Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “mission progress”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Science Goal Driven Observing and Spacecraft Autonomy

Spacecraft autonomy will be an integral part of mission operations in the coming decade. While recent missions have made great strides in the ability to autonomously monitor and react to changing health and physical status of spacecraft, little progress has been made in responding quickly to science driven events. For observations of inherently variable targets and targets of opportunity, the ability to recognize early if an observation will meet the science goals of a program, and react accordingly, can have a major positive impact on the overall scientific returns of an observatory and on its operational costs. If the onboard software can reprioritize the schedule to focus on alternate targets, discard uninteresting observations prior to downloading, or download a subset of observations at a reduced resolution, the spacecraft's overall efficiency will be dramatically increased. The science goal monitoring (SGM) system is a proof- of-concept effort to address the above challenge. The SGM will have an interface to help capture higher-level science goals from the scientists and translate them into a flexible observing strategy that SGM can execute and monitor. We are developing an interactive distributed system that will use on-board processing and storage combined with event-driven interfaces with ground-based processing and operations, to enable fast re-prioritization of observing schedules, and to minimize time spent on non-optimized observations. This paper will focus on our strategy for developing SGM and the technical challenges that we have encountered. We will discuss the SGM architecture as it applies to the proposed MIDEX-class mission Kronos. However, the architecture and interfaces will also be designed for easy adaptability to other observing platforms, including ground-based systems and to work with different scheduling and pipeline processing systems.

Jones, Jeremy↗

Affordable and Lightweight High-Resolution X-ray Optics for Astronomical Missions

Future x-ray astronomical missions require x-ray mirror assemblies that provide both high angular resolution and large photon collecting area. In addition, as x-ray astronomy undertakes more sensitive sky surveys, a large field of view is becoming increasingly important as well. Since implementation of these requirements must be carried out in broad political and economical contexts, any technology that meets these performance requirements must also be financially affordable and can be implemented on a reasonable schedule. In this paper we report on progress of an x-ray optics development program that has been designed to address all of these requirements. The program adopts the segmented optical design, thereby is capable of making both small and large mirror assemblies for missions of any size. This program has five technical elements: (1) fabrication of mirror substrates, (2) coating, (3) alignment, (4) bonding, and (5) mirror module systems engineering and testing. In the past year we have made progress in each of these five areas, advancing the angular resolution of mirror modules from 10.8 arc-seconds half-power diameter reported (HPD) a year ago to 8.3 arc-seconds now. These mirror modules have been subjected to and passed all environmental tests, including vibration, acoustic, and thermal vacuum. As such this technology is ready for implementing a mission that requires a 10-arc-second mirror assembly. Further development in the next two years would make it ready for a mission requiring a 5-arc-second mirror assembly. We expect that, by the end of this decade, this technology would enable the x-ray astrophysical community to compete effectively for a major x-ray mission in the 2020s that would require one or more 1-arc-second mirror assemblies for imaging, spectroscopic, timing, and survey studies.

glass slumping↗

LISA Pathfinder and eLISA news

Two important gatherings of the space-based gravitational-wave detector community were held in Zurich, Switzerland this past March. The first was a meeting of the Science Working Team for LISA Pathfinder (LPF), a dedicated technology demonstrator mission for a future LISA-like gravitational wave observatory. LPF is entering an extremely exciting phase with launch less than 15 months away. All flight components for both the European science payload, known as the LISA Technology Package (LTP), and the NASA science payload, known as the Space Technology 7 Disturbance Reduction System (ST7-DRS), have been delivered and are undergoing integration. The final flight component for the spacecraft bus, a cold-gas thruster based on the successful GAIA design, will be delivered later this year. Current focus is on completing integration of the science payload (see Figures 1 and 2) and preparation for operations and data analysis. After a launch in Summer 2015, LPF will take approximately 90 days to reach its operational orbit around the Earth-Sun Lagrange point (L1), where it will begin science operations. After 90 days of LTP operations followed by 90 days of DRS operations, LPF will have completed its prime mission of paving the way for a space-based observatory of gravitational waves in the milliHertz band. Immediately following the meeting of the LPF team, the eLISA consortium held its third progress meeting. The consortium (www.elisascience.org) is the organizing body of the European space-based gravitational-wave community, and it was responsible for the "The Gravitational Universe" whitepaper that resulted in the November 2013 election of a gravitational-wave science theme for ESA's Cosmic Visions L3 opportunity. In preparation for an L3 mission concept call, which is expected later this decade, and for launch in the mid 2030s, the eLISA consortium members are coordinating technology development and mission study activities which will build on the LPF results. The final mission concept is expected to include some international (non-European) contributions, and NASA has expressed an interest in participating in this ground-breaking mission. The US research community supports such a collaboration, or any other mission scenario that achieves the high-priority science of a space-based gravitational-wave observatory at the earliest possible date.

pathfinder↗

SATCOP mission planning software package

As the CDSLR Network grows into the 1990's, it is undergoing many changes in both its capabilities and requirements. On the one hand, great progress has been made in terms of increasing the SLR systems' performance. Upgrades to the onsite computer and improved laser ranging hardware have greatly increased the number of satellite passes which can be acquired during an operating shift by reducing the amount of time needed for operations other than actual ranging. On the other hand, more requirements have been placed on the systems. Many more satellites have become available, with more scheduled for launch, thus, increasing the likelihood of simultaneous satellite visibility. In addition, the possible scenarios required for ranging these many satellites are changing frequently, with conflicting priorities and needs. It became apparent that some tools needed to be developed to assist the planners in determining Network ranging priorities. Such tools have been developed at Bendix under the direction of NASA's Dynamics of the Solid Earth Project (DOSE) for both long range planning and routine operations to maximize the amount of data collected. This paper reviews some of these tools and describe their uses.

Bucey, Steve↗

Progress of the Dust Accumulation and Removal Technology Experiment (DART) for the Mars 2001 Lander

Dust deposition could be a significant problem for photovoltaic array operation for long duration missions on the surface of Mars. Measurements made by Pathfinder showed 0.3 percent loss of solar array performance per day due to dust obscuration. We have designed an experiment package, "DART", which is part of the Mars ISPP Precursor (MIP) package, to fly on the Mars-2001 Surveyor Lander. This mission, to launch in April 2001, will arrive on Mars in January 2002. The DART experiment is designed to quantify dust deposition from the Mars atmosphere, measure the properties of settled dust, measure the effect of dust deposition on array performance, and test several methods of clearing dust from solar cells.

Jenkins, Phillip↗

Crew Medical Training to Progressively Enable EIMO

Background. Onboard medical capabilities have greatly expanded over the history of the US space program. Newly identified space-related medical conditions, technological advances, and longer mission durations have led to an increasing need for on-demand medical expertise. Lengthy communications delays, lack of resupply and evacuation opportunities on exploration-class missions place an ever-increasing burden on the crew to provide medical care. Having adequate knowledge, skills, and abilities (KSA) available is an essential component of successful Earth Independent Medical Operations (EIMO). Without appropriate crew training and KSA, cutting-edge medical equipment has little value. Presumably, the crew will include a qualified physician; however, if the physician is incapacitated, a non-physician crew medical officer (CMO) will be needed. While more crew time is needed for medical training, there will be concomitant increases in preflight training demands for vehicle system management, operations, science, and contingencies. In truly independent operations, onboard resources such as just-in-time training, mixed reality, decision support tools, and AI-enabled chatbot “consultants” will be needed to augment KSA. Overview. Because of crew time constraints, topical priorities must be determined for preflight training. Curricula should be developed that emphasize management of conditions with relatively high incidence and morbidity/mortality. Defining the required KSA levels to treat each condition is essential, but all crewmembers should have basic lifesaving skills. Procedural and diagnostic training on live patients and simulators should be prioritized over classroom lectures. Crews must be trained with onboard equipment, resources, mixed reality, and AI-based decision support tools. Mission simulations should include medical problems with/without ground support and with appropriate communication delays. Certification guidelines for each level of KSA must be established. Skills rapidly decay for non-physician CMO’s; both pre-flight and in-flight refresher training will be needed. During spaceflight just-in-time training, simulations, and onboard CME with crew physician can help retain skills. Discussion. Medical technology, simulation design, mixed reality, and AI are advancing at a dizzying rate. Recognizing the severe constraints on crew time, it is critical that astronaut training is highly efficient and adapted to keep pace with new innovations both pre-flight and during exploration missions. These challenges will be discussed during this panel session.

Jay Lemery↗

Summary of NASA Progress on the Development and Qualification of a 12-kW Hall-Effect, Solar Electric Propulsion Thruster

Beginning in 2014, the National Aeronautics and Space Administration (NASA) Space Technology Mission Directorate (STMD) began a project to increase the state of the art for the Hall-Effect Solar Electric Propulsion (SEP) technology. The Technology Demonstration Missions (TDM) Program Office provides programmatic oversight of SEP with the project being led by Glenn Research Center, supported by the Jet Propulsion Laboratory and development, qualification & flight hardware all provided by Aerojet Rocketdyne (AR). This technology was pursued as the propulsion system for the Asteroid Redirect and Robotic Mission (ARRM). While the concept was originally slated for ARRM, it was realigned to Gateway to support future Moon to Mars objectives. The Gateway lunar station was established and will play a key role in NASA’s Artemis Program which utilizes collaboration with the Canadian Space Agency (CSA), the European Space Agency (ESA) and the Japanese Space Agency (JAXA). The 12-kW hardware will be the primary propulsion for the Gateway element, Power & Propulsion Element (PPE), from Low Earth Orbit to a Near Rectilinear Halo Orbit around the Moon. Initial efforts began with utilizing Technology Development Units (TDU) built by NASA as the predecessor to the contract activity with AR. Over the past few years, AR has built Engineering Test Units (ETU), Engineering Development Units (EDU) and qualification & flight models (QM and FM, respectively). With requirement changes from the AARM mission to PPE, the joint team has modified the design and has started qualification activities for environment testing (shock, vibe) at multiple facilities in the US leading to eventual life testing. This paper will explore the various design changes, system modeling and the latest status for qualification testing.

Joel Robinson↗

Pu-238 Production Progress at Idaho National Laboratory From December 2023 to November 2024

Idaho National Laboratory (INL) has continued in the effort to produce Pu-238 to support NASA deep space missions. In support of the production goal of contributing 700 g to the 1.5 kg per year constant rate production of Pu-238 heat source material in the United States by 2026. All available inner core positions of the Advanced Test Reactor (ATR) have been qualified for production for a 20% Np target, with efforts nearing completion for a 30% Np target further increasing production amounts. This includes the North East Flux Trap (NEFT), South Flux Trap (SFT), Inner A, H positions. With the completion of qualifying the inner core of ATR, work has started on the qualifying the outer core. The portion of the outer core that will produce Pu-238 includes the Large and Medium I positions. With the continued qualification work, INL is on track to contribute to the production goal by 2026.

07 - ISOTOPES AND RADIATION SOURCES↗

Mars Aqueous Chemistry Experiment (MACE)

The concept of an aqueous-based chemical analyzer for Martian surface materials has been demonstrated to be feasible. During the processes of analysis, design, breadboarding, and most importantly, testing, it has become quite apparent that there are many challenges in implementing such a system. Nonetheless, excellent progress has been made and a number of problems which arose have been solved. The ability to conduct this work under a development environment which is separate and which precedes the project-level development has allowed us to find solutions to these implementation realities at low cost. If the instrument had been selected for a mission without this laboratory pre-project work, the costs of implementation would be much higher. In the four areas covered in Sections D, E, F, and G of this Final Report, outstanding progress has been made. There still remains the task of flight-qualifying certain of the components. This is traditionally done under the aegis of a Flight Project, but just as the concept development can be done at much lower cost when kept small and focused, so could the qualification program of critical parts benefit. We recommend, therefore, that NASA consider means of such qualifications and brass-boarding, in advance of final flight development. This is a generic recommendation, but hardware such as the Mars aqueous chemistry experiment (MACE) and other similarly-new concepts are particularly applicable. MACE now has wide versatility, in being able to reliably dispense both liquids and solids as chemical reagents to an entire suite of samples. The hardware and the experiment is much simpler than was developed for the Viking Biology instrument, yet can accomplish all the inorganic chemical measurements that the Viking desing was capable of. In addition, it is much more flexible and versatile to new experiment protocols (and reagents) than the Viking design ever could have been. MACE opens up the opportunity for many different scientific disciplines to design sub- experiments and to benefit from the investigations that can be conducted. In this sense, it will have the value of a facility, although our recommendation would be that it be under the stewardship of a single lead investigator to insure that conflicting requirements not compromise the straight-forward design that have been achieved. MACE is an excellent candidate for upcoming Mars missions, including the Mars Surveyor Program (MSP) lander missions in 2001 and 2003. In addition, it could be used for any mission to the surface of any other planet or planetary body (including small bodies). An important next step is to encourage various investigators to propose specific uses for this experiment that specifically address their major scientific objectives for upcoming missions.

Benton, Clark C.↗

STS-77 Flight Day 5

On this fifth day of the STS-77 mission, the flight crew, Cmdr. John H. Casper, Pilot Curtis L. Brown, Jr., and Mission Specialists Andrew S.W. Thomas, Ph.D., Daniel W. Bursch, Mario Runco, Jr., and Marc Garneau, Ph.D., spend the first half of their workday assisting payload controllers with investigations into materials processing of samples and the growth of crystals. The progress of starfish and mussel development in a spaceborne aquarium in the Spacehab module in the Shuttle's cargo bay is seen. The crew then move off in different directions to support work with many of the experiments that make up the fourth mission of the Spacehab pressurized module. Endeavour is about 64 miles away from the Passive Aerodynamically Stabilized Magnetically Damped Satellite-Satellite Test Unit, or PAMS-STU, which was deployed from a canister in the payload bay on day four. Since mission day five coincided with Memorial Day , the crew started the 'Indy 500' from earth orbit.

Source record↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek A Whitman↗

Adaptive Independent Verification and Validation (IV&V) Reduces Risk of Software Impacting Safety in Artemis Missions

The National Aeronautics and Space Administration (NASA) is asking more of its human spaceflight programs than ever before through the collective Artemis Missions. The NASA Independent Verification and Validation (IV&V) Program contributes to NASA’s human spaceflight goals by providing IV&V services for NASA’s critical spacecraft and ground software. The IV&V Program is tasked with providing assurance from both individual and integrated mission software perspectives. The Artemis IV&V organization is actively supporting six distinct development efforts: Orion, the Space Launch System (SLS), Exploration Ground Systems (EGS), Mission Control Center (MCC), the Lunar Gateway, and the Human Landing System (HLS), representing a wide diversity of developer organizations, management structures, and development approaches. With much of this extremely complex flight and ground software being essential to human safety both on the ground and in space, Artemis IV&V is likewise challenged to provide more value-added assurance to future Artemis missions within a constrained budget. To meet this challenge, Artemis IV&V employs a variety of novel and evolving “Adaptive IV&V” approaches for planning and executing IV&V analysis to increase both the efficiency and effectiveness of the IV&V Program’s assurance activities, and to address the difficulties imposed by assuring software for a large, highly integrated, multi-mission enterprise managed and executed by physically and organizationally distinct programs. Instilling agile principles like iterative planning cycles, self-organizing teams, and regular retrospectives, into IV&V planning and execution has led to a more rapid turnaround of a minimum viable assurance product and allowed for increased alignment of assurance activities with development progress. Adopting an assurance case methodology has led to greater consistency and clearer communication of assurance design and provided a foundation for long-term maintenance of assurance plans, products, and results across missions. The IV&V-developed Assurance / Safety Case Analytical Network (A-SCAN) framework and tool has enabled the quantification and tracking of system/software risk and confidence. These confidence measures provide a means to repeatedly express the impact of planned and completed assurance work and the remaining residual risk. Applied as part of a “Follow-the-Risk” organizational ethos, this allows consistent rightsizing of analysis rigor and intensity commensurate with the perceived risk of defects, as well as appropriate targeting of the highest risk areas of the software to find safety issues before they can manifest. Finally, the development of the IV&V Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE), an integrated software-only simulation of Orion, SLS, and EGS systems, has made it possible to independently test integrated pad and flight scenarios and inject faults to observe how the Artemis multi-program, mission software behaves in degraded modes and in response to hazards. These adaptive IV&V investments have enabled Artemis IV&V to become more efficient and effective in IV&V planning and execution and respond more readily to changes in the risk landscape, increasing the breadth and depth of risk reduction possible within the available resources. Residual risk tracking allows IV&V to communicate more effectively with stakeholders, both internal and external at all levels, and inform key decision-making personnel. This evolving assurance design approach provides IV&V surety that work is performed in the highest risk, most value-added areas of the software, to keep our astronauts and ground crews safe and ensure mission success.

Gerek Whitman↗

Driving Curiosity: Mars Rover Mobility Trends During the First Seven Years

NASA’s Mars Science Laboratory (MSL) mission landed the Curiosity rover on Mars on August 6, 2012. As of August 6, 2019 (sol 2488), Curiosity has driven 21,318.5 meters over a variety of terrain types and slopes, employing multiple drive modes with varying amounts of onboard autonomy. Curiosity’s drive distances each sol have ranged from its shortest drive of 2.6 centimeters to its longest drive of 142.5 meters, with an average drive distance of 28.9 meters. Real-time human intervention during Curiosity drives on Mars is not possible due to the latency in uplinking commands and downlinking telemetry, so the operations team relies on the rover’s flight software to prevent an unsafe state during driving. Over the first seven years of the mission, Curiosity has attempted 738 drives. While 622 drives have completed successfully, 116 drives were prevented or stopped early by the rover’s fault protection software. The primary risks to mobility success have been wheel wear, wheel entrapment, progressive wheel sinkage (which can lead to rover embedding), and terrain interactions or hardware or cabling failures that result in an inability to command one or more steer or drive actuators. In this paper, we describe mobility trends over the first 21.3km of the mission, operational aspects of the mobility fault protection, and risk mitigation strategies that will support continued mobility success for the remainder of the mission.

Rankin, Arturo↗

Progress in Payload Separation Risk Mitigation for a Deployable Venus Heat Shield

A deployable decelerator known as the Adaptive Deployable Entry and Placement Technology (ADEPT) offers substantial science and mass savings for the Venus In Situ Explorer (VISE) mission. The lander and science payload must be separated from ADEPT during atmospheric entry. This paper presents a trade study of the separation system concept of operations and provides a conceptual design of the baseline: aft-separation with a subsonic parachute. Viability of the separation system depends on the vehicle's dynamic stability characteristics during deceleration from supersonic to subsonic speeds. A trajectory sensitivity study presented shows that pitch damping and Venusian winds drive stability prior to parachute deployment, while entry spin rate is not a driver of stability below Mach 5. Additionally, progress in free-flight CFD techniques capable of computing aerodynamic damping parameters is presented. Exploratory simulations of ADEPT at a constant speed of Mach number of 0.8 suggest the vehicle may have an oscillation limit cycle near 5 angle-of-attack. The proposed separation system conceptual design is thought to be viable.

Smith, Brandon P.↗

SAMS Acceleration Measurement on Mir From March to September 1996

During NASA Increment 2 (March to September 1996), over 15 gigabytes of acceleration data were collected by the Space Acceleration Measurement System (SAMS) onboard the Russian Space Station, Mir. The data were recorded on 55 optical disks and were returned to Earth on STS-79. During this time, SAMS data were collected in the Kristall and Kvant modules, and in the Priroda module to support the following experiments: the Queen's University Experiments in Liquid Diffusion (QUELD), the Technological Evaluation of the MIM (TEM), the Forced Flow Flame Spreading Test (FFFT), and Candle Flames in Microgravity (CFM). This report points out some of the salient features of the microgravity environment to which these experiments were exposed. Also documented are mission events of interest such as the docked phase of STS-76 operations, an extravehicular activity (EVA) to install and deploy solar panels on the Kvant module, a Progress engine burn to raise Mir's altitude, and an on-orbit SAMS calibration procedure. Also included are a description of the Mir module orientations, and the panel notations within the modules. This report presents an overview of the SAMS acceleration measurements recorded by 10 Hz and 100 Hz sensor heads. Variations in the acceleration environment caused by unique activities such as crew exercise and life-support fans are presented. The analyses included herein complement those presented in previous mission summary reports published by the Principal Investigator Microgravity Services (PIMS) group.

Moskowitz, Milton E.↗

The Value of a Spaceflight Clinical Decision Support System for Earth-Independent Medical Operations

As NASA prepares for crewed lunar missions over the next several years, plans are also underway to journey farther into deep space. Deep space exploration will require a paradigm shift in astronaut medical support toward progressively earth-independent medical operations (EIMO). The Exploration Medical Capability (ExMC) element of NASA’s Human Research Program (HRP) is investigating the feasibility and value of advanced capabilities to promote and enhance EIMO. Currently, astronauts rely on real-time communication with ground-based medical providers. However, as the distance from Earth increases, so do communication delays and disruptions. Moreover, resupply and evacuation will become increasingly complex, if not impossible, on deep space missions. In contrast to today’s missions in low earth orbit (LEO), where most medical expertise and decision-making are ground-based, an exploration crew will need to autonomously detect, diagnose, treat, and prevent medical events. Due to the sheer amount of pre-mission training required to execute a human spaceflight mission, there is often little time to devote exclusively to medical training. One potential solution is to augment the long duration exploration crew’s knowledge, skills, and abilities with a clinical decision support system (CDSS). An analysis of preliminary data indicates the potential benefits of a CDSS to mission outcomes when augmenting cognitive and procedural performance of an autonomous crew performing medical operations, and we provide an illustrative scenario of how such a CDSS might function.

Brian K. Russell↗

Current Perspectives in High Energy Astrophysics

High energy astrophysics is a space-age discipline that has taken a quantum leap forward in the 1990s. The observables are photons and particles that are unable to penetrate the atmosphere and can only be observed from space or very high altitude balloons. The lectures presented as chapters of this book are based on the results from the Compton Gamma-Ray Observatory (CGRO) and Advanced Satellite for Cosmology and Astrophysics (ASCA) missions to which the Laboratory for High Energy Astrophysics at NASA's Goddard Space Flight Center made significant hardware contributions. These missions study emissions from very hot plasmas, nuclear processes, and high energy particle interactions in space. Results to be discussed include gamma-ray beaming from active galactic nuclei (AGN), gamma-ray emission from pulsars, radioactive elements in the interstellar medium, X-ray emission from clusters of galaxies, and the progress being made to unravel the gamma-ray burst mystery. The recently launched X-ray Timing Explorer (XTE) and prospects for upcoming Astro-E and Advanced X-ray Astronomy Satellite (AXAF) missions are also discussed.

Ormes, Jonathan F.↗

Tribal Colleges and Universities/Advanced Manufacturing Network Initiative (Q3 FY2020 Progress Report)

The National Nuclear Security Agency (NNSA) initiated the Minority Serving Institution Partnership Plan (MSIPP) to 1) align investments in a university capacity and workforce development with the NNSA mission to develop the needed skills and talent for NNSA's enduring technical workforce at the laboratories and production plants, and 2) to enhance research and education at under-represented colleges and universities. Out of this effort, MSIPP launched a new consortium in early FY17 focused on Tribal Colleges and Universities (TCUs) known as the Advanced Manufacturing Network Initiative (AMNI). This consortium has been extended for FY20 and FY21. The following report summarizes the status update during this quarter.

42 ENGINEERING↗