Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system engineering program”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Transforming Cyber Education thru Open to All Accessible Pathways

Boise State University’s (BSU) Cyber Operations and Resilience CORe program was intentionally designed so that any student, especially non-traditional and non-technical students, with an interest in cybersecurity could have an education and training pathway to enter the cyber workforce. The CORe curriculum focuses on teaching students how to design, apply, and improve cybersecurity through the interaction of people, processes, and technology. CORe is a stackable curriculum with elective credit hours and options for various academic and industry certificates and certifications that enable students to customize their unique career pathway. The CORe program guides students to think about the system being managed, the risks presented, and the dynamic intersection of system elements when considering how to incorporate resilience frameworks in achieving a resilient system. By developing systems thinking, the students gain an understanding of the interdependencies interacting with the operational system. Further, the CORe program encourages students to integrate cybersecurity knowledge with models and frameworks found in other academic disciplines through a unifying systems approach. CORe is designed around the realities of today’s broad cyber landscape: that breaches will occur in any system over time and proactive design of resilience into systems to detect, respond, and recover in a timely and orderly manner is critical. Students are taught to think holistically about cybersecurity focusing on all system elements. CORe is not a traditional cybersecurity degree. CORe is distinguished by the non-traditional engineering, computer science approach to cybersecurity education with the singular focus on infusing resilience operations and transdisciplinary systems thinking principles throughout the curriculum.

99 GENERAL AND MISCELLANEOUS↗

SimCCS: An open-source tool for optimizing CO 2 capture, transport, and storage infrastructure

Commercial-scale carbon capture and storage (CCS) technology will involve deploying infrastructure on a massive and costly scale. This effort will require careful and comprehensive planning to ensure that capture locations, storage sites, and the dedicated CO 2 distribution pipelines are selected in a robust and cost-effective manner. Presented in 2009, SimCCS is an optimization model for integrated system design that enables researchers, stakeholders, and policy makers to design CCS infrastructure networks. SimCCS 2.0 is a complete, ground-up redesign that is now a portable software package, useable and shareable by the CCS research, industrial, policy, and public communities. SimCCS 2.0 integrates multiple new capabilities including a refined optimization model, novel candidate network generation techniques, and optional integration with high-performance computing platforms. Accessing user-provided CO 2 source, sink, and transportation data, SimCCS 2.0 creates candidate transportation routes and formalizes an optimization problem that determines the most cost-effective CCS system design. This optimization problem is further solved either through a high-performance computing interface, or through third-party software on a local desktop computing platform. Finally, SimCCS 2.0 employs an open-access geographic information system framework to enable analysis and visualization capabilities. SimCCS 2.0 is written in Java and is publicly available via GitHub to encourage collaboration, modification, and community development.

42 ENGINEERING↗

Implementing a Hardware Testbed Using 3-Level ANPC Software Defined Inverters for Fault Analysis of a Transmission Network

In this paper, we propose the implementation of a hardware testbed using 3-level active neutral point clamped (ANPC) software-defined inverters for fault analysis. A test case transmission network equipped with two grid forming (GFM) inverters and four resistive loads is considered in this research. Firstly, grid forming control laws including PI feedback control and droop control are implemented to operate the inverters in parallel. Then, we implement a fault ride-through (FRT) logic and perform a simulation of the test system by applying a three-phase fault. Simulation results show the effectiveness of the fault recovery algorithm upon clearance of the fault. Finally, a 3-level ANPC software-defined inverter is programmed with required control laws and characterized through various lab experiments.

3-level ANPC inverter↗

Baseline Evaluations to Support Control Room Modernization at Nuclear Power Plants

For any major control room modernization activity at a commercial nuclear power plant (NPP) in the U.S., a utility should carefully follow the four phases prescribed by the U.S. Nuclear Regulatory Commission in NUREG-0711, Human Factors Engineering Program Review Model. These four phases include Planning and Analysis, Design, Verification and Validation, and Implementation and Operation. While NUREG-0711 is a useful guideline, it is written primarily from the perspective of regulatory review, and it therefore does not provide a nuanced account of many of the steps the utility might undertake as part of control room modernization. The guideline is largely summative—intended to catalog final products—rather than formative—intended to guide the overall modernization process. In this paper, we highlight two crucial formative sub-elements of the Planning and Analysis phase specific to control room modernization that are not covered in NUREG-0711. These two sub-elements are the usability and ergonomics baseline evaluations. A baseline evaluation entails evaluating the system as-built and currently in use. The usability baseline evaluation provides key insights into operator performance using the control system currently in place. The ergonomics baseline evaluation identifies possible deficiencies in the physical configuration of the control system. Both baseline evaluations feed into the design of the replacement system and subsequent summative benchmarking activities that help ensure that control room modernization represents a successful evolution of the control system.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Rational Modulation of Plant Root Development Using Engineered Cytokinin Regulators

Achieving precise control over quantitative developmental phenotypes is a key objective in plant biology. Recent advances in synthetic biology have enabled tools to reprogram entire developmental pathways; however, the complexity of designing synthetic genetic programs and the inherent interactions between various signaling processes remains a critical challenge. Here, we leverage Type-B response regulators to modulate the expression of genes involved in cytokinin-dependent growth and development processes. We rationally engineered these regulators to modulate their transcriptional activity (i.e., repression or activation) and potency while reducing their sensitivity to cytokinin. By localizing the expression of these engineered transcription factors using tissue-specific promoters, we can predictably tune cytokinin-regulated traits. As a proof of principle, we deployed this synthetic system in Arabidopsis thaliana to either decrease or increase the number of lateral roots. The simplicity and modularity of our approach makes it an ideal system for controlling other developmental phenotypes of agronomic interest in plants.

Cell signaling↗

Directing Nanoparticle Organization in Response to Diverse Chemical Inputs

Signaling cascades are crucial for transducing stimuli in biological systems, enabling multiple stimuli to regulate a downstream target with precisely controlled timing and amplifying signals through a series of intermediary reactions. Developing a robust signaling system with such capabilities would be pivotal for programming complex behaviors in synthetic DNA-based molecular devices. However, although “software” such as nucleic acid circuits could potentially be harnessed to relay signals to DNA-based nanostructure hardware, such explorations have been limited. Here, in this study, we develop a platform for transducing a variety of stimuli via messenger-mediated reactions to regulate the release and reloading of gold nanoparticles (AuNPs) in a 3D DNA framework. In the first step, an in vitro transcription circuit is engineered to sense and amplify chemical stimuli, including arbitrary DNA sequences and proteins, producing RNA. In the second step, the RNA releases the DNA-coated AuNPs from the DNA framework via a strand displacement reaction. AuNP reloading is controlled by a separate step driven by degradation of the RNA. Our platform holds promise for applications requiring dynamic multiagent control over DNA-based devices, offering a versatile tool for advanced molecular device engineering.

36 MATERIALS SCIENCE↗

Baseline Characterization Database Verification Report – IG-110 Billet 08-9-052-7

The purpose of this Engineering Calculations and Analysis Report is to present the data being collected in the Baseline Graphite Characterization program, which is directly tasked with supporting the Idaho National Laboratory’s (INL’s) research and development efforts on the Advanced Reactor Technologies (ART) program. This program is populating a comprehensive database that will reflect the baseline properties of nuclear-grade graphite with regard to individual grade, billet, and position within individual billets. The physical and mechanical property information being collected will be transferred to the NGNP Nuclear Data Management and Analysis System (NDMAS), and from that database will help populate the handbook of property data available to member nations of the Generation IV International Forum (GIF). The transfer of this data from the applicable technical lead to the dissemination databases available to other end users requires a full review of the test procedures and data collection efforts through an analysis of the multiple summary spreadsheets and values being collected. This report represents that analysis for IG-110 billet 08-9-052-7 and facilitates the release of the associated data to the NDMAS custodians.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of Enabling Technologies for a Pressurized Dry Feed Oxy-Coal Reactor

Researchers at Brigham Young University (3 faculty, 9 graduate students, and 35 undergraduate students) completed this 5-year research program with the main objective to build and test a 100 kWth pressurized dry-feed oxy-coal combustor (POC). This objective was achieved through the development and testing of a unique pressurized dry coal fluidization feed system that operates in conjunction with a pressurized oxycoal combustor. The project included a series of R&D tasks, including design, modeling, bench-scale testing, construction, safety reviews, and reactor testing which are detailed in this report. BYU researchers were supported in some modeling tasks by project partners Reaction Engineering International (REI) and CPFD Software.

01 COAL, LIGNITE, AND PEAT↗

Whole program Adaptive Error Detection and Mitigation

Our project investigated methods to detect soft errors in computing systems. Such detection schemes must have low overheads and also generate no false positives. Our solutions focused on control-space error detection based on changing addressing schemes so that faults tend to cascade – rather than being masked. Our solutions also addressed data-space error detection by synthesizing error detectors based on rigorous floating-point error analysis.

42 ENGINEERING↗

Whole program Adaptive Error Detection and Mitigation

Our project investigated methods to detect soft errors in computing systems. Such detection schemes must have low overheads and also generate no false positives. Our solutions focused on control-space error detection based on changing addressing schemes so that faults tend to cascade – rather than being masked. Our solutions also addressed data-space error detection by synthesizing error detectors based on rigorous floating-point error analysis.

42 ENGINEERING↗

Precursor Analysis Report: SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003

The SQL Slammer Worm Infection of Davis-Besse Nuclear Power Plant 2003 Precursor Analysis Report leverages publicly available information about Davis-Besse’s 2003 cyber attack and catalogs anomalous observables for each technique employed in the attack. This analysis is based upon the methodology of the Cybersecurity for the Operational Technology Environment (CyOTE) program. On 25 January 2003, the SQL Slammer worm infected more than 90% of vulnerable hosts and crashed the internet in 10 to 15 minutes, making it one of the fastest spreading worms in history. SQL Slammer is a fileless, memory-resident worm that remotely exploits a stack-based buffer overflow vulnerability on local hosts to intensively scan and rapidly self-propagate across the internet. The worm infected approximately 300,000 unpatched hosts running Microsoft Structured Query Language (SQL) Server 2000 or Microsoft Desktop Engine (MSDE) 2000 with SQL Server Resolution Service. The SQL Slammer worm indirectly infected FirstEnergy’s Davis-Besse nuclear power plant by first infecting a consultant’s company network server and then propagating through an external misconfigured connection into Davis-Besse’s site network. The infection caused major network congestion, slow performance, data overloads, and the inability of local hosts to communicate with each other, which eventually caused a loss of availability and a loss of view when the Safety Parameter Display System (SPDS) and Plant Process Computer (PPC) crashed. At the time of the infection, the plant was already offline, the digital monitoring systems had redundant analog backups, and the plant control and safety functions were not affected, so there were no concerns of a safety breach. However, this incident resulted in many lessons learned and spawned important discussions about cybersecurity’s role in nuclear safety and electric power reliability regulation, policy, and guidance. Researchers and analysts identified 10 unique techniques utilized during the attack with a total of 640 observables using MITRE ATT&CK® for Industrial Control Systems. The CyOTE program assesses observables accompanying techniques used prior to the triggering event to identify opportunities to detect malicious activity. If observables accompanying the attack techniques are perceived and investigated prior to the triggering event, earlier comprehension of malicious activity can take place. Eight of the identified techniques used during Davis-Besse cyber attack were precursors to the triggering event. Analysis identified 596 observables associated with these precursor techniques, 428 of which were assessed to have an increased likelihood of being perceived in the 331 days preceding the triggering event. The response and comprehension time could have been reduced if the observables had been identified earlier. The information gathered in this report contributes to a library of observables tied to a repository of artifacts, data sources, and technique detection references for practitioners and developers to support the comprehension of indicators of attack. Asset owners and operators can use these products if they experience similar observables or to prepare for comparable scenarios.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Exe-Guard Project

The exe-Guard Project is an alliance between Dominion Virginia Power (DVP), Sandia National Laboratories (SNL), Dartmouth University, and Schweitzer Engineering Laboratories (SEL). SEL is primary recipient on this project. The exe-Guard project was selected for award under DE-FOA-0000359 with CFDA number 81.122 to address Topic Area of Interest 4: Hardened platforms and Systems. The exe-Guard project developed an antivirus solution for control system embedded devices to prevent the execution of unauthorized code and maintain settings and configuration integrity. This project created a white list antivirus solution for control systems capable of running on embedded Linux® operating systems. White list antivirus methods allow only credible programs to run through the use of digital signatures and hash functions. Once a system’s secure state is baselined, white list antivirus software denies deviations from that state because of the installation of malicious code as this changes hash results. Black list antivirus software has been effective in traditional IT environments but has negative implications for control systems. Black list antivirus uses pattern matching and behavioral analysis to identify system threats while relying on regular updates to the signature file and recurrent system scanning. Black list antivirus is vulnerable to zero day exploits which have not yet been incorporated into a signature file update. System scans hamper the performance of high availability applications, as revealed in NIST special publication 1058 which summarizes the impact of blacklist antivirus on control systems: Manual or “on-demand” scanning has a major effect on control processes in that they take CPU time needed by the control process (Sometimes close to 100% of CPU time). Minimizing the antivirus software throttle setting will reduce but not eliminate this effect. Signature updates can also take up to 100% of CPU time, but for a much shorter period than a typical manual scanning process. Control systems are vulnerable to performance losses if off-the-shelf blacklist antivirus solutions aren’t implemented with care. This investment in configuration in addition to constant decommissioning to perform manual signature file updates is unprecedented and impractical. Additionally, control systems are often disconnected or islanded from the network making the delivery of signature updates difficult. Exe-Guard project developed a white list antivirus solution that mitigated the above drawbacks and allows control systems to cost-effectively apply malware protection while maintaining high reliability. The application of security patches can also be minimized since white listing maintains constant defense against unauthorized code execution. Security patches can instead be applied in less frequent intervals where system decommissioning can be scheduled and planned for. Since control systems are less dynamic than IT environments, the feasibility of maintaining a secure baselined state is more practical. Because upgrades are performed in infrequent, calculated intervals, it allows a new security baseline to be established before the system is returned to service. Exe-Guard built on the efforts of SNL under the Code Seal project. SNL demonstrated prototype Trust Anchors on the project which are independent monitoring and control devices that can be integrated into untrustworthy components. The exe-Guard team started with the lessons learned under this project then designed commercial solution for white list malware protection. Malware is a real threat, even on islanded or un-networked installations, since operators can unintentionally install infected files, plug in infected mass storage devices, or infect a piece of equipment on the islanded local area network that can then spread to other connected equipment. Protection at the device level is one of the last layers of defense in a security-in-depth defense model before an asset becomes compromised. This project provided non-destructive intrusion, isolation and automated response solution, achieving a goal of the Department of Energy (DOE) Roadmap to Secure Control Systems. It also addressed CIP-007-R4 which requires asset owners to employ malicious software prevention tools on assets within the electronic security perimeter. In addition, the CIP-007-R3 requirement for security patch management is minimized because white listing narrows the impact of vulnerabilities and patch releases. The exe-Guard Project completed all tasks identified in the statement of project objective and identified additional tasks within scope that were performed and completed within the original budget. The cost share was met and all deliverables were successfully completed and submitted on time. Most importantly the technology developed and commercialized under this project has been adopted by the Energy sector and thousands of devices with exe-Guard technology integrated in them have now been deployed and are protecting our power systems today

24 POWER TRANSMISSION AND DISTRIBUTION↗

Terry Turbopump Expanded Operating Band Full-Scale Component and Basic Science Detailed Test Plan - Final.

This document details the milestone approach to define the true operating limitations (margins) of the Terry turbopump systems used in the nuclear industry for Milestone 3 (full-scale component experiments) and Milestone 4 (Terry turbopump basic science experiments) efforts. The overall multinational-sponsored program creates the technical basis to: (1) reduce and defer additional utility costs, (2) simplify plant operations, and (3) provide a better understanding of the true margin which could reduce overall risk of operations.

42 ENGINEERING↗

Embedding Agile Practices within a Plan-Driven Hierarchical Project Life Cycle

Organizations use structured, plan-driven approaches to provide continuity, direction, and control to large, multi-year programs. Projects within these programs vary greatly in size, complexity, level of maturity, technical risk, and clarity of the development objectives. Organizations that perform exploratory research, evolutionary development, and other R&D activities can obtain the benefits of Agile practices without losing the benefits of their program’s overarching plan-driven structure. This paper describes application of Agile development methods on a large plan-driven sensor integration program. While the client employed plan-driven, requirements flow-down methodologies, tight project schedules and complex interfaces called for frequent end-to-end demonstrations to provide feedback during system development. The development process maintained the many benefits of plan-driven project execution with the rapid prototyping, integration, demonstration, and client feedback possible through Agile development methods. This paper also describes some of the tools and implementing mechanisms used to transition between and take advantage of each methodology, and presents lessons learned from the project management, system engineering, and developer’s perspectives.

Agile Development↗

Development of Data Reporting Standards for High-Temperature Gas-cooled Reactor (HTGR) Nuclear Energy University Program (NEUP) Thermal-Fluid Experiments

Since 2009, the U.S. Department of Energy (DOE) Office of Nuclear Energy's Nuclear Energy University Program (NEUP) has been at the forefront of nuclear research, specifically concentrating on advancing high-temperature gas-cooled reactor (HTGR) technologies. By Fiscal Year 2023, NEUP has authorized 35 projects dedicated to HTGR research, each contributing significantly to the enhancement of our understanding of this technology. The outcomes of these diverse projects have been disseminated through final NEUP reports, peer-reviewed journal articles, and presentations at academic conferences, forming a comprehensive tapestry of knowledge. Despite the substantial value of these findings, their dissemination has been fragmented, posing challenges for accessibility to researchers and policymakers and leading to underutilization of DOE investments. Recognizing this critical gap and its potential consequences for the future of nuclear research, the Advanced Reactor Technologies (ART) Gas-Cooled Reactor (GCR) program conducted an extensive survey of completed and ongoing HTGR NEUP projects. This survey enabled the compilation of crucial data, resulting in the development of a specialized public-access database tailored for computational fluid dynamics and system code validation, specifically designed for HTGR applications. However, the data collection process revealed a significant challenge in central data organization due to individual researchers from different institutes employing varying logics and preferences for recording and documenting experimental data. Consequently, an urgent need has been identified to establish a standardized reporting format for HTGR experimental projects. Addressing this issue is essential for enhancing collaboration, maximizing the impact of DOE investments, and ensuring the seamless advancement of HTGR technologies in nuclear research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

NSR&D Program Fiscal Year (FY) 2015 Call for Proposals Mitigation of Seismic Risk at Nuclear Facilities using Seismic Isolation

Seismic isolation (SI) has the potential to drastically reduce seismic response of structures, systems, or components (SSCs) and therefore the risk associated with large seismic events (large seismic event could be defined as the design basis earthquake (DBE) and/or the beyond design basis earthquake (BDBE) depending on the site location). This would correspond to a potential increase in nuclear safety by minimizing the structural response and thus minimizing the risk of material release during large seismic events that have uncertainty associated with their magnitude and frequency. The national consensus standard America Society of Civil Engineers (ASCE) Standard 4, Seismic Analysis of Safety Related Nuclear Structures recently incorporated language and commentary for seismically isolating a large light water reactor or similar large nuclear structure. Some potential benefits of SI are: 1) substantially decoupling the SSC from the earthquake hazard thus decreasing risk of material release during large earthquakes, 2) cost savings for the facility and/or equipment, and 3) applicability to both nuclear (current and next generation) and high hazard non-nuclear facilities. Issue: To date no one has evaluated how the benefit of seismic risk reduction reduces cost to construct a nuclear facility. Objective: Use seismic probabilistic risk assessment (SPRA) to evaluate the reduction in seismic risk and estimate potential cost savings of seismic isolation of a generic nuclear facility. This project would leverage ongoing Idaho National Laboratory (INL) activities that are developing advanced (SPRA) methods using Nonlinear Soil-Structure Interaction (NLSSI) analysis. Technical Approach: The proposed study is intended to obtain an estimate on the reduction in seismic risk and construction cost that might be achieved by seismically isolating a nuclear facility. The nuclear facility is a representative pressurized water reactor building nuclear power plant (NPP) structure. Figure 1: Project activities The study will consider a representative NPP reinforced concrete reactor building and representative plant safety system. This study will leverage existing research and development (R&D) activities at INL. Figure 1 shows the proposed study steps with the steps in blue representing activities already funded at INL and the steps in purple the activities that would be funded under this proposal. The following results will be documented: 1) Comparison of seismic risk for the non-seismically isolated (non-SI) and seismically isolated (SI) NPP, and 2) an estimate of construction cost savings when implementing SI at the site of the generic NPP.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development and Demonstration of Medium-Heavy Duty PHEV Work Trucks

The heavy-duty vehicle market (Class 6-8) has been a difficult segment for the introduction of plug-in vehicles due to the large energy storage requirement (with corresponding cost), challenging duty cycles, and the diversity of vehicle configurations. The Work Truck market represents a significant opportunity for Heavy-Duty PHEV adoption. (1) The usage cycle includes driving and stationary/worksite power requirements, ensuring full daily usage of the grid-charged battery (battery size: 15-30kWhr). Though daily driving can often be short (an average of 26 miles per day), worksite power includes substantial demand (hydraulics, exportable 110/220V power, 12V support, HVAC). (2) Worksite power demands for conventional vehicles require continuous loaded engine operation, resulting in significant emissions, fuel consumption and noise impacts. (3) These trucks serve an industry that is highly diverse in final vehicle duty cycle, configuration, and jobsite power demands resulting in the need for a modular, configurable hybrid solution. Through this program, Odyne has developed and demonstrated a medium/heavy duty plug-in hybrid solution capable of meeting the needs of the work truck market while delivering fuel and emissions reductions of 50% or greater when evaluated against the full-day work truck duty cycle. The Odyne system developed in this project was released for commercial sale as the G2V7 Odyne Plug-in Hybrid and ePTO systems. The testing and field demonstration proved that the Odyne hybrid system is capable of reducing work truck fuel use and emissions by over 50% while subsequent commercial sales demonstrate the flexibility of the modular design and the capability to support electric systems of 12 – 30 kW and hydraulic based systems of 60 kW (80 HP) or greater. Odyne is continuing to work with suppliers on reducing component costs and working with supporting agencies to initiate projects to increase the driving and full day fuel and emissions savings in order to continue to improve the customer value and return on investment.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗