At least 937 records · Page 52

RG217 V2-V2 Coaxial Cable Soldering Procedure

The ECSE Solid State Pulsed Power unit is a high-current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the soldering procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This soldering procedure describes the process used to solder cable tips properly onto the cable center conductor.

42 ENGINEERING↗

RG217 V2-V2 Coaxial Cable Assembly Procedure

The ECSE Solid State Pulsed Power unit is a high-current, high power solid-state pulse modulator. The RG217 V2-V2 Coaxial Cable Assembly is the interface cable between the Solid State Pulser and the load. This document covers the assembly procedure for the RG217 V2-V2 Coaxial Cable Assembly. This assembly is comprised of RG217 Coaxial Cable with a LRU Connector on either end. This assembly procedure describes the process used to install cable connectors properly onto the cable.

42 ENGINEERING↗

Leveraging Environmental Monitoring Results from Department of Energy Sites for Research on the Food-Energy-Water Nexus

The Annual Site Environmental Report (ASER) from a U.S. Department of Energy (DOE) Site summarizes environmental data; environmental management performance; compliance with applicable DOE, federal, state, and local regulations; and restoration and surveillance monitoring programs. The Savannah River Site (SRS) produces ASERs that include results of monitoring mercury levels in fish samples obtained in the vicinity of SRS. Mercury is a toxic trace metal and the methylated organic form is a neurotoxin that bioaccumulates in the food web, endangering humans and other organisms. In United States, power plants are the largest source of mercury emissions. Research Objective: To determine the patterns of mercury levels in fish samples reported in the SRS environmental monitoring reports. We developed box plot visualizations to make sense of the data as well as identify fish species, dates and location with outlier mercury content. The integration and visual representation of multi-year datasets can support decision making processes on environmental compliance and environmental sustainability conducted at U.S. DOE Sites. We are constructing datasets from textual, image and multivariable data sources in the multi-year ASERs of the U.S. DOE Savannah River Site (SRS https://www.srs.gov/general/pubs/ERsum/index.html). The Fish Surveillance for mercury presents a case study for the intersection of food, energy and water systems. The dataset of 864 records (2008 and 2009) of mercury levels includes water location of fish, fish species, collection date and mercury content of fish sample. The patterns of mercury levels in the fish species as well as locations provide knowledge for further investigations. A research area for future studies is the composition of microbial communities in fish guts of varying levels of mercury.

54 ENVIRONMENTAL SCIENCES↗

PV Systems Reliability and Outreach

The project purpose was to collaborate with the Electric Power Research Institute (EPRI) to reach out to the photovoltaic (PV) industry to cooperate, collaborate and facilitate establishment and access to PV plant data for use in the Photovoltaic Reliability Operations and Maintenance (PVROM) database. Sandia National Laboratories (SNL) and EPRI conducted this outreach to expand and accelerate the implementation of PVROM by gathering more data for analyzing trends, with a goal of accelerating the adoption of PV systems as a primary power generation source in the United States. SNL and EPRI analyzed the data from the PVROM database to assess industry trends in operations and maintenance (O&M) and develop guidelines for the industry. More specifically, this project was intended to leverage SNL’s expertise in PV plant reliability data collection and analysis, with data sharing partners that own or operate PV systems who wanted to learn about rigorous reliabilitybased data collection to track issues over time and improve O&M activities. The partnership also worked to host multiple workshops as part of the SNL/EPRI PV Systems Symposium to gather industry feedback on O&M process improvement and data standards, and share insights learned from the collaboration between SNL and EPRI in the area of PV system reliability. Additional outreach included multiple ‘expert elicitation’ interviews led by EPRI to gather best practices and paths forward for improving/standardizing PV plant O&M and asset management practices. Technical accomplishments included further development of the PVROM database process, sharing best practices for reliability data collection and improving industry understanding of existing O&M practices, important knowledge, and new and novel techniques for benefitting EPRI utility partners and the broader PV industry. Improved reliability at a PV power plant leads to a lower levelized cost of energy (LCOE), which is reflected most directly in its operating expenses. Electric utilities that utilize PV as a larger share of plants they own and operate are interested in having a high degree of availability or ‘uptime’, similar to other power generation sources in their service area. Having low cost, reliable PV generation can lead to fewer costs that need to be recovered by the utility over the lifetime of the power plant, and less regulatory uncertainty when considering bulk transmission and distribution system reliability. The public and taxpayers benefit by the electric utility passing through lower electricity costs.

14 SOLAR ENERGY↗

Improving Transparency in Electric Distribution System Planning to Support Affordability [Slides]

This resource identifies opportunities for communities to participate in the distribution system planning process to achieve their energy goals, including affordability. It begins with background information on the distribution system and distribution system planning, and then focuses on topical areas where communities could focus their engagement (e.g., non-wires alternatives, DER forecast, scenario analysis). The report concludes with illustrative examples of how communities have engaged in distribution system planning. The appendix provides procedural guidance on engagement in utility planning processes.

24 POWER TRANSMISSION AND DISTRIBUTION↗

A real-time multiphysics model of a pressurized solid oxide electrolysis cell (SOEC) for cyber-physical simulation

Solid oxide electrolysis cells (SOEC) can play important roles in integrated energy systems (IES) as the hydrogen production hub and the resilience energy hub. When tied to a microgrid with high renewable penetration, the SOEC is subjected to rapid load transitions in response to the intermittent renewable generations that occur not only in diurnal cycles but also in short timeframes (e.g., sub-minute). The cyber-physical simulation approach can derisk operability research but requires a real-time dynamic SOEC model. In the present work, a real-time multiphysics model for pressurized SOEC is developed and validated in the pressure range from 1.4 to 8bar. Further, the accuracy of the single repeating unit (SRU) assumption in SOEC stack simulation is quantified. A guidance of more than 45 cells in one SOEC stack is recommended to safely apply the SRU assumption. Modeling results suggest that at a given current density, more power is consumed by SOEC at elevated operating pressures. The anode air and cathode stream have major impacts on thermal management, highlighting the potential benefit of integrating SOEC with other thermal processes in IES. To achieve high hydrogen production efficiency, the SOEC could operate at the maximum endothermic point to maximize the use of thermal energy. The real-time execution of the developed SOEC model is also demonstrated, which only takes 0.1% of the fixed time step of 5ms. The developed model establishes the basis for cyber-physical simulation of SOEC hybrid systems.

25 ENERGY STORAGE↗

Valorization of waste polyolefins to butene, unsaturated fatty alcohols, and branched alkenes using CO 2 and plasma catalyst

Butene, branched alkenes, and short-chain unsaturated fatty alcohols are among the chemicals that have a wide range of industrial applications in the production of fuels, chemicals, and polymers. In this work, we produced these valuable commodity chemicals from waste plastics using a single-step plasma-catalytic process at atmospheric pressure CO 2 . The study shows that combining non-thermal plasma and zeolite could convert polyolefins at a temperature of 200 °C within 15 minutes, producing liquids rich in C 5 and C 6 branched alkenes and C 6 -C 8 unsaturated fatty alcohols. Additionally, gaseous products include a high yield of butene. Comparative studies indicate that combining CO 2 plasma with zeolite synergistically increases reaction rates and alters product compositions. Product selectivity was strongly dependent on reaction conditions, including plasma power, gas flow rates, reactor temperature, and catalyst loading. Furthermore, this process was applicable to common polyolefins and post-consumer polyethylene, indicating that the plasma catalytic approach has promising potential to valorize waste plastics and greenhouse gas CO 2 into versatile chemicals.

42 ENGINEERING↗

Life Cycle Assessment and Techno-Economic Assessment of Lithium Recovery from Geothermal Brine

Lithium-ion batteries (LIB) play an essential role in the electrification of the transportation sector, and battery demand for lithium compounds will see a significant increase in the coming decades. This has raised concerns on the supply of lithium, and as a result, technologies are being developed to process unconventional lithium sources. One promising technology is to extract lithium from geothermal brine using lithium-aluminum-layered double hydroxide chloride (LDH) sorbent and forward osmosis. A combined life cycle assessment (LCA) and techno-economic assessment (TEA) is conducted to evaluate the environmental and economic performance of this technology. It is assumed that the lithium extraction unit is an add-on to a 50 MW geothermal power plant located in California. The analysis is based on lab-scale experimental data and stoichiometry while considering the economy of scale for an industrial system. LCA results suggest that, compared with conventional LiOH and Li 2 CO 3 production pathways, the new technology achieves 1–95% reduction in environmental impacts. Even higher reduction can be achieved for LiOH produced via electrolysis. This add-on unit for lithium extraction could achieve a payback period of less than 1 year and reach net present values of $454M and $315M and internal rates of return of 792 and 1130% for LiOH and Li 2 CO 3 production pathways, respectively. The favorable environmental and economic performance suggests that LDH sorption coupled with forward osmosis has great potential to enable the domestic production of battery lithium compounds and that further development should be carried out.

15 GEOTHERMAL ENERGY↗

Indirect, dual-media, phase changing material modular thermal energy storage system

Design, validate at prototype level, and then demonstrate a full size, 800 MWht Thermal Energy Storage (TES) system based on Phase Changing Material (PCM) TES modules with round trip efficiency in excess of 93%. The PCM TES module would be the building block of a TES system which can be deployed at costs inline with the DOE benchmark of 2020. The development of a reliable, unsophisticated, modular, and scalable TES system designed to be massmanufactured utilizing advanced automated fabrication and assembly processes and field installed in the most cost-effective configuration could facilitate the attainment of a Levelized Cost of Energy (LCOE) of $.07/kWh by 2015. It was believed that the DOE targets can be attained by finding the best combinationTES module size, its optimal integration in the power cycle, and readily available PCM. Work under this project ultimately focused on the development and performance evaluation of a 100kWht prototype heat exchanger. The design utilizes a commercially available heat exchanger product to create a unique latent heat PCM storage module. The novel ideal associated with this technology is the inclusion of an agitation mechanism that is activated during the discharge process to improve heat transfer. The prototype unit did not meet the performance goals estimated through modeling, nor did the estimated costs of the system fall in line with the goals established by DOE.

14 SOLAR ENERGY↗

RISMC Advanced Safety Analysis Project Plan – FY 2015 - FY 2019

In this report, a project plan is developed, focused on industry applications, using Risk-Informed Safety Margin Characterization (RISMC) tools and methods applied to realistic, relevant, and current interest issues to the operating nuclear fleet. RISMC focuses on modernization of nuclear power safety analysis (tools, methods and data); implementing state-of-the-art modeling techniques (which include, for example, enabling incorporation of more detailed physics as they become available); taking advantage of modern computing hardware; and combining probabilistic and mechanistic analyses to enable a risk informed safety analysis process. The modernized tools will maintain the current high level of safety in our nuclear power plant fleet, while providing an improved understanding of safety margins and the critical parameters that affect them. Thus, the set of tools will provide information to inform decisions on plant modifications, refurbishments, and surveillance programs, while improving economics. This set of tools will also benefit the design of new reactors, enhancing safety per unit cost of a nuclear plant. The proposed plan will focus on application of the RISMC toolkit, in particular, solving realistic problems of important current issues to the nuclear industry, in collaboration with plant owners and operators to demonstrate the usefulness of these tools in decision making.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

United States–Brazil Joint Study: A Preliminary Assessment of Opportunities and Challenges for Small Modular Reactors in Brazil

This report supplies the technical information to enable a broader understanding of different technology choices for nuclear reactors in Brazil. The assessment characteristics of this process include reactor technology, economic costs for deployment, and regulatory analyses of small modular reactors, advanced reactors, and microreactors. The analysis documented in this report provides economic and technological information to assist Brazil, whose official indicative scenarios show an increase in operating nuclear power from 2 Gigawatt in 2022 to 8–10 Gigawatt by 2050, in policy making and long-term energy planning. To protect company proprietary information, the information in this report was limited to publicly available information and therefore can only inform preliminary reactor technology assessments. This report does not recommend or endorse any specific reactor developer or technology.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Process Design and Techno-Economic Analysis of the Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Biomass

This work describes the process design and techno-economic analysis (TEA) of the modular stage pressurized oxy-combustion (SPOC) power plant for biomass firing and coal-biomass co-firing. The SPOC process was modelled using Aspen Plus®, and largely based on a previous model designed by this group for SPOC coal firing. To enable comparison with current National Energy Technology Laboratory (NETL) Bio-Energy Carbon Capture and Storage (BECCS) studies, a 550 MWe SPOC power plant with a supercritical Rankine cycle (241 bar, 593°C, and 593°C), and 90% carbon capture was modeled, and hybrid poplar biomass was chosen. Two cases were evaluated, namely 100% biomass (carbon negative) and 25% biomass co-firing (carbon neutral), and the 100% Powder River Basin coal firing case was chosen for comparison purposes. In the SPOC process, oxygen is produced via a cryogenic air separation unit (ASU) and the heat generated from the compression of air is integrated into the steam cycle and utilized for boiler feed water regeneration. Unique to the SPOC process, the boilers are arranged in a series-parallel configuration, with minimized flue gas recirculation. The flue gas is cooled and scrubbed in the direct-contact cooler (DCC) column, and the water leaving the bottom of the DCC is at a sufficiently high temperature that it can be used for boiler feed water heating, improving plant thermal efficiency. The SPOC efficiencies were above the BECCS cases with capture, and no efficiency penalty on the SPOC plant was observed with an increase of biomass in the mix mostly due to the higher oxygen content in biomass that resulted in lower oxygen requirement from the ASU, and the higher moisture in biomass that due to the key benefit of the SPOC process can be partially recovered as latent heat.

Magalhaes, Duarte↗

Results of Absolute Cavity Pyrgeometer (ACP), InfraRed Integrating Sphere (IRIS), and Atmospheric Emitted Radiance Interferometer (AERI) Comparisons and CIMO Recommendations

Presenting results of five comparisons between ACPs and IRISs and the difference between the longwave irradiance measured by the ACPs and IRISs versus the average irradiance measured by the WISG. The process of CIMO recommendation to establish the world reference for measuring the atmospheric longwave irradiance with traceability to the International System of Units (SI) is also presented.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Formulations and Valid Inequalities for Optimal Black Start Allocation in Power Systems

The restoration of a power system after a blackout starts around units with enhanced technical capabilities, referred to as black start units (BSUs). We examine the planning problem of optimally allocating these units on the grid subject to a budget constraint. We present a mixed integer programming model based on current literature in power systems. Binary variables are associated with the allocation of BSUs and with the energization state of buses, branches, and generators of the power system over a time horizon. We extract a substructure of the feasible region which imposes the requirement that each island that appears during the restoration process must have at least one operational generator. We discuss three equivalent reformulations for this requirement. We introduce a family of exponentially many, polynomially separable, valid inequalities to strengthen the formulation. Under simplifying assumptions, we show that the convex hull of the feasible region is a full-dimensional polyhedron, and prove that some of the constraints we introduced are facet-defining. We perform experiments to examine the difference in strength between the formulations as well as the computational times to solve the problem to near optimality for synthetic instances of the IEEE-39, IEEE-118, Illinois-200, WECC-225, IEEE-300, South Carolina-500, and Texas-2000 power systems. We illustrate a use case of the model. We conclude by suggesting extensions of the current work for future research.

Black Start Allocation↗

Estimation of Radiation Source Terms of Hanbit Unit3 Spent Fuel with Realistic Spent Fuel Data - 19043

Besides public acceptance, the construction of the dry storage facilities requires a sophisticated safety analysis for licensing, which needs accurate estimation of radiation source terms including the spent fuel inventories. In this work, we estimated the characteristics such as heat generations, radiotoxicities, and radioactivities of spent fuels discharged from HanBit Unit 3 using the recent realistic data of the spent fuels including detailed operational histories. The estimation was performed by writing an in-house program which automatically generates ORIGEN-S input files and processes their output files. Also, we performed the evaluation of source terms using these spent fuel assemblies. In particular, these results are compared with those obtained using a simple way with a single specific power and no cooling time between successive cycles. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Decontamination of urban surfaces contaminated with radioactive materials and consequent onsite recycling of the waste water

Enhancing rapid remediation strategies is paramount for recovery after a large-scale nuclear contamination event in an urban environment. Some current strategies recommend use of readily available equipment, materials, and facilities to expedite recovery. For example, applying pressurized water to contaminated surfaces may effectively remove radioactive contamination. In this study, a commercial power washer removes soluble forms of 152 Eu 3 + , 85 Sr 2 + , and 137 Cs + contamination from common porous building materials, and computer simulations characterize the recycling of the resultant contaminated wash water. Pressure washing the porous building materials under spray conditions typical with do-it-yourself units improved decontamination factors (DFs) for 152 Eu compared to low-pressure application of tap water (majority of two-tailed t-test p-values < 0.1), but pressure did not improve DFs for 137 Cs or 85 Sr. For both pressurized and low-pressure applications, adding potassium ions (K + ) to promote ion exchange reactions produced significantly higher DFs for tested radionuclides on asphalt, brick, and concrete. The resultant contaminated wash water can be processed through self-prepared chemical filtration beds of clay and sand. Modeled in a prior study, the beds yielded linear trends (R 2 > 0.98) in sensitivity analyses between most bed configuration variables and bed performance variables, permitting flexible ad-hoc bed design. The experimental and simulation results led to estimates of the remediation rate and waste generated after cleaning 250 m 2 of cesium-contaminated concrete from the combined deployment of a power washer and two different mobile treatment beds. Furthermore, the first treatment bed was designed to reduce treatment time and processed 1900 L of wash solution in 70 min using 880 kg of clay/sand infill material. Designed to reduce the solid waste generated, the second bed processed the same solution volume in 1040 min (17 h) using 170 kg of clay/sand infill material. The results of this analysis warrant further investigation of power washing with recycled salt solution as an effective rapid decontamination method with manageable waste.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Field Validation of Thermoelectric Generation System at Holcim Cement Plant in Alpena, Michigan

Executive Summary Project Background The Industrial Technology Validation (ITV) program aims to identify and demonstrate the performance of new, emerging, and underutilized energy-saving technologies in the industrial sector to help inform decisions to help accelerate their commercialization and deployment, as well as to help make industries more competitive. This ITV demonstration evaluated a thermoelectric generation (TEG) technology at a cement plant, aiming to reduce energy demand in the cement industry. A median cement plant consumes 5.73 million British thermal units per ton of clinker production (resulting in 0.838 metric tons of carbon dioxide [CO₂] emissions per ton of clinker) (Boyd and Zhang 2011, EPA 2021), equivalent to approximately 6.9 trillion British thermal units (TBtu) per year in energy consumption at a cement plant producing 3,300 tons of clinker per day.¹ Collaborating with Holcim, Advanced Thermovoltaic Systems (ATS) developed and deployed a pilot-scale thermoelectric power system to efficiently capture and convert waste heat to electricity. The system leverages the Seebeck effect to convert temperature differences on two sides of semiconductor cartridges into electrical power (ScienceDirect, n.d.). This generation is realized with minimal moving parts compared to existing waste-heat-to-generation solutions and allows capture from heat sources with temperatures as low as 150°C. This project aimed to validate a scalable solution applicable for capturing medium-temperature waste heat, including ambient losses from other high-temperature processes, and high-temperature sources less suitable for other waste-heat-to-power solutions. By recovering this otherwise wasted heat, this project intends to validate improvements to overall process efficiency through reduction in purchased electricity, thereby reducing operational costs while enhancing resiliency and competitiveness. Description and Scope This study evaluated the performance of a TEG system from ATS as a solution to convert waste heat into useful power at a Holcim cement plant in Alpena, Michigan. This plant is a fully integrated cement plant that has been operating since 1907. The facility operates continuously (24/7/365) with approximately 250 employees and five long dry kilns, yielding a total production capacity of 7,852 tons of cement per day (EPA 2023). Currently, the Alpena plant uses waste heat boilers to convert waste heat from the exhaust of each kiln into steam, which drives steam turbine generators. The ATS TEG is being evaluated for its potential to supplement the steam turbines by capturing the remaining lower grade heat. This technology is also being considered for other Holcim plants where steam turbines are not a viable option. ATS installed a pilot-scale TEG unit with an array of 582 individual thermoelectric semiconductor cartridges, of which 573 were operational. The cartridges are sandwiched between 48 hot plates and 49 cold plates. Each cartridge is designed to generate 20 watts (W) of gross power at a hot-side temperature of 240°C and cold-side temperature of 20°C. As such, the total gross generation capacity of the installed system is 11.5 kilowatts (kW) at design conditions. The system configuration for the evaluation was designed to prioritize convenience of installation and minimize disruption to production at the site, while ensuring that the heat required can be obtained for evaluating the TEG system at various operational conditions. To accomplish this, a portion of the steam supplied to Alpena’s steam turbine generation system was diverted to be used as the heat source for the TEG system, while water was supplied to the cold side of the system from nearby Lake Huron. This configuration was designed for the evaluation of the pilot-scale system to assess the performance at different conditions. A commercial-scale system will likely vary from the pilot system depending on typical configurations, including both scale and application. Future commercial applications of the ATS system would involve integrating the system into the exhaust from kiln preheaters, clinker coolers, or radiant heat capture from kiln shells for the heat source. For the cold source, a range of cooling solutions can be considered, including a mechanical cooling system, depending on the location and the application. To increase the generation capacity for commercial applications, the technology provider is working toward developing a commercial-scale TEG system, which would combine multiple TEG units (each similar in design to the pilot system) together. The scope of this evaluation includes the pilot-scale TEG system and all impacted equipment including pumps, controllers, and power handling equipment. Study Objectives The evaluation's goal was to assess the potential of the ATS TEG system to generate useful electrical power by capturing waste heat from cement production kilns. The objectives of this study are to evaluate and verify the following claims made by ATS regarding the pilot-scale system installed at the Holcim Alpena plant. The following design parameters and claims are also outlined in Table ES- 1 and Table ES- 2: • Gross Power: The thermoelectric system converts heat into power to create gross power, the total measured power generated by the system. The 573 active cartridge pilot-scale system is expected to generate 11.5 kW of gross power at the designed hot-side temperature of 240°C and cold-side temperature of 20°C. Power production is dependent on the temperature difference between the heat source (ultimately from the waste heat) and cold temperature supply source. • Net Power: The net power is the total usable power provided to the site by the TEG system after deducting parasitic power loads from the gross generated power. Supplementary equipment is required to operate the TEG system including pumps, controllers, and, in certain anticipated applications, mechanical cooling, which introduce parasitic loads to system operation. After deducting the parasitic loads from the gross power generation, ATS anticipates achieving a net power generation of 7.5 kW from the pilot-scale system. • Thermal Efficiency: The thermal efficiency is the percent of the total heat transferred to the TEG system that is converted to gross power. Historically, TEGs have a thermal efficiency of 2%–5% (DOE 2008). Prior industrial-scale TEG systems, such as the E1 TEG offered by Alphabet Energy, operated at an efficiency of 2.5% (Lamonica, 2014). ATS anticipates achieving an average efficiency of 4.8% or higher in converting heat energy to usable electricity. • Cartridge Performance: The TEG system comprises 573 active individual semiconductor cartridges, each of which generates a portion of the total power. Cartridge optimization and selection is an important design consideration for potential future TEG system design performance. Therefore, understanding the distribution of gross power and efficiency within the pilot system is vital to understanding what is achievable. At a design hot-side temperature of 240°C and cold-side temperature of 20°C, ATS anticipates a cartridge performance of 20 W of gross power per cartridge at an efficiency of 4.8% per cartridge. In addition to evaluating the claimed performance of the TEG pilot-scale unit, the study estimated the potential annual impacts of a scaled-up commercial system used to capture kiln waste heat over annual operations. The evaluation estimated the gross and net annual electric generation achievable by capturing heat from the two proposed tap-in points: the kiln exhaust and the clinker cooler exhaust; see Section 2.1 for details. Two use cases were examined: • Holcim Alpena: The Holcim Alpena site consists of long dry kilns with superheater boilers, which differs from the rest of Holcim’s cement plant portfolio and results in lower waste heat temperatures. The study estimates gross and net annual generation using the superheater boiler exhaust and clinker cooler exhaust, based on 2023 operational data. • Typical Installation: Common cement plants have preheater kilns with higher exhaust temperatures than Holcim Alpena across a range of production rates. The study estimates gross and net annual generation using the preheater exhaust and clinker cooler exhaust, with a sensitivity analysis to account for the typical range of preheater exhaust temperatures, clinker cooler exhaust temperatures, and clinker production rates. Methodology The evaluation methodology followed a measurement and verification (M&V) strategy based on the International Performance Measurement and Verification Protocol Option B through comprehensive measurements and analyses of the affected systems. Evaluation data was collected from March 9 to March 11, 2024, the test period of the pilot TEG system. During the test period, in coordination with the ITV team, the ATS team adjusted system operations to capture the range of variability expected for each of the variables pertinent to performance of the system. The methodology consisted of two parts: evaluating the performance of the pilot unit's TEG system and estimating the annual TEG impact in terms of gross and net power based on a given waste heat profile. First, the evaluation of the thermoelectric generation performance of the pilot unit relative to the claims was performed by analyzing the collected test data. Gross power of the pilot TEG system was directly measured. Net power was determined by deducting the measured parasitic power from the gross power. The gross power generation was compared to heat transferred to the system by the working fluid (which was heated by steam generated from the kiln waste heat) to calculate the thermal efficiency achieved by the system. Performance of individual semiconductor cartridges within the pilot array was also assessed in terms of measured gross cartridge power and calculated cartridge thermal efficiency. The second part of the evaluation estimated the annual TEG impacts in terms of gross power and net power (calculated from the difference between gross power and parasitic power). This analysis comprised development of mathematical regression models for gross power and parasitic power, with assessment of each model’s goodness-of-fit characteristics to ensure satisfaction of statistical requirements. The models predicted the gross power generation, the parasitic load based on the temperature difference between the hot working fluid and the cold-side fluid (cold water from Lake Huron) entering the system, the volumetric flow rate of the cold-side fluid at the inlet, and the volumetric flow rate of the hot working fluid at the inlet. The annual impact analysis considered a theoretical commercial-scale system sized to capture the available waste heat at a cement plant, consisting of linked pilot-scale units that receive heat from a theoretical gas-to-working-fluid heat exchanger. To estimate annual impacts at the Alpena plant, the gross power and parasitic power regression models were applied to the arrays in the theoretical commercial-scale system. The heat supplied to the unit was calculated based on the kiln run time, annual production, kiln exhaust waste heat, and clinker cooler waste heat derived from 2023 Holcim Alpena kiln operational data. Net power impacts were calculated by deducting the resulting parasitic power from the estimated gross power. Inputs for the model were generated from a combination of hourly data, assumed design considerations for TEG system scale-up from the pilot-scale unit, and assumptions regarding TEG system operations. This analysis was then used as the basis for estimating annual impacts of typical TEG installation at cement plants, by applying sensitivity analyses to key kiln operational characteristics including kiln preheater exhaust temperatures, cooler clinker exhaust temperatures, and plant daily production rates across a range of expected values. Project Results/Findings Table ES- 2 and Table ES- 2 provide a summary of the operating conditions and evaluation results compared to the stated claims from the technology provider. Key takeaways include: • Gross Power: The peak gross power achieved during the testing period was 10.0 kW, compared to the 11.5 kW expected for 573 active cartridges. The claimed gross power was associated with a target hot side of 240°C; however, the system only received a maximum hot-side mean plate temperature of 212°C during the testing period. • Net Power: The pilot-scale unit exceeded the claims for net power, achieving a peak of 7.7 kW net compared to a claim of 7.5 kW. One factor contributing to the higher achieved net power is the relatively high water pressure available through Lake Huron. The pilot TEG system did not require cold-side pumps during the test, whereas most installations would. This reduced the parasitic loads on the system, ultimately contributing to higher net power relative to the gross power. • Thermal Efficiency: The pilot-scale unit outperformed the claimed efficiency, achieving a peak system efficiency of 5.0% thermal efficiency compared to the stated 4.8%. • Cartridge Performance: To compare cartridge performance against claims, the study focused on the third day of testing, which aimed for conditions closest to the design specifications, with a hot side of 240°C and cold-side exit temperature of 6.4°–30°C. On this day, the mean gross power observed in the cartridges within the TEG array was 18.1 W/cartridge, and the peak performance was 34.7 W/cartridge. The estimated mean cartridge efficiency was 5.2%, and the estimated efficiency at peak gross cartridge power was 10%. The regression models developed for gross power generation and parasitic loads were used to estimate the generation impact for given heat input to the TEG from the working fluid (captured from the waste heat) and from the cold loop (Lake Huron) on an hourly basis for a year of operation. Based on this analysis, installation of a commercial-scale TEG system at the Holcim cement plant in Alpena, Michigan, with a waste heat exchanger of 0.85 effectiveness, would generate up to 391 kW of net power, translating to between 920,000 and 1,800,000 kilowatt-hours (kWh) in net electricity per year. Based on typical grid emissions for Alpena, this would avoid estimated net emissions by 752 metric tons of CO₂ annually.² The sensitivity analysis estimated that typical TEG system installations at cement plants could generate an average of 56–1,040 kW of net power, or between 488,000 and 9,110,000 kWh of net energy. This generation potential is most significantly affected by plant production rates and also influenced by preheater and clinker cooler exhaust temperatures. Applying the national average emission rate, typical commercial-scale installations at Holcim plants are projected to avoid between 182 and 3,401 metric tons of CO₂ annually per site. Table ES- 3 shows a summary of the estimated annual impacts.³ While parasitic loads are significant and vary by application, this analysis assumed the use of heating loop pumps and access to Lake Huron as a cold sink. This setup assumed no need for cooling loop pumps due to the available water pressure at the test site. Applications that require cooling towers or additional equipment are likely to experience higher parasitic loads. Therefore, the study’s estimates are most applicable to scenarios with similar parasitic load configurations—namely, access to a high-pressure cold sink. Applicability to other locations may be limited, as differing conditions could necessitate additional pumps and cooling systems, potentially impacting performance significantly.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗