from USD 14.40 to USD 24.30 (USD 2023/m 3 distillate). Recovery opportunities range from USD 0.11 to USD 1.13 (USD 2023/m 3 permeate) for leachate and from USD 8.28 to USD 42.10 (USD 2023/m 3 distillate) for produced water, dominated by the value of magnesium and lithium. Comparing the maximum value of critical minerals contained in produced water and the maximum treatment costs, the value of critical minerals exceeds the cost of treatment by USD 17.80/m 3 distillate, which signals a potential revenue opportunity.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

AGR-1, AGR-2, AGR-3/4, and AGR-5/6/7 DimensionalChange Analysis

A series of fuel irradiation experiments have been planned in the Advanced Test Reactor (ATR) at Idaho National Laboratory (INL) to support the licensing and operation of the Advanced Reactor Technologies high temperature gas-cooled reactor. The advanced gas reactor (AGR) experiments are comprised of multiple independent capsules containing multiple cylindrical fuel compacts, placed inside of a graphite cylinder in ATR. The purpose of the AGR experiments is to provide data on fuel performance under irradiation, support fuel process development, qualify the fuel for normal operating conditions, provide irradiated fuel for accident testing, and support the development of fuel performance and fission product transport models. The advanced graphite creep (AGC) experiments provide irradiation creep data for design and licensing. To date, six irradiation campaigns have been completed: AGR-1 (December, 2006 – November, 2009); AGR-2 (June, 2010 – October, 2013); AGR-3/4 (December, 2011 – April, 2014); AGC-1 (September, 2009 – January, 2011); AGC-2 (April, 2011 – May, 2012); and AGC-3 (November, 2012 – April, 2014).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Intentional and Responsible Energy Transitions: Integrating Design Choices in the Pursuit of Carbon-Neutral Futures

The transitions of energy systems to carbon neutrality are among is one of the most ambitious, complex, uncertain, significant, and transformative projects in human history. They will therefore demand extraordinarily thoughtful, informed, and careful leadership. In recent years, this project has reached an important turning point, with widespread agreement to decarbonize energy systems by 2050. We argue that the next step is to engage leaders in doing the work necessary to achieve that goal. Specifically, we argue that regional leaders, across sectors, should build collaborative initiatives to intentionally and responsibly design and advance regional energy transitions. These transitions will entail navigating uncertain and unknown terrain, requiring diverse organizations and communities to work together to chart and construct potential pathways, assess their implications, and collectively work to make progress. To address these challenges, we recommend adopting region-first, anticipatory, justice-oriented approaches. In such approachesthis process, regions can collaboratively identify, deliberate, design, and navigate toward endpoints along complex and shifting pathways that recognize that design will matter. Efuture energy systems will deeply shape and be shaped by the futures of both societies and economies. Transitions will therefore need to be inclusive, to provide broad public input into both how to proceed with transitions and the goals that guide their design.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Solar Photovoltaic (PV) Module Facts and Trends

Unprecedented growth of solar PV has led to growing concerns about PV module toxicity and potential environmental and human health impacts. This factsheet provides objective, science-based data to help address these concerns and empower communities with the resources they need to make solar PV decisions.

14 SOLAR ENERGY↗

Improved Cost Estimates to Boost Pumped Storage Hydropower Construction

Pumped storage hydropower is often overlooked in future grid planning efforts, in part because the cost to build a new facility is not always clear. That's why the National Renewable Energy Laboratory (NREL), along with the U.S. Department of Energy's Water Power Technologies Office, is developing improved cost estimates and cost models to reduce that uncertainty and give developers the data they need to decide where and when to construct new PSH facilities to support the country's evolving energy grid.

ENERGY PLANNING, POLICY, AND ECONOMY,HYDRO ENERGY↗