Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SUPPLY”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Disruptive Supplies of Affordable Biomass Feedstock Grown in the Open Ocean

Marine BioEnergy was founded to commercialize a patented invention to enable open ocean kelp farms to produce feedstock by depth-cycling the farms. The concept is to surface the kelp during the day to absorb sunlight and CO 2 , and submerge the kelp at night to the nutrient-rich waters below the thermocline (~60-300 m deep). In an experiment, the kelp thrived in the depth-cycling environment. ARPA-E provided additional funds for Marine BioEnergy to develop a design of a full-scale farm system. Marine BioEnergy is preparing to deploy these farms, towed by unmanned drone submarines, to depth-cycle the kelp and produce disruptive supplies of affordable biomass feedstock that can be used to make carbon-neutral, drop-in fuels to enable the transition to net-zero carbon.

09 BIOMASS FUELS↗

Quantification of Commercially Planned Battery Component Supply in North America through 2035

There is the potential for rapid growth in battery manufacturing in North America in the coming years, as indicated by investment plans which companies have announced. Argonne National Laboratory is tracking these investment announcements to understand the availability of domestically produced battery cells and battery components over the next decade. We find that companies have made announcements for over 1,300 GWh/year of lithium-ion battery cell production by 2030, enough to conservatively supply ten million electric vehicles and expected growth in stationary grid storage. From 2021 to 2032, battery cell production is modeled to grow 28-fold. For each of the core battery components of lithium-ion batteries (cathodes, anodes, separators, electrolytes, and foils), we describe the current announced capacities for materials with respect to cell production and end-use demand, finding similar rapid growth for each.

25 ENERGY STORAGE↗

Evaluating Optical Techniques to Characterize Solid State Samples for the Pu-238 Supply Program

This report documents steps that have been taken to establish advanced characterization capabilities for solid-state samples to support the 238 Pu Supply Program. The program has already invested significantly in spectroscopy and online monitoring development for liquid processes. Many of the data, analytical methods, and equipment could also be leveraged for the analysis of Np/Pu oxides and Np pellets to help classify material properties and link them to operations. The techniques described in this work include diffuse reflectance spectroscopy (DRS), Raman spectroscopy, and laser-induced breakdown spectroscopy (LIBS). Each technique is sensitive to various chemical and/or elemental species and can provide complimentary information to more standard methods such as powder x-ray diffraction and scanning electron microscopy. These options are remotely deployable via fiber-optic cables. DRS and Raman spectroscopy are already approved for glove box and hot cell work, but LIBS requires US Department of Energy approval for incorporation. Raman spectroscopy does require laser shielding, which means that DRS is the easiest method to implement. However, each technique provides complimentary data, and the most robust sample characterization could be achieved when all three, among other methods, are harnessed together. This report documents some of the progress made testing these capabilities, some of the challenges, and next steps to optimize the technology and integration strategies.

07 ISOTOPE AND RADIATION SOURCES↗

Power Supply Options for the Marpi Landfill, Saipan: Feasibility Study

The Marpi Landfill, located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by an on-site diesel generator that only operates when the landfill is open and staffed. The CNMI Office of Planning and Development (OPD) aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location and to increase the use of sustainable energy within the CNMI. CNMI has a 20% target for renewable energy consumption, as documented in Sustainable Development Goal #7 in the Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (GPO 2014). To accomplish these goals, the U.S. Department of Energy, through its Interagency Reimbursable Work Agreement with the Federal Emergency Management Agency, funded this feasibility study to assess and prioritize power supply options for the landfill. The availability of solar and wind resources varies seasonally, as does the load. A BESS can help to balance mismatches between generation and load on short (hourly or daily) timescales, but not across seasons. The microgrid scenarios evaluated for Marpi consider options for technology combinations that will both meet the load and utilize available resources, despite the challenge presented by higher loads and lower solar and wind availability during the rainy season, depicted in Figure ES-2. The seven scenarios evaluated are summarized in Table ES-1. Each scenario’s configuration was optimized to include component capacities that reduce capital and operating costs, meet the load, and minimize carbon emissions, as feasible. The costs and levelized cost of energy (LCOE) shown do not assume the use of any grant funding or incentives, although these options were also evaluated. To assist with decision-making, a prioritization matrix (Table ES-3) was created to compare the microgrid scenarios evaluated in this feasibility study according to various stakeholder priorities. The prioritization metrics were chosen based on discussions with OPD and will be finalized through stakeholder feedback. The scenarios were given a score between 1 and 7 for each prioritization metric (the lower the score, the higher the priority), and total scores were calculated using assigned weights based on the relative priority of each metric. The total scores were then ranked to produce a prioritized list of microgrid scenarios based on the metrics most important to the project stakeholders. As shown, scenario 4 (100 kW of solar PV, a 75 kW/300 kWh BESS, and 160 kW of diesel generation) ranks highest.

14 SOLAR ENERGY↗

Uninterruptible Power Supply Systems, UTrain Course 58423 [Slides]

Identify the principles of operation of uninterruptible power supply (UPS) systems, focusing on double conversion and offline/standby/backup types. The traditional UPS is now referred to as a “double conversion” UPS. The AC input power is rectified into DC. The DC feeds an inverter which provides the AC output. The DC bus is also connected to batteries. It is called double conversion because the first conversion is from AC to DC and the second conversion is from DC to AC. The inverter creates the output waveform to match the bypass input. Because of this, the static bypass switch may be switched between inverter and bypass seamlessly.

42 ENGINEERING↗

Electric Vehicle Supply Equipment (EVSE) Study for Vernon County, Wisconsin [Slides]

Viroqua is a town in Wisconsin with a population of approximately 4,500. The Vernon County Energy district is a local nonprofit in Viroqua that provides energy education, individualized energy consulting and coaching to residents and businesses. They have a very good relationship with our county government and wish to support their efforts. The Vernon County government is currently working on a comprehensive plan and would like to include planning for electric vehicle (EV) charging infrastructure in the plan. They are seeking guidance on logical phases for implementation and identifying the best locations for Level 2 and Level 3 EV chargers. NREL provided technical input on strategic planning for electric vehicle (EV) adoption and electric vehicle supply equipment (EVSE) expansion in Vernon County through the Clean Energy to Communities (C2C) Expert Match technical assistance program. NREL provided strategic planning support for EV expansion planning in Vernon County and siting considerations for locating EVSE.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Development Results on Replacement Materials for Current Scarce or High Supply Chain Risk Materials

In September 2020, the U.S. government issued an executive order to address the threat to the domestic supply chain from its reliance on critical minerals (CMs) from foreign competitors and to support the domestic mining and processing industry. The Advanced Materials and Manufacturing Technology (AMMT) program is addressing this executive order by evaluating advanced manufacturing (AM) and its impact on the demands of CMs for energy production in general and how the deployment of AM in nuclear energy will support the projected goals of the Paris Accord and further a net-zero carbon economy (NZE) by 2050. Three strategic reports were previously prepared by the AMMT program to date and identified two areas for more detailed exploration: (1) the replacement of high-risk CMs such as cobalt and niobium by more abundant minerals and (2) the minimization and utilization of CM waste streams. The design of nuclear materials without critical elements as alloying elements, is a part of the nuclear materials strategy to overcome the critical minerals scarcity. In this report, two approaches are evaluated namely (1) replacement of critical elements as alloying elements in nuclear materials, and (2) the design of a new alloys that does not contain critical minerals as an alloying element.

36 MATERIALS SCIENCE↗

Potential Availability of Alternative Fuel to Supply Maritime Activities in Pacific Northwest Ports

The international shipping sector represented 3% of global greenhouse gas emissions in 2023 (Office of Energy Efficiency & Renewable Energy 2024). International shipping has been classified as a difficult-to-decarbonize industry (IRENA 2024). In an effort to drive decarbonization, the U.S. Department of Energy has partnered with Mission Innovation to co-lead the Zero-Emission Shipping Mission, which launched in 2021(Office of Energy Efficiency & Renewable Energy 2021). In addition, the U.S. Department of State partnered with Norway to launch the Green Shipping Challenge in 2022 (Office of the Spokesperson 2022b). As part of the ZESM and Green Shipping Challenge, the United States is collaborating with the Republic of Korea (ROK) to develop a green shipping corridor (U.S. Mission Korea 2023). The United States and ROK have conducted a pre-feasibility study as the first step in developing a green shipping corridor between the countries. The ports included in the study are Seattle, Tacoma, and Everette in the U.S. Pacific Northwest (PNW) and Busan, Ulsan, and Masan in ROK. The National Renewable Energy Laboratory's role in the study was to analyze the availability and technical potential of alternative marine fuels in proximity to U.S. PNW ports. The findings show most of the existing alternative fuel capacity within the region is from renewable diesel, biodiesel, and sustainable aviation fuel facilities. The largest growth in fuel capacity in the region by 2030 is projected to be in renewable diesel and hydrogen. The overall technical readiness of non-drop-in alternative fuel production and conversion technologies is more developed than alternative-fueled ships and associated fueling infrastructure. However, much of the fuel capacity in the region is comprised of drop-in fuels, making it technically possible to use existing infrastructure for transporting and bunkering to the existing fleet. Data to inform regional alternative fuel quantity estimations were collected from an extensive review of databases, reports, announcements, and other publicly available resources. A maturity index and sector competition factor were applied to announced fuel projects to determine the quantity of alternative fuel available to the marine sector in the region by 2030. Demand data were collected from fuel bunkering logs covering the PNW seaports (State of Washington 2021). Both supply and demand data were converted to very-low sulfur fuel oil gallon equivalents (VLSFO-GE) for better comparison. Qualitative data were gathered through interviews with stakeholders, project developers, and industry experts. Total alternative fuel capacity available to the marine sector in the region is estimated to be 824 million VLSFO-GE per year by 2030. This is sufficient to cover the requirements of a green shipping corridor between the United States and ROK. The findings from this report are being used to inform detailed feasibility studies for several U.S. PNW -ROK green shipping corridors. Updates from the U.S. PNW - ROK feasibility studies will continue to be published on Mission Innovation's green corridor tracking website (Zero Emission Shipping Mission, n.d.). In addition, this report has helped to inform further work on shipping decarbonization in the U.S. PNW, including the Pacific Northwest to Alaska Green Corridor focused on cruise vessels.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Electric Vehicle Supply Equipment and Considerations for a Reasonable Rate of Return

This white paper identifies the following recommendations for states as they consider issues related to electric vehicle supply equipment program income under the National Electric Vehicle Infrastructure program and other programs covered by National Electric Vehicle Infrastructure Standards and Requirements in the U.S. Code of Federal Regulations (23 CFR 680): 1. Conduct value analysis for better outcomes 2. Promote pricing transparency

33 ADVANCED PROPULSION SYSTEMS↗

Bipartisan Infrastructure Law (BIL) – Illinois Rare Earth Novel Extraction and Supply (IRENES)

This report presents the physical and chemical characterization of breaker and sorter reject materials sourced from the Prairie State Generation facility, as part of the Illinois Rare Earth Novel Extraction and Supply (IRENES) project. Key analyses include particle size distribution, density, angle of repose, proximate and ultimate composition, mineralogy, and elemental content. Breaker reject material was found to be coarser and higher in ash content (~80%) with lower calorific value, while sorter reject showed finer distribution, lower ash (~68%), and higher carbon and energy content. XRD and XRF analyses confirmed the presence of REE-bearing minerals and relevant oxides, supporting process design and beneficiation strategy development for critical mineral recovery.

01 COAL, LIGNITE, AND PEAT↗

Nano- and Earth-Science-inspired Electric Vehicle Battery Recycling to Secure Battery Supply Chain

With the expected growth of electric vehicles (EV) in the transportation sector, recycling or upcycling spent battery materials will be required to reduce EV costs, lessen waste, and ease critical material supply chain pressure for EV battery applications. “Direct” recycling or upcycling is an alternative to current industrial approaches. Many challenges remain for viable direct battery upcycling, including upgrading the transition metal ratio in the costliest component (cathode oxide); separation of transition metal ions in the exit stream; battery disassembly; improving cathode exfoliation which can lead to a new way of direct recycling; and lithium metal anode recycling -- including safety concerns. We devise and deploy a suite of methods to deal with these challenges. The results pave the way to future work on battery recycling, in areas of technological/commercial readiness level ranging from basic research to large-scale commercialization.

25 ENERGY STORAGE↗

Power Supply Options for the Marpi Landfill, Saipan: Comprehensive Feasibility Study

The Marpi Landfill (“Marpi” or “the landfill”), located on the northern end of the island of Saipan in the Commonwealth of the Northern Mariana Islands (CNMI), is powered by a single on-site diesel generator that only operates when the landfill is open and staffed. The project team, composed of representatives of the Department of Public Works and the Office of Planning and Development (OPD), aspires to provide the Marpi Landfill with 24-hour power availability despite its remote location to increase the use of sustainable energy and to ensure environmentally compliant landfill operations. This is consistent with the sustainable development goals documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021), including Goal #12 (ensure environmentally compliant waste management facilities) and Goal #7 (renewable energy deployment). Further, the CNMI has a 20% target for renewable energy consumption by 2030, as documented in the 2021–2030 Comprehensive Sustainable Development Plan (OPD 2021) and the renewable portfolio standard (Public Law 18-62). To accomplish these goals, the Federal Emergency Management Agency, through its Interagency Reimbursable Work Agreement with the U.S. Department of Energy, funded a feasibility study and follow-up study in 2023–2024 to assess and prioritize power supply options for the landfill. This report combines the results from both feasibility studies.

14 SOLAR ENERGY↗

Retrofit & Expansion Project at Ultra-High Molecular Weight Polyethylene Plant: Completing a Full Domestic Supply Chain for Lithium-Ion Batteries (Final Scientific and Technical Report)

The UTEC-1 LIBS Retrofit and Expansion Project aimed to retrofit and expand Braskem’s UHMWPE unit in La Porte, TX to produce lithium-ion battery separator (LIBS) grade material and increase capacity. The project sought to strengthen the domestic supply chain for advanced battery manufacturing and reduce reliance on imports. While significant progress was achieved in conceptual design and FEL-2 engineering, strategic realignment and external factors led to project termination prior to FEL-3 and FEED execution.

25 ENERGY STORAGE↗