Exploring impacts of electricity tariff on charging infrastructure planning: An activity-based approach

In the past decade, electric vehicles (EVs) have gained popularity for their efficiency and environmental benefits. Advances in battery technology and charging equipment have yielded long-range EVs and fast-charging. However, many major cities lack adequate charging infrastructure for daily EV use. This study addresses this gap by integrating activity-based modeling, charging behavior simulation, and charging infrastructure optimization. The research utilizes the POLARIS agent-based transportation model to accurately capture user activities, trip patterns, and traffic flows. Additionally, the study investigates the impact of fixed and spatiotemporal electricity rate distributions on optimal charging infrastructure deployment. The framework is applied to the Chicago regional area network and analyzed under various EV ownership scenarios. Further, the results reveal significant impacts of the charging pricing strategy on user decision-making and charging demand distribution. There is also a need for consistent pricing policies in charging infrastructure planning and operational phases to avoid drops in service quality.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

The use of visual cues for vehicle control and navigation

At least three levels of control are required to operate most vehicles: (1) inner-loop control to counteract the momentary effects of disturbances on vehicle position; (2) intermittent maneuvers to avoid obstacles, and (3) outer-loop control to maintain a planned route. Operators monitor dynamic optical relationships in their immediate surroundings to estimate momentary changes in forward, lateral, and vertical position, rates of change in speed and direction of motion, and distance from obstacles. The process of searching the external scene to find landmarks (for navigation) is intermittent and deliberate, while monitoring and responding to subtle changes in the visual scene (for vehicle control) is relatively continuous and 'automatic'. However, since operators may perform both tasks simultaneously, the dynamic optical cues available for a vehicle control task may be determined by the operator's direction of gaze for wayfinding. An attempt to relate the visual processes involved in vehicle control and wayfinding is presented. The frames of reference and information used by different operators (e.g., automobile drivers, airline pilots, and helicopter pilots) are reviewed with particular emphasis on the special problems encountered by helicopter pilots flying nap of the earth (NOE). The goal of this overview is to describe the context within which different vehicle control tasks are performed and to suggest ways in which the use of visual cues for geographical orientation might influence visually guided control activities.

Hart, Sandra G.↗

NASA Processes and Requirements for Conducting Human-in-the-Loop Closed Chamber Tests

NASA has specific processes and requirements that must be followed for tests involving human subjects to be conducted in a safe and effective manner. There are five distinct phases of test operations. Phase one, the test request phase, consists of those activities related to initiating, processing, reviewing, and evaluating the test request. Phase two, the test preparation phase consists of those activities related to planning, coordinating, documenting, and building up the test. Phase three, the test readiness phase consists of those activities related to verifying and reviewing the planned test operations. Phase four, the test activity phase, consists of all pretest operations, functional checkouts, emergency drills, and test operations. Phase five, the post test activity phase, consists of those activities performed once the test is completed, including briefings, documentation of anomalies, data reduction and archiving, and reporting. Project management processes must be followed for facility modifications and major test buildup, which include six phases: initiation and assessment, requirements evaluation, preliminary design, detailed design, use readiness review (URR) and acceptance. Compliance with requirements for safety and quality assurance are documented throughout the test buildup and test operation processes. Tests involving human subjects must be reviewed by the applicable Institutional Review Board (IRB).

Barta, Daniel J.↗

Mars Optimal Aerobrake Maneuver Estimation

Mars science satellites often perform orbit changes to obtain different measurements, ground tracks or relay operations. Large reductions in semi-major axis and eccentricity can be done efficiently using the atmospheric drag, a.k.a aerobrake. Aerobraking is one of the most challenging planetary orbit maneuvers in terms of planning and operations. The most important consideration for aerobraking is maintaining the spacecraft's periapsis within an allocated atmospheric density corridor, which is accomplished by raising or lowering periapsis through one or a series of very small and short maneuvers. These maneuvers must be performed as efficiently as possible due to propellant constraints. Work herein details a fast and accurate method to calculate the required impulsive velocity changes in the orbit to guarantee that the spacecraft remains in a prescribed density corridor. The method makes use of the orbit's state transition matrix to map the solution space around the reference orbit. It evaluates the most efficient maneuver epochs to target a given periapsis change with a linear optimal control for single or multiple maneuvers. A fast calculation of the maneuver allows for a more comprehensive evaluation of the trade space, and the selected maneuver may be re-targeted later with a higher- fidelity model. Comparisons against fully propagated models and direct method optimizations demonstrate the new method's performance.

Sarli, Bruno V.↗

Lunar COTS Mission Concept: Using the Moon's Resources to Enable an Economical and Sustainable Pathway to Mars and Beyond

To support and enable future human missions to the surface of the Moon, a new plan was formulated to gradually develop an economical, evolvable and sustainable lunar infrastructure using a public/private partnerships between NASA and industry to share cost and risk in the development phase and ultimately transfer operation of these infrastructure services to its industry owners. These infrastructure services may include but are not limited to the following: lunar cargo transportation, power stations, energy storage devices, communication towers and relay satellites, and resource extraction operations. The plan is called the Commercial Orbital Transfer Services (COTS) Program, using NASA's well-proven Commercial Orbital Transportation Services (COTS) Program acquisition model.

Zuniga, A. F.↗

Monitoring Airspace Complexity and Determining Contributing Factors

The national airspace has evolved over many years to accommodate increased traffic demand [1] while simultaneously maintaining one of the safest forms of transportation [2], [3]. One of the reasons for this success is the ability of the system and the operators to adapt and accommodate to situations that routinely disrupt optimal operations. These situations may include: adverse weather, delays, early arrivals, equipment outages, and other factors that are outside the operators ability to control. These factors can lead to states where automation is unable to properly handle these issues and therefore air traffic controllers and pilots have to intervene, ultimately increasing communication between operators resulting in higher workload. As controller workload increases to handle sub-optimal operating conditions this can be viewed as an increase in complexity. The reasoning for this is because humans are now required to make tactical decisions in response to external factors, resulting in a departure from the strategic plan where operations would be more efficiently managed. Human operators control airspace complexity under rigid regulations that are constantly changing. The airspace is divided into sectors and the number of aircraft assigned to each controller is limited for safe handling. There has been past work that devised airspace complexity metrics in commercial aviation and related these metrics to controller workload (e.g., [4],[5]). The upper bounds on the system load are pre-determined. Such bounds on complexity make for a safe system, but the system cannot scale and adapt to autonomous, dense, and heterogeneous traffic, including the many types of Unmanned Aerial Vehicles (UAVs) envisioned to be added to the operations. We hypothesize that, as traffic density and heterogeneity grow, and other key metrics change, there will be phase transitions at which the way traffic should be managed changes significantly [6]. We offer a method for in-time detection of contributing factors that lead to phase transitions, characterized by increased complexity. To the best of our knowledge, there is no tool similar to our proposed effort that identifies such contributing factors or precursor patterns. To define the scope we are proposing to measure complexity from the viewpoint of the Terminal Radar Approach Control Facilities (TRACON) controller’s perspective. In particular we are analyzing arrivals into KSFO. With safety as the top concern for airspace operators, it is important to recognize that as density and heterogeneity grow, the focus of the system will change. Times of the day when the airspace has low density and heterogeneity, the flights will follow more efficient paths where the aircraft move on established routes that are more or less directly to the destination. However, when density and heterogeneity increases, the system will begin changing focus to avoiding conflicts and collisions and route the flights in a more flexible way. Higher flexibility requires more communication and coordination between controllers and pilots which the current automation is unable to handle. This paper proposes a novel approach that monitors airspace complexity at multiple scales, uses a Machine Learning-based tool that predicts when operations will transition to a regime of greater complexity, and identifies actions that can reduce the complexity while still maintaining efficient and safe operations. We demonstrate our proposed approach using data from multiple complementary sources. This includes, but is not limited to: historical aircraft surveillance data from NASA’s Sherlock Data Warehouse [7], METAR weather data, and airport configuration data from Aviation System Performance Metrics (ASPM). The surveillance data flight paths are sampled at a variable sample rate — increasing as the aircraft approaches the airport. This is due to how Sherlock manages flight track stitching between different radar facilities which have different sampling rates. The weather and performance data are logged at defined intervals throughout the day at a courser refresh rate. In addition to the logged data and metrics, we leverage pre-defined Standard Terminal Arrival Routes (STARs) procedures to characterize the path of each flight. Each flight files for one of these routes in the flight plan well before entering the terminal airspace, and approximately follows the route until it leaves the STAR, typically on the final fix of a runway transition. However, most flights do not always fly the full STAR procedure to completion [8], but the majority do adhere to the fixes within the common route of the procedure. Our approach leverages fixes in the common route of each of the STARs to build a reference path to the airport. This allows us to characterize the flight paths in what we are defining as the “maneuvering area” (the airspace between the STAR and before the flight is lined up on the runway’s final approach) to determine how off nominal the flights are to calculate its complexity score. Determining airspace complexity is a concept that does not have a concrete answer. In designing this metric, we consider what increases the workload for the air traffic controllers. Consequently more specialized vectoring maneuvers results in higher workload. Accordingly, we start with a theory: each flight has a direct path it takes from the STAR’s common route to the final approach’s outer marker fix for the flight’s landing runway. It is important to note that the direct path is only used as a reference. If the majority of the flights have a large consistent offset as compared to other routes it does not necessarily mean that those flights have higher complexity. We are merely building a distribution based on this direct path for that particular STAR and runway pair to determine the normal mode of operations for that route. Flights that are in the upper tail of these distributions will result in higher complexity scores and flights that fly in the median will represent the normal mode of operations and therefore will have lower complexity scores. Since flights following each STAR route take different paths to the airport, we have a different distribution for each STAR route and therefore can model these distributions to compute a complexity score from their respective normalized distributions. To evaluate the effectiveness of our proposed airspace complexity metric we will compare against an established approach based on trajectory clustering [9]. This unsupervised learning technique consists of the following steps: (1) identify the general maneuvering areas (waypoints) by performing $\kappa$-means or DBSCAN clustering on locations where aircraft frequently turn based on the surveillance radar track data, (2) map flight trajectories onto sequences of waypoints, and (3) cluster the sequences based on their common subsequences. From a high-level perspective, this baseline model learns nominal operations in the airspace through the sequence of waypoints that are representative of where aircraft change direction and defines deviations from the nominal operations as “complex.” Therefore, more deviations from the nominal operations correspond to higher complexity values. For our validation, we re-implemented this technique and tune model hyper-parameters to correctly detect waypoints for the arrival traffic into the San Francisco bay area. We will compute the complexity measure over a one-year period using our proposed technique as well as the baseline. Our validation will be based on each technique’s ability to detect a set of undesirable outcomes (e.g., go-arounds, holding patterns, average time in the airspace, etc.). Since our current complexity metric is derived from the offset from the direct reference path, it’s important to understand what causes these offsets. In many of the flights with high offset distance, flights performing holding patterns and S turns can be observed. These maneuvering tactics are utilized to add distance between the aircraft and the destination runway to prevent multiple flights from having conflicting arrival times. In order to predict a rise in complexity (or the precursor to complexity), it’s necessary to be able to identify these potential conflicts (which in turn, result in higher offsets). To do this, we define a “representative flight” for each STAR route and runway pair. This flight is approximately the path the flight would take if there was a clear path with no other flights in the airspace — including the time remaining to the airport. We first identify the flights for a given STAR runway pair using the offset to the reference path distributions that fall between the 44-55 percentiles. This yields the flights that conform to the most normal mode of operation. Each of these flights is partitioned based on the percent complete from the entry point into the maneuvering areas from 0\% – 100\% complete. Then for each percent “bin”, we take the median value of the flight’s latitude/longitude coordinates, airspeed, and (non causal) time remaining to the airport to construct a lookup table for each percent complete bin on a given route. As a flight enters the maneuvering area, we can find the estimated arrival time of a flight to the airport by finding the closest point to the representative path’s percent complete bin (relative to the flight’s current position at any snapshot in the airspace) and therefore retrieve the corresponding remaining time left on the “representative path”. We assume that the flight will follow the representative path to completion when deriving these estimates. We can then compare these estimated arrival times against other flights for the same snapshot in time to identify potential conflicts. If more flights are estimated to arrive within a tolerance window than there are runways available, then we have a potential conflict. We can use this derived measure along with other factors expected to add disruption to the operation such as weather and runway configuration changes as an input to machine learning tools to detect precursors that increases in our complexity measure. This novel method will assist in uncovering insights into the contributing factors that lead to increased complexity that may allow for in-time responses to avoid reaching a high complexity state in the airspace.

complexity↗

Application of computer-aided dispatch in law enforcement: An introductory planning guide

A set of planning guidelines for the application of computer-aided dispatching (CAD) to law enforcement is presented. Some essential characteristics and applications of CAD are outlined; the results of a survey of systems in the operational or planning phases are summarized. Requirements analysis, system concept design, implementation planning, and performance and cost modeling are described and demonstrated with numerous examples. Detailed descriptions of typical law enforcement CAD systems, and a list of vendor sources, are given in appendixes.

Sohn, R. L.↗

System Engineering & Integration (SE&I) In-Situ Resource Utilization (ISRU) Modeling and Analysis (SIMA) Tool for Subsystem Integration into Full-Scale Architectures

In situ resource utilization (ISRU) is the practice of producing mission consumables from local lunar/planetary resources, thereby minimizing system launch mass requirements, mainly through the production of propellant fuel components and life support resources. Modeling full ISRU technology architectures significantly impacts the design and optimization of individual unit processes and facilitates their introduction into service with the Science Technology Mission Directorate (STMD) logistical planning and operation space. The Mission Analysis and Integration Tool (MAIT) is a modeling framework that connects individual ISRU subsystem models for the purposes of technology down select, scaling & optimization, and end-to-end process planning. The development project team seeks to address specific STMD capability gaps by simulating ISRU systems in MAIT. The goal is to produce system architectures for the Moon and Mars that are linked to Key Performance Parameters (KPP) and environmental requirements. To that end, the framework is adaptive, flexible, and suitable for collaboration among government, private sector, and international entities. Our approach currently provides conventional outputs, such as mass, power, and volume, to analyze whole system trade spaces. However, the framework was designed to validate current breadboard subsystems, simulate future process design capacity, and allow flexibility to any external developer-driven subsystem model that is in a state of evolution.

SE&I↗

Mars Observer Mission Operations

Mars Observer, planned for launch in September 1992, will be the first deep space planetary mission to fully utilize a distributed operations concept for science instrument control. In addition, several of the other concepts proposed by the Mission Operations and Information Systems Subcommittee of the Solar System Exploration Committee have been adopted for the purpose of improving the efficiency and reducing the costs of Deep Space Mission Operations.

Mckinley, Edward L.↗

Failure Probability Constrained AC Optimal Power Flow

Despite cascading failures being the central cause of blackouts in power transmission systems, existing operational and planning decisions are made largely by ignoring their underlying cascade potential. This paper posits a reliability-aware AC Optimal Power Flow formulation that seeks to design a dispatch point which has a low operator-specified likelihood of triggering a cascade starting from any single component outage. By exploiting a recently developed analytical model of the probability of component failure, our Failure Probability-constrained ACOPF (FP-ACOPF) utilizes the system's expected first failure time as a smoothly tunable and interpretable signature of cascade risk. Here, we use techniques from bilevel optimization and numerical linear algebra to efficiently formulate and solve the FP-ACOPF using off-the-shelf solvers. Extensive simulations on the IEEE 118-bus case show that, when compared to the unconstrained and N-1 security-constrained ACOPF, our probability-constrained dispatch points can significantly lower the probabilities of long severe cascades and of large demand losses, while incurring only minor increases in total generation costs.

24 POWER TRANSMISSION AND DISTRIBUTION↗

ISS Operations Cost Reductions Through Automation of Real-Time Planning Tasks

In 2007 the Johnson Space Center s Mission Operations Directorate (MOD) management team challenged their organizations to find ways to reduce the cost of operations for supporting the International Space Station (ISS) in the Mission Control Center (MCC). Each MOD organization was asked to define and execute projects that would help them attain cost reductions by 2012. The MOD Operations Division Flight Planning Branch responded to this challenge by launching several software automation projects that would allow them to greatly improve console operations and reduce ISS console staffing and intern reduce operating costs. These tasks ranged from improving the management and integration mission plan changes, to automating the uploading and downloading of information to and from the ISS and the associated ground complex tasks that required multiple decision points. The software solutions leveraged several different technologies including customized web applications and implementation of industry standard web services architecture; as well as engaging a previously TRL 4-5 technology developed by Ames Research Center (ARC) that utilized an intelligent agent-based system to manage and automate file traffic flow, archive data, and generate console logs. These projects to date have allowed the MOD Operations organization to remove one full time (7 x 24 x 365) ISS console position in 2010; with the goal of eliminating a second full time ISS console support position by 2012. The team will also reduce one long range planning console position by 2014. When complete, these Flight Planning Branch projects will account for the elimination of 3 console positions and a reduction in staffing of 11 engineering personnel (EP) for ISS.

Hall, Timothy A.↗

Engineering and Safety Partnership Enhances Safety of the Space Shuttle Program (SSP)

Project Management must use the risk assessment documents (RADs) as tools to support their decision making process. Therefore, these documents have to be initiated, developed, and evolved parallel to the life of the project. Technical preparation and safety compliance of these documents require a great deal of resources. Updating these documents after-the-fact not only requires substantial increase in resources - Project Cost -, but this task is also not useful and perhaps an unnecessary expense. Hazard Reports (HRs), Failure Modes and Effects Analysis (FMEAs), Critical Item Lists (CILs), Risk Management process are, among others, within this category. A positive action resulting from a strong partnership between interested parties is one way to get these documents and related processes and requirements, released and updated in useful time. The Space Shuttle Program (SSP) at the Marshall Space Flight Center has implemented a process which is having positive results and gaining acceptance within the Agency. A hybrid Panel, with equal interest and responsibilities for the two larger organizations, Safety and Engineering, is the focal point of this process. Called the Marshall Safety and Engineering Review Panel (MSERP), its charter (Space Shuttle Program Directive 110 F, April 15, 2005), and its Operating Control Plan emphasizes the technical and safety responsibilities over the program risk documents: HRs; FMEA/CILs; Engineering Changes; anomalies/problem resolutions and corrective action implementations, and trend analysis. The MSERP has undertaken its responsibilities with objectivity, assertiveness, dedication, has operated with focus, and has shown significant results and promising perspectives. The MSERP has been deeply involved in propulsion systems and integration, real time technical issues and other relevant reviews, since its conception. These activities have transformed the propulsion MSERP in a truly participative and value added panel, making a difference for the safety of the Space Shuttle Vehicle, its crew, and personnel. Because of the MSERP's valuable contribution to the assessment of safety risk for the SSP, this paper also proposes an enhanced Panel concept that takes this successful partnership concept to a higher level of 'true partnership'. The proposed panel is aimed to be responsible for the review and assessment of all risk relative to Safety for new and future aerospace and related programs.

Duarte, Alberto↗

Solar and Storage Integration in the U.S. Southeast: Implications for Resource Adequacy

Resource adequacy concerns may be very different in electricity systems that have higher levels of solar and storage, requiring changes to existing planning models. This study explores a novel approach to evaluating resource adequacy under future scenarios with higher solar and storage in the Southeast U.S. It uses NREL’s Probabilistic Resource Adequacy Suite (PRAS), a collection of probabilistic resource adequacy modeling tools, and compares results when interacting PRAS and a portfolio planning tool with a more traditional modeling approach. The results suggest that traditional models perform reasonably well with lower levels of solar PV, but at higher levels of solar probabilistic tools better capture the changes in resource adequacy concerns—such as winter energy availability—associated with higher solar systems. This is the final study in the Preparing Southeast Markets for Reliable and Affordable Integration of Solar into Operations and Planning project. Two prior reports can be found at: Solar and Storage Integration in the Southeastern United States: Economics, Reliability, and Operations. https://emp.lbl.gov/publications/solar-and-storage-integration Solar and Wind Forecast Error Reserve Sharing in a Multi-Utility Region. https://eta-publications.lbl.gov/sites/default/files/2024-11/multiutility_fe_reserve_sharing_final.pdf

14 SOLAR ENERGY↗

Satellite Data Applications for Sustainable Energy Transitions

Transitioning to a sustainable energy system poses a massive challenge to communities, nations, and the global economy in the next decade and beyond. A growing portfolio of satellite data products is available to support this transition. Satellite data complement other information sources to provide a more complete picture of the global energy system, often with continuous spatial coverage over targeted areas or even the entire Earth. We find that satellite data are already being applied to a wide range of energy issues with varying information needs, from planning and operation of renewable energy projects, to tracking changing patterns in energy access and use, to monitoring environmental impacts and verifying the effectiveness of emissions reduction efforts. While satellite data could play a larger role throughout the policy and planning lifecycle, there are technical, social, and structural barriers to their increased use. We conclude with a discussion of opportunities for satellite data applications to energy and recommendations for research to maximize the value of satellite data for sustainable energy transitions.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Satellite Data Applications for Sustainable Energy Transitions

Transitioning to a sustainable energy system poses a massive challenge to communities, nations, and the global economy in the next decade and beyond. A growing portfolio of satellite data products is available to support this transition. Satellite data complement other information sources to provide a more complete picture of the global energy system, often with continuous spatial coverage over targeted areas or even the entire Earth. We find that satellite data are already being applied to a wide range of energy issues with varying information needs, from planning and operation of renewable energy projects, to tracking changing patterns in energy access and use, to monitoring environmental impacts and verifying the effectiveness of emissions reduction efforts. While satellite data could play a larger role throughout the policy and planning lifecycle, there are technical, social, and structural barriers to their increased use. We conclude with a discussion of opportunities for satellite data applications to energy and recommendations for research to maximize the value of satellite data for sustainable energy transitions.

energy↗

Development Efforts and Status of Plume-Surface Interaction Capabilities for Propulsive Landing Systems

Rocket plume-surface interaction is a multi-phase problem characterized by plume flow physics, erosion physics, and ejecta dynamics. All propulsive landers will experience plume-surface interaction. The risks posed by such effects can vary greatly as a function of the local environment, lander concept of operations, configuration, and physical scale. Prior Lunar and Martian landers have overcome challenges posed by these environments, on the basis of scaled ground testing and subsequent flight experience, but the landing systems for present and future missions are planning to operate increasingly outside of NASA's current experience with plume-surface interaction. This presentation discusses the current efforts and status of activities within NASA to progress understanding of fundamental plume-surface interaction physics, the capability to predict resulting environments and effects, and the definition of implications for current and future Lunar and planetary landing systems.

Landing↗

Introduction to Microgrids

A microgrid is simply a typical power system that has distributed energy resources (DERs), like small diesel generators, with loads in the network. The resiliency offered by microgrids to retain service during system events makes them a suitable support for the electric grid during natural disasters. One key factor that differentiates microgrids from a typical distribution grid is its ability to disconnect itself in the event of a blackout and sustain its loads through DERs. Microgrid systems will reconnect to the main grid when the grid comes back up. The resiliency offered by microgrids to retain service during system events makes them a suitable support for the electric grid during natural disasters. This presentation discusses the typical key steps involved in microgrid planning, installation, operation in a interoperable and interconnectable fashion.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Design of a Combined Beacon Receiver and Digital Radiometer for 40 GHz Propagation Measurements at the Madrid Deep Space Communications Complex

NASA Glenn Research Center (GRC) and the Jet Propulsion Laboratory (JPL) have jointly developed an atmospheric propagation terminal to measure and characterize propagation phenomena at 40 GHz at the Madrid Deep Space Communications Complex (MDSCC) in Robledo de Chavela, Spain. The hybrid Q-band system combines a 40 GHz beacon receiver and digital radiometer into the same RF front-end and observes the 39.402 GHz beacon of the European Space Agencys Alphasat Aldo Paraboni TDP5 experiment. The goals of these measurements are to assist MDSCC mission operations as well as to contribute to the development and improvement of International Telecommunications Union (ITU) models for prediction of communications systems performance within the Q-band. Herein, we provide an overview of the system design, characterization, and plan of operations to commence at the MDSCC beginning in March 2017.