Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “installations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

System Noise Assessment and the Potential for a Low Noise Hybrid Wing Body Aircraft with Open Rotor Propulsion

An aircraft system noise assessment was conducted for a hybrid wing body freighter aircraft concept configured with three open rotor engines. The primary objective of the study was to determine the aircraft system level noise given the significant impact of installation effects including shielding the open rotor noise by the airframe. The aircraft was designed to carry a payload of 100,000 lbs on a 6,500 nautical mile mission. An experimental database was used to establish the propulsion airframe aeroacoustic installation effects including those from shielding by the airframe planform, interactions with the control surfaces, and additional noise reduction technologies. A second objective of the study applied the impacts of projected low noise airframe technology and a projection of advanced low noise rotors appropriate for the NASA N+2 2025 timeframe. With the projection of low noise rotors and installation effects, the aircraft system level was 26.0 EPNLdB below Stage 4 level with the engine installed at 1.0 rotor diameters upstream of the trailing edge. Moving the engine to 1.5 rotor diameters brought the system level noise to 30.8 EPNLdB below Stage 4. At these locations on the airframe, the integrated level of installation effects including shielding can be as much as 20 EPNLdB cumulative in addition to lower engine source noise from advanced low noise rotors. And finally, an additional set of technology effects were identified and the potential impact at the system level was estimated for noise only without assessing the impact on aircraft performance. If these additional effects were to be included it is estimated that the potential aircraft system noise could reach as low as 38.0 EPNLdB cumulative below Stage 4.

Thomas, Russell H.↗

Thermal Protection Systems Technology Transfer from Apollo and Space Shuttle to the Orion Program

This paper describes how the Orion program is utilizing the Thermal Protection System (TPS) experience from the Apollo and Space Shuttle programs to reduce program risk and improve affordability to meet NASA's future manned exploration missions. The Orion program successfully completed the Exploration Flight Test (EFT-1) mission in 2014 and is currently assembling, integrating, and testing the next spacecraft for the Exploration Mission (EM-1) to meet the flight test objectives of an unmanned orbital mission to the moon and return to earth in 2019. The Orion spacecraft production operations are located in the Neil Armstrong Operations and Checkout (O&C) facility at the Kennedy Space Center (KSC) providing an affordable and seamless delivery approach of vehicles directly to the launch site eliminating spacecraft transportation and additional checkout testing. Innovative vehicle design, manufacturing and test operations approaches are maturing and evolving with each Orion vehicle build to support the challenging NASA exploration mission requirements beyond Low Earth Orbit (LEO) while reducing program cost and schedule impacts. An example of Orion's evolution is the incorporation of an improved heat shield design, assembly and testing approach to meet the higher re-entry velocities for a lunar return for the EM-1 mission. The EFT- 1 heat shield was based on the Apollo heat shield manufacturing processes and was assembled at a supplier location and then transported to KSC for final integration. The EM-1 heat shield is now manufactured, assembled, tested, and installed into the spacecraft at the O&C facility reducing program cost and production schedules. The transition of the Space Shuttle TPS capabilities has enabled Orion to provide a human rated capsule design using proven materials and processes established over years of orbiter re-entry missions. The Orion Crew Module (CM) TPS configuration is derived from the Apollo CM approach utilizing improved materials and processes developed from the Space Shuttle program. The Orion EFT-1 heat shield utilized the Avcoat ablative material from Apollo which was injected into a honeycomb substrate and has been updated for EM-1 incorporating a block configuration bonded to a composite shell structure. This approach utilizes the proven Avcoat material for the heat shield ablator and is utilizing derived bonding and inspection methods and techniques from the Space Shuttle tile experience. The Orion back shell TPS configuration is based on Space Shuttle tile designs using proven tile materials and coatings. The Orion forward bay cover utilizes the high temperature tiles similar to the back shell tiles and low temperature blankets derived from the Space Shuttle program reducing weight impacts. Space Shuttle Multi-Layer Insulation (MLI) is installed in the Orion capsule to control the interior temperature environment providing a light weight design. These TPS design approaches have performed successfully on the Orion first flight test on EFT-1 and are incorporated in the configuration for the next flight test for EM-1. Completion of these two flight tests will certify the TPS for the Orion program for human rated exploration missions and has reduced the development cost to the Orion program. In addition to transitioning the Space Shuttle TPS design configurations to Orion, the supporting manufacturing infrastructure, manufacturing processes, and inspection methods are also incorporated into the Orion assembly operations at KSC. This has avoided significant startup schedule and costs impacts of new capabilities and development of support operations necessary to fabricate, install, inspect, and validate the TPS installations for the Orion spacecraft. The Thermal Protection System Facility (TPSF) which supported the Space Shuttle program provides the heat shield Avcoat blocks and the back shell AETB-8 tiles for Orion program. Extending the existing Space Shuttle TPS operations at KSC provides onsite support to the Orion spacecraft assembly operations. A significant benefit to the Orion program is the transition of the Space Shuttle technician work force at KSC. This highly skilled workforce was able to transition to the Orion program and immediately support the TPS installation operations. They brought with them the human rated manufacturing and assembly operations culture that was critical to the Space Shuttle success avoiding the retraining cost and schedule impacts of a new workforce to Orion. The technician skills certification program from the Space Shuttle was found to be compatible with the Lockheed Martin technician certification programs enabling a seamless training process utilizing process similarity avoiding the cost of retraining the work force to Orion standards. The existing workforce is certificated for multiple processes enabling reassignment of technicians to other tasks in the Orion AI&P operations reducing the overall touch labor manpower requirements. Additional benefits of using the Space Shuttle workforce is the incorporation of the lessons learned from Space Shuttle processes to improve the Orion TPS processes. This has resulted in a continuous evolution of TPS processes to improve the producibility and reduce the program cost for the TPS for the Orion program. Transitioning the Apollo and Space Shuttle TPS designs, processes, and technician workforce has been instrumental in enabling Orion to successfully meet the program challenges for NASA's exploration missions of the future.

Stewart, Michael↗

Initial Calibrations and Wind Tunnel Test Results for an In-Flow Reference Array Using New In-Flow Acoustic Sources in Four Array Mount Configurations

This paper describes efforts to develop a small in-flow phased microphone array as a reference acoustic sensor and quantify its level-measurement accuracy with new in-flow calibration sources. The devices can be applied to a wide variety of in- and out-of-flow measurement applications and test facilities. Recent tests of the array and two calibration sources in the NASA Anechoic Chamber and Army 7- by 10-foot Wind Tunnel at NASA Ames Research Center demonstrated that the array was functional over a frequency range of 2 to 100 kilohertz for emission angles of 92 degrees, 108 degrees, and 120 degrees, and Mach numbers of 0, 0.15, and 0.25. The array and calibration sources were then used to assess the relative effects of array installation on background noise and level measurement accuracy by locating the array in the flow (strut- and wall-mounted) as well as outside the flow behind a porous wall screen and a free shear layer. The wind tunnel array measurements were compared with anechoic chamber measurements using discrete microphones at the same source distance and emission angles. At 92 degrees, the noise floor and attenuation spectra were comparable (within 5 decibels) for each installation from 2 to 30 kilohertz. At higher angles, the array installation behind the Kevlar screen had the lowest noise floor at M = 0.15 and 0.25. The array installation 10 inches (maximum available distance) behind a free shear layer had higher background noise that is typically reduced to a lower level by moving the array back further from the flow. For emission angles greater than 92 degrees, both the Kevlar and free shear layer installations exhibited stronger attenuations in measured level, beginning at lower frequencies than either the wall- or strut-mount configurations. Additional array and calibration source units of the same design are being tested at NASA’s Glenn Research Center and Langley Research Center in their aeroacoustic research facilities in an effort to improve measurement accuracy and repeatability.

Aeroacoustic Wind Tunnel Research↗

External Wireless Communications (EWC) Coverage Expansion Boom Interface Control Document (ICD)

This document defines and controls the physical and functional interfaces between the External Wireless Communications Coverage Expansion (EWCCE) boom and any payload that is planned to be installed on the scarred locations on the boom. The hardware will be referenced as EWCCE boom or simply boom in this document. The boom is comprised of two short boom sections,the upper boom and the lower boom, an Active Worksite Interface (AWIF) and two mounting plates. The boom will be launched soft stowed in a bag and assembled in the Internation Space Station (ISS) via IVA. The assembly will include two sections of the boom and a built-to-print AWIF. The installation of the final assembly to the ISS Truss location is designated as a free-float EVA worksite activity. Once installed on the truss, the interfaces on the Long Boom may be used for attachment of future Orbital Replacement Units (ORUs) to either the Television Camera (TVC) Mounting Slide interface (e.g., an External High Definition Camera [EHDC] or similar ORU) or to future On-orbit Installed Hand-rails (OIHs) installed at the seat track interfaces. Compliance with this Interface Control Document (ICD) will ensure compatibility and successful integration of the hardware.

Vidyasagar, Sagar↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout and a longer nominal use. This paper will summarize operations of the Toilet and Toilet Integration Hardware in both of those configurations, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

life support↗

NASA Universal Waste Management System and Toilet Integration Hardware Operations on ISS – Issues, Modifications and Accomplishments

The Universal Waste Management System (UWMS), which has the ISS operational nomenclature “Toilet”, was initially installed on the International Space Station (ISS) in 2020 with final installation completed in 2021. Although technical issues were encountered that delayed installation and operations, progress was made towards the objectives of the project. Technical issue work-arounds resulted in operation of the Toilet with use by male and female crew members in a controlled extended checkout. This paper will summarize operations of the Toilet and Toilet Integration Hardware in this limited configuration, problems encountered during installation and checkout, the modifications made to allow further usage on ISS, and the future modifications planned for nominal use. It will also describe the portions of the technology demonstration that were completed and the benefits from that work and how that knowledge informs the Orion-installed UWMS unit and future manifesting of consumables for both Orion and ISS.

Toilet↗

Wilson Corners, Solid Waste Management Unit 001(SWMU 01) 2023 Annual Long-Term Monitoring Report

This report presents a summary of the long-term monitoring (LTM) activities that occurred in 2023 at Wilson Corners, Solid Waste Management Unit 001, at Kennedy Space Center (KSC), Florida. Annual LTM of groundwater is being conducted at the site. Based on results from groundwater sampling activities performed during the 2019 through 2020 LTM reporting period and the 2020 and 2021 DPT groundwater sampling, it was determined that the LTM sampling plan was no longer meeting the goal of LTM because delineation was not verified and the installation of an air sparge (AS) system to treat the area of the High Concentration Plume was recommended. The AS System was installed in late 2022 and early 2023. System start-up activities were initiated in April 2023. Following system startup, several site wells required retrofitting to equip wellheads for withstanding the air pressure released from air sparge wells during system operation. Some site wells also required repair or abandonment, and replacement. Survey of location and top-of-casing of newly installed monitoring wells was combined with scheduled AS system survey activities and was completed in January 2024. The activities presented in this report include the February and April 2023 LTM monitoring well installations; March and April 2023 LTM and performance monitoring well water level gauging and sampling; November 2023 LTM well retrofits and repairs; a summary of December 2023 LTM well abandonments and installations (complete site well abandonment activities will be presented under a separate cover); and January 2024 LTM well survey. During the March and April 2023 sampling events, the low-flow sampling method was used, and samples were analyzed for a select list of volatile organic compounds. In March 2023, groundwater flow for the site was generally to the west was generally consistent with historical observations at the site. The Low Concentration Plume (LCP) continues to extend both horizontally and vertically beyond the terminal depth of the current monitoring well network. Data, inclusive of the 2023 LTM and baseline performance monitoring sampling events, indicate that the LCP encompasses an estimated 19.5 acres, compared to the 2021 LCP footprint, inclusive of the 2020 and 2021 DPT sampling events of 20.7 acres. The vertical extent of VOCs was historically delineated by monitoring wells screened greater than 48 feet below land surface (bls). The results from the three vertical extent monitoring wells screened below 48 feet bls that were sampled during the 2023 LTM indicate that groundwater vinyl chloride concentrations in these three wells are greater than the GCTL. As presented in the 2021 Long-Term Monitoring Report (NASA 2022), the KSCRT agreed to delay deeper investigations in this area to prevent the creation of additional pathways for vertical migration. Based on groundwater sampling activities performed in 2023, recommendations are to perform the next annual LTM sampling event, scheduled for April 2024 and to conduct quarterly performance monitoring of the AS System. The current selection of monitoring wells in the recommended 2024 LTM plan will provide an adequate data set for monitoring groundwater plume behavior; however, the LTM monitoring well network will be evaluated and refined based on 2024 LTM and year one performance monitoring data.

King Linnea↗

Panel-Segmentation: A Python Package for Automated Solar Array Metadata Extraction Using Satellite Imagery

The NREL Python Panel-Segmentation package is a toolkit that automates the process of extracting accurate and valuable metadata related to solar array installations, using publicly available Google Maps satellite imagery. Previously published work includes automated azimuth estimation for individual solar installations in satellite images. Our continued research focuses on automated detection and classification of solar installation mounting configuration (tracking or fixed-tilt; rooftop, ground, or carport). Specifically, a Faster-RCNN Resnet-50 feature pyramid network (FPN) model was trained and validated on 862 manually labeled satellite images. This model was used to perform object detection on satellite imagery, locating and classifying individual solar installations' mounting configuration and type. Model results showed a mean average precision score (mAP) of 77.79%, with the model strongest at detecting fixed-tilt ground mount and fixed-tilt carport installations. The object detection model and its outputs have been incorporated into the Panel-Segmentation package's automated metadata extraction pipeline, which returns the mounting configuration and azimuth for individual solar arrays in satellite imagery. The complete image data set with labels has been released on the U.S. Department of Energy (DOE) DuraMAT DataHub, to encourage further research in this area.

deep learning↗

Automated tracking of prefabricated components for areal-time evaluator to optimize and automateinstallation

Trade associations for prefabricated construction estimate that about 50% of prefabricated wall projects have alignment problems that lead to defects and rework. Additionally, component installation times average between 30 and 60 minutes per component. To address these issues, a real-time evaluator (RTE) system was introduced to decrease cost and automate prefabricated component installation by reducing the installation time, decreasing rework, and enhancing energy performance through higher installation quality. The RTE uses commonly available hardware and software to perform autonomous tracking to measure the real-time location and orientation of components as they are crane-lifted and installed. The hardware, software, and algorithms that allow the autonomous tracking of components are detailed. An algorithm to automate the initial search for a component with three attached retroreflectors is proposed. Algorithms to automate the measurement of component position and orientation are also proposed. Simple lab-scale proof-of-concept experiments were conducted to assess the algorithms for automation of component searching, measurement of real-time movement, and measurement of component orientation. With additional development, the system can be used as a tool to generate the commands for autonomous crane operation or single-task construction robots.

Hayes, Nolan↗

Using Resin to Reduce Silica in Borated Fluid - 20072

The Electric Power Research Institute (EPRI) strongly recommends the concentration of silica in the reactor coolant be limited, potential ingress be carefully controlled, and frequently monitored to assess potential silica deposits on fuel cladding surfaces. Boraflex is a product with silicone rubber encasing a neutron absorber for criticality control, and it was installed in the majority of nuclear power plant spent fuel pools. Over time and in the presence of radiation, the silicone rubber lining degrades into silica (SiO{sub 2}) and hydrogen gas. Silica is somewhat soluble in water and spent fuel pool water communicates with other plant systems during refueling outages, leading to a buildup of silica in the reactor coolant and connected systems. Due to the prevalence of Boraflex racks in spent fuel pools, the presence of silica is a chronic nuclear industry concern. To address this concern, many nuclear plants have installed reverse osmosis skid systems to remove the silica from their spent fuel pools and, by extension, from reactor coolant. These skids are expensive to install and maintain. Arcadis personnel demonstrated that an iron-impregnated resin could be used to remove silica from borated systems without impacting the water quality. The resin was readily available, inexpensive, and easy to install in existing plant equipment. During a nuclear power plant's refueling outage the iron-impregnated resin proved to be effective in reducing the need for feed and bleed operations, with concurrent cost savings and reduction in required outage water management activities. Thus, the following savings were realized: - Eliminated the need to purchase, install, and maintain a reverse osmosis system avoiding more than $10 million in up-front capital cost and ongoing operating and maintenance costs. - Removed 9.57 kilograms (21 pounds) of silica dioxide from the primary system fluid. - Reduced the volume of feed and bleed from 70,000 gallons (2.65 E+05 liters) to 35,000 gallons (1.32 E+05 liters). - Saved $380,000 in water production and disposal costs. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Large Format Composite Additive Manufacturing for Low-Head Hydropower

Hydropower with a small elevation change from inlet to outlet, known as “low-head” hydropower, is a relatively untapped resource for reliable green power generation. One major barrier to entry is the cost of the components needed to generate the power. Each installation site is unique, with various head levels, flow rates, and other unique site characteristics that drive up the cost of development and installation. As a result, custom-made components are necessary because the sites are intrinsically inefficient. However, customized parts are generally more expensive to manufacture than ready-made parts. Often times, the cost of custom-made components is so high that the low-head hydropower installation becomes non-viable. Additive manufacturing offers the ability to make custom components, ideal for one-off applications, at low costs that are well suited for the needs of low-head hydropower. Indirect additive manufacturing, such as making tools or dies rather than end use components, can also be used to make low-cost composite tooling as needed for these custom applications. This paper explores the use of additive manufacturing, both directly and indirectly, to produce the components of a turbine system for a low-head hydropower site. The parts were designed to form a unique modular system, which saves time for future designs and iterations. The system has operated for more than three years without failure at a test site in Wisconsin, USA. This work serves as a basis for future application of AM to low-head systems, in which the modular components can be customized for each unique hydropower installation.

36 MATERIALS SCIENCE↗

Patience is a virtue: A data-driven analysis of rooftop solar PV permitting timelines in the United States

© 2020 The Authors Local permitting can ensure the safe installation and operation of rooftop solar photovoltaic (PV) systems. At the same time, burdensome local permitting processes and local variation in requirements may pose challenges to PV deployment. In this article, we explore new data on the durations between key steps in the PV permitting process in the United States. The data suggest that a typical customer can expect to wait around 25–100 days from permit application until an installed system passes inspection. Permit durations vary significantly across jurisdictions, due in part to differences in local permitting policies. However, permit durations vary as significantly within jurisdictions as across them, in part due to significant variation across installers, suggesting that installer strategies and practices play an important role in permitting timelines. Permit durations have declined over time, reflecting progress from permit streamlining policies and jurisdiction learning-by-doing, though durations have stabilized in recent years. The data suggest that typical PV customers still face long and uncertain permitting timelines in the United States.

O'Shaughnessy, E↗

Bulk Storage of Hydrogen

The technical aspects and economics of bulk hydrogen storage in underground pipes, lined rock caverns (LRC) and salt caverns are analyzed. Hydrogen storage in underground pipes is more economical than in geological caverns for useable amounts <20-t-H2. However, because the pipe material is a major cost factor, the capital and operating costs for this storage method do not decrease appreciably with an increase in the amount of stored H2. Unlike underground pipes, the installed capital cost of salt caverns decreases appreciably from ~$95/kg-H2 at 100 t-H2 stored to <$19/kg-H2 at 3000 t-H2 stored. Over the same scale, the annual storage cost decreases from ~$17/kg-H2 to ~$3/kg-H2. Like salt caverns, the installed capital cost of lined rock caverns decreases from ~$160/kg-H2 at 100 t-H2 stored to <$44/kg-H2 at 3000 t-H2 stored. Storing >750-t useable H2 requires multiple caverns. The cost of salt caverns scales more favorably with size because the salt caverns are larger than lined rock caverns and need to be added at a slower rate as the storage capacity is increased.

Bulk storage of hydrogen↗

Global Techno-Economic Performance of Bifacial and Tracking Photovoltaic Systems

Although most of the current photovoltaic (PV) system installations use monofacial modules with fixed-tilt mounting structures, bifacial modules, trackers, and the combination of them are also getting more attention as potential candidates to further reduce the PV levelized cost of electricity (LCOE). This work is then the first to present a worldwide analysis on the yield potential and cost-effectiveness of PV farms composed of monofacial fixed-tilt and single/dual (1T/2T) tracker installations, as well as their bifacial counterparts. Our approach starts by estimating the irradiance reaching the front and rear surface of the modules for the different system designs (validated based on data from real PV systems and results from the literature) to estimate their energy production (row-row shading is neglected). Subsequently, the overall system cost during their 25-year lifetime is factored in, and LCOE is obtained. The results reveal that bifacial-1T installations increase energy yield by 35% and reach the lowest LCOE for the majority of the world (93.1% of the land area). Although dual axis trackers achieve the highest energy generation — especially for bifacial modules — their cost is still too high, and are therefore not as cost-effective. Sensitivity analyses based on the Monte Carlo and region sensitivity approach are performed to analyze the impact of input assumptions on the calculated LCOE. These reveal that our conclusions are robust in general but exact configuration to choose depends on specific site conditions. This investigation is not only of interest to the scientific community, but also can be used as a guide for PV installation companies and investors to determine the most suitable technology for a particular location.

14 SOLAR ENERGY↗

The "Perfect Storm" for Distributed Wind Markets

Close to 1 GW of distributed wind has been installed across all 50 states, the District of Columbia, Puerto Rico, and the U.S. Virgin Islands. Yet the number of installations varies greatly by state, even when wind resources are similar. This article examines three key factors that over the past thirteen years have shown to be enablers of success for distributed wind installations in the United States: 1) favorable policy environments, including consistent incentives, administrative support for cutting through red tape, and favorable interconnection, net metering, and permitting policies; 2) high electricity prices that would be displaced by wind energy generation, and, 3) favorable wind resources, enabling steady production of energy. Not all conditions need to be met simultaneously, yet of the studied markets for distributed wind in Iowa, New York, Washington, and Oregon, the most successful ones exhibit at least two out of the three conditions mentioned. We describe steps that policymakers, regulators, and market players have taken in the past to increase distributed wind installations in the United States.

Foster, Nikolas AF↗

System benefits of industrial battery storage: A comparison of grid and facility control and dispatch

Customer-owned, distributed battery installations are being incentivized by utilities to increase installed battery capacity. In many of these incentive agreements, the battery owner relinquishes battery control to the utility in exchange for incentive money. The industrial sector has lagged in storage installation when compared to the residential and commercial sectors. This study compares the economic advantages to utilities and industrial facilities in different dispatch control situations. The study presents a novel framework for the optimization of multiple systems using load profiles from the industrial, residential, and commercial sectors. Case studies are presented to illustrate different dispatch scenarios. Further, the simulations showed more fiscal benefit for the industrial facilities to dispatch the battery for electrical demand reduction than utility dispatch. In the case studies, facility dispatch control resulted in an increase of facility savings by a factor of about 8.7 when compared to utility dispatch. Battery size plays a significant factor on the impact of the grid’s generating costs, showing that larger batteries can provide significant benefit even if dispatched by the facility. Future policies concerning industrial battery installations should consider overall economic benefits to utility and facility in the form of rate structures and incentive participation based on battery size.

25 ENERGY STORAGE↗

Force-Triggered, Biobased Sealants for Prefabricated Building Components: Toward Improved Efficiency and Performance

The prefabricated building construction industry has made extensive progress in expediting the manufacture of prefabricated components at off-site plants. However, the sealing of joints between these components, which is crucial to ensuring the weatherproofing of the assembly, still represents a labor-intensive, on-site effort that relies on the manual installation of tapes and caulks. Here, to reduce work at the jobsite and improve the airtightness and waterproofness of building envelopes, we developed a sealant that can be installed at the plant on prefab components and have the curing reaction triggered at the jobsite by using microencapsulation technology to separate the reactive agents. A series of force-triggered, high-strength, and fast-curing sealants derived from biobased feedstocks were developed, which consist of a biobased epoxy agent encapsulated in a polymer shell, embedded in a biobased amine curing agent. The shell of the microcapsules allows an effective separation of the reactive species in the one-part sealant, allowing shelf stability to an otherwise fast-curing system as well as improving the hydrophobicity of the whole system. When force activates and breaks the microcapsules, the highly reactive epoxy and amine mix and cure, exhibiting peel strength values of up to 143 ppi (pounds per inch). The hydrophobicity of the sealants allows them to retain up to 94% of the original peel strength after complete submersion in water for 24 h, showcasing the water resistivity of the sealant system. The open-air shelf stability of the sealant complex is demonstrated by the obtention of peel strength values of ∼16 ppi when triggering the curing reaction even after being exposed 8 months to open air and humidity. The successful on-demand triggering of curing reactions and the shelf stability provide efficacy of these force-triggered sealants for installation on prefabricated components, storage for months prior to delivery, and assembly at a jobsite. These force-triggered biobased sealants for prefabricated buildings can result in lower installation time and cost and better performance than tapes and caulks at the jobsite.

biobased↗

Process-based balance of system cost modeling for offshore wind power plants in the United States

This paper describes the development of a process-based and open-source balance of system cost model that provides the capability to evaluate both existing and novel offshore wind technologies. Individual design and installation steps are represented with bottom-up engineering models that compute times and costs associated with the process; furthermore, operational constraints are assigned to each process so that delays caused by weather and presence of marine mammals may be accounted for in the overall project timeline. The model structure, assumptions, inputs, and results are vetted with industry partners and compared against actual projects for validation. Installation times show reasonable agreement with real data. Project cost sensitivities are investigated to compute the system-level impact of different design choices. First, individual vessel efficiencies are computed for varying numbers of installation vessels and weather time series to show the diminishing returns of more than two feeder barges. Then, array cable capital costs and installation times are determined for a representative project with different turbine sizes. These values quantify the cost-benefit tradeoffs and show a net-cost savings of decreasing numbers of turbines, increased turbine spacing, and fewer turbine terminations. These results demonstrate that the balance of system model features the accuracy, functionality, and accessibility to serve as the foundation for a wide range of analyses to identify cost reduction potentials for offshore wind energy in the United States.

17 WIND ENERGY↗