Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “authorization”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Detecting Anomalous Computation with RNNs on GPU-Accelerated HPC Machines

This paper presents a workload classification framework that discriminates illicit computation from authorized workloads on GPU-accelerated HPC systems. As such systems become more and more powerful, they are exploited by attackers to run malicious and for-profit programs that typically require extremely high computing ability to be successful. Our classification framework leverages the distinctive signatures between illicit and authorized workloads, and explore machine learning methods to learn the workloads and classify them. The framework uses lightweight, non-intrusive workload profiling to collect model input data, and explores multiple machine learning methods, particularly recurrent neural network (RNN) that is suitable for online anomalous workload detection. Evaluation results on three generations of GPU machines demonstrate that the workload classification framework can tell apart the illicit authorized workloads with a high accuracy of over 95%.

Pengfei, Zou↗

Evaluating Safeguards Statistical Assumptions via Stochastic Simulation

Herein, the authors built and tested a stochastic simulation to estimate achieved detection probabilities (DPs) on a stratum basis, over a tailorable range of diverted amounts from 0 to 2 SQ, using typical IAEA inspection data: i.e., SQ in stratum, number of items, number of gross/partial/bias defect measurements conducted, and realistic relative standard deviation (RSD) values for typical IAEA verification measurements. For bulk strata, the model calculates achieved DP at 0.01 SQ diversion increments; for item strata, the model calculates DP using the smallest realistic diversion increment (e.g., a plate, pin, or coupon). After successfully benchmarking against IAEA deterministic models, the simulation was used to test the sensitivity of DP to certain standard assumptions and selected input parameters. First, the equal defect assumption was tested; the results suggest significant complexity in the effectiveness of partial defect measurements. Next, the authors explored the sensitivity of DP to the assumed RSD of attribute tests. Then, the authors compared non-normal models for instrument performance (e.g., logistic, step, or arbitrary functions) to the typical results from a normal distribution (characterized by RSD). This last comparison was supplemented with experimentally derived performance data for an HM-5. The HM-5 was used to make enrichment measurements on both LEU and HEU MTR fuel elements as plates were removed, and the results fit with logistic and step curves and applied in the simulation. These stochastic DP results were compared to DP estimates from a deterministic model assuming a normal curve and typical RSD, yielding insights that could improve effectiveness in the field. These early results illustrate the potential of stochastic models to better understand achieved DP and to improve safeguards effectiveness.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Guidelines for predicting stress in cemented doublets undergoing temperature change

This work explores quick predictive methods for calculating potentially risky stresses and deflections in cemented doublets experiencing temperature change that agree well with finite element analysis. There are three failure modes of interest: cohesive failure of the adhesive, delamination (surface bond failure or debonding), and glass fracture. Adhesive theory, confirmed by finite element analysis, predicts stress singularities that complicate interpretation of the stress calculations. The presence of a stress singularity indicates the breakdown of linear elastic assumptions, but damage initiation and stress singularities are related. The authors find that geometry details near a bond edge can exacerbate or minimize damage initiation and stress concentrations. Because the interpretation of the stress results is complicated, the authors investigated predicted stresses in doublets that have been successfully tested between -40 and 85 °C. This study found that the product (ΔT ∙ Δα) should be less than 189 ppm, where ΔT is the temperature excursion and Δα is the difference in glass coefficient of thermal expansion. If the product (ΔT ∙ Δα) is equal to or greater than 189 ppm, further analysis and testing is warranted. But the authors also show that the fabrication process can significantly influence stress failure, particularly with large diameter doublets.

47 OTHER INSTRUMENTATION↗

Guidelines for predicting stress in cemented doublets undergoing temperature change

This work explores quick predictive methods for calculating potentially risky stresses and deflections in cemented doublets experiencing temperature change that agree well with finite element analysis. There are three failure modes of interest: cohesive failure of the adhesive, delamination (surface bond failure or debonding), and glass fracture. Adhesive theory, confirmed by finite element analysis, predicts stress singularities that complicate interpretation of the stress calculations. The presence of a stress singularity indicates the breakdown of linear elastic assumptions, but damage initiation and stress singularities are related. The authors find that geometry details near a bond edge can exacerbate or minimize damage initiation and stress concentrations. Because the interpretation of the stress results is complicated, the authors investigated predicted stresses in doublets that have been successfully tested between -40 and 85 °C. This study found that the product (∆T ∙ ∆α) should be less than 189 ppm, where ∆T is the temperature excursion and ∆α is the difference in glass coefficient of thermal expansion. If the product (∆T ∙ ∆α) is equal to or greater than 189 ppm, further analysis and testing is warranted. But the authors also show that the fabrication process can significantly influence stress failure, particularly with large diameter doublets

42 ENGINEERING↗

Exploring Microsimulation Process for Energy Impact Evaluation of Connected and Automated Vehicles

In this paper, the authors present a microsimulation-based methodological approach for evaluating the energy impact of connected and automated vehicles (CAVs). They use an open-source micro-simulator, SUMO, and provide a way to set up a simulation environment that emulates real-world traffic dynamics. They also employ the Intelligent Driver Model to represent human drivers and calibrate its driving behavior using real-world traffic data and driving statistics. The authors conduct extensive simulation studies considering different penetration rates of CAVs, different car-following models, and varying car-following model parameters. Using the state-of-the-art Future Automotive System Technology Simulator (FASTSim), they estimate the fuel economy of each vehicle and analyze the energy impact of the given CAV implementation. Finally, the authors analyze the possible factors affecting the simulation results, and also discuss limitations and future work.

ADVANCED PROPULSION SYSTEMS↗

SAFSTOR and License Renewal: Making Them Coexist

The Indian Point Energy Center is located on the eastern shore of the Hudson River in the town of Buchanan, New York. It lies approximately thirty miles north of New York City, and thus, holds the distinction of being the closest nuclear facility to a major metropolitan area. Units 1 and 2 were constructed and operated by Consolidated Edison and Unit 3 was owned and operated by the New York State Power Authority. All three units are now owned and operated by Entergy Nuclear- Northeast. Indian Point Unit 1 was powered by a pressurized water reactor which operated with an authorized maximum steady state power level of 615 thermal megawatts until October 31, 1974. On June 19, 1980, the Commission issued an order revoking authority to operate the facility. Although 244 spent fuel assemblies were successfully shipped offsite to a spent fuel reprocessing facility, 160 assemblies remain in the Unit 1 spent fuel pool awaiting relocation to dry cask storage. Units 2 and 3 are also pressurized water reactors which each produce slightly in excess of 1,000 MWe. Since 1974, Unit 1 has been maintained in a Safe Store Mode (SAFSTOR). For the purposes of this document, the term 'SAFSTOR' is intended to mean 'Custodial SAFSTOR' as described in section 2.4.3 of NUREG 0586 (Final Generic Environmental Impact Statement on Decommissioning of Nuclear Facilities (GEIS) as follows: 'Custodial SAFSTOR requires a minimum cleanup and decontamination effort initially, followed by a period of continuing care with the active protection systems (principally the ventilation system) kept in service throughout the storage period. Full-time onsite surveillance by operating and security forces is required to carry out radiation monitoring, to maintain the equipment, and to prevent accidental or deliberate intrusion into the facility and the subsequent exposure to radiation or the disposal of radioactivity beyond the confines of the facility'. The decision to enter SAFSTOR was based upon the immediate proximity of Unit 1 to the operating units and the fact that a number of Unit 1 systems are shared with Unit 2. Over the past few decades, additional Unit 1 space (primarily within the turbine building) has been cleaned out and is being used to support the operating Units. The original plan to maintain Unit 1 in a SAFSTOR condition until it could be safely dismantled along with Unit 2 at the end of the Unit 2 operating license in 2012, requires some level of re-thinking now that Units 2 and 3 are applying for renewal of their licenses with the desire to continue operation until the 2033 time frame. The remainder of this paper summarizes the inspections and assessments undertaken by Entergy to investigate and document the condition of Indian Point Unit 1 and the resulting steps taken to assure that it would not pose a threat to the license extension efforts being under taken by Units 2 and 3. In conclusion: the Entergy Indian Point management team has systematically undertaken an effort to ensure the Unit 1 SAFSTOR condition and has implemented programs and procedural controls which will assure that it will continue to be safely maintained and will not impact the continued safe operation of Units 2 and 3 during their license renewal period.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Packaging, Transportation, and Disposal Logistics for Large Radioactively Contaminated Reactor Decommissioning Components

The packaging, transportation and disposal of large, retired reactor components from operating or decommissioning nuclear plants pose unique challenges from a technical as well as regulatory compliance standpoint. In addition to the routine considerations associated with any radioactive waste disposition activity, such as characterization, ALARA, and manifesting, the technical challenges for large radioactively contaminated components, such as access, segmentation, removal, packaging, rigging, lifting, mode of transportation, conveyance compatibility, and load securing require significant planning and execution. In addition, the current regulatory framework, domestically in Titles 49 and 10 and internationally in TS-R-1, does not lend itself to the transport of these large radioactively contaminated components, such as reactor vessels, steam generators, reactor pressure vessel heads, and pressurizers, without application for a special permit or arrangement. This paper addresses the methods of overcoming the technical and regulatory challenges. The challenges and disposition decisions do differ during decommissioning versus component replacement during an outage at an operating plant. During decommissioning, there is less concern about critical path for restart and more concern about volume reduction and waste minimization. Segmentation on-site is an available option during decommissioning, since labor and equipment will be readily available and decontamination activities are routine. The reactor building removal path is also of less concern and there are more rigging/lifting options available. Radionuclide assessment is necessary for transportation and disposal characterization. Characterization will dictate the packaging methodology, transportation mode, need for intermediate processing, and the disposal location or availability. Characterization will also assist in determining if the large component can be transported in full compliance with the transportation and disposal regulations and criteria or if special authorizations must be granted to transport and/or dispose. The U.S. DOT routinely issues special permits for large components where compliance with regulatory or acceptance criteria is impractical or impossible to meet. Transportation and disposal safety must be maintained even under special permits or authorizations. For example, if transported un-packaged, performance analysis must still be performed to assess the ability of the large component's outer steel shell to contain the internal radioactive contamination under normal transportation conditions and possibly incidence normal to transportation. The dimensions and weight of a large component must be considered when determining the possible modes of transportation (rail, water, or highway). At some locations, rail and/or barge access is unavailable. Many locations that once had an active rail spur to deliver new construction materials and components have let the spur deteriorate to the point that repair and upgrade of the spur is no longer economically feasible. Barge slips that have not been used since new plant construction require significant repair and/or dredging. Short on-site haul routes must be assessed for surface and subsurface conditions, as well as longer off-site routes. Off-site routes require clearance approvals from the regulatory authorities or, in the case of rail transport, the rail lines. Significant engineering planning and analysis must be performed during the pre-mobilization. In conclusion, the packaging, transportation, and disposal of large, oversized radioactively contaminated components removed during plant decommissioning is complex. However, over the last 15 years, a 100 or more components have been safely and compliantly packaged and transported for processing and/or disposal.

42 ENGINEERING↗

Decommissioning Lines-of-Inquiry for Design Review of New Nuclear Facilities

An independent review of the design of the Salt Waste Processing Facility (SWPF) at Savannah River included a requirement to address the ability to decommission the facility. This paper addresses the lines of inquiry (that were developed for the review and their use in future for reviews of other projects, referred to herein as 'DDLOI'. Decommissioning activities for almost any type of facility are well within the technological state-of-the-art. The major impacts for complications resulting from insufficient consideration during design of a new facility that involves radioactive processes and/or material is the cost of: a) gaining access to high radiation areas and b) dealing with high levels of contamination. For this reason, the DDLOI were developed as a way of raising the awareness of designers and design reviewers to design features that can impede or facilitate ultimate decommissioning. The intent is that this report can be used not only for review, but also by engineers in the early stages of design development when requirements are being assembled. The focus for the DDLOI is on types of facilities that contain nuclear and/or radioactive processes and materials. The level of detail is more specific than would be found in decommissioning plans prepared for regulatory purposes. In commencing this review, the author's could find no precedent for a systematic review of design for decommissioning that included results of a review. Therefore, it was decided to create a report that would provide detailed lines of inquiry along with the rationale for each. The resulting DDLOI report included 21 topical areas for design review. The DDLOI combined the authors' experience in developing baselines for facilities to be deactivated or demolished with prior publications by the U.S. Army and the International Atomic Energy Agency. These two references were found via an Internet search and were the only ones judged to be useful at a field application level. Most others addressed principles or methods but did not have specific recommendations at a detailed design level. The DDLOI not only recommended what reviewers should look for, but also provides the reason as to why each item is important. Overall, the 21 topical areas there are presented in four main sections, which are: - Yard and Exterior Spaces addresses yard areas, underground tunnels, vaults, roofs and siding. - Structures and Interior Spaces addresses interior spaces, use of hazardous materials, placement of large or heavy equipment, and walls and floors designed for shielding. - Systems and Equipment first addresses systems for deactivation, service and utility systems isolation, pipes and ducts, tanks, and crud traps. In addition, DDLOI for laboratories, gloveboxes, and hot cells are included. - Contamination Control addresses the design of, walls, floors, ceilings, sumps, and drains with regard to contamination control. The ability to decontaminate is also included. The final section of the report is a listing of the individual DDLOI topics in a table format, which is designed as a tool that for use as a review checklist. In applying the DDLOI, two cautions are advised: - Designing for the operational mission of the facility is a higher priority than accommodating ease of decommissioning. The recommendations should be considered as preferable design practices when they can be accommodated without compromising the primary design objectives. - The DDLOI should be considered as guidance and not design requirements; noting some will become requirements because they are incorporated in modern building codes. Applying the DDLOI to the SWPF resulted in an overall conclusion that the design for the most part was compatible with the ability to decommission the facility. The most significant recommendation was to completely line the walls of a hot cell with stainless steel that was originally designed with two of its sides as the concrete wall of the building. This recommendation was subsequently incorporated in the design. Future design reviews of nuclear or radioactively contaminated facilities, whether by independent parties or the designers themselves, can benefit from the lines-of-inquiry that are the subject of this paper. The DDLOI, with an example of their use, are in a public domain report, which is freely available from the authors.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Shipping Remote Handled Transuranic Waste to the Waste Isolation Pilot Plant - An Operational Experience

On January 18, 2007, the first ever shipment of Remote Handled Transuranic (RH TRU) waste left the gate at the Idaho National Laboratory (INL), headed toward the Waste Isolation Pilot Plant (WIPP) for disposal, thus concluding one of the most stressful, yet rewarding, periods the authors have ever experienced. The race began in earnest on October 16, 2006, with signature of the New Mexico Environment Department Secretary's Final Order, ruling that the '..draft permit as changed is hereby approved in its entirety.' This established the effective date of the approved permit as November 16, 2006. The permit modification was a consolidation of several Class 3 modification requests, one of which included incorporation of RH TRU requirements and another of which incorporated the requirements of Section 311 of Public Law 108-137. The obvious goal was to complete the first shipment by November 17. While many had anticipated its approval, the time had finally come to actually implement, and time seemed to be the main item lacking. At that point, even the most aggressive schedule that could be seriously documented showed a first ship date in March 2007. Even though planning for this eventuality had started in May 2005 with the arrival of the current Idaho Cleanup Project (ICP) contractor (and even before that), there were many facility and system modifications to complete, startup authorizations to fulfill, and many regulatory audits and approvals to obtain before the first drum could be loaded. Through the dedicated efforts of the ICP workers, the partnership with Department of Energy (DOE) - Idaho, the coordinated integration with the Central Characterization Project (CCP), the flexibility and understanding of the regulatory community, and the added encouragement of DOE - Carlsbad Field Office and at Headquarters, the first RH TRU canister was loaded on December 22, 2006. Following final regulatory approval on January 17, 2007, the historic event finally occurred the following day. While some of the success of this endeavor can be attributed to the sheer will and determination of the individuals involved, the fact that it was established and managed as a separate sub-project under the ICP, accounts for a majority of the success. Utilizing a structured project management approach, including development of, and management to, a performance baseline, allowed for timely decision making and the flexibility to adapt to changing conditions as the various aspects of the project matured. This paper provides some insight into how this was achieved, in a relatively short time, and provides an overview of the experience of start-up of a new retrieval, characterization, loading, and transportation operation in the midst of an aggressive cleanup project. Additionally, as one might expect, everything within the project did not go as planned, which provides a great opportunity to discuss some lessons learned. Finally, the first shipment was just the beginning. There are 224 additional shipments scheduled. In keeping with the theme of WM 2008, Phoenix Rising: Moving Forward in Waste Management, this paper will address the future opportunities and challenges of RH TRU waste management at the INL. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Outlook for Some Fission Products Utilization with the Aim to Immobilize Long-Lived Radionuclides

The prospects for development of nuclear power are intimately associated with solving the problem of safe management and removal from the biosphere of generated radioactive wastes. The most suitable material for fission products and actinides immobilization is the crystalline ceramics. By now numerous literature data are available concerning the synthesis of a large range of various materials with zirconium-based products. It worth mentioning that zirconium is only one of fission products accumulated in the fuel in large amounts. The development of new materials intended for HLW immobilization will allow increasing of radionuclides concentration in solidified product so providing costs reduction at the stage of subsequent storage. At the same time the idea to use for synthesis of compounds, suitable as materials for long-term storage or final disposal of rad-wastes some fission products occurring in spent fuel in considerable amount and capable to form insoluble substances seems to be rather attractive. In authors opinion in the nearest future one can expect the occurrence of publications proposing the techniques allowing the use of 'reactor's zirconium, molybdenum or, perhaps, technetium as well, with the aim of preparing materials suitable for long-lived radionuclides storage or final disposal. The other element, which is generated in the reactor and worth mentioning, is palladium. The prospects for using palladium are defined not only by its higher generation in the reactor, but by a number of its chemical properties as well. It is evident that the use of natural palladium with the purpose of radionuclides immobilization is impossible due to its high cost and deficiency). In author's opinion such materials could be used as targets for long-lived radionuclides transmutation as well. The object of present work was the study on methods that could allow to use 'reactor' palladium with the aim of long-lived radionuclides such as I-129 and TUE immobilization. In the paper the results of experiments on synthesis of matrices with TUE oxides and PdI{sub 2} on palladium base are presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress in Norwegian-Russian Regulatory Cooperation in Management of the Nuclear Legacy

The Norwegian Radiation Protection Authority (NRPA) and the Federal Medical-Biological Agency (FMBA) of the Russian Federation have a collaboration programme which forms part of the Norwegian government's Plan of Action to improve radiation and nuclear safety in northwest Russia. The background to the NRPA-FMBA collaboration programme has been described in previous WM presentations. This paper presents the substantial progress made within that programme, describes ongoing progress within specific projects and sets out the value arising from wider involvement in the programme of other organisations such as NATO and the technical support derived from other national agencies such as the IAEA, and regulatory authorities from the USA, the UK and France. The main activities of the cooperation projects are concerned with the management of the nuclear legacy in northwest Russia, in particular the remediation of facilities, and related spent fuel and radioactive waste management, at the former Shore Technical Bases at Andreeva Bay and Gremikha Village. New regulatory guidance documents have been developed, necessary because of the special abnormal situation at these sites, now designated as Sites of Temporary Storage (STS), but also because of the transition from military to civilian regulatory supervision and the evolving regulatory system in the Russian Federation. The work has involved major technical inputs from the Russian Federation Institute of Biophysics, as well as review and advice on international recommendations and good practice in other countries provided by other technical support organisations. Projects on-going in 2007 are described which involve regulatory guidance on very Low-Level Waste management, specifically for the licensing and operation of new VLLW disposal facilities; optimisation of operational radiation protection, particularly in areas of high ambient radiation dose rate as are found in some parts of the STSs; determination of factors which can be used to identify when to apply emergency procedures before the full emergency is obvious; and development of the radio-ecological basis for identifying radiation supervision area boundaries. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Disposal of LLW and ILW in Germany - Characterisation and Documentation of Waste Packages with Respect to the Change of Requirements

Since the 1998 termination of LLW and ILW emplacement in the Morsleben repository (ERAM), Germany, the treatment, conditioning and documentation of radioactive waste products and packages have been continued on the basis of the waste acceptance requirements as of 1995, prepared for the Konrad repository near Salzgitter in Lower Saxony, Germany. The resulting waste products and packages are stored in interim storage facilities. Due to the Konrad license issued in 2002 the waste acceptance requirements have to be completed by additional requirements imposed by the licensing authority, e. g. for the declaration of chemical waste package constituents. Therefore, documentation of waste products and packages which are checked by independent experts and are in parts approved by the responsible authority (Office for Radiation Protection, BfS) up to now will have to be checked again for fulfilling the final waste acceptance requirements prior to disposal. In order to simplify these additional checks, databases are used to ensure an easy access to all known facts about the waste packages. A short balance of the existing waste products and packages which are already checked and partly approved by BfS as well as an overview on the established databases ensuring a fast access to the known facts about the conditioning processes is presented. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Plutonium Finishing Plant Model for the Cercla Removal Action and Decommissioning Construction Final Report

The joint policy between the U.S. Environmental Protection Agency (EPA) and the U.S. Department of Energy (DOE) for decommissioning buildings at DOE facilities documents an agreement between the agencies to perform decommissioning activities including demolition under the Comprehensive Environmental Response Compensation and Liability Act (CERCLA). The use of removal actions for decommissioning integrates EPA oversight authority, DOE lead agency responsibility, and state authority for decommissioning activities. Once removal actions have been performed under CERCLA, a construction completion report is required to document the completion of the required action. Additionally, a decommissioning report is required under DOE guidance. No direct guidance was found for documenting completion of decommissioning activities and preparing a final report that satisfies the CERCLA requirements and the DOE requirements for decommissioning. Additional guidance was needed for the documentation of construction completion under CERCLA for D and D projects undertaken under the joint policy that addresses the requirements of both agencies. A model for the construction completion report was developed to document construction completion for CERCLA D and D activities performed under the joint EPA/DOE policy at the Plutonium Finishing Plant (PFP). The model documentation report developed at PFP integrates the DOE requirements for establishing decommissioning end-points, documenting end-point completion and preparing a final decommissioning report with the CERCLA requirements to document completion of the action identified in the Action Memorandum (AM). The model includes the required information on health and safety, data management, cost and schedule and end-points completion. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Development of the Updated Environmental Protection Agency Manual of Protective Action Guides (PAGS) and Protective Actions for Nuclear Incidents

As a student intern with the United States Environmental Protection Agency (EPA) Headquarters, the author was trained in the National Response Plan (NRP) and assisted in the editing of the new (unpublished) EPA Protective Action Guides (PAGs) [1] which has been revised in light of the perceived post 9/11 potential for 'Dirty Bomb' and 'Improvised Nuclear Device' attacks on civilian areas. Technical aspects and the public policy aspects of developing the new guides are discussed. Early Phase initial responses discussed include: Notification of state and/or local authorities, immediate evacuation/sheltering prior to release information or measurements, monitoring of releases and exposure rate measurements, estimation of dose consequences, implementation of protective actions in other areas. The new PAG clarifies the use of 1992 PAGs [2] for incidents other than nuclear power plant accidents, lowers projected thyroid dose for potassium iodine (KI), provides drinking water guidance, includes guidance for long-term site restoration, and updates dosimetry from ICRP 26 to ICRP 60. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Romanian Experience in The Conditioning of Radium Sources

Ra{sup 226} first radionuclide separated from pitchblende in 1898 by Pierre and Marie Curie was successfully used in medicine, industry as in other fields being the only one available radionuclide till 1940 when were produced other radionuclides in accelerators. On long term the use of Ra{sup 226} sealed sources are not any more safe due to: the high specific activity, long half live, decays in Rn{sup 226} gas which increases the internal pressure of capsule leading in time to the leakage, the salts as raw materials from which the sealed sources are manufactured are soluble, there is a leak of information and records on the manufacture and operation. Based on this consideration in Romania regulatory authority did not authorized any more the use of these sealed sources [1]. The paper presents some aspects from Romanian experience related to the collection and conditioning of radium sealed sources. Data relating the radium inventory as well as the arrangements made in order to create a workshop for the conditioning of radium sources are presented. (authors)

07 ISOTOPE AND RADIATION SOURCES↗

The effect of water on tritium release behavior from solid breeder candidates

The authors have made a tritium release model to represent the release behavior of bred tritium from solid breeder materials using a series of studies. It has been observed that a large amount of adsorbed water and water produced by water formation reaction are released to the purge gas even though dry purge gas with hydrogen is introduced to solid breeder materials. According to our tritium release model, the presence of water in the purge gas and surface water on the material has a large effect on the tritium release behavior. In this study, the authors quantified the amount of adsorbed water and the capacity of the water formation reaction for various solid breeder materials (Li{sub 2}TiO{sub 3}, Li{sub 4}SiO{sub 4}, Li{sub 2}ZrO{sub 3}, LiAlO{sub 2}). The effect of surface water on the chemical form of tritium released from the LiAlO{sub 2} blanket is also discussed in this study. (authors)

36 MATERIALS SCIENCE↗

Chooz A, First Pressurized Water Reactor to be Dismantled in France - 13445

Nine commercial nuclear power plants have been permanently shut down in France to date, of which the Chooz A plant underwent an extensive decommissioning and dismantling program. Chooz Nuclear Power Station is located in the municipality of Chooz, Ardennes region, in the northeast part of France. Chooz B1 and B2 are 1,500 megawatt electric (MWe) pressurized water reactors (PWRs) currently in operation. Chooz A, a 305 MWe PWR implanted in two caves within a hill, began operations in 1967 and closed in 1991, and will now become the first PWR in France to be fully dismantled. EDF CIDEN (Engineering Center for Dismantling and Environment) has awarded Westinghouse a contract for the dismantling of its Chooz A reactor vessel (RV). The project began in January 2010. Westinghouse is leading the project in a consortium with Nuvia France. The project scope includes overall project management, conditioning of the reactor vessel (RV) head, RV and RV internals segmentation, reactor nozzle cutting for lifting the RV out of the pit and seal it afterwards, dismantling of the RV thermal insulation, ALARA (As Low As Reasonably Achievable) forecast to ensure acceptable doses for the personnel, complementary vacuum cleaner to catch the chips during the segmentation work, needs and facilities, waste characterization and packaging, civil work modifications, licensing documentation. The RV and RV internals will be segmented based on the mechanical cutting technology that Westinghouse applied successfully for more than 13 years. The segmentation activities cover the cutting and packaging plan, tooling design and qualification, personnel training and site implementation. Since Chooz A is located inside two caves, the project will involve waste transportation from the reactor cave through long galleries to the waste buffer area. The project will end after the entire dismantling work is completed, and the waste storage is outside the caves and ready to be shipped either to the ANDRA (French National Radioactive Waste Management Agency) waste disposal facilities - (for low-level waste [LLW] and very low-level waste [VLLW], which are considered short lived) - or to the EDF Interim Storage Facility planned to be built on another site - (for low- and intermediate-level waste [LILW], which is considered long lived). The project has started with a detailed conceptual study that determines the step-by-step approach for dismantling the reactor and eventually supplying the packed containers ready for final disposal. All technical reports must be verified and approved by EDF and the French Nuclear Safety Authority before receiving the authorization to start the site work. The detailed conceptual study has been completed to date and equipment design and manufacturing is ongoing. This paper will present the conceptual design of the reactor internals segmentation and packaging process that will be implemented at Chooz A, including the planning, methodology, equipment, waste management, and packaging strategy. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗