Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “risk mitigation”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

SAVANNAH RIVER SITE TANK 48H WASTE TREATMENT PROJECT TECHNOLOGY READINESS ASSESSMENT

ABSTRACT One of U.S. Department of Energy’s (DOE) primary missions at Savannah River Site (SRS) is to retrieve and treat the high level waste (HLW) remaining in SRS tanks and close the F&H tank farms. At present, a significant impediment to timely completion of this mission is the presence of significant organic chemical contamination in Tank 48H. Tank 48H is a 1.3 million gallon tank with full secondary containment, located and interconnected within the SRS tank system. However, the tank has been isolated from the system and unavailable for use since 1983, because its contents – approximately 250,000 gallons of salt solution containing Cs-137 and other radioisotopes – are contaminated with nearly 22,000 Kg of tetraphenylborate, a material which can release benzene vapor to the tank head space in potentially flammable concentrations. An important element of the DOE SRS mission is to remove, process, and dispose of the contents of Tank 48H, both to eliminate the hazard it presents to the SRS H-Tank Farm and to return Tank 48H to service. Tank 48H must be returned to service to support operation of the Salt Waste Processing Facility, to free up HLW tank space, and to allow orderly tank closures per Federal Facility Agreement commitments. The Washington Savannah River Company (WSRC), the SRS prime contractor, has evaluated alternatives and selected two processes, Wet Air Oxidation (WAO) and Fluidized Steam Bed Reforming (FBSR) as candidates for Tank 48H processing. Over the past year, WSRC has been testing and evaluating these two processes, and DOE is nearing a final technology selection in late 2007. In parallel with WSRC’s ongoing work, DOE convened a team of independent qualified experts to conduct a Technology Readiness Assessment (TRA). The purpose of the TRA was to determine the maturity level of the Tank 48H treatment technology candidates – WAO and FBSR. The methodology used for this TRA is based on detailed guidance for conducting TRAs contained in the Department of Defense (DoD), Technology Readiness Assessment Deskbook. The TRA consists of three parts: • Determination of the Critical Technology Elements (CTEs) for each of the candidate processes. • Evaluation of the Technology Readiness Levels (TRLs) of each CTE for each process. • Defining of the technology testing or engineering work necessary to bring immature technologies to the appropriate maturity levels. The TRA methodology assigns a TRL to a technology based on the lowest TRL assigned to any CTE of that technology. Based on the assessment, the overall TRL for WAO was 2 and the TRL for FBSR was 3. WAO was limited by the current lack of definition for the off-gas treatment system (TRL of 2). The FBSR Product Handling had little or no test work and therefore received the lowest score (TRL of 3) for the FBSR CTEs. In summary, both FBSR and WAO appear to be viable technologies for treatment of Tank 48H legacy waste. FBSR has a higher degree of maturity than WAO, but additional technology development will be required for both technologies. However, the Assessment Team believes that sufficient information is available for DOE to select the preferred or primary technology. Limited testing of the backup technology should be conducted as a risk mitigation strategy.

Harmon, Harry D↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Nuclear reactor melt arrest and coolability device

Example embodiments provide a Basemat-Internal Melt Arrest and Coolability device (BiMAC) that offers improved spatial and mechanical characteristics for use in damage prevention and risk mitigation in accident scenarios. Example embodiments may include a BiMAC having an inclination of less than 10-degrees from the basemat floor and/or coolant channels of less than 4 inches in diameter, while maintaining minimum safety margins required by the Nuclear Regulatory Commission.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

To The Biorefinery: Delivered Forestland and Agricultural Resources

It can be challenging and costly to transport biomass feedstock supplies from the roadside, or farmgate, to a biorefinery. Given the geographic dispersion and lowbulk density of cellulosic feedstocks, cost effective scaling of commercial biorefinery operations requires overcoming many challenges. The Biomass Research and Development Board’s Feedstock Logistics Interagency Working Group identified four primary barriers related to biorefinery commercialization: • Capacity and efficiency of harvest and collection equipment • High-moisture content leading to degradation of biomass • Variable biomass quality upon arrival at the biorefinery • Costly transportation options.1 Further, feedstock supply systems do not currently mitigate risks such as low crop yield, fire, or competition for resource use. Delivery and preprocessing improvements will allow for the development of a commercial-scale bioenergy industry that achieves national production and cost targets.

To The Biorefinery Factsheet↗

Drones in Automation - Secured Unmanned Aerial Systems

Factories, refineries, utilities (water/wastewater, electric) and related industrial sites are complex systems and structures with inspection and maintenance procedures required for optimal operation and regulatory compliance. As a specific example, consider just the bulk electric power system which is comprised of more than 200,000 miles of highvoltage transmission lines, thousands of generation plants and millions of digital controls. More than 1,800 entities own and operate portions of the grid system, with thousands more involved in the operation of distribution networks across North America. The interconnected and interdependent nature of the bulk power system requires a consistent and systematic application of risk mitigation across the entire grid system to be truly effective. Similar situations are found throughout automation where frequently an aging infrastructure is in place too. Consider, for example, the situation present in a refinery or chemical processing setting with the requirement for leak detection inspection of pipes, interconnects and systems stretching across the plant. The current practices and challenges relating just to this task - leak detection and repair (LDAR) – of detecting any fugitive emissions present and documenting all measurements thereby meeting air compliance regulations are typically “handled” by a small army of individuals with handheld or backpack-sized detectors who crawl through piping racks conducting measurements at each flange. Such work is performed in difficult conditions (temperature, humidity, physically challenging) with frequently a high level of employee turnover. Finaly, enter low cost sensors and mobile platforms – in other words unmanned aerial systems (UASs, or drones) with enhanced sensing capabilities.

24 POWER TRANSMISSION AND DISTRIBUTION↗

LBNF CMGC Delivery Method: ICE Process

The Construction Manager/General Contractor (CM/GC) delivery method is intended to benefit the design process, value engineering, risk mitigation, and schedule optimization while promoting construction and design innovation. This delivery method is particularly suited for complex projects that require significant consideration of contractor means and methods. Fermilab’s Far Site Conventional Facilities proceeded with a CM/GC delivery method to account for the unique conditions of excavating over 300,000 cubic yards of rock in tunnels and caverns that will be constructed approximately 5000-ft deep in the repurposed Homestake Mine in Lead, SD. The experiences of the Independent Cost Estimating (ICE) process are presented.

Pelletier, Douglas↗

Smart Ventilation Controls Boost Energy Efficiency and Indoor Air Quality

The average American household spends more than $2,200 a year on energy, and heating, ventilating, and air conditioning (HVAC) costs comprise nearly half of the bill. This is one reason why home builders focus on tightening building envelopes to save energy. Yet, limiting the potential for air exchange can negatively impact indoor air quality (IAQ). When outdoor conditions are most extreme during occupied periods, there may be comfort implications from continuing high levels of ventilation during associated weather events. This is true even with heat recovery. To mitigate risks, the Florida Solar Energy Center developed and tested approaches for “smart” ventilation system controls that enable more reliable design, installation, and operation to achieve desired IAQ while also minimizing energy and comfort impacts.

Building America↗

Smart Ventilation Controls Boost Energy Efficiency and Indoor Air Quality

The average American household spends more than $2,200 a year on energy, and heating, ventilating, and air conditioning (HVAC) costs comprise nearly half of the bill. This is one reason why home builders focus on tightening building envelopes to save energy. Yet, limiting the potential for air exchange can negatively impact indoor air quality (IAQ). When outdoor conditions are most extreme during occupied periods, there may be comfort implications from continuing high levels of ventilation during associated weather events. This is true even with heat recovery. To mitigate risks, the Florida Solar Energy Center developed and tested approaches for “smart” ventilation system controls that enable more reliable design, installation, and operation to achieve desired IAQ while also minimizing energy and comfort impacts.

30 DIRECT ENERGY CONVERSION↗

Progress in the Investigation of Nuclear Power Plant Cable Aging

The thousands of miles of polymer-insulated cables used for power, control and communications in nuclear power plants were originally qualified for forty years of plant operation. Continued use of cable in existing plants for periods much beyond their original qualified life will require a detailed understanding of cable degradation under plant operating conditions to assess and mitigate risk of continued use. The effect and relative importance of individual and combined environmental stresses including radiation, heat and moisture on reliable cable performance is essential to inform condition monitoring, lifetime prediction and required cable replacement planning. We present an overview and update of the nuclear cable aging program at the Pacific Northwest National Laboratory and the Oak Ridge National Laboratory supported by the U.S. Department of Energy, Office of Nuclear Energy, Light Water Reactor Sustainability program

Fifield, Leonard S.↗

BENCH-SCALE DEVELOPMENT OF A TRANSFORMATIVE MEMBRANE PROCESS FOR PRE-COMBUSTION CO 2 CAPTURE

This final technical report describes work conducted by Membrane Technology and Research, Inc. (MTR) for the Department of Energy, National Energy Technology Laboratory (DOE NETL) on development of the second generation (Gen-2) Proteus™ membrane modules and a pre-combustion membrane process for carbon dioxide (CO 2 ) capture from an Integrated Gasification Combined Cycle (IGCC) plant for power generation (award number DE-FE0031632). The work was conducted from October 1, 2018 through March 30, 2022. The overall goal of this project was to bring a Gen-2 version of the H2-selective Proteus membrane to bench-scale module (component) testing with real syngas. MTR was assisted in this project by Susteon, a technology development company with extensive experience in gasification processes, and the University of North Dakota Energy & Environmental Research Center (EERC), who provided the host site for the slipstream field testing. This report details the work conducted to optimize the Gen-2 Proteus membrane and develop modules capable of operation at 200°C; demonstrate membrane module performance processing coal-derived syngas during a field test at EERC; and optimize integration of a dual-membrane process into an IGCC with carbon capture. Work for this project included membrane optimization and scale-up, module component screening and fabrication of high-temperature lab- and bench-scale modules, design and fabrication of a bench-scale field test membrane skid, operation of the field test skid processing coal-derived syngas at EERC, and a detailed techno-economic analysis (TEA) of the MTR dual-membrane process for IGCC power plant pre-combustion CO 2 capture. This project validated recent membrane technology advancements, mitigates risk in future scale-up activities, and moved the membrane pre-combustion capture technology from TRL-4 to TRL-5. Key results for each major task are discussed in the report.

10 SYNTHETIC FUELS↗

PROGRESS IN THE INVESTIGATION OF NUCLEAR POWER PLANT CABLE AGING

The thousands of miles of polymer-insulated cables used for power, control and communications in nuclear power plants were originally qualified for forty years of plant operation. Continued use of cable in existing plants for periods much beyond their original qualified life will require a detailed understanding of cable degradation under plant operating conditions to assess and mitigate risk of continued use. The effect and relative importance of individual and combined environmental stresses including radiation, heat and moisture on reliable cable performance is essential to inform condition monitoring, lifetime prediction and required cable replacement planning. We present an overview and update of the nuclear cable aging program at the Pacific Northwest National Laboratory and the Oak Ridge National Laboratory supported by the U.S. Department of Energy, Office of Nuclear Energy, Light Water Reactor Sustainability program.

cable, insulation, polymer, EPR, XLPE, aging, degr↗

Solar Photovaltaics Durability and Resilience - A Win-Win

Solar photovoltaics (PV) will play a crucial role in decarbonizing the electrical grid and limit the effects of detrimental climate change. Long lifetimes of PV installations are a win-win situation, as it not only reduces carbon emissions directly through avoidance of fossil fuel emissions but also indirectly, as it reduces the demand of needed materials and potentially recycling. However, during their decades-long lifetime expectations installations are also more commonly exposed to extreme weather events. Building durable solar system to withstand extreme weather events is essential in the electrification of the economy and will save lives, particularly when they power critical infrastructure such as hospitals. As more PV is installed in regions prone to extreme weather events, high-quality materials, installation and monitoring practices can mitigate risk. Evaluating resilience requires combined computational, analytical, and experimental capabilities that are best leveraged by teams working across multiple disciplines.

durability↗

Characterization of the Aerosol Source Term in Dry Storage Canisters

As long-term dry storage of used nuclear fuel at independent spent fuel storage installations (ISFSI) trends toward the de facto back end of the US fuel cycle, it becomes appropriate to investigate potential degradation and dispersion scenarios for suitable risk mitigation purposes. Pitting and subsequent stress corrosion cracking of the canister wall is currently viewed as a potential scenario leading to a through-wall pathway for contamination to be transferred from within the storage container to the surrounding environment. While stress corrosion cracking measurements are currently underway to further characterize this scenario, a parallel effort endeavors to perform a consequence analysis of conditions in which through wall cracks are indeed formed. This effort consists of engineering scale modeling using the GOTHIC and MELCOR software packages along with experimental depletion and penetration tests.

spent fuel storage, aerosol deposition, Stress Cor↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development: Preprint

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

Global recycling services for short and long term risk reduction

New schemes are being developed by AREVA in order to provide global solutions for safe and non-proliferating management of used fuels, thereby significantly contributing to overall risks reduction and sustainable nuclear development. Utilities are thereby provided with a service through which they will be able to send their used fuels and only get returned vitrified and compacted waste, the only waste remaining after reprocessing. This waste is stable, standard and has demonstrated capability for very long term interim storage. They are provided as well with associated facilities and all necessary services for storage in a demonstrated safely manner. Recycled fuels, in particular MOX, would be used either in existing LWRs or in a very limited number of full MOX reactors (like the EPR reactor), located in selected countries, that will recycle MOX so as to downgrade the isotopic quality of the Pu inventories in a significant manner. Reprocessed uranium also can be recycled. These schemes, on top of offering demonstrated operational advantages and a responsible approach, result into optimized economics for all shareholders of the scheme, as part of reactor financing (under Opex or Capex form) will be secured thanks to the value of the recycled flows. It also increases fuel cost predictability as recycled fuel is not subject to market fluctuations as much and allows, in a limited span of time, for clear risk mitigation. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Alternative D and D Planning Tool - 12466

On August 1, 2011, URS - CH2M Oak Ridge LLC (UCOR) began cleanup of the East Tennessee Technology Park (ETTP). UCOR's $2.2 billion contract has an initial five-year term and a four-year option period for completing the cleanup of ETTP and performing surveillance and maintenance and waste management operations at both the Oak Ridge National Laboratory and the Y-12 National Security Complex. ETTP D and D work includes disposition of large, complex, contaminated, Manhattan Project-era facilities such as the K-25 and K-27 uranium enrichment facilities. At ETTP, UCOR views the D and D process as a 'Waste Factory' with waste production lines from the point-of-generation to the point-of-disposal. Safely transforming vertically-standing buildings into horizontally-lying waste in a disposal facility is the primary cleanup objective. Whereas a factory produces widgets, D and D produces waste-lots of waste. In support of the Waste Factory view, UCOR is developing a systems planning tool to help better plan how to effect cleanup by improving waste planning, uniting waste generator with waste dis-positioner, and represent the 'waste factory' in a computer model that allows the D and D and waste management teams to better understand available disposal paths, waste uncertainties and potential consequences, driving variables, and sensitivity to changes. Any model of reality represents a compromise. Part of the Waste Factory Model's value may be in providing standardization and relative direction for assisting decision making as opposed to absolute cost or schedule answers. From that relative direction, management can commission detailed planning and estimating. Also, the model's output credibility is tied directly to its input quality. That is why, as discussed above, the Waste Factory Model's key informational component will be the standardized waste streams (e.g., Structure/Debris disposed at EMWMF) and associated standardized unit costs. The model development process generally, and the development team's collaboration, specifically, is most important. Building-in this integrity up-front, transparently, will help ensure that the model outputs are known, understood, and credible (no mysterious 'black-box' components). The Waste Factory Model is envisioned to help improve understanding of a given project's waste implications; help reveal and suggest the important few variables out of the trivial many; reveal likely process bottlenecks, and help focus risk mitigation and assumption management efforts to better manage the projected total cost. In the long term, the UCOR team's goal is to incorporate an information feedback loop to help improve the accuracy of key model attributes, such as the standardized cost information. This way, by design, the model output should improve over time and thus help the model mature into both a credible scenario tool and a standardized project planning resource. The initial model capabilities may be narrow, but with time and effort it may prove to be a timely and cost-effective tool. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Historical Pattern Analysis of Global Geothermal Power Capacity Development

Between 1913 and 1958, Italy was the only country with an operational geothermal power plant until New Zealand installed its first plant in 1958. At present, 24 countries are involved in the geothermal power market, and they have a combined installed capacity of 16,127 GW. This study analyzes the historical patterns of geothermal power capacity in the world and in individual countries to investigate the ideal global geothermal development pattern by examining the annual cumulative capacity (ACC) and the annual capacity addition (ACA) graphs of the historical development of geothermal power capacity in 24 countries. First, the global patterns are analyzed using these graphs in five periods (1945-1957, 1958-1976, 1977-1991, 1992-2002, and 2003-2020) that are marked by a series of characteristics of ACA peaks separated by two major troughs. Then, five characteristic patterns are developed in five periods globally. These patterns correspond to the early-stage linear, the first acceleration, the first steady-state linear, the second acceleration, and the second steady-state linear developments. A positive relationship exists between global patterns and the 5-year shifted oil-price curve: two major factors influenced global development: 1) increasing oil prices and increasing awareness of global climate change, and 2) global development of geothermal power. Last, we investigate these patterns in each country. The top ten countries, which comprise 93.3% of the world's total installed capacity are separated into five groups based on the availability and characteristics of patterns globally developed in five periods. Group-1 (the United States) has an installed capacity of 3,794 MW, Group-2 (Mexico and Philippines) 963-1935 MW, Group-3 (New Zealand, Italy, Iceland, and Japan) 601-1,037 MW, and Group-4 (Indonesia, Kenya, and Turkiye) 944-2,356 MW. The remaining 14 countries (6.7%), which are called Group 5, are still in an immature stage and have installed capacities of 7-262 MW and are not involved in pattern analysis. Overall, geothermal power in the world is in its third stage of development, which had its peak development after 1977. A fourth development peak may be expected to occur after this through business-as-usual cases. The biggest barrier to the development of the global geothermal power market is the risk associated with exploration and drilling. If risk mitigation systems and funds are employed, the growth of geothermal power production projects could accelerate.

GEOTHERMAL ENERGY↗

The DISTINCTIVE University Consortium: Structural Integrity - 18272

The Engineering and Physical Sciences Research Council (EPSRC) sponsored DISTINCTIVE consortium (Decommissioning, Immobilisation and Storage Solutions for Nuclear Waste Inventories) is developing technologies for civil infrastructure repair, in-situ subsurface waste immobilisation, and groundwater protection during construction and decommissioning. The consortium has contributed to the development of skilled cross-disciplinary civil engineers and scientists, that have the knowledge and experience required to develop engineering solutions tailored for application within radiologically contaminated sites. The Structural Integrity Theme focuses on challenges ranging from site-scale infrastructure preservation and restoration, through injectable ground barriers for risk mitigation, to the remote characterisation and handling of individual waste packages. The main aim of the theme is to develop novel engineering solutions, tailored for use on radiologically contaminated sites, for: ground protection; infrastructure characterisation; concrete restoration and waste characterisation. Technologies should minimise current, and future, radiation exposure of the workforce whilst providing economically viable engineering solutions. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗