Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “SITE APPROVALS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

EFFECTS OF MOISTURE IN THE 9975 SHIPPING PACKAGE FIBERBOARD ASSEMBLY

The fiberboard assembly used in 9975 shipping packages as an impact-absorption and insulation component has the capacity to absorb moisture, with an accompanying change to its properties. While package fabrication requirements generally maintain the fiberboard moisture content within manufacturing range, there is the potential during use or storage for atypical handling or storage practices which result in the absorption of additional moisture. In addition to performing a transportation function, the 9975 shipping packages are used as a facility storage system for special nuclear materials at the Savannah River Site. A small number of packages after extended storage have been found to contain elevated moisture levels. Typically, this condition is accompanied by an axial compaction of the bottom fiberboard layers, and the growth of mold. In addition to potential atypical practices, fiberboard can exchange moisture with the surrounding air, depending on the ambient humidity. Laboratory data have been generated to correlate the equilibrium moisture content of cane fiberboard with the humidity of the surrounding air. These data are compared to measurements taken within shipping packages. With a reasonable measurement of the fiberboard moisture content, an estimate of the fiberboard properties can be made. Over time, elevated moisture levels will negatively impact performance properties, and promote fiberboard mold growth and resultant degradation.

42 ENGINEERING↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 18327

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to cleanup radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever, built for radioactive waste processing. DOE is proceeding with its approach to complete the WTP Project in phases, which includes the following principal actions: - Completing construction of the Low-Activity Waste (LAW) Facility, Balance of Facilities (BOF), and Analytical Laboratory (LAB) (collectively referred to as LBL); - Implementing a direct-feed low-activity waste (DFLAW) process to treat low-activity waste independent of the Pretreatment (PT) Facility; - Resolving the technical issues associated with primarily the PT Facility; - Completing the design and construction of the High-Level Waste (HLW) and PT facilities to enable integrated WTP operations. In March 2016, a federal judge amended the 2010 Consent Decree 1 completion milestones for the Hanford WTP, which generally aligns with DOE's plans for completing the WTP facilities in sequence: - Complete LAW Facility hot commissioning: December 31, 2023; - Complete HLW Facility hot commissioning: December 31, 2033; - Complete PT Facility hot commissioning: December 31, 2033; - Achieve initial plant operations for the WTP: December 31, 2036. Having established milestones for completing the WTP facilities has enabled DOE to formally implement its plans for completing the WTP facilities in sequence, starting with the LAW Facility. In December 2016, DOE executed a contract modification and approved a change to the project's performance baseline to complete the LBL facilities and incorporate modifications needed to allow direct feed of low-activity waste to the LAW Facility. Significant progress has been made toward completing the design, construction, and planning for commissioning of the facilities needed to enable the DFLAW operations to commence as early as January 2022. In 2012, DOE partially suspended production work on the WTP's PT Facility and to a lesser degree the HLW Facility because of unresolved technical issues associated with those facilities. In September 2017, DOE acknowledged the WTP contractor had met all the criteria for full resumption of engineering, procurement, and construction (EPC) activities for the HLW Facility. By December 2017, DOE had completed the actions needed to resolve the six of the eight primary technical issues associated with the PT Facility, with the remaining two issues expected to be resolved in the first quarter of 2018. Although significant progress has been made to prepare for resuming production activities for the HLW and PT facilities, DOE has made the decision to constrain EPC work on those facilities in the near term based on DOE's higher priority of completing the WTP facilities needed to begin DFLAW operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Sandia National Laboratories Facilities Management and Operations Center Design Standards Manual

At Sandia National Laboratories in New Mexico (SNL/NM), the design, construction, operation, and maintenance of facilities is guided by industry standards, a graded approach, and the systematic analysis of life cycle benefits received for costs incurred. The design of the physical plant must ensure that the facilities are "fit for use," and provide conditions that effectively, efficiently, and safely support current and future mission needs. In addition, SNL/NM applies sustainable design principles, using an integrated whole-building design approach, from site planning to facility design, construction, and operation to ensure building resource efficiency and the health and productivity of occupants. The safety and health of the workforce and the public, any possible effects on the environment, and compliance with building codes take precedence over project issues, such as performance, cost, and schedule. These design standards generally apply to all disciplines on all SNL/NM projects. Architectural and engineering design must be both functional and cost-effective. Facility design must be tailored to fit its intended function, while emphasizing low-maintenance, energy-efficient, and energy-conscious design. Design facilities that can be maintained easily, with readily accessible equipment areas, low maintenance, and quality systems. To promote an orderly and efficient appearance, architectural features of new facilities must complement and enhance the existing architecture at the site. As an Architectural and Engineering (A/E) professional, you must advise the Project Manager when this approach is prohibitively expensive. You are encouraged to use professional judgment and ingenuity to produce a coordinated interdisciplinary design that is cost-effective, easily contractible or buildable, high-performing, aesthetically pleasing, and compliant with applicable building codes. Close coordination and development of civil, landscape, structural, architectural, fire protection, mechanical, electrical, telecommunications, and security features is expected to ensure compatibility with planned functional equipment and to facilitate constructability. If portions of the design are subcontracted to specialists, delivery of the finished design documents must not be considered complete until the subcontracted portions are also submitted for review. You must, along with support consultants, perform functional analyses and programming in developing design solutions. These solutions must reflect coordination of the competing functional, budgetary, and physical requirements for the project. During design phases, meetings between you and the SNL/NM Project Team to discuss and resolve design issues are required. These meetings are a normal part of the design process. For specific design-review requirements, see the project-specific Design Criteria. In addition to the design requirements described in this manual, instructive information is provided to explain the sustainable building practice goals for design, construction, operation, and maintenance of SNL/NM facilities. Please notify SNL/NM personnel of design best practices not included in this manual, so they can be incorporated in future updates. You must convey all documents describing work to the SNL/NM Project Manager in both hard copy and in an electronic format compatible with the SNL/NM-prescribed CADD and other software packages, and in accordance with a SNL/NM approved standard format. Print all hard copy versions of submitted documents (excluding drawings and renderings) double-sided when practical.

42 ENGINEERING↗

Annual Report for Los Alamos National Laboratory Technical Area 54, Area G Disposal Facility – Fiscal Year 2011

As a condition to the Disposal Authorization Statement issued to Los Alamos National Laboratory (LANL or the Laboratory) on March 17, 2010, a comprehensive performance assessment and composite analysis maintenance program must be implemented for the Technical Area 54, Area G disposal facility. Annual determinations of the adequacy of the performance assessment and composite analysis are to be conducted under the maintenance program to ensure that the conclusions reached by those analyses continue to be valid. This report summarizes the results of the fiscal year 2011 annual review for Area G. Revision 4 of the Area G performance assessment and composite analysis was issued in 2008 and formally approved in 2009. These analyses are expected to provide reasonable estimates of the long-term performance of Area G and, hence, the disposal facility's ability to comply with Department of Energy (DOE) performance objectives. Annual disposal receipt reviews indicate that smaller volumes of waste will require disposal in the pits and shafts at Area G relative to what was projected for the performance assessment and composite analysis. The future inventories are projected to decrease modestly for the pits but increase substantially for the shafts due to an increase in the amount of tritium that is projected to require disposal. Overall, however, changes in the projected future inventories of waste are not expected to compromise the ability of Area G to satisfy DOE performance objectives. The Area G composite analysis addresses potential impacts from all waste disposed of at the facility, as well as other sources of radioactive material that may interact with releases from Area G. The level of knowledge about the other sources included in the composite analysis has not changed sufficiently to call into question the validity of that analysis. Ongoing environmental surveillance activities are conducted at, and in the vicinity of, Area G. However, the information generated by many of these activities cannot be used to evaluate the validity of the performance assessment and composite analysis models because the monitoring data collected are specific to operational releases or address receptors that are outside the domain of the performance assessment and composite analysis. In general, applicable monitoring data are supportive of some aspects of the performance assessment and composite analysis. Several research and development (R and D) efforts have been initiated under the performance assessment and composite analysis maintenance program. These investigations are designed to improve the current understanding of the disposal facility and site, thereby reducing the uncertainty associated with the projections of the long-term performance of Area G. The status and results of R and D activities that were undertaken in fiscal year 2011 are discussed in this report. Special analyses have been conducted to determine the feasibility of disposing of specific waste streams, to address proposed changes in disposal operations, and to consider the impacts of changes to the models used to conduct the performance assessment and composite analysis. These analyses are described and the results of the evaluations are summarized in this report. The Area G disposal facility consists of Material Disposal Area (MDA) G and the Zone 4 expansion area. To date, all disposal operations at Area G have been confined to MDA G. Material Disposal Area G is scheduled to undergo final closure in 2015; disposal of waste in the pits and shafts is scheduled to end in 2013. In anticipation of the closure of MDA G, plans are being made to ship the majority of the waste generated at LANL to off-site locations for disposal. It is not clear at this time if waste that will be disposed of at LANL will be placed in Zone 4 or if disposal operations will move to a new location at the Laboratory. Separately, efforts to optimize the final cover used in the closure of MDA G are underway; a final cover design different than that adopted for the performance assessment and composite analysis will likely emerge from that investigation. All of these changes will require re-examination of the assumptions upon which the performance assessment and composite analysis are based and, in all likelihood, revision of those analyses.

54 ENVIRONMENTAL SCIENCES↗

Alternative Liquid DSA Containers for Sludge Slurry Storage in the SRNL Shielded Cells

A pending revision of the Documented Safety Analysis (DSA) for the Savannah River National Laboratory (SRNL) defines “DSA containers'’ for liquid sludge slurries as containers not susceptible to a flashing spray release in a fire and requires that a list of DSA containers be maintained. High Level Waste (HLW) samples are typically received from the Savannah River Site (SRS) tank farm after retrieval from the storage tanks. Glass bottles are preferred for long-term storage of radioactive liquid sludge slurry samples but are not on the DSA container list. An evaluation has been conducted to identify vessel lids for the glass bottles that would vent prior to pressurization and liquid superheating in a fire event. Low melting Field's Metal eutectic alloy with a melting point of 62°C has been identified as a preferred material of construction for vessel lids for this application because the material is resistant to puncture and is expected to have good chemical compatibility and radiation stability in the shielded cells environment. A test vessel was designed to evaluate the alloy and confirm that it would melt before the water in the vessel reaches the boiling point. The tests confirmed: 1) that the reported melting point of the alloy was accurate, 2) that a top fashioned from this material will melt creating an open atmosphere in the vessel headspace prior to sample boiling under moderate and fast heating rates, and 3) that nonuniform heating of the bottle from the bottom also results in melting of the alloy prior to boiling. Based on the results, neither an engulfing fire with standing or toppled bottles or a fire producing localized heat at the vessel bottom would result in flashing spray conditions. It is recommended that glass vessels of various volumes ranging from 125 mL to 1 gallon with modified tops containing the specified Field's Metal eutectic alloy which are appropriately designed to avoid flashing spray material releases be added to the DSA container list. These vessels will be utilized in the Shielded Cells for the storage of radioactive liquid samples of sludge slurries. Use of these vessels will also be advantageous for other liquid samples containing accountable amounts of nuclear material throughout other SRNL laboratories. Similarly constructed paraffin vessel lids could also potentially be added to the approved list, though additional testing would be required.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prolonged Treatments With Antiresorptive Agents and PTH Have Different Effects on Bone Strength and the Degree of Mineralization in Old Estrogen-Deficient Osteoporotic Rats

Current approved medical treatments for osteoporosis reduce fracture risk to a greater degree than predicted from change in BMD in women with postmenopausal osteoporosis. In this work, we hypothesize that bone active agents improve bone strength in osteoporotic bone by altering different material properties of the bone. Eighteen-month-old female Fischer rats were ovariectomized (OVX) or sham-operated and left untreated for 60 days to induce osteopenia before they were treated with single doses of either risedronate (500 mg/kg, IV), zoledronic acid (100 mg/kg, IV), raloxifene (2 mg/kg, PO, three times per week), hPTH(1-34) (25 mg/kg, SC, three times per week), or vehicle (NS; 1 ml/kg, three times per week). Groups of animals were killed after days 60 and 180 of treatment, and either the proximal tibial metaphysis or lumbar vertebral body were studied. Bone volume and architecture were assessed by mCT and histomorphometry. Measurements of bone quality included the degree of bone mineralization (DBM), localized elastic modulus, bone turnover by histomorphometry, compression testing of the LVB, and three-point bending testing of the femur. The trabecular bone volume, DBM, elastic modulus, and compressive bone strength were all significantly lower at day 60 post-OVX (pretreatment, day 0 study) than at baseline. After 60 days of all of the bone active treatments, bone mass and material measurements agent were restored. However, after 180 days of treatment, the OVX + PTH group further increased BV/TV (+30% from day 60, p < 0.05 within group and between groups). In addition, after 180 days of treatment, there was more highly mineralized cortical and trabecular bone and increased cortical bone size and whole bone strength in OVX + PTH compared with other OVX + antiresorptives. Treatment of estrogen-deficient aged rats with either antiresorptive agents or PTH rapidly improved many aspects of bone quality including microarchitecture, bone mineralization, turnover, and bone strength. However, prolonged treatment for 180 days with PTH resulted in additional gains in bone quality and bone strength, suggesting that the maximal gains in bone strength in cortical and trabecular bone sites may require a longer treatment period with PTH.

59 BASIC BIOLOGICAL SCIENCES↗

Disposition of Radioisotope Thermoelectric Generators Currently Located at the Oak Ridge National Laboratory - 12232

Under the American Recovery and Reinvestment Act (ARRA), the U.S. Department of Energy (DOE) awarded SEC Federal Services Corporation (SEC) a 34-building demolition and disposal (D and D) project at the Oak Ridge National Laboratory (ORNL) that included the disposition of six Strontium (Sr-90) powered Radioisotope Thermoelectric Generators (RTGs) stored outside of ORNL Building 3517. Disposition of the RTGs is very complex both in terms of complying with disposal facility waste acceptance criteria (WAC) and U.S. Department of Transportation (DOT) requirements for packaging and transportation in commerce. Two of the RTGs contain elemental mercury which requires them to be Land Disposal Restrictions (LDR) compliant prior to disposal. In addition, all of the RTGs exceed the Class C waste concentration limits under Nuclear Regulatory Commission (NRC) Waste Classification Guidelines. In order to meet the LDR requirements and Nevada National Security Site (NNSS) WAC, a site specific treatability variance for mercury was submitted to the U.S. Environmental Protection Agency (EPA) to allow macro-encapsulation to be an acceptable treatment standard for elemental mercury. By identifying and confirming the design configuration of the mercury containing RTGs, the SEC team proved that the current configuration met the macro-encapsulation standard of 40 Code of Federal Regulations (CFR) 268.45. The SEC Team also worked with NNSS to demonstrate that all radioisotope considerations are compliant with the NNSS low-level waste (LLW) disposal facility performance assessment and WAC. Lastly, the SEC team determined that the GE2000 Type B cask met the necessary size, weight, and thermal loading requirements for five of the six RTGs. The sixth RTG (BUP-500) required a one-time DOT shipment exemption request due to the RTG's large size. The DOT exemption justification for the BUP-500 relies on the inherent robust construction and material make-up of the BUP- 500 RTG. DOE-ORO, SEC, and the entire SEC RTG team are nearing the conclusion of the Sr-90 RTG disposition challenge - a legacy now 50 years in the making. Over 600,000 Ci of Sr-90 waste await disposal and its removal from ORNL will mark an historical moment in the clean-up of the cold-war legacy in the ORNL central industrial area. Elimination (i.e., removal) of the RTGs will reduce security risks at ORNL and disposal will permanently eliminate security risks. The RTGs will eventually decay to benign levels within a reasonable timeframe relative to radiological risks posed by long-lived isotopes. The safety authorization basis at ORNL Building 3517 will be reduced enabling greater operational flexibility in future clean-out and D and D campaigns. Upon disposition the Department of Energy will realize reduced direct and indirect surveillance and maintenance costs that can be reapplied to accelerated and enhanced clean-up of the Oak Ridge Reservation. At present, waste profiles for the RTGs are developed and under review by NNSS RWAP staff and approval authorities. Disposition schedule is driven by the availability of compliant shipping casks necessary to safely transport the RTGs from ORNL to NNSS. The first disposal of the RCA RTG is expected in April 2012 and the remaining RTGs disposed in 2012 and 2013. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A Perspective on the Successes of the NNSS Underground Test Area (UGTA) Activity - 20221

Between 1951 and 1992, 828 underground nuclear tests were performed at the Nevada National Security Site (NNSS). Underground testing was done in five major testing areas, which included (1) Frenchman Flat, (2) Rainier Mesa/Shoshone Mountain, (3) Yucca Flat/Climax Mine (4) Central Pahute Mesa, and (5) Western Pahute Mesa. About one third of the underground tests were detonated near, at or below the water table, and thus radioactive contamination was introduced to the groundwater system. The U.S. Department of Energy's Underground Test Area (UGTA) Activity was established in the late 1990's to address the fate and movement of residual radioactivity in groundwater, and characterize the risk that it may pose to NNSS workers and the offsite public. It has accomplished this goal through a process of iterative groundwater sampling and numerical groundwater flow and transport modeling, and long-term monitoring. The UGTA Activity draws on the expertise of scientists in the fields of geology, hydrology, radiochemistry, and risk assessment from the U.S. DOE staff, the lead contractor (currently Navarro) and many other organizations, in cooperation with the governing regulatory body, the State of Nevada's Division of Environmental Protection (NDEP). Los Alamos National Laboratory (LANL) is one of the participating research organizations involved with the UGTA Activity. Under the direction of DOE and the lead contractor, LANL's role in UGTA has evolved over time from an initial focus on geologic characterization, to conducting field and laboratory experiments, and finally to its current role of providing modeling and geochemistry expertise to characterize the rates and directions of groundwater and radionuclide movement. In its current role, LANL has either developed or provided the numerical tools for developing flow and transport models in each of the four major testing areas. In addition, LANL has provided an independent assessment of future groundwater flow and transport behavior through the analysis of naturally-occurring geochemical and isotopic tracers in groundwater. The five major testing areas are now in different stages of investigation or closure: (1) Frenchman Flat is in its fifth year of post closure modeling; (2) The Rainier Mesa/Shoshone Mountain Closure Report has been submitted to NDEP and is awaiting approval; (3) The Yucca Flat/Climax Mine Closure Report is under development; and (4) Central and (5) Western Pahute Mesa is still undergoing investigation and flow and transport model development. The success of the UGTA Activity in reaching or approaching closure in three of the five major testing areas is primarily due to the DoE's focus on regulatory closure requirements, but also is in part attributable to a rigorous internal review process and the involvement of NDEP and Nye County water professionals as participants and observers in the reviews. County and state involvement in the internal review process has promoted trust that the U.S. DOE is deeply committed to ensuring the present and future safely of NNSS workers and the surrounding communities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

ALTERNATE APPROACH TO HAZARD CATEGORIZATION FOR SALTSTONE FACILITY AT SRS

The Saltstone Facility at Savannah River Site (SRS) was originally segmented into two segments: the Saltstone Production Facility (SPF) and the Saltstone Disposal Facility (SDF). Based on the inventory of radionuclides available for release the SPF and SDF were categorized as Nonreactor Hazard Category (HC)-3. The hazard categorization recognized the SDF will contain contributions of radionuclides which would exceed the HC-2 Threshold Quantity (TQ) in the form of grout. However it was determined not to impact the facility hazard categorization based on the grout being in a solid, monolithic form which was not easily dispersible. But, the impact of a quantity of unset grout expected to be present at the vault following operation of the process was not addressed. A Potential Inadequacy in Safety Analysis (PISA) was later issued based on the hazard categorization determination for the facility not addressing unset grout. This initiated a re-evaluation of the accident scenarios within the hazards analysis. During this re-evaluation, the segmentation of the facility was challenged based on the potential interaction between facility segments; specifically, the leachate return line and the grout transfer line, which were considered separate segments, are located in close proximity at one point. such that for certain events (NPH as well as External Vehicle Impact) both could be damaged simultaneously and spill contents on the ground that could commingle. This would violate the guideline for segmentation. Therefore, the Hazard Categorization (HC) was reevaluated based on the facility being a single segment and including the additional unset grout as part of total inventory. This total inventory far exceeded the limit for HC-2 TQ and made the facility's initial categorization as HC-2. However, alternative analysis methodology based on credible release fractions allowed in DOE-STD-1027-92 (Ref.1) showed that the Saltstone facility could still be categorized as Hazard Category 3 Nuclear Facility with no segmentation. Since it was the first time any facility at SRS tried this alternate approach safety analyst had to face substantial resistance and reservations from both the facility and local DOE customers which were eventually overcome with approval and acceptance from DOE-HQ.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Oak Ridge Site Specific Advisory Board - How a Recommendation Comes to Life - 18523

The Oak Ridge Site Specific Advisory Board (ORSSAB) is a federally appointed citizens' panel that provides independent advice and recommendations to the DOE's Oak Ridge Office of Environmental Management (OREM). To provide unbiased evaluation and recommendations on DOE's cleanup efforts related to the Oak Ridge Reservation (ORR), the board seeks opportunities for input through collaborative dialogue with the communities surrounding the Oak Ridge Reservation, Governmental regulators, and other stakeholders. This paper describes how a recommendation from the ORSSAB comes to life. There are two stages to the board's process, the planning stage and the execution stage. The planning stage begins several months prior to the start of the fiscal year (FY). During this planning stage OREM develops a list of issues that it would like input from the community on. The EPA and Tennessee Department of Environment and Conservation (TDEC) act as consulting parties and provide their input in the form of letters to the board. ORSSAB holds a planning meeting in August, where DOE EM, EPA and TDEC present their suggestions to the board. The board members have opportunity to ask questions and hold discussions on the issues presented but can also present issues of their own. DOE then takes the input from the meeting and develops the ORSSAB Work Plan for the next FY. The execution stage begins with the ORSSAB Work Plan which sets the issues for each month and the specific dates of the activities associated with each issue. The remaining elements of the execution stage include: presentations by DOE OREM at the monthly ORSSAB Meetings, field trips (as appropriate), and additional discussion at the monthly subcommittee meeting of the EM/Stewardship Committee. Early in the FY, members of the ORSSAB are given the opportunity to sign up to be involved with the potential development of a recommendation for the various issues on the Work Plan that interest them and to provide support as an issue manager. Then at the EM/Stewardship Committee Meeting the issue manager is assigned to lead the issue group and a decision is made as to whether to make a recommendation on the specific issue. The issue group prepares the recommendation for discussion and approval by the EM/Stewardship Committee. Once the EM/Stewardship Committee has reached consensus on the wording for the recommendation, the EM/Stewardship Committee Chair presents the recommendation to the ORSSAB Executive Committee for discussion and approval. The Executive Committee then approves the recommendation for presentation and discussion at the next month's ORSSAB General Meeting, providing opportunity for discussion by the full board. The ORSSAB may approve the recommendation as is, approve it with changes, or it may send the recommendation back to the EM/Stewardship Committee for further consideration. Once approved by the full ORSSAB, the recommendation is sent to DOE OREM for consideration. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vaginal Dose Is Associated With Toxicity in Image Guided Tandem Ring or Ovoid-Based Brachytherapy

Purpose: To calculate vaginal doses during image guided brachytherapy with volume-based metrics and correlate with long-term vaginal toxicity. Methods and Materials: In this institutional review board–approved study, institutional databases were searched to identify women undergoing computed tomography and/or magnetic resonance–guided brachytherapy at the Duke Cancer Center from 2009 to 2015. All insertions were contoured to include the vagina as a 3-dimensional structure. All contouring was performed on computed tomography or magnetic resonance imaging and used a 0.4-cm fixed brush to outline the applicator and/or packing, expanded to include any grossly visible vagina. The surface of the cervix was specifically excluded from the contour. High-dose-rate (HDR) and low-dose-rate (LDR) doses were converted to the equivalent dose in 2-Gy fractions using an α/β of 3 for late effects. The parameters D0.1cc, D1cc, and D2cc were calculated for all insertions and summed with prior external beam therapy. Late and subacute toxicity to the vagina were determined by the Common Terminology Criteria for Adverse Events version 4.0 and compared by the median and 4th quartile doses, via the log-rank test. Univariate and multivariate hazard ratios were calculated via Cox regression. Results: A total of 258 insertions in 62 women who underwent definitive radiation therapy including brachytherapy for cervical (n=48) and uterine cancer (n=14) were identified. Twenty HDR tandem and ovoid, 32 HDR tandem and ring, and 10 LDR tandem and ovoid insertions were contoured. The median values (interquartile ranges) for vaginal D0.1cc, D1cc, and D2cc were 157.9 (134.4-196.53) Gy, 112.6 (96.7-124.6) Gy, and 100.5 (86.8-108.4) Gy, respectively. At the 4th quartile cutoff of 108 Gy for D2cc, the rate of late grade 1 toxicity at 2 years was 61.2% (95% confidence interval [CI] 43.0%-79.4%) below 108 Gy and 83.9% (63.9%-100%) above (P=.018); grade 2 or greater toxicity was 36.2% (95% CI 15.8%-56.6%) below 108 Gy and 70.7% (95% CI 45.2%-96.2%) above (P=.004); and grade 3 or worse toxicity was 9.9% (95% CI 0.0%-23.6%) below 108 Gy and 30.0% (95% CI 4.7%-55.3%) above (P=.025). This association was maintained on multivariate analysis, independent of covariates such as applicator type, age, and dose rate. Conclusions: Vaginal dose was associated with all grades of vaginal toxicity. Confirmation at other sites using this methodology will be necessary to establish reproducibility; however, the integration of routine calculation of vaginal dose may be warranted.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

PILOT PEAT-BED TREATMENT SYSTEM FOR NPDES OUTFALL H-12

A National Pollutant Discharge Elimination System (NPDES) Permit was issued to the Savannah River Site (SRS) by the South Carolina Department of Health and Environmental Control (SCDHEC) and became effective on December 1, 2003. The new permit contained revised limits for copper and zinc derived by adjusting the South Carolina aquatic life water quality standards in accordance with dissolved metals criteria. The new copper and zinc limits are very low and may not be met consistently at Outfall H-12. The outfall has periodically exceeded the new 6 {micro}g/l (0.006 mg/L) monthly average limit and the 8 {micro}g/l (0.008 mg/L) maximum limit for copper and recently has begun exceeding the 100 {micro}g/l (0.100 mg/L) limit for zinc. The compliance date for Outfall H-12 is November 1, 2008. A study was conducted on this outfall and other outfalls to evaluate possible alternatives for meeting the new permit limits (Shipman and Bugher 2004). The study team recommended construction of a peat bed for treatment of the Outfall H-12 effluent. This recommendation was repeated by a second alternatives study team in 2007 (WSRC 2007). A bench-scale laboratory study demonstrated the feasibility of peat-bed treatment for Outfall H-12 effluent, with the peat demonstrating excellent removal of copper (Nelson and Specht 2005). An additional study was performed in 2006 and early 2007 using vertical-flow peat columns to investigate the influence of water retention time (contact time) on the removal of copper and zinc from the water (Nelson 2007c). Analytical results indicated that copper removal was very high at each of the three retention times tested, ranging from 99.6% removal at five and three hours to 98.8% removal at one hour. Effluent copper levels from these studies were much lower than the new compliance limit for the outfall. Most divalent metals, including zinc, were removed to below their normal reporting detection limit. The H-Area Material Disposition organization requested a larger-scale study to investigate key design and operation parameters/issues, such as the possibility of rapid plugging of the piping or clogging of the peat bed, the effectiveness of the treatment, hydraulic conductivity, etc. The resulting pilot-scale facility was constructed adjacent to Outfall H-12 with SCDHEC approval (Mullinax 2007). The pilot-scale study was performed by the Savannah River National Laboratory's (SRNL) Environmental Science and Biotechnology Directorate personnel. Since the construction and operation of the pilot-scale peat bed facility, however, a new strategy for achieving compliance of Outfall H-12 effluent with the new permit limits has been selected. This new strategy incorporates a variety of efforts including source reduction, recalculation of limits using an aquatic species that is indigenous to the area instead of a standard species, and dissolved organic carbon addition to reduce copper toxicity. This report documents the construction and operation of the pilot-scale treatment system, the results obtained, and recommendations on the usefulness of this technology for Outfall H-12 or other outfalls at SRS.

01 COAL, LIGNITE, AND PEAT↗

Progress Updates for the Hanford Waste Treatment and Immobilization Plant Project - 16281

The Waste Treatment and Immobilization Plant (WTP) Project is vital to the U.S. Department of Energy's (DOE) mission to clean up radioactive waste at the Hanford Site, located in southeastern Washington State. The overall WTP Project objective is to design, build, and commission the facilities and systems that will treat and immobilize approximately 56 million gallons of radioactive waste stored in Hanford's 177 underground storage tanks. The combination of technologies in the WTP makes it a first-of-a-kind facility at a scale larger than ever built for radioactive waste processing. The WTP includes several facilities that will contribute to waste processing: (1) the Pretreatment (PT) Facility, which is designed to receive waste retrieved from the Hanford tank farms and separate it into low-activity and high-level waste streams; (2) the Low-Activity Waste (LAW) Facility, which will vitrify the low-activity waste stream; (3) the High-Level Waste (HLW) Facility, which will vitrify the high-level waste stream; (4) the Analytical Laboratory (Lab), which will support both vitrification facilities' operations; and (5) the Balance of Facilities (BOF), which will provide industrial support capabilities and infrastructure, like electricity and steam, needed for WTP operations. In 2012, DOE suspended production work on the WTP's Pretreatment (PT) Facility and to a lesser degree the High-Level Waste (HLW) Facility because of unresolved technical issues associated with those facilities. DOE has established an approach that would facilitate immobilization of tank waste to begin as early as practicable without waiting for completion of work to resolve the technical issues associated with the PT and HLW Facilities. This approach enables LAW treatment to begin before the PT and HLW facilities are completed by transferring low activity waste directly from the Hanford tank farms to the LAW Facility - referred to as Direct Feed LAW (DFLAW). ORP has placed the highest priority on completing the Low Activity Waste Facility, Balance of Facilities, and Analytical Laboratory (collectively known as LBL) in support of the planned phased start to the Hanford Tank waste treatment mission. DOE has requested, and the WTP contractor has delivered contract modifications proposals for: (1) design of a permanent capability to accommodate DFLAW in WTP; (2) procurement and construction of modifications to enable DFLAW operations in WTP, and (3) completion of LBL work scope in the current contract through hot commissioning in a manner to accommodate a phased start toward completing the WTP mission. DOE is reviewing and approving contract modifications in a sequence and schedule that allows for an orderly completion of the LBL Facilities and to begin treating low-activity tank waste as soon as practicable. In August 2014, ORP authorized the WTP contractor to resume all engineering work necessary to finalize the design of the HLW Facility. Authorization for HLW equipment procurements and construction is forthcoming, based on conditions that must be satisfied for a full release of these activities, including completion of an update to the Preliminary Documented Safety Analysis. DOE has also established a comprehensive plan for resuming production activities for the PT Facility that is similar to the process established and implemented for the HLW Facility. Resolution of the technical issues and establishment of a revised safety basis are key prerequisites to resuming engineering, procurements, and construction. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Compiling a Comprehensive EVA Training Dataset for NASA Astronauts

Training for a spacewalk or extravehicular activity (EVA) is considered a hazardous duty for NASA astronauts. This places astronauts at risk for decompression sickness as well as various musculoskeletal disorders from working in the spacesuit. As a result, the operational and research communities over the years have requested access to EVA training data to supplement their studies. The purpose of this paper is to document the comprehensive EVA training data set that was compiled from multiple sources by the Lifetime Surveillance of Astronaut Health (LSAH) epidemiologists to investigate musculoskeletal injuries. The EVA training dataset does not contain any medical data, rather it only documents when EVA training was performed, by whom and other details about the session. The first activities practicing EVA maneuvers in water were performed at the Neutral Buoyancy Simulator (NBS) at the Marshall Spaceflight Center in Huntsville, Alabama. This facility opened in 1967 and was used for EVA training until the early Space Shuttle program days. Although several photographs show astronauts performing EVA training in the NBS, records detailing who performed the training and the frequency of training are unavailable. Paper training records were stored within the NBS after it was designated as a National Historic Landmark in 1985 and closed in 1997, but significant resources would be needed to identify and secure these records, and at this time LSAH has not pursued acquisition of these early training records. Training in the NBS decreased when the Johnson Space Center in Houston, Texas, opened the Weightless Environment Training Facility (WETF) in 1980. Early training records from the WETF consist of 11 hand-written dive logbooks compiled by individual workers that were digitized at the request of LSAH. The WETF was integral in the training for Space Shuttle EVAs until its closure in 1998. The Neutral Buoyancy Laboratory (NBL) at the Sonny Carter Training Facility near JSC opened in March 1997 and is the current site for US EVA training. Other space agencies also have used water to simulate weightlessness and train for EVAs. Russia has a training facility similar to the NBL named the Hydro Lab. The Hydro Lab began operations at the Gagarin Cosmonaut Training Center (GCTC) in 1980 and has been used extensively to the present. Although a majority of training in the Hydro Lab uses the Russian Orlan suit, a small number of sessions have been conducted using a NASA suit. The Japanese Weightlessness Environment Test System (WETS) went into service at the Tsukuba Space Center in 1997 but was closed in 2011 due to extensive earthquake damage. Several sessions were performed using a NASA suit, but these sessions were short and considered "development" runs. LSAH has assembled records from the WETF, NBL and Hydro Lab. Recording of the EVA training data has changed considerably from 1967 to present. The goal of early record keeping was to track use of hardware components, and the person involved was treated as a suited operator, not as a focus of interest. Records from the past two decades are fairly precise with the person, date, suit type and size noted. On occasion the length of the session was listed, but this data is not included on all records. Records were merged from data sources and extensive cleaning of the records was required since the multiple sources frequently overlapped and duplicated records. To date the LSAH EVA training dataset includes over 12,500 EVA training sessions performed by NASA astronauts since 1981. The following variables are included for most records: Name, Sex, Event date, Event name, HUT type, HUT size, Facility, and Estimated run time. For a smaller subset of records, the following variables are available: Actual run time, Time inverted, and the suit components Waist bearing type, Shoulder harness, Shoulder pads, and Teflon inserts. The LSAH dataset is currently the most complete resource for data regarding EVA training sessions performed by NASA astronauts. However, it is not 100 percent complete since the WETS (Japan) and NBS (Marshall) training facility data were not included. This dataset has been compiled by LSAH to study the relationship of EVA training to musculoskeletal injuries but has many other non-medical applications. This dataset can be provided to other groups in order to respond to program and research questions with appropriate board approvals.

Laughlin, M. S.↗

Managing Aging Effects on Dry Cask Storage Systems for Extended Long-Term Storage and Transportation of Used Fuel (Rev. 2)

At present, the United States does not have a designated disposal site for used nuclear fuel — the nation therefore faces the prospect of extended long‐term storage (i.e., >60 years) and deferred transportation of used fuel at operating and decommissioned nuclear power plant sites. Under current U.S. federal regulations contained in Title 10 of the Code of Federal Regulations (CFR) 72.42, the initial license term for an Independent Spent Fuel Storage Installation (ISFSI) must not exceed 40 years from the date of issuance (20 years before the rule change in 2010 that became effective in 2011). The U.S. Nuclear Regulatory Commission (NRC) may renew licenses at the expiration of the license term upon application by the licensee for a period not to exceed 40 years. Applications for ISFSI license renewals must include the following: 1. Time‐limited aging analyses (TLAAs) that demonstrate that structures, systems, and components (SSCs) important to safety will continue to perform their intended function for the requested period of extended operation and 2. A description of the aging management program (AMP) for the management of issues associated with aging that could adversely affect SSCs important to safety. In addition, the application must include design basis information as documented in the most recently updated final safety analysis report, as required by 10 CFR 72.70. Information contained in previous applications, statements, or reports filed with the Commission under the license may be incorporated by reference, provided that these references are clear and specific. The NRC has issued the “Standard Review Plan for Renewal of Spent Fuel Dry Cask Storage System Licenses and Certificates of Compliance,” NUREG‐1927, under which NRC may renew a specific license or a Certificate of Compliance (CoC) for a term not to exceed 40 years. Both the license and the CoC renewal applications must contain revised technical requirements and operating conditions (fuel storage, surveillance and maintenance, and other requirements) for the ISFSI and dry cask storage system (DCSS) that address aging effects that could affect the safe storage of the used fuel. The information contained in the license and CoC renewal applications will require NRC review to verify that the aging effects on the SSCs in DCSSs/ISFSIs are adequately managed for the requested period of extended operation. To date, all of the ISFSIs across the United States with more than 1,500 dry casks loaded with used fuel have initial license terms of 20 years — three ISFSIs (Surry, H.B. Robinson, and Oconee) have received their renewed licenses for 40 years, and two other ISFSIs (Calvert Cliffs and Prairie Island) have applied for license renewal for 40 years. In addition, renewal of the CoC for the VSC‐24 system is pending approval from NRC.

Chopra, O. K.↗

Regulatory and Licensing Strategy for Microreactor Technology

With electricity demand on the rise, an increase in the use of nuclear energy is needed in order to meet future energy demands. The use of nuclear energy will not only begin to positively address this demand, but will also mitigate the negative impacts of carbon-induced climate change and provide energy security to the United States. An appropriate option to address the increasing energy demand is the use of advanced reactor systems like microreactors. Microreactors, often referred to as special-purpose reactors or vSMRs, are neutronically simple, factory manufacturable, easily transportable, and designed to produce less than 20 MWt (for classification as Hazard Category 2 per 10 CFR 830, DOE STD 1027). These reactors are decentralized energy sources that have the ability to provide sustainable and affordable power to remote communities and to industrial users, while having self-contained geometry that requires very low maintenance care. In order for microreactors to be approved for operation, they must abide by and successfully complete a rigorous regulatory and licensing process monitored by the Nuclear Regulatory Commission (NRC), the Department of Energy (DOE), or the Department of Defense (DoD). Because microreactors are a relatively new and disruptive technology, there is no clear licensing path for them to follow. Current licensing frameworks are tailored specifically to large, traditional light water reactors (LWRs) that have been developed and understood by the nuclear industry for many years. Unlike LWRs, microreactors have major design differences, specifically in the materials, coolant, reflectors and potential technology applications used. They also have higher in-core operating temperatures, which have the potential to push the materials used past their allowable limits. Because they are much smaller, safety margins, the amount of space required for assembly, and the distances required to meet dose-based regulatory criteria can technically be altered to better fit their new size. The following strategies and recommendations are intended to assure that key licensing issues do not influence the path to microreactor development, demonstration, and commercialization: Nuclear Regulatory Commission • The NRC should address the lack of knowledge and support of risk informed decision-making concepts from staff members and continue to advance and communicate risk initiatives using their Risk Informed Steering Committee • More research should be done into whether or not microreactors, which are small Class 103 facilities, can be licensed using Class 104-type guidance (e.g., NUREG 1537) • The NRC should use frequency-consequence curves to incrementally reduce regulatory uncertainty and risk to facilitate future construction and operation of advanced reactor designs Department of Energy • The DOE should continue to implement their multi-step Phenomena Identification and Ranking Table process in order to help detect and recommend the major design and technology work needed for licensing future reactor systems • The DOE should consider a joint licensing approach with the NRC where microreactors first go through the DOE process, then finish with the NRC process, providing an advantage for both applicants and NRC staff Department of Defense • The DoD should invest in personnel with sufficient expertise, incorporate their military reactors into tactical power systems, and self-regulate using Section 91b of the Atomic Energy Act Transportation • Licensees should convert enriched uranium hexafluoride into metal or oxide at an enrichment facility and then transport them to a fabrication facility • To avoid transportation issues altogether, licensees should consider positioning the enrichment and fabrication facilities on the same site • The DOE should provide their support in developing new shipping packages for safe transport, criticality benchmark data needed to license high-assay low-enriched uranium fuel facilities and transport packages, and provide financial and technical help to the Department of Transportation; and, • The NRC should help transportation efforts by finalizing and developing guidance for implementing 10 CFR 73 and 10 CFR 74 specifically for Category 2 Special Nuclear Material.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

NDCX-II project commencing at LBNL

Earlier this year, the U.S. Department of Energy Office of Fusion Energy Sciences approved the NDCX-II project, a second-generation Neutralized Drift Compression eXperiment. NDCX-II is a collaborative effort of scientists and engineers from Lawrence Berkeley National Laboratory (LBNL), Lawrence Livermore National Laboratory (LLNL), and the Princeton Plasma Physics Laboratory (PPPL), in a formal collaboration known as the Virtual National Laboratory for Heavy Ion Fusion Science (HIFS-VNL). Supported by $11 M of funding from the American Recovery and Reinvestment Act, construction at LBNL commenced in July of 2009, with completion anticipated in March of 2012. Applications of this facility will include studies of: the basic physics of the poorly understood 'warm dense matter' regime of temperatures around 1 eV and densities near solid, using uniform, volumetric ion heating of thin foil targets; ion energy coupling into an ablating plasma (such as that which occurs in an inertial fusion target) using beams with time-varying kinetic energy; space-charge-dominated ion beam dynamics; and beam focusing and pulse compression in neutralizing plasma. The machine will complement facilities at GSI in Darmstadt, Germany, but will employ lower ion kinetic energies and commensurately shorter stopping ranges in matter. Much of this research will contribute directly toward the collaboration's ultimate goal of electric power production via heavy-ion beam-driven inertial confinement fusion ('Heavy-Ion Fusion', or HIF). In inertial fusion, a target containing fusion fuel is heated by energetic 'driver' beams, and undergoes a miniature thermonuclear explosion. Currently the largest U.S. research program in inertial confinement is at Livermore's National Ignition Facility (NIF), a multibillion-dollar, stadium-sized laser facility optimized for studying physics issues relevant to nuclear stockpile stewardship. Nonetheless, NIF is expected to establish the fundamental feasibility of fusion ignition on the laboratory scale, and thus advance this approach to fusion energy. Heavy ion accelerators have a number of attributes (such as efficiency, longevity, and use of magnetic fields for final focusing) that make them attractive candidates as Inertial Fusion energy (IFE) drivers As with LBNL's existing NDCX-I, the new machine will produce short ion pulses using the technique of neutralized drift compression. A head-to-tail velocity gradient is imparted to the beam, which then shortens as it drifts in neutralizing plasma that suppresses space-charge forces. NDCX-II will make extensive use of induction cells and other hardware from the decommissioned ATA facility at LLNL. Figure (1) shows the layout of the facility, to be sited in LBNL's Building 58 alongside the existing NDCX-I apparatus. This second-generation facility represents a significant upgrade from the existing NDCX-I. It will be extensible and reconfigurable; in the configuration that has received the most emphasis, each NDCX-II pulse will deliver 30 nC of ions at 3 MeV into a mm-scale spot onto a thin-foil target. Pulse compression to {approx} 1 ns occurs in the accelerator as well as in the drift compression line; the beam is manipulated using suitably tailored voltage waveforms in the accelerating gaps. NDCX-II employs novel beam dynamics. To use the 200 kV Blumlein power supplies from ATA (blue cylinders in the figure), the pulse duration must first be reduced to less than 70 ns. This shortening is accomplished in an initial stage of non-neutral drift compression, downstream of the injector and the first few induction cells. The compression is sufficiently rapid that fewer than ten long-pulse waveform generators are needed, with Blumleins powering the rest of the acceleration. Extensive simulation studies have enabled an attractive physics design; these employ both a new 1-D code (ASP) and the VNL's workhorse 2-D/3-D code Warp. Snapshots from a simulation movie (available online) appear in Fig. 2. Studies on a dedicated test stand are quantifying the performance of the ATA hardware and of pulsed solenoids that will provide transverse beam confinement (ions require much stronger fields than the electrons accelerated by ATA). For more information, see the recent article in the Berkeley Lab News and references therein. Joe Kwan is the NDCX-II project manager and Alex Friedman is the leader for the physics design.

43 PARTICLE ACCELERATORS↗

Mega salt-stone Disposal Units at the Savannah River site - 15322

The Liquid Waste (LW) System at Savannah River Site (SRS) is a highly integrated operation involving safely storing radioactive liquid waste in underground storage tanks; vitrifying the higher activity waste; and storing the vitrified waste in stainless steel canisters until permanent disposition is provided; and removing, treating, and dispositioning the low-level waste (LLW) fraction in concrete with final disposition being the salt-stone Disposal Units (SDUs) at the SRS salt-stone Disposal Facility (SDF). Treatment and disposition of salt waste is the critical path to completion of the SRS Liquid Waste (LW) Disposition Program. Successful and timely salt waste removal and disposal is integral to efforts by SRS to proceed with all aspects of tank cleanup and removal from service. The construction and implementation of the first-of-a-kind Mega SDU (MSDU) is underway to provide the most environmentally safe and cost-effective solution for salt processing and long term storage of the LLW at SRS. The MSDU design is a duplicate of the Water Treatment Tanks located in Syracuse, New York. This commercial design, developed by an affiliate of Savannah River Remediation LLC (SRR), was slightly modified to meet the requirements of the nuclear industry. The MSDU is a critical link in salt disposition. In comparison to the current SDU design, approximately 46 meters (150 feet) in diameter and 7 meters (22 feet) tall with a capacity of approximately 11,000 m{sup 3} (3.0 million gallons), the MSDU is 114 meters (375 feet) in diameter and 13 meters (43 feet) tall which will provide a capacity of approximately 121,000 m{sup 3} (32.0 million gallons) to receive the LLW fraction embedded in a grout-like form. The MSDU will provide the taxpayers an estimated $300 M in life cycle savings at SRS by reducing the number of SDUs from the estimated 72 smaller vessels to 7 of the new larger vessels. Additionally, based on the reduced number of SDUs, the environmental footprint is significantly reduced as well. Due to the similarities between the existing SDU design and the MSDU design, efforts to integrate the MSDU into the LW system are minimal. Required infrastructure modifications will consist of tying into the existing grout and drain lines, as well as the installation of new electrical and instrumentation services for the MSDU. Grout flow testing has been successfully completed, with results showing the MSDU will be a safe and cost-effective replacement for the existing SDUs. The MSDU design is complete, Critical Decision (CD)-3 was approved on June 17, 2014, and the first MSDU, salt-stone Disposal Unit n.6 (SDU 6), is being constructed in the existing LW SDF operated by SRR as a Capital Line Item project. As an added benefit, once constructed, lessons learned will be available for future MSDUs at SRS and throughout the complex as necessary. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗