Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “plug”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Vehicle Residual Value Analysis by Powertrain Type and Impacts on Total Cost of Ownership

Vehicle depreciation is a key factor in determining the total cost of vehicle ownership and consumer purchase behavior. This report examines how light-duty-vehicle residual values have evolved over time for conventional and advanced vehicle technologies, accounting for important factors such as market segment, size class, and country of assembly. Although plug-in vehicles have historically depreciated faster than conventional vehicles, advancements in electric vehicle technology have led to plug-in vehicles exhibiting depreciation curves similar to those of conventional vehicles. This report compares two methods for determining depreciation trends (snapshot method and time-series method) in order to identify potential impacts on calculating vehicle total cost of ownership given differing data availability.

33 ADVANCED PROPULSION SYSTEMS↗

Breakdown of Electric Vehicle Supply Equipment Installation Costs

The plug-in electric vehicles (PEVs) market is receiving help from the current political climate, incentives at the federal and state levels, excessive cost of petroleum fuel, growing focus on climate solutions, increasing investment and direction by automobile manufacturers and increased awareness through media reports and advertising. Increasingly, the transportation industry, in both the United States and many other countries, is aimed at electric motive energy where practical. Increased investment in research and development have led to increasing vehicle range and lower battery costs; both of which have been deterrents in the past. The increasing demand for PEVs (consisting of the battery electric vehicle [BEV] and plug-in hybrid electric vehicle [PHEV], is challenged by the need for charging infrastructure to support these vehicles. The BEV relies totally on the on-board battery to supply the motive energy while the PHEV utilizes its battery and an installed internal combustion engine (ICE). The maximum benefit is achieved by using the battery power as much as possible. This arrangement requires the use of battery charging equipment, known as electric vehicle supply equipment (EVSE).

33 ADVANCED PROPULSION SYSTEMS↗

How to estimate O&G well leak rates from near field concentration and wind observations?

About 2.3 million orphan oil and gas (O&G) wells exist and are estimated to emit 200G g CH 4 y -1 by EPA/Enverus that implies an average CH 4 leak rate of 10 g CH 4 hr -1 per well. US government has an aggressive plan to plug orphan wells at costs of around $100K/well. In order to manage the costs of plugging millions of wells, quantifying leaks from individual wells is essential for prioritization. Current methods to quantify leaks require costly hardware, labor-intensive protocols and expensive analysis.

02 PETROLEUM↗

Advanced Monitoring and Control in the ANL METL Facility Using an Engineering Digital Twin

The potential benefits of using an engineering digital twin to achieve greater autonomy for monitoring and control functions in advanced reactors was investigated for the Mechanisms Engineering Test Loop (METL) liquid sodium facility at Argonne National Laboratory. The METL sodium purification system served as a representative system as it requires significant human in-the-loop interaction to accomplish its design function. The objective was to demonstrate how real-time operation could be automated while preserving oversight of the operator for ensuring that the system design functions are met. A digital twin model of the purification system was developed for both the cold trap purification loop and plugging meter diagnostic loop using information from the METL piping and instrumentation diagram (P&ID). Automated monitoring and diagnosis of component degradation in the METL facility was demonstrated in tests using the PRO-AID health monitoring software with the digital twin model incorporated in the library of components. Component failures were introduced and were successfully diagnosed in real time. These tests serve to demonstrate an advanced monitoring capability able to differentiate sensor degradation from component degradation, to generate a rank ordering of probabilities of different failure mechanisms that serves to circumvent the false alarm problem with current anomaly detection methods, and how facility monitoring can be transformed from anomaly detection to identification of a specific fault. Automated control of the purification system was demonstrated through simulations that exercised a model predictive controller designed using the digital twin model. Results of these simulations compared favorably with experimental data showing very good reference tracking response with negligible overshoot. In conclusion, these pilot tests and simulations successfully demonstrated the use of a digital twin for improved automation of monitoring and control. It was shown how the digital twin enables switching between control modes from cold trap operation where impurities are removed to plugging meter operation where impurity concentrations are measured.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Progress Report on Model Development for Aerosol Transport through Divergent Cracks Paths

This report summarizes the progress in developing a phenomenological model of aerosol transport, deposition, and plugging through microchannels. The purpose of this effort is to introduce to a user community—involving researchers, regulators, and industry—a generic, reliable numerical model for the prediction of aerosol transport while accounting for potential deposition and plugging of the leak paths to model spent nuclear fuel (SNF) release from postulated Stress Corrosion Cracks in canisters under storage or transportation. Current work focuses on expanding the model to predict aerosol (and gas) flow through complex microchannel (nozzle) geometries in addition to the rectangular and cylindrical geometries, as we approach more realistic Stress Corrosion Crack conditions. In this regard, a divergent nozzle geometry, used at Sandia National Laboratories (SNL) for testing aerosol release and retention (Durbin et al. 2021), was added to the model. The model was then validated with blowdown data for the particular microchannel, from experiments conducted at SNL. The report also presents preliminary non-benchmarked aerosol penetration fraction and mass flow rate for a monodisperse 10-micron (AED) particle concentration of 1.7e-08 kg/m 3 being released through the divergent microchannel geometry from the SNL’s aerosol experimental tank setup.Future work will involve validating the aerosol model and updating the model’s Graphical User Interface (GUI) to include the divergent nozzle geometry. This is expected to help stakeholders perform quick and easy first principles calculations without needing to understand the underlying MATLAB script.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Solar Energy Extension Project

The town of Stratford plans to develop and own a 6 kilowatt (kW) solar array on the roof of a municipal-owned public pavilion on the town green. A SolarEdge level 2 EV charging station will be installed at the pavilion to be used by the public. The charging station will have one charging port. The town will install 3 air source heat pumps in the library located adjacent to the pavilion to reduce the use of propane to heat the library. The town will install 4 air source heat pumps in the Town Hall to reduce the use of #2 heating oil to heat the facility. The 6 kW solar array will provide electricity to the library to offset electricity usage, and when an EV plugs into the charging station the solar will provide electricity to the charging station. There is no ground disturbance or ground trenching associated with this project. The 6 kW solar array on the roof of the pavilion will include 20 (390) watt all black panels. A SolarEdge level 2 EV charger will be installed at the pavilion with the 240 V inverter. The solar array will provide electricity to the library and when a vehicle plugs into the EV charger the solar array will switch to power the charger. Any excess electricity that is generated by the array and not used by the library or the EV charger will be fed onto the grid and the town will receive a net metering credit applied towards future consumption. There is no ground disturbance associated with the EV charger or solar array, and the town will install signage to direct the public to the charger. The library will install 2 (18,000) BTU ductless air source heat pumps and 1 (24,000) BTU unit. This will significantly reduce the amount of propane required to heat the library. The Town Hall will install 2 (36,000) BTU ductless air source heat pumps and 2 (9,000) BTU units to reduce the amount of #2 heating oil required to heat the building.

14 SOLAR ENERGY↗

Qualitative Risk Assessment of Legacy Wells within the Estimated Prairie State Generating Company Area of Review

This report details the digitization of a legacy wellbore database, including data processing assumptions, parameter estimation, and risk assessment methodology. The database, comprising 6,454 documents, was provided by ISGS. It includes valuable data from the Prairie State Generating Company (PSGC) and One Earth Energy (OEE) sites of the CarbonSAFE Phase III – Illinois Storage Corridor project. The report focuses on wells within a 15-mile radius from the Lively Grove #1 (LG#1) well at PSGC site, evaluating subsurface conditions and potential risks. A total of 4,386 wellbores within 15 miles of the LG#1 well were filtered based on depth and formation codes. LG#1 is the stratigraphic well at the PSGC site drilled in 2021. Ninety-four (94) wells penetrating the Maquoketa Shale Group (the primary confining unit) within the estimated area-of-review (AoR) for the PSGC site were evaluated using a qualitative risk assessment (QRA) methodology. The QRA developed by Arbad et al. 2022 focuses on legacy wells within the AoR and categorizes them based on well construction details. The QRA identifies wells that need immediate attention by categorizing them based on penetration depth and protection. Wells within the AoR were categorized into nine groups based on penetrations and protections. These categories range from Type 1 wells, with no documentation, to Type 9 wells, which do not penetrate the primary confining unit or storage reservoir (unit). Well accessibility within the AoR varies based on well status, including Dry & Abandoned (DA), Plugged & Abandoned (PA), Injection (INJ), Oil/Gas Producing (PROD), and Observation (Obs) wells. Accessibility levels were determined by well construction, with DA wells being the least accessible and Observation wells the most accessible, impacting gas leakage detection possibilities. Remedial action priority of wells decreases from Type 1 to Type 9 wells. Type 1 to Type 6 wells with status DA and PA require immediate attention, while Type 7 and Type 8 wells are low priority. A risk matrix used to prioritize corrective actions for legacy wells is proposed to categorize wells within an AoR based on penetrations, protections, and accessibility. The methodology involves data acquisition, well categorization into nine types, and determining CO 2 leakage pathways using well schematics and geospatial mapping. This approach is particularly useful for managing the integrity of legacy wells throughout the lifecycle of a Carbon Capture and Storage (CCS) project. A qualitative risk assessment of 94 wells within the AoR of the PSGC site identified 54 wells with high priority for corrective action due to penetration of the primary containment seal. The assessment utilizes color-coded maps to categorize well types and prioritize corrective actions, providing a comprehensive analysis. Schematics of wells penetrating the primary confining unit were drawn, and leakage pathways were identified. Details of all wells penetrating the confining zone are provided in the appendix, including information on well types, plugging, and casing status.

01 COAL, LIGNITE, AND PEAT↗

Geology of the One Earth Energy Site

The One Earth Energy site is one of two sites in the Illinois Storage Corridor (ISC) project. The objectives of the ISC project is to accelerate commercial deployment of carbon capture utilization and storage at two individual sites and receive approvals for Underground Injection Control (UIC) Class VI permits for construction at each site. At the One Earth Energy site, an extensive data collection program was undertaken, which included the drilling of a test well (One Earth Energy #1 [OEE #1]), four 2D seismic lines, and a small 3D seismic survey. The OEE #1 well was drilled in 2022 and acquired extensive core, log, and testing data to characterize the subsurface geology of the site. Coring was focused on the storage interval, the Mt. Simon Sandstone, and the confining interval, the Eau Claire Formation. The core and log data were used to evaluate the sedimentology and sequence stratigraphy, as well as to develop the conceptual geologic model. This report includes the geological summaries of the Mt. Simon Sandstone and the Eau Claire Formation. The extensive analysis of the log data is included in the petrophysical section, showing ranges of porosity, estimated pore size, and the mineral content of selected zones in the well. The separate petrographic technical report entitled “Petrographic and Advanced Geologic Characterization Report on One Earth Energy #1 (API# 1211325373)”, report number DOE-UIUC-0031892-04, details thin section point-counting analysis that includes mineralogical and pore space analysis, including grain size analysis, annotated thin section photomicrographs, scanning electron microscopy (SEM) with energy dispersive X-ray spectroscopy (EDS), and statistics of grain size analysis on Mt. Simon thin sections from OEE #1. The final OEE #1 well data to be included in this geology report is the routine core analysis of both whole core plugs and rotary sidewall core plugs. In addition to the OEE #1 well, four 2D seismic lines and a small 3D survey were acquired as part of the overall subsurface geological characterization. This geology report references the seismic interpretation report, entitled “One Earth Energy Site Seismic Interpretation Task 5.0”, report number DOE-UIUC-0031892-07. This report details the stratigraphic and structural interpretation of the 2D and 3D seismic data acquired at the One Earth Energy site. The 2D seismic data was acquired in 2019 and 2021, and the 3D survey was acquired in 2022. The objectives of the seismic programs were to contribute to the subsurface characterization of the Mt. Simon-Eau Claire Storage Complex by evaluating the continuity of potential storage reservoirs and containment intervals across the project area, and to determine if any geologic features are present that would increase containment risk to the proposed carbon storage project.

09 BIOMASS FUELS↗

The Carolina Bay Restoration Project - Final Report 2000-2006.

A Wetlands Mitigation Bank was established at SRS in 1997 as a compensatory alternative for unavoidable wetland losses. Prior to restoration activities, 16 sites included in the project were surveyed for the SRS Site Use system to serve as a protective covenant. Pre-restoration monitoring ended in Fall 2000, and post restoration monitoring began in the Winter/Spring of 2001. The total interior harvest in the 16 bays after harvesting the trees was 19.6 ha. The margins in the opencanopy, pine savanna margin treatments were thinned. Margins containing areas with immature forested stands (bay 5184 and portions of bay 5011) were thinned using a mechanical shredder in November 2001. Over 126 hectares were included in the study areas (interior + margin). Planting of two tree species and the transplanting of wetland grass species was successful. From field surveys, it was estimated that approximately 2700 Nyssa sylvatica and 1900 Taxodium distichum seedlings were planted in the eight forested bays resulting in an average planting density of ≈ 490 stems ha-1. One hundred seedlings of each species per bay (where available) were marked to evaluate survivability and growth. Wetland grass species were transplanted from donor sites on SRS to plots that ranged in size from 100 – 300 m2, depending on wetland size. On 0.75 and 0.6 meter centers, respectively, 2198 plugs of Panicum hemitomon and 3021 plugs Leersia hexandra were transplanted. New shoots originating from the stumps were treated with a foliar herbicide (Garlon® 4) during the summer of 2001 using backpack sprayers. Preliminary information from 2000-2004 regarding the hydrologic, vegetation and faunal response to restoration is presented in this status report.

60 APPLIED LIFE SCIENCES↗

Benefits and Challenges of Achieving a Mainstream Market for Electric Vehicles

The Plug-in Hybrid electric Vehicle (PHEV) Market Introduction Study Final Report identified a range of policies, incentives and regulations designed to enhance the probability of success in commercializing PHEVs as they enter the automotive marketplace starting in 2010. The objective of the comprehensive PHEV Value Proposition study, which encompasses the PHEV Market Introduction Study, is to better understand the value proposition that PHEVs (as well as other plug-in electric vehicle platforms - PEVs) provide to the auto companies themselves, to the consumer and to the public at large as represented by the government and its public policies. In this report we use the more inclusive term PEVs, to include PHEVs, BEVs (battery electric vehicles that operate only on battery) and EREVs (extended range electric vehicles that combine battery electric vehicles with an internal combustion engine that charges the battery as needed). The objective of Taratec's contribution to Phase 2 of the PHEV Value Proposition Study is to develop a clear understanding of the benefits of PEVs to three stakeholders - auto original equipment manufacturers (OEMs), utilities, and the government - and of the technical and commercial challenges and risks to be overcome in order to achieve commercial success for these vehicles. The goal is to understand the technical and commercial challenges in moving from the 'early adopters' at the point of market introduction of these vehicles to a 'sustainable' mainstream market in which PEVs and other PEVs represent a normal, commercially available and attractive vehicle to the mainstream consumer. For the purpose of this study, that sustainable market is assumed to be in place in the 2030 timeframe. The principal focus of the study is to better understand the technical and commercial challenges in the transition from early adopters to a sustainable mainstream consumer market. Effectively, that translates to understanding the challenges to be overcome during the transition period - basically the middle years as the second and third generation of these vehicles are developed and come to market. The concern is to understand those things that in the near term would delay that transition. The study looked at identifying and then quantifying these technical and commercial risks and benefits from three perspectives: (1) The auto industry original equipment manufacturers (OEMs) themselves; (2) The utilities who will provide the electric 'fuel' that will fully or partially power the vehicles; and (3) The government, representing public policy interest in PEV success. By clarifying and quantifying these benefits and the technical and commercial risks that could delay the transition to a sustainable mainstream market, the study provides the basis for developing recommendations for government policies and support for PHEV and PEV development.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence W - Raw Data

Sequence W: Extended Blade (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 21 m/s, and the yaw angle was held at 0°. The blade pitch angle was 3°. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pretensioned to 40,000 N. During postprocessing, the probe channels were set to read –99999.99. The standard tip blocks were replaced with blade extensions that created a 5.532-m radius rotor as shown in Appendix A. The extension used the S809 airfoil throughout, and the linear taper of the blade continued along the extension. Note that the blade radius was not changed during post-processing so the pressure tap locations are at the same radial location, but the reference to 30% represents 30% of 5.029 m, not 5.532 m. Throughout this report, references to the blade span are made for the 5.029-m radius, not the 5.532-m radius.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence 5 - Raw Data

Sequence 5: Sweep Wind Speed (F,P) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed was ramped from 5 m/s to 25 m/s by the wind tunnel operator. This was repeated with a decreasing ramp. The yaw angle was maintained at 0°. The blade tip pitch was 3° or 6°. The rotor rotated at 72 RPM. Blade pressure and probe measurements were collected for both pitch angles. The five-hole probes were removed and the plugs were installed for another 3° pitch case. Plastic tape 0.03 mm thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. The 6- minute campaigns were named using the sequence designation 5, followed by DN or UP, which indicates the wind speed ramp direction. The next four digits are 0000, and the sequence digit is at the end.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence 8 - Raw Data

Sequences 8 and 9: Downwind Sonics (F,P) and Downwind Sonics Parked (P) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 60° were achieved. The blade tip pitch was 3°. The rotor rotated at 72 RPM during Sequence 8, but it was parked during Sequence 9. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. Sonic anemometers were mounted on a strut downwind of the turbine. The strut was mounted to the T-frame, which was rotated to align the anemometers aft of the 9% and 49% radius locations at hub height. Because of this configuration, the tunnel balance data are considered invalid. Sequence 9 was designed to compare the downwind sonic anemometer readings with the upwind sonic anemometers without interference from the turbine. The rotor was parked with the instrumented blade at 0° azimuth. All pressure measurements obtained in Sequence 9 are invalid because sufficient time for temperature stabilization did not occur, thus all associated data values were flagged as not applicable by setting the measured values in the data file to 0.0000 Pa. This test is further described in Appendix G.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence 9 - Raw Data

Sequences 8 and 9: Downwind Sonics (F,P) and Downwind Sonics Parked (P) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 60° were achieved. The blade tip pitch was 3°. The rotor rotated at 72 RPM during Sequence 8, but it was parked during Sequence 9. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. Sonic anemometers were mounted on a strut downwind of the turbine. The strut was mounted to the T-frame, which was rotated to align the anemometers aft of the 9% and 49% radius locations at hub height. Because of this configuration, the tunnel balance data are considered invalid. Sequence 9 was designed to compare the downwind sonic anemometer readings with the upwind sonic anemometers without interference from the turbine. The rotor was parked with the instrumented blade at 0° azimuth. All pressure measurements obtained in Sequence 9 are invalid because sufficient time for temperature stabilization did not occur, thus all associated data values were flagged as not applicable by setting the measured values in the data file to 0.0000 Pa. This test is further described in Appendix G.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence M - Raw Data

Sequence M: Transition Fixed (P) Test sequence M used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 15 m/s. Yaw angles ranged from 0° to 90°. The blade tip pitch was 3°. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read –99999.99. Zigzag tape was installed near the leading edge of the instrumented blade on both the upper and lower surfaces as described in Appendix K. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s. These 90-second campaigns were collected while the yaw drive rotated the turbine 90° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence R - Raw Data

Sequence R: Step AOA, No Probes (P) This sequence was designed to quantify the effect of the five-hole probes on the 3-D blade static angle-of-attack response in the presence of rotational influences by repeating Sequence K without five-hole probes. This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speeds ranged from 6 m/s to 20 m/s, and data were collected at yaw angles of 0° and 30°. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to –99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read –99999.99. The blade pitch angle ramped continuously at 0.18°/s over a wide range of increasing and decreasing pitch angles. A step sequence was also performed. The blade pitch was stepped 5°; the flow was allowed to stabilize; and the pitch angle was held for 5 seconds. Then the pitch angle step was repeated. Again, a wide range of pitch angles was obtained, both increasing and decreasing. The file lengths for this sequence varied from 96 seconds to 6 minutes, depending on the pitch angle range. Some short points were collected at 0° yaw and 3° pitch to ascertain the functionality of the instrumentation and repeatability over time. The file name convention used the initial letter R, followed by two digits specifying wind speed, followed by two digits for yaw angle, followed by RU, RD, or ST, followed by the repetition digit. The angle of attack motion was differentiated by RU (ramp up), RD (ramp down), and ST (step down, then step up). This sequence is related to Sequences K and L.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence S - Raw Data

Sequences S, T, and U: Upwind, No Probes (F); Upwind 2° Pitch (F); Upwind 4° Pitch (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 180° were achieved for Sequence S, but the yaw angle remained at 0° for Sequences T and U. The blade tip pitch was 3° for Sequence S, 2° for Sequence T, and 4° for Sequence U. These three sequences were interleaved during testing because the pitch angle change was easily made by the turbine operator. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s for the Sequence S configuration. These 6-minute campaigns were collected while the yaw drive rotated the turbine 360° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗

UAE6 - Wind Tunnel Tests Data - UAE6 - Sequence T - Raw Data

Sequences S, T, and U: Upwind, No Probes (F); Upwind 2° Pitch (F); Upwind 4° Pitch (F) This test sequence used an upwind, rigid turbine with a 0° cone angle. The wind speed ranged from 5 m/s to 25 m/s. Yaw angles of 0° to 180° were achieved for Sequence S, but the yaw angle remained at 0° for Sequences T and U. The blade tip pitch was 3° for Sequence S, 2° for Sequence T, and 4° for Sequence U. These three sequences were interleaved during testing because the pitch angle change was easily made by the turbine operator. The rotor rotated at 72 RPM. Blade pressure measurements were collected. The five-hole probes were removed and the plugs were installed. Plastic tape 0.03-mm-thick was used to smooth the interface between the plugs and the blade. The teeter dampers were replaced with rigid links, and these two channels were flagged as not applicable by setting the measured values in the data file to -99999.99 Nm. The teeter link load cell was pre-tensioned to 40,000 N. During post-processing, the probe channels were set to read -99999.99. In addition to the standard 30-second campaigns, yaw sweeps were done at 7 m/s and 10 m/s for the Sequence S configuration. These 6-minute campaigns were collected while the yaw drive rotated the turbine 360° at a rate of 1°/s. The file names for these campaigns use the letter designation, followed by two digits for wind speed, followed by YSU, followed by 00.

17 WIND ENERGY↗