Advanced Reactor Technologies (ART): Very High Temperature Reactor (VHTR) Research and Development (R&D) Quarterly Report
Highlights of Advanced Gas Reactor (AGR) activities during January through March 2019.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Highlights of Advanced Gas Reactor (AGR) activities during January through March 2019.
Rev 0 Highlights of ART activities October through December 2017 Rev 1 Highlights of ART activities January through March 2018 Rev 2 Highlights of ART activities April through June 2018 Rev 3 Highlights of ART activities July through September 2018 Rev 4 Highlights of ART activities October through December 2018
This is a set of slides that will be used to aid discussions related to the performance of the AGR-5/6/7 experiment. The discussion will be part of the bi-annual Technical Coordination Team associated with this experiment. All participants have been part of this experiment from the beginning (5 year effort). There is nothing technically new in this presentation compared to previous presentations given to this Team. The slides were separated into four separate presentations
This plan describes post-irradiation examination (PIE) activities (simultaneous three-compact temperature transient safety testing and optional post-safety test analyses) to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compacts 5-1-1, 5-1-2, and 5-3-1 taken from the Advanced Gas Reactor (AGR) experiment, AGR 2. This work will be performed in accordance with general objectives outlined in the AGR-2 PIE plan and guidance in the ORNL PIE statement of work.
Task: Generate plots of the distribution of power per particle per power bin over time. Kairos needs these for licensing purposes. Basically, they need to know which power/particle was sustained by which fraction of the fuel and for how long. The idea is to leverage AGR results. However, Kairos wants to operate at relatively high power/particle and, therefore, they need to check how much of their range is covered by AGR. These plots are made for AGR-1, AGR-2 US UCO, and what is predicted for AGR-5/6 and AGR-7 (for which there are no daily as-run values but projected values for every cycle). The predicted AGR-5/6/7 data was provided by the attached Excel file in an Email by Blaise Collin to Cam Binh Pham on May 21, 2018.
The U. S. Department of Energy (DOE) has made a significant investment in research to develop the next generation of reactor technologies as well as to improve the performance and lengthen the life cycle of existing nuclear reactors. Data collected to demonstrate new concepts may also be used in the future to support licensing of these technologies. Provenance of these data must be preserved. The Nuclear Data Management and Analysis System (NDMAS) was established to manage and preserve data collected by fuels and materials research conducted by the high-temperature, gas-cooled reactor program. The scope of NDMAS is expanding to include other nuclear research programs that have the shared need to preserve the provenance of research data. Nuclear research funded by DOE is conducted by Idaho National Laboratory (INL), universities, other national laboratories, foreign research partners, and private companies. This research will generate a large amount of data from a variety of sources over a period of many years. Managing the data generated by the research and development projects presents a significant challenge for retaining data integrity and availability.
This plan describes the post irradiation examination (PIE) oxidation testing activities to be performed by Oak Ridge National Laboratory (ORNL) on individual particles from Compact 5 4 2 taken from the Advanced Gas Reactor (AGR) experiment, AGR 2. This work will be performed in accordance with the general objectives outlined in the AGR 2 PIE Plan1 and guidance in the ORNL PIE Statement of Work.
Kernels, coated particles, and compacts will be manufactured to predefined specifications for irradiation in the AGR 5/6/7 experiments. Many tests will be performed for quality assurance and most of these tests correspond to criteria that have to be met with 95% confidence, based on random samples. This report describes the statistical acceptance testing methods and gives minimum sample sizes for kernels to achieve 95% confidence. Coated particles and compacts will be addressed in revisions to this report. The methods used for sample size determination are described in detail in INL/EXT 05 00349, Statistical Methods Handbook for Advanced Gas Reactor Fuel Materials (Einerson 2005). The statistical approach is to collect a representative sample, apply an acceptance test to the sample, and accept or reject the product based on this test for each criterion. The criteria or “product specifications” are contained in SPC-1352, “AGR 5/6/7 Fuel Specification,” Revision 1 and are duplicated in this plan.
This plan describes the post irradiation examination (PIE) activities to be performed by Oak Ridge National Laboratory (ORNL) on irradiated Compact 10 4 taken from the Advanced Gas Reactor (AGR) experiment, AGR 3/4. This work will be performed in accordance with the general objectives outlined in the AGR 3/4 PIE Plan and guidance in the ORNL PIE Statement of Work.
Update on AGR-5/6/7 PIE including initial results, plans, and future work. This is a presentation to our DOE sponsors.
Updates on AGR-3/4 PIE at INL and ORNL for the July 2021 review meeting with DOE sponsors.
This plan describes the post irradiation examination (PIE) oxidation testing activities to be performed by Oak Ridge National Laboratory (ORNL) on individual particles from Compact 5 4 2 taken from the Advanced Gas Reactor (AGR) experiment, AGR 2. This work will be performed in accordance with the general objectives outlined in the AGR 2 PIE Plan1 and guidance in the ORNL PIE Statement of Work.
Volumes I, II and III. These are OECD Benchmarks - not edited.
Highlights and significant accomplishments of Advanced Gas Reactor (AGR) fuels development activities during July, August and September 2021
Highlights of Advanced Gas Reactor (AGR) fuels development activities during April, May and June 2021.
Highlights and significant accomplishments of Advanced Gas Reactor (AGR) fuels development activities during January, February and March 2021
A one-dimensional finite-element model based on the MOOSE framework has been constructed, and overall transport estimates are predicted based on available diffusivities and sorption isotherms in the extant literature. The predicted transport profiles are compared to experimental results, where such results are available, including total inventory analysis of gamma emitters, liquid scintillation results for Sr-90 concentrations, radial deconsolidation leach-burn-leach within compacts, tomographic reconstructions based on detailed gamma scanning and destructive physical sampling of several rings. The magnitude of expected transport to the sink ring is generally predicted by the model for silver and cesium, however, modeled detailed concentration profiles are not consistent with experimental results. Strontium and europium transport is not well characterized by model results.
Examination plan for AGR-3/4 Compact 10-2. Work is to be performed at ORNL.