Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “fleet operations”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Crew Factors in Flight Operations XII: A Survey of Sleep Quantity and Quality in On-Board Crew Rest Facilities

Many aircraft operated on long-haul commercial airline flights are equipped with on-board crew rest facilities, or bunks, to allow crewmembers to rest during the flight. The primary objectives of this study were to gather data on how the bunks were used, the quantity and quality of sleep obtained by flight crewmembers in the facilities, and the factors that affected their sleep. A retrospective survey comprising 54 questions of varied format addressed demographics, home sleep habits, and bunk sleep habits. Crewmembers from three airlines with long-haul fleets carrying augmented crews consisting of B747-100/200, B747-400, and MD-11 aircraft equipped with bunks returned a total of 1404 completed surveys (a 37% response rate). Crewmembers from the three carriers were comparable demographically, although one carrier had older, more experienced flight crewmembers. Each group, on average, rated themselves as "good" or "very good" sleepers at home, and all groups obtained about the same average amount of sleep each night. Most were able to sleep in the bunks, and about two thirds indicated that these rest opportunities benefited their subsequent flight deck alertness and performance. Comfort, environment, and physiology (e.g., being ready for sleep) were identified as factors that most promoted sleep. Factors cited as interfering with sleep included random noise, thoughts, heat, and the need to use the bathroom. These factors, in turn, suggest potential improvements to bunk facilities and their use. Ratings of the three aircraft types suggested differences among facilities. Bunks in the MD-11 were rated significantly better than either of the B747 types, and the B747-400 bunks received better ratings than did the older, B747-100/200 facilities.

Rosekind, Mark R.↗

NASA's Earth Science Research and Environmental Predictions

NASA Earth Science program began in the 1960s with cloud imaging satellites used for weather observations. A fleet of satellites are now in orbit to investigate the Earth Science System to uncover the connections between land, Oceans and the atmosphere. Satellite systems using an array of active and passive remote sensors are used to search for answers on how is the Earth changing and what are the consequences for life on Earth? The answer to these questions can be used for applications to serve societal needs and contribute to decision support systems for weather, hazard, and air quality predictions and mitigation of adverse effects. Partnerships with operational agencies using NASA's observational capabilities are now being explored. The system of the future will require new technology, data assimilation systems which includes data and models that will be used for forecasts that respond to user needs.

Hilsenrath, E.↗

Probabilistic Analysis of Space Shuttle Body Flap Actuator Ball Bearings

A probabilistic analysis, using the 2-parameter Weibull-Johnson method, was performed on experimental life test data from space shuttle actuator bearings. Experiments were performed on a test rig under simulated conditions to determine the life and failure mechanism of the grease lubricated bearings that support the input shaft of the space shuttle body flap actuators. The failure mechanism was wear that can cause loss of bearing preload. These tests established life and reliability data for both shuttle flight and ground operation. Test data were used to estimate the failure rate and reliability as a function of the number of shuttle missions flown. The Weibull analysis of the test data for a 2-bearing shaft assembly in each body flap actuator established a reliability level of 99.6 percent for a life of 12 missions. A probabilistic system analysis for four shuttles, each of which has four actuators, predicts a single bearing failure in one actuator of one shuttle after 22 missions (a total of 88 missions for a 4-shuttle fleet). This prediction is comparable with actual shuttle flight history in which a single actuator bearing was found to have failed by wear at 20 missions.

Oswald, Fred B.↗

Towards an Open, Distributed Software Architecture for UxS Operations

To address the growing need to evaluate, test, and certify an ever expanding ecosystem of UxS platforms in preparation of cultural integration, NASA Langley Research Center's Autonomy Incubator (AI) has taken on the challenge of developing a software framework in which UxS platforms developed by third parties can be integrated into a single system which provides evaluation and testing, mission planning and operation, and out-of-the-box autonomy and data fusion capabilities. This software framework, named AEON (Autonomous Entity Operations Network), has two main goals. The first goal is the development of a cross-platform, extensible, onboard software system that provides autonomy at the mission execution and course-planning level, a highly configurable data fusion framework sensitive to the platform's available sensor hardware, and plug-and-play compatibility with a wide array of computer systems, sensors, software, and controls hardware. The second goal is the development of a ground control system that acts as a test-bed for integration of the proposed heterogeneous fleet, and allows for complex mission planning, tracking, and debugging capabilities. The ground control system should also be highly extensible and allow plug-and-play interoperability with third party software systems. In order to achieve these goals, this paper proposes an open, distributed software architecture which utilizes at its core the Data Distribution Service (DDS) standards, established by the Object Management Group (OMG), for inter-process communication and data flow. The design decisions proposed herein leverage the advantages of existing robotics software architectures and the DDS standards to develop software that is scalable, high-performance, fault tolerant, modular, and readily interoperable with external platforms and software.

Cross, Charles D.↗

Airport Ground Support Equipment Analysis

Ground support equipment (GSE) plays a critical role in providing services to aircraft at arrival and departure gates, ensuring smooth and efficient airport operations. As the airline industry seeks to reduce costs and expand energy options, electric GSE (eGSE) is emerging as a promising solution. This project examines the integration of eGSE into airport operations, addressing key considerations such as vehicle deployment, charging infrastructure, and grid impacts. We developed a flexible, bottom-up modeling framework to evaluate energy demands and infrastructure requirements across more than 300 U.S. airports, providing actionable insights to support electrification planning and implementation. The study focuses on eight major types of GSE with commercially available electric counterparts: aircraft tractors, ground power units, baggage tractors, belt loaders, cargo loaders, catering trucks, lavatory trucks, and water trucks. Project results include annual charging load profiles, total energy consumption, and the charger and fleet requirements for each airport.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Design of a SMART Valve Testbed for Nuclear Thermal Dispatch

By the year 2050, the United States aims to achieve net-zero carbon emissions. To achieve this target, the licensing of the Light Water Reactor (LWR) fleet has been extended for 20 more years. To stay economically competitive with other power sources such as renewable and fossil-fuel power plants, the U.S. Department of Energy has introduced a plan to modernize the existing LWR fleet and diversify the revenue stream. One of the plans is to dispatch thermal energy to endothermic industrial processes. SMART valves will play an important role in this initiative by efficiently balancing the load by regulating valves in a coordinated manner while monitoring the thermal-hydraulic systems to enhance safety and maintain the integrity of the power plant. This research aims to develop a facility to test the coordinated control algorithm and produce various test results for training the monitoring system. The constructed facility is capable of simulating various operational and accidental scenarios by coordinating all the valves (positions) and pump (flowrate). The facility is developed with an Internet of Things (IoT)-based custom system and a python-based valve position control and coordination mechanism. It has achieved stable sensor outputs, pump control, and coordinated valve regulation in all three valves with minimum obstruction in the system.

22 - GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of a Reconstruction Methodology Based on X-Ray Computed Tomography to Generate Realistic 3D Concrete Microstructures in MOSAIC

Despite being passive components, concrete structures represent a major capital investment in nuclear power plants. However, some concrete components are critical for the safety and long-term operation of the reactors: the concrete containment building protects the reactors from external aggression. The concrete biological shield (CBS) contains the radiation exiting the reactor to protect equipment and personnel. Depending on the design, the CBS also has a function for supporting the reactor’s systems. This function needs to be ensured in-service and during accident scenarios. After several decades of use, the CBS is exposed to high-energy irradiation over an extended operation time, exceeding the fluence level currently considered detrimental for the concrete’s structural properties. Such conditions occur at different times depending on the reactor’s operation and design. Nevertheless, from the perspective of subsequent license application, it is mandatory to assess the potential effects of prolonged irradiation on concrete. Unlike steel components, concrete structures are built with local constituents (cement, sand, and coarse aggregates) to avoid prohibitive transportation costs. Thus, concrete performance is determined by the tolerance or the susceptibility of its constituents against any aging mechanism. The tolerance against irradiation of the CBSs may vary greatly among the 56 nuclear power plants and 93 nuclear power reactors that form the current US light-water reactor fleet. Irradiation-induced degradation is mainly a result of amorphization-induced expansions of the silicated minerals present in the aggregates. The neutron irradiation–induced expansion varies from one rock-forming mineral to another: well framework–structured silicates (e.g., quartz and feldspars) exhibit higher swelling than chained (e.g., pyroxene) or isolated silicates (e.g., garnet). Silicates make up nearly 90% of the Earth’s crust. Other common minerals present in construction aggregates are carbonates found, for example, in limestone. Irradiated carbonates exhibit only very minor expansions.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Collaborative Arrival Planning: Data Sharing and User Preference Tools

Air traffic growth and air carrier economic pressures have motivated efforts to increase the flexibility of the air traffic management process and change the relationship between the air traffic control service provider and the system user. One of the most visible of these efforts is the U.S. government/industry "free flight" initiative, in which the service provider concentrates on safety and cross-airline fairness, and the user on their business objectives and operating preferences, including selecting their own path and speed in real-time. In the terminal arrival phase of flight, severe restrictions and rigid control are currently placed on system users, typically without regard for individual user operational preferences. Airborne delays applied to arriving aircraft into capacity constrained airports are imposed on a first-come, first-serve basis, and thus do not allow the system user to plan for or prioritize late arrivals, or to economically optimize their arrival sequence. A central tenant of the free-flight operating paradigm is collaboration between service providers and users in reaching air traffic management decisions. Such collaboration would be particularly beneficial to an airline's "hub" operation, where off-schedule arrival aircraft are a consistent problem, as they cause serious air-port ramp difficulties, rippling airline scheduling effects, and result in large economic inefficiencies. Greater collaboration can also lead to increased airport capacity and decrease the severity of over-capacity rush periods. In the NASA Collaborative Arrival Planning (CAP) project, both independent exchange of real-time data between the service provider and system user and collaborative decision support tools are addressed. Data exchange of real-time arrival scheduling, airspace management, and air carrier fleet data between the FAA service provider and an air carrier is being conducted and evaluated. Collaborative arrival decision support tools to allow intra-airline arrival preferences are being developed and simulated. The CAP project is part of and leveraged from the NASA/FAA Center TRACON Automation System (CTAS), a fielded set of decision support tools that provide computer generated advisories for both enroute and terminal area controllers to manage and control arrival traffic more efficiently. In this paper, the NASA Collaborative Arrival Planning project is outlined and recent results detailed, including the real-time use of CTAS arrival scheduling data by a major air carrier and simulations of tactical and strategic user preference decision support tools.

Zelenka, Richard E.↗

Probabilistic Analysis of Space Shuttle Body Flap Actuator Ball Bearings

A probabilistic analysis, using the 2-parameter Weibull-Johnson method, was performed on experimental life test data from space shuttle actuator bearings. Experiments were performed on a test rig under simulated conditions to determine the life and failure mechanism of the grease lubricated bearings that support the input shaft of the space shuttle body flap actuators. The failure mechanism was wear that can cause loss of bearing preload. These tests established life and reliability data for both shuttle flight and ground operation. Test data were used to estimate the failure rate and reliability as a function of the number of shuttle missions flown. The Weibull analysis of the test data for the four actuators on one shuttle, each with a 2-bearing shaft assembly, established a reliability level of 96.9 percent for a life of 12 missions. A probabilistic system analysis for four shuttles, each of which has four actuators, predicts a single bearing failure in one actuator of one shuttle after 22 missions (a total of 88 missions for a 4-shuttle fleet). This prediction is comparable with actual shuttle flight history in which a single actuator bearing was found to have failed by wear at 20 missions.

Oswald, Fred B.↗

Human-Centered and Explainable Artificial Intelligence in Nuclear Operations

Nuclear power plants in the United States are critical to the nation’s energy security, accounting for 20% of all electricity produced for the power grid. As energy needs grow, 100 gigawatts of additional nuclear power will be necessary by 2050, more than double the current capacity. Realizing this target requires cutting-edge technology like artificial intelligence (AI) and machine learning (ML) that can bring about significant increases in the level of automation. Human-centered AI (HCAI) is a combination of human-centered design (human factors, human-in-the-loop, etc.) with AI/ML to help produce an efficient and reliable system with full consideration for human engagement. This paper provides a comprehensive and novel discussion of HCAI considerations in nuclear power, introducing unique applications for the existing fleet as well as new advanced reactor designs. We include real-life use cases of AI applications to work management processes at nuclear power sites and highlight lessons learned for HCAI.

Hall, Anna↗

Innovative Advanced Hydrogen Mobile Fueler (Final Technical Report)

The US Department of Energy (DOE) funded a project to design, develop, deploy and analyze the economic viability of an innovative Advanced Hydrogen Mobile Fueler (AHMF). As part of the design activity the project team defined specifications based upon vehicle requirements and compliance with specific fueling performance criteria. The AHMF was originally designed to fuel 10-20 fuel cell vehicles (FCV) per day, consistent with the requirements of the H70 fueling category. The AHMF is able to operate without remote power connections, is modular for easy transport and deployment, and can provide expanded daily capacity and multi-day operations using delivered gaseous hydrogen. Toward the end of the project, due to request from the hydrogen industry and some necessary modifications of the AHMF, the system is now modified to fuel heavy duty vehicles. The project was conducted over two primary phases, each including several key tasks, subtasks, and project milestones. Phase 1 involved the design, development, and construction of the AHMF, moving from a conceptual design through to completion of assembly and testing. In addition to reviewing several different approaches, the team chose to take a conventional station design and modify it for mobile fueling. There were several innovative components included in the design. The high pressure storage was the first to achieve a US Department of Energy (DOE) Special Permit (SP 20391) to transport high pressure hydrogen (95 MPa) in a composite cylinder. The second novel system was a liquid nitrogen (LIN) cooling system with a compact heat exchanger. Without this change, the cooling system would not be able to fit into the AHMF. Phase 2 demonstrated the AHMF by fueling fuel cell buses at a fleet in Pomona, CA. The site was chosen because a temporary fueling solution was required while a fixed station was being installed. The existing permits for the fixed station and non-public access also was a determining factor. Over two months, the buses were fueled 320 times with over 5000 kg of hydrogen from tube trailers. Existing shore power was used, and the average electrical efficiency was 0.13 kWh/kg. The average liquid nitrogen (LIN) consumption was 90.68 scf/kg. The fueling and consumption data was provided to the National Renewable Energy Laboratory (NREL) for analysis. An economic analysis was performed and will be provided in a separate report. The project was successful, but not without challenges and lessons learned. The DOT special permit led the way for the use of high pressure, composite cylinders and is being by multiple other systems and applications. The pandemic along with time for the DOT special permit approval delayed the project for years. The team also believes that hydrogen mobile fueling has a use for the industry, especially during this upcoming phase of expansion. However, it does have its limitations due to high cost to build and operate, and the same permitting challenges as a fixed station. A fully capable system at the speeds and pressures of the AHMF may not be necessary for most applications and would help reduce the cost and increase storage capacity. The on-board generator can be easily replaced with shore power or the wide range of power generation solutions in the marketplace. One of the major results of the project was the development of new code language in National Fire Protection Agency (NFPA) 2 and the International Fire Code (IFC) for on-demand mobile fueling. This will provide guidance for Authorities Having Jurisdiction (AHJ) and user on how to permit temporary fueling sites across the nation.

08 HYDROGEN↗

Executive summary: Benefit-cost evaluation of an intra-regional air service in the Bay Area and a technology assessment of transportation system investments

The benefits and costs that would result from an intra-regional air service operation in the San Francisco Bay area were determined by utilizing an iterative statistical decision model to evaluate combinations of commuter airport sites and surface transportation facilities in conjunction with service by a given commuter aircraft type in light of area regional growth alternatives and peak and off-peak regional travel patterns. The model evaluates such transportation option with respect to criteria of airline profitability, public acceptance, and public and private non-user costs. In so doing, it incorporates information on modal split, peak and off-peak use of the air commuter fleet, terminal and airport costs, development costs and uses of land in proximity to the airport sites, regional population shifts, and induced zonal shifts in travel demand. The model is multimodal in its analytic capability, and performs exhaustive sensitivity analysis.

Haefner, L. E.↗

Utility and Industry Perceptions of Control Room Modernization Over the Last 10 Years

Within the current United States (U.S.) nuclear power fleet, main control room modernization (CRM) is an important step towards cost savings. In recent decades, plants have been engaged in upgrades to varying degrees. This process requires a nuanced, balanced, and timely approach that ensures continued safety and long-term sustainability. In 2012 a survey was issued to individuals from the nuclear industry to learn their perspectives on a range of CRM issues. The survey targeted the benefits and challenges for utilities undertaking this process, including the main drivers and barriers to technology upgrades, regulatory compliance, and the effects these factors have on concepts of operations, strategic approaches, and staffing. In 2022, the survey was issued again to understand whether CRM perceptions had changed in the last 10 years. Our findings identify changes in industry thinking from a decade ago. Here we reveal perspective shifts that represent increased optimism and, in some instances, increased doubt regarding the opportunities and challenges inherent in CRM and implementation. We also report nuanced differences in CRM perspectives between utility and surrounding nuclear industry respondents.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Phase 1: Duke Energy Zero Emission Resource Integration Study (ZERIS); Phase 2: Carbon-Free Resource Integration Study for Duke Energy (Final Report)

Phase 1: This statement of work makes up Phase 1 of a larger effort. During this Phase 1 effort, NREL will work with Duke Energy to analyze the impacts of integrating significant amounts of new solar power into the Duke Energy power system under a variety of different penetrations scenarios, with a maximum of ten (10) full scenarios examined. The existing fleet, particularly the nuclear generation, will be considered in the quantitative assessments and discussions. Duke Energy is looking to quantify how much solar generation its system can handle. NREL will work with Duke Energy to quantify solar potential, identify likely integration challenges and possible opportunities for wind, storage, demand side resources and other technologies. Phase 2: This Statement of Work consists of a follow-up effort (Phase 2) to a recently completed Phase 1 modeling effort. During Phase 2, NREL will work closely with Duke Energy to analyze the impacts of integrating significant amounts of variable generation resources (wind and solar) and storage into Duke Energy's system in the Carolinas. The existing fleet, particularly nuclear generation, will be considered in the quantitative assessment and discussions. This Statement of Work also includes an extension to Phase II of the Carbon-Free Resource Integration Study for Duke Energy. In this extension, NREL will work closely with Duke Energy to extend the production cost analysis developed in Phase II to 2018 weather and load data for Duke Energy's territory. This extension leverages the modeling tools and datasets developed as part of Phase II. The analysis will compare results from Phase II (using 2012 weather and load) with 2018 results to assess system operations with increased penetration of renewables and storage. Simplifying assumptions will be made for modeling Duke Energy's neighbors in the production cost model.

14 SOLAR ENERGY↗

Long-lived space observatories for astronomy and astrophysics

NASA's plan to build and launch a fleet of long-lived space observatories that include the Hubble Space Telescope (HST), the Gamma Ray Observatory (GRO), the Advanced X Ray Astrophysics Observatory (AXAF), and the Space Infrared Telescope Facility (SIRTF) are discussed. These facilities are expected to have a profound impact on the sciences of astronomy and astrophysics. The long-lived observatories will provide new insights about astronomical and astrophysical problems that range from the presence of planets orbiting nearby stars to the large-scale distribution and evolution of matter in the universe. An important concern to NASA and the scientific community is the operation and maintenance cost of the four observatories described above. The HST cost about $1.3 billion (1984 dollars) to build and is estimated to require $160 million (1986 dollars) a year to operate and maintain. If HST is operated for 20 years, the accumulated costs will be considerably more than those required for its construction. Therefore, it is essential to plan carefully for observatory operations and maintenance before a long-lived facility is constructed. The primary goal of this report is to help NASA develop guidelines for the operations and management of these future observatories so as to achieve the best possible scientific results for the resources available. Eight recommendations are given.

Savage, Blair D.↗

Launch Alaska Transportation and Energy Accelerator (LATEA)

The Launch Alaska Transportation and Energy Accelerator (LATEA), funded through the U.S. Department of Energy Office of Technology Commercialization’s Energy Program for Innovation Clusters (EPIC),advanced deployment of innovative and efficient transportation and energy technology in Alaska from October 2021 through June 2025. The project was designed to leverage Launch Alaska’s accelerator model to identify, recruit, and support transportation technology companies with novel solutions to market needs while building the stakeholder networks, demonstration opportunities, and institutional capacity necessary to accelerate commercialization in one of the most challenging operating environments in the United States.

08 HYDROGEN↗

Severe Accident Phenomena: A Comparison Among the NuScale SMR, Other Advanced LWR Designs, and Operating LWRs

During a severe accident in a nuclear reactor, there are a number of phenomenological events which can present a challenge to containment integrity. These include the generation and combustion of hydrogen, energetic fuel-coolant interactions, thermal attack of fission product barriers, core-concrete interactions, direct containment heating, and gradual overpressurization. The advanced design of the NuScale small modular reactor has resulted in the reduced likelihood and severity of severe accident challenges to containment. This paper discusses the features of the NuScale design that reduce the likelihood of occurrence of these severe accident phenomena, and discusses the ability of containment to survive in the unlikely event that they do occur. Here, the impact of severe accident phenomena for the NuScale design is compared and contrasted against other advanced light water reactors, such as AP1000 and ESBWR, as well as the existing fleet, using information from publicly available documents.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Dynamic Probabilistic Risk Assessment Based Response Surface Approach for FLEX and Accident Tolerant Fuels for Medium Break LOCA Spectrum

After the Fukushima Daiichi Accident, the safety features such as accident tolerant fuel (ATF) and diverse and flexible coping strategies (FLEX) for existing nuclear fleets are being investigated by the US Department of Energy under the Light Water Reactor Sustainability Program. This research is being conducted to quantify the risk-benefit of these safety features. Dynamic probabilistic risk assessment (DPRA)-based response-surface approach has been presented to quantify the FLEX and ATF benefits by estimating the risk associated with each option. ATFs with multilayered silicon carbide (SiC), iron-chromium-aluminum, and chromium-coated zirconium cladding were considered in this study. While these ATF candidates perform better than the current zirconium cladding (Zr), they may introduce additional failure modes in some operating conditions. The fuel failure analysis modules (FAMs) were developed to investigate ATF performance. The dynamic risk assessments were performed using RAVEN, a DPRA tool, coupled with RELAP5 and FAMs. A cumulative distribution function-based index provided a mean of comparing the benefits of safety enhancements. For medium break loss of coolant accidents, FLEX operational timing window for each fuel type was estimated. Among these ATF candidates, SiC-type ATF was the most beneficial candidate for an increased safety margin than Zr-based fuel and was found to complement FLEX strategies in terms of risk and coping time.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗