Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “operational assessment”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Advanced Materials Testing Plan for the Space Suit Portable Life Support System

The Space Suit Portable Life Support System (PLSS) has a tight mass requirement to meet while also meeting other requirements for supporting a crewmember in space, on the Moon, or on Mars. To meet these requirements, atypical materials must be considered to close the mass budget allocations. However, many of these materials and processes are relatively new and untested. Therefore, initial analysis and testing of some new and advanced processes have been conducted following a roadmap presented last year. This material testing has focused primarily on thermoplastics, both additively manufactured and machined, to assess plating and fastening operations that will be required. These processes will provide additional strength and shielding capability typically only achieved with metallics. This testing has also helped to define a forward plan to certify these materials and processes for critical spaceflight applications. This report will review testing plated thermoplastics both for strength and thermal properties. It will also review fastener and fastening options and look at insert and fastener testing. It will also review state-of-the-art methods being considered elsewhere and some additional testing being conducted. Using the testing results researched here, there will be recommendations on applications for each of these types of methods going forward.

Ryan Ogilvie↗

Cybersecurity Value-at-Risk Framework: Preprint

As more variable renewable energy sources are added to the grid, the critical role of hydropower as a reliable baseline and firming resource is rapidly growing. However, the U.S hydropower fleet is not fully prepared to face modern issues such as cybersecurity threats. Hydropower accounts for 37% of U.S. utility-scale renewable electricity but is challenged by diverse infrastructure and legacy devices that predate modern security practices. While new cybersecurity solutions cannot simply be added to current hydropower generation and operation technologies, custom cybersecurity assessments can reveal system-specific threats and risk probabilities and identify mitigating enhancements.

cybersecurity valuation↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Early warning and crop condition assessment research

The Early Warning Crop Condition Assessment Project of AgRISTARS was a multiagency and multidisciplinary effort. Its mission and objectives were centered around development and testing of remote-sensing techniques that enhance operational methodologies for global crop-condition assessments. The project developed crop stress indicators models that provide data filter and alert capabilities for monitoring global agricultural conditions. The project developed a technique for using NOAA-n satellite advanced very-high-resolution radiometer (AVHRR) data for operational crop-condition assessments. This technology was transferred to the Foreign Agricultural Service of the USDA. The project developed a U.S. Great Plains data base that contains various meteorological parameters and vegetative index numbers (VIN) derived from AVHRR satellite data. It developed cloud screening techniques and scan angle correction models for AVHRR data. It also developed technology for using remotely acquired thermal data for crop water stress indicator modeling. The project provided basic technology including spectral characteristics of soils, water, stressed and nonstressed crop and range vegetation, solar zenith angle, and atmospheric and canopy structure effects.

Boatwright, G. O.↗

Tailoring a Human Reliability Analysis to Your Industry Needs

Companies at risk of accidents caused by human error that result in catastrophic consequences include: airline industry mishaps, medical malpractice, medication mistakes, aerospace failures, major oil spills, transportation mishaps, power production failures and manufacturing facility incidents. Human Reliability Assessment (HRA) is used to analyze the inherent risk of human behavior or actions introducing errors into the operation of a system or process. These assessments can be used to identify where errors are most likely to arise and the potential risks involved if they do occur. Using the basic concepts of HRA, an evolving group of methodologies are used to meet various industry needs. Determining which methodology or combination of techniques will provide a quality human reliability assessment is a key element to developing effective strategies for understanding and dealing with risks caused by human errors. There are a number of concerns and difficulties in "tailoring" a Human Reliability Assessment (HRA) for different industries. Although a variety of HRA methodologies are available to analyze human error events, determining the most appropriate tools to provide the most useful results can depend on industry specific cultures and requirements. Methodology selection may be based on a variety of factors that include: 1) how people act and react in different industries, 2) expectations based on industry standards, 3) factors that influence how the human errors could occur such as tasks, tools, environment, workplace, support, training and procedure, 4) type and availability of data, 5) how the industry views risk & reliability, and 6) types of emergencies, contingencies and routine tasks. Other considerations for methodology selection should be based on what information is needed from the assessment. If the principal concern is determination of the primary risk factors contributing to the potential human error, a more detailed analysis method may be employed versus a requirement to provide a numerical value as part of a probabilistic risk assessment. Industries involved with humans operating large equipment or transport systems (ex. railroads or airlines) would have more need to address the man machine interface than medical workers administering medications. Human error occurs in every industry; in most cases the consequences are relatively benign and occasionally beneficial. In cases where the results can have disastrous consequences, the use of Human Reliability techniques to identify and classify the risk of human errors allows a company more opportunities to mitigate or eliminate these types of risks and prevent costly tragedies.

DeMott, D. L.↗

KSC ground operations planning for Space Station

At the Kennedy Space Center (KSC) in Florida, processing facilities are being built and activated to support the processing, checkout, and launch of Space Station elements. The generic capability of these facilities will be utilized to support resupply missions for payloads, life support services, and propellants for the 30-year life of the program. Special Ground Support Equipment (GSE) is being designed for Space Station hardware special handling requirements, and a Test, Checkout, and Monitoring System (TCMS) is under development to verify that the flight elements are ready for launch. The facilities and equipment used at KSC, along with the testing required to accomplish the mission, are described in detail to provide an understanding of the complexity of operations at the launch site. Assessments of hardware processing flows through KSC are being conducted to minimize the processing flow times for each hardware element. Baseline operations plans and the changes made to improve operations and reduce costs are described, recognizing that efficient ground operations are a major key to success of the Space Station.

Lyon, J. R.↗

Mars Surface System Common Capabilities and Challenges for Human Missions

NASA has begun a process to identify and evaluate candidate locations where humans could land, live and work on the martian surface. These locations are referred to as Exploration Zones (EZs). Given current mission concepts, an EZ is a collection of Regions of Interest (ROIs) that are located within approximately 100 kilometers of a centralized landing site. ROIs are areas that are relevant for scientific investigation and/or development/maturation of capabilities and resources necessary for a sustainable human presence. The EZ also contains a landing site and a habitation site that will be used by multiple human crews during missions to explore and utilize the ROIs within the EZ. In parallel with this process, NASA continues to make progress on the Evolvable Mars Campaign examining alternatives that can pioneer an extended human presence on Mars that is Earth independent. This involves ongoing assessments of surface systems and operations to enable a permanent, sustainable human presence. Because of the difficulty in getting equipment and supplies to the surface of Mars, part of these assessments involve identifying those systems and processes that can perform in multiple, sometimes completely unrelated, situations. These assessments have been performed in a very generic surface mission carried out at a very generic surface location. As specific candidate EZs are identified it becomes important to evaluate the current suite of surface systems and operations as they are likely to perform for the specific locations and for the types of operations - both scientific and development - that are proposed for these EZs. It is also important to evaluate the proposed EZs for their suitability to be explored or developed given the range of capabilities and constraints for the types of surface systems and operations being considered within the EMC. This means looking at setting up and operating a field station at a central location within the EZ as well as traversing to and exploring the scientific ROIs within the boundaries of the EZ. The proposed paper will describe the current status of common systems and operations as they can be applied to actual EZ locations on Mars. Initially these EZs will be the four locations identified MEPAG's Human Exploration of Mars Science Analysis Group (HEM‐SAG) that will be used as representative of the EZs that will emerge from the process that NASA has initiated. An example process that could be commonly applied is an approach for developing a field station site plan that would be demonstrated by applying this process to each of the four HEM‐SAG sites. Examples of common systems include (a) mobility systems that can be used to off‐load and move payloads to specific locations at the central field station location that could also be used to traverse long distances to reach some of the more remote ROIs or (b) robotic systems that can support various activities (such as system set up and maintenance) at the field station that could also be used to explore scientific ROIs and used to support site‐specific ISRU production activities.

Hoffman, Stephen J.↗

Compilation and Analysis of 20- and 30-GHz Rain Fade Events at the ACTS NASA Ground Station: Statistics and Model Assessment

Since the beginning of the operational phase of the NASA Research Center's Advanced Communication Technology Satellite (ACTS), signal-fade measurements have been recorded at the NASA Ground Station located in Cleveland, Ohio, with the use of the 20- and 30-GHz beacon signals. Compilations of the daily data have been statistically analyzed on a monthly and yearly basis. Such analyses have yielded relevant parameters as (1) cumulative monthly and yearly probability distributions of signal attenuation by rain, (2) attenuation duration versus attenuation threshold probabilities, and (3) rate-of-fade probabilities. Not only are such data needed for a realistic data base to support the design and performance analysis of future satellite systems, but they are necessary to assess predictions made with the ACTS Rain Attenuation Prediction Model.

Manning, Robert M.↗

General Aviation Flight Test of Advanced Operations Enabled by Synthetic Vision

A flight test was performed to compare the use of three advanced primary flight and navigation display concepts to a baseline, round-dial concept to assess the potential for advanced operations. The displays were evaluated during visual and instrument approach procedures including an advanced instrument approach resembling a visual airport traffic pattern. Nineteen pilots from three pilot groups, reflecting the diverse piloting skills of the General Aviation pilot population, served as evaluation subjects. The experiment had two thrusts: 1) an examination of the capabilities of low-time (i.e., <400 hours), non-instrument-rated pilots to perform nominal instrument approaches, and 2) an exploration of potential advanced Visual Meteorological Conditions (VMC)-like approaches in Instrument Meteorological Conditions (IMC). Within this context, advanced display concepts are considered to include integrated navigation and primary flight displays with either aircraft attitude flight directors or Highway In The Sky (HITS) guidance with and without a synthetic depiction of the external visuals (i.e., synthetic vision). Relative to the first thrust, the results indicate that using an advanced display concept, as tested herein, low-time, non-instrument-rated pilots can exhibit flight-technical performance, subjective workload and situation awareness ratings as good as or better than high-time Instrument Flight Rules (IFR)-rated pilots using Baseline Round Dials for a nominal IMC approach. For the second thrust, the results indicate advanced VMC-like approaches are feasible in IMC, for all pilot groups tested for only the Synthetic Vision System (SVS) advanced display concept.

Glaab, Louis J.↗

Operating Experience Data Analysis for Digital Instrumentation and Control System Reliability and Risk Assessment in Nuclear Power Plants

The implementation of advanced digital instrumentation and control (DI&C) systems in U.S. nuclear power plants (NPPs) can bring significant advancements in reliability, monitoring, and control capabilities. However, these systems also introduce new challenges, particularly in assessing risks such as common-cause failures (CCFs) and establishing robust reliability estimates for DI&C components. Addressing these challenges is critical for ensuring the safe and efficient operation of NPPs. Recently, Idaho National Laboratory was tasked by the U.S. Nuclear Regulatory Commission (NRC) to conduct a DI&C reliability study using operating experience data from the nuclear industry. The two operating experience data sources for the study are the Institute of Nuclear Power Operations’ Industry Reporting and Information System (IRIS) and the NRC’s Licensee Event Report database which is hosted at Idaho National Laboratory at https://lersearch.inl.gov/LERSearchCriteria.aspx. This report provides a comprehensive examination of DI&C systems, including their architecture, operational advantages, and associated challenges. It reviews existing industry DI&C studies and failure mode taxonomies, along with reliability data from various industries. Through a detailed analysis of these databases, the study provides insights into DI&C system performance. Considerations should be given to incorporate DI&C failure data into the NRC's Integrated Data Collection and Coding System and updating the Reliability and Availability Data System to support ongoing DI&C reliability studies. Recommendations are also provided for modeling DI&C reliability and CCF in probabilistic risk assessment, thereby supporting risk-informed decision-making and enhancing the reliability and safety of NPPs.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

A Summary Of: Collecting Sleep, Circadian, Fatigue, and Performance Data in Complex Operational Environments

Sleep loss and circadian misalignment contribute to a meaningful proportion of operational accidents and incidents. Countermeasures and work scheduling designs aimed at mitigating fatigue are typically evaluated in controlled laboratory environments, but the effectiveness of translating such strategies to operational environments can be challenging to assess. This manuscript summarizes an approach for collecting sleep, circadian, fatigue, and performance data in a complex operational environment. We studied 44 airline pilots over 34 days while they flew a fixed schedule, which included a baseline data collection with 5 days of mid-morning flights, four early flights, four high-workload mid-day flights, and four late flights that landed after midnight. Each work block was separated by 3-4 days of rest. To assess sleep, participants wore a wrist-worn research-validated activity monitor continuously and completed daily sleep diaries. To assess the circadian phase, pilots were asked to collect all urine produced in four or eight hourly bins during the 24 h after each duty block for the assessment of 6-sulfatoxymelatonin (aMT6s), which is a biomarker of the circadian rhythm. To assess subjective fatigue and objective performance, participants were provided with a touchscreen device used to complete the Samn-Perelli Fatigue Scale and Psychomotor Vigilance Task (PVT) during and after each flight, and at wake-time, mid-day, and bedtime. Using these methods, it was found that sleep duration was reduced during early starts and late finishes relative to baseline. Circadian phase shifted according to duty schedule, but there was a wide range in the aMT6s peak between individuals on each schedule. PVT performance was worse on the early, high-workload, and late schedules relative to baseline. Overall, the combination of these methods was practical and effective for assessing the influence of sleep loss and circadian phase on fatigue and performance in a complex operational environment.

Arsintescu, Lucica↗

Dynamic probabilistic risk assessment and game theory for cyber security risk analysis in nuclear power plants

Nuclear Power Plants and energy systems have become more prone to cyber-attacks with their digitalization and the increased use of smart equipment. Hence, it is important to quantify the risk associated with cyber-attacks in such systems. Dynamic Probabilistic Risk Assessment which involves studying the evolution of a system due to random events and operator and attacker actions during a cyber-attack by employing a physics-based model of the system is a suitable framework to quantify cybersecurity risk in nuclear power plants. In addition to the plant dynamics, it is also important to model the strategies of the attackers and plant operators for an effective cybersecurity risk assessment. Game theory provides a set of necessary tools to model such strategic interactions. In this research, a framework that integrates dynamic probabilistic risk assessment with game theory for cybersecurity risk analysis in nuclear power plants is presented. The mathematical formulation is derived based on the theory of continuous event trees. We propose a game theory based action model, that utilizes physics-based rewards to define the strategies of attackers and operators at every decision epoch. As a case study, the risk associated with cyber-attacks on the digital components in the secondary side of a pressurized water reactor is studied using a reduced order model. A set of attacker actions and a set of operator actions are defined for the system. The operator and attacker interactions were modelled using simultaneous game, their action policies were computed using the concept of mixed strategy Nash equilibrium and the evolution of the system was studied.

97 MATHEMATICS AND COMPUTING↗

Planning for the storm: Considering renewable energy for critical infrastructure resilience

This study uses the renewable energy optimization model to assess three critical facilities in North Carolina. Techno-economic results were then compared to analyses completed for critical facilities in California and New York to assess energy system cost effectiveness. Though solar photovoltaic (PV) arrays are cost-effective across each of the three North Carolina facilities, adopting battery storage to enable PV to operate with existing diesel generators in a hybrid energy system reduces the economic value of the system. This is in contrast to more economically viable systems in California and New York. All of these systems also offer unquantified resilience benefits by extending operation from hours to weeks across the facilities. If decision makers were able to value the resilience benefits offered by each system or utility rate structures were changed to incentivize battery storage during normal operations, it would impact these assessments. Even so, this analysis provides decision makers a key set of cost benchmarks when considering how they might improve resilience at their critical operations.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Systems Analysis in Support of the NASA Fuel Cell Upgrade Program for the Space Shuttle Orbiter

In early 1996 as part of NASA's overall efforts to improve space shuttle operations, NASA undertook an internal assessment of the shuttle to identify subsystems in the greatest need of upgrading. The criteria used to rank the candidate subsystems were safety improvement, reduction in acquisition and operational costs, improvement in fleet supportability, improvement in mission effectiveness, implementation risk, and commonality with future NASA missions. On the basis of the preliminary results of the NASA assessment, the Fuel Cell Power Plant (FCP) for the shuttle orbiter was among those subsystems selected for further consideration.

Hoberecht, Mark A.↗

Constellation Program Mission Operations Project Office Status and Support Philosophy

The Constellation Program Mission Operations Project Office (CxP MOP) at Johnson Space Center in Houston Texas is preparing to support the CxP mission operations objectives for the CEV/Orion flights, the Lunar Lander, and and Lunar surface operations. Initially the CEV will provide access to the International Space Station, then progress to the Lunar missions. Initial CEV mission operations support will be conceptually similar to the Apollo missions, and we have set a challenge to support the CEV mission with 50% of the mission operations support currently required for Shuttle missions. Therefore, we are assessing more efficient way to organize the support and new technologies which will enhance our operations support. This paper will address the status of our preparation for these CxP missions, our philosophical approach to CxP operations support, and some of the technologies we are assessing to streamline our mission operations infrastructure.

Smith, Ernest↗

Reducing Risk of InSight Surface Operations Through High-Fidelity Command Sequence Modeling

Simulating spacecraft behavior is crucial for the success of deep space missions, and failure to do so may result in damages to or the loss of the spacecraft. Many previous deep space missions have made use of ground-simulation of sequenced commanding, at speeds far greater than real time, to predict spacecraft state over time through the execution of onboard sequences. This type of modeling can be done at any fidelity, and most missions have opted to decrease fidelity to reduce cost and complexity. However, NASA’s Interior Exploration using Seismic Investigations, Geodesy and Heat Transport (InSight) mission expanded the scope of ground modeling considerably, which has led to numerous benefits over past implementations. This paper will discuss the process and products that InSight created, as well as the lessons learned from successfully operating the spacecraft on Mars. InSight is the first JPL mission to expand the scope of ground modeling to include the uplink of files from Earth to the spacecraft, rather than making the simplification that any command sequences already exist onboard the spacecraft. The advantages of modeling the uplink of files are numerous. First, it allows for accurate modeling of the onboard filesystem of the spacecraft at all points in time, meaning that all file loads and deletions throughout the mission are modeled at the exact moment they are predicted to actually happen. Second, operators can be more certain that dependencies between sequences are not broken due to the dynamic nature of the filesystem as files are deleted, copied, and uplinked. Lastly, spacecraft filesystem tracking allows for management of sequences prior to uplink, limiting the uplink to only new sequences. The onboard filesystem model became crucial to mission success, emphasizing the importance of investing in accurate models before the need for them arises. During daily tactical operations of a spacecraft on Mars, a model is only useful if the results can be interpreted quickly. In this fast-paced environment, it is essential that command products are modeled and reviewed, errors are found and diagnosed, and new command products are redelivered, remodeled, re-reviewed in a timely manner. It is impossible to review the entire model and therefore the results of the model must be condensed and presented in a fashion that is intuitive, easy-to-navigate, complete, and trustworthy. InSight developed a number of innovative sequence review products that are designed to provide operators with the information required to quickly assess the validity of command products and diagnose potential issues. Together, these products provide a complete, yet succinct picture of the command and sequence model to the operators and facilitate a quick assessment of all sequence command products. This paper will cover planning and sequencing innovations made during InSight surface operations, and will compare the tools, processes, and results to those on other missions. Additionally, the paper will cover the flexible, yet robust nature of the planning and sequencing system architecture and how that flexibility allowed for rapid development and response to the unpredictability of Mars.

Cloutier, Kyle↗

Comparison of Ground-Based and Airborne Function Allocation Concepts for NextGen Using Human-In-The-Loop Simulations

Investigation of function allocation for the Next Generation Air Transportation System is being conducted by the National Aeronautics and Space Administration (NASA). To provide insight on comparability of different function allocations for separation assurance, two human-in-the-loop simulation experiments were conducted on homogeneous airborne and ground-based approaches to four-dimensional trajectory-based operations, one referred to as ground-based automated separation assurance (groundbased) and the other as airborne trajectory management with self-separation (airborne). In the coordinated simulations at NASA s Ames and Langley Research Centers, controllers for the ground-based concept at Ames and pilots for the airborne concept at Langley managed the same traffic scenarios using the two different concepts. The common scenarios represented a significant increase in airspace demand over current operations. Using common independent variables, the simulations varied traffic density, scheduling constraints, and the timing of trajectory change events. Common metrics were collected to enable a comparison of relevant results. Where comparisons were possible, no substantial differences in performance or operator acceptability were observed. Mean schedule conformance and flight path deviation were considered adequate for both approaches. Conflict detection warning times and resolution times were mostly adequate, but certain conflict situations were detected too late to be resolved in a timely manner. This led to some situations in which safety was compromised and/or workload was rated as being unacceptable in both experiments. Operators acknowledged these issues in their responses and ratings but gave generally positive assessments of the respective concept and operations they experienced. Future studies will evaluate technical improvements and procedural enhancements to achieve the required level of safety and acceptability and will investigate the integration of airborne and ground-based capabilities within the same airspace to leverage the benefits of each concept.

Wing, David J.↗

Space Shuttle Communications Coverage Analysis for Thermal Tile Inspection

The space shuttle ultra-high frequency Space-to-Space Communication System has to provide adequate communication coverage for astronauts who are performing thermal tile inspection and repair on the underside of the space shuttle orbiter (SSO). Careful planning and quantitative assessment are necessary to ensure successful system operations and mission safety in this work environment. This study assesses communication systems performance for astronauts who are working in the underside, non-line-of-sight shadow region on the space shuttle. All of the space shuttle and International Space Station (ISS) transmitting antennas are blocked by the SSO structure. To ensure communication coverage at planned inspection worksites, the signal strength and link margin between the SSO/ISS antennas and the extravehicular activity astronauts, whose line-of-sight is blocked by vehicle structure, was analyzed. Investigations were performed using rigorous computational electromagnetic modeling techniques. Signal strength was obtained by computing the reflected and diffracted fields along the signal propagation paths between transmitting and receiving antennas. Radio frequency (RF) coverage was determined for thermal tile inspection and repair missions using the results of this computation. Analysis results from this paper are important in formulating the limits on reliable communication range and RF coverage at planned underside inspection and repair worksites.

Kroll, Quin D.↗