Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Resource Reporting”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Soft costs and knowledge pathways in the US solar photovoltaic ecosystem

An enduring puzzle in the US solar industry is that despite substantial reductions in the cost of photovoltaic hardware, soft costs (defined here as all costs not directly driven by hardware) have not done the same (US DOE, 2012). In fact, soft costs now account for the majority of the cost of total cost of installed solar systems, despite decades of efforts by firms and policy-makers to reduce these costs. In this study, we address two questions: a) what drives soft costs within the US solar industry, and b) how do firms gain the knowledge required to address these costs? We address this question through an explorative inductive multiple-case study (e.g., Eisenhardt, 1989; Appleyard, 1996). Our sample consists of 15 actors from across various roles within the industry, including residential and commercial installers (8), distribution intermediaries (3), and business software vendors (4). We conducted extensive interviews with executives at each firm (76 interviews in total), and supplemented this information with archival resources such as press releases, news coverage, analyst reports, and internet articles. This data was synthesized into a comprehensive case for each actor, detailing the activities conducted within each firm, the drivers of soft costs within that firm, and knowledge flows (e.g., new technologies, best practices, etc) within and across firms. We then compared across these cases to identify common patterns in cost and knowledge dynamics. Our study contributes a nuanced perspective on the drivers of soft costs within the solar industry as well as the patterns and mechanisms of knowledge flows within the industry. We find for example that the majority of the soft costs occur at the interface between firms (e.g., utilities, suppliers). We also observe substantive variation in costs across different types of actors and even within firm types (e.g., small vs. large installers). We also provide insight into how firms acquire knowledge and when they are able to apply it in order to reduce these costs. Our data reveal heterogeneity in a) the types of knowledge, and b) the pathways of knowledge flow between the actors in the industry. For example, we observe that distributors and suppliers play a key role in the dissemination of new technologies as well as general management knowledge for smaller firms. In contrast, informal personal networks and internal experimentation appear to be more important for larger firms. We also reveal critical distinctions across markets – e.g., differences in organizational culture that facilitate learning and experimentation more readily in residential vs. commercial markets. Overall, these results contribute preliminary insights into the knowledge dynamics of the solar industry, the persistence of soft costs over time, heterogeneity across firm types and regions, and the effective design of policy to support the solar industry.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Environmental Performance Report 2022: Annual Site Environmental Report per the U.S. Department of Energy Order 231.1B Chg 1

The National Renewable Energy Laboratory's (NREL's) Environmental Performance Report provides a description of the laboratory's environmental management activities in calendar year 2022, including information on environmental and sustainability performance, environmental compliance activities and status, and environmental protection programs, highlights, and successes. The purpose of this report is to ensure that the U.S. Department of Energy (DOE) and the public receive timely, accurate information about events that have positively affected or could adversely affect the health and safety of the public or workers, the environment, or the operations of DOE facilities. This report meets the DOE requirements of the Annual Site Environmental Report (ASER) and has been prepared in accordance with DOE Order 231.1B Chg 1, Environment, Safety and Health Reporting.

air quality↗

Tools Ensure Reliability of Critical Software

In November 2006, after attempting to make a routine maneuver, NASA's Mars Global Surveyor (MGS) reported unexpected errors. The onboard software switched to backup resources, and a 2-day lapse in communication took place between the spacecraft and Earth. When a signal was finally received, it indicated that MGS had entered safe mode, a state of restricted activity in which the computer awaits instructions from Earth. After more than 9 years of successful operation gathering data and snapping pictures of Mars to characterize the planet's land and weather communication between MGS and Earth suddenly stopped. Months later, a report from NASA's internal review board found the spacecraft's battery failed due to an unfortunate sequence of events. Updates to the spacecraft's software, which had taken place months earlier, were written to the wrong memory address in the spacecraft's computer. In short, the mission ended because of a software defect. Over the last decade, spacecraft have become increasingly reliant on software to carry out mission operations. In fact, the next mission to Mars, the Mars Science Laboratory, will rely on more software than all earlier missions to Mars combined. According to Gerard Holzmann, manager at the Laboratory for Reliable Software (LaRS) at NASA's Jet Propulsion Laboratory (JPL), even the fault protection systems on a spacecraft are mostly software-based. For reasons like these, well-functioning software is critical for NASA. In the same year as the failure of MGS, Holzmann presented a new approach to critical software development to help reduce risk and provide consistency. He proposed The Power of 10: Rules for Developing Safety-Critical Code, which is a small set of rules that can easily be remembered, clearly relate to risk, and allow compliance to be verified. The reaction at JPL was positive, and developers in the private sector embraced Holzmann's ideas.

Source record↗

Multi-Lab EV Smart Grid Integration Requirements Study. Providing Guidance on Technology Development and Demonstration

The report begins with a discussion of the current state of the energy and transportation systems, followed by a summary of some VGI scenarios and opportunities. The current efforts to create foundational interface standards are detailed, and the requirements for enabling PEVs as a grid resource are presented. Existing technology demonstrations that include vehicle to grid functions are summarized. The report also includes a data-based discussion on the magnitude and variability of PEVs as a grid resource, followed by an overview of existing simulation tools that vi This report is available at no cost from the National Renewable Energy Laboratory (NREL) at www.nrel.gov/publications. can be used to explore the expansion of VGI to larger grid functions that might offer system and customer value. The document concludes with a summary of the requirements and potential action items that would support greater adoption of VGI.

33 ADVANCED PROPULSION SYSTEMS↗

Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries

A strategically planned transmission network is an important source of flexibility for the integration of large-scale renewable energy (RE). Such a network can offer access to a broad geographic diversity of resources, which can reduce flexibility needs and facilitate sharing between neighboring balancing areas. This report builds on two previous NREL technical reports - Advancing System Flexibility for High Penetration Renewable Integration (Milligan et al. 2015) and 'Renewables-Friendly' Grid Development Strategies (Hurlbut et al. 2015) - which discuss various flexibility options and provide an overview of U.S. market models and grid planning. This report focuses on addressing issues with cross-regional/provincial transmission in China with the aim of integrating renewable resources that are concentrated in remote areas and require inter-regional/provincial power exchange.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Transmission Challenges and Best Practices for Cost-Effective Renewable Energy Delivery across State and Provincial Boundaries

A strategically planned transmission network is an important source of flexibility for the integration of large-scale renewable energy (RE). Such a network can offer access to a broad geographic diversity of resources, which can reduce flexibility needs and facilitate sharing between neighboring balancing areas. This report builds on two previous NREL technical reports - Advancing System Flexibility for High Penetration Renewable Integration (Milligan et al. 2015) and 'Renewables-Friendly' Grid Development Strategies (Hurlbut et al. 2015) - which discuss various flexibility options and provide an overview of U.S. market models and grid planning. This report focuses on addressing issues with cross-regional/provincial transmission in China with the aim of integrating renewable resources that are concentrated in remote areas and require inter-regional/provincial power exchange.

24 POWER TRANSMISSION AND DISTRIBUTION↗

MHK Levelized Cost of Energy (LCOE) Guidance and Techno-Economic Analysis Materials

Useful information and tools for calculating the Levelized Cost of Energy (LCOE) and MHK Cost Breakdown Structure. Includes a structure for calculating the capital expenditures and operating costs of a marine energy technology or device, reference resource data for both wave and tidal, and LCOE reporting guidance. These tools are meant to be used to help calculate the Levelized Cost of Energy (LCOE) for an MHK or MRE technology or device.

16 TIDAL AND WAVE POWER↗

Program Management Tool

The Program Management Tool (PMT) is a comprehensive, Web-enabled business intelligence software tool for assisting program and project managers within NASA enterprises in gathering, comprehending, and disseminating information on the progress of their programs and projects. The PMT provides planning and management support for implementing NASA programmatic and project management processes and requirements. It provides an online environment for program and line management to develop, communicate, and manage their programs, projects, and tasks in a comprehensive tool suite. The information managed by use of the PMT can include monthly reports as well as data on goals, deliverables, milestones, business processes, personnel, task plans, monthly reports, and budgetary allocations. The PMT provides an intuitive and enhanced Web interface to automate the tedious process of gathering and sharing monthly progress reports, task plans, financial data, and other information on project resources based on technical, schedule, budget, and management criteria and merits. The PMT is consistent with the latest Web standards and software practices, including the use of Extensible Markup Language (XML) for exchanging data and the WebDAV (Web Distributed Authoring and Versioning) protocol for collaborative management of documents. The PMT provides graphical displays of resource allocations in the form of bar and pie charts using Microsoft Excel Visual Basic for Application (VBA) libraries. The PMT has an extensible architecture that enables integration of PMT with other strategic-information software systems, including, for example, the Erasmus reporting system, now part of the NASA Integrated Enterprise Management Program (IEMP) tool suite, at NASA Marshall Space Flight Center (MSFC). The PMT data architecture provides automated and extensive software interfaces and reports to various strategic information systems to eliminate duplicative human entries and minimize data integrity issues among various NASA systems that impact schedules and planning.

Gawadiak, Yuri↗

Visual Resource Analysis for Solar Energy Zones in the San Luis Valley

This report summarizes the results of a study conducted by Argonne National Laboratory’s (Argonne’s) Environmental Science Division for the U.S. Department of the Interior Bureau of Land Management (BLM). The study analyzed the regional effects of potential visual impacts of solar energy development on three BLM-designated solar energy zones (SEZs) in the San Luis Valley (SLV) in Colorado, and, based on the analysis, made recommendations for or against regional compensatory mitigation to compensate residents and other stakeholders for the potential visual impacts to the SEZs. The analysis was conducted as part of the solar regional mitigation strategy (SRMS) task conducted by BLM Colorado with assistance from Argonne. Two separate analyses were performed. The first analysis, referred to as the VSA Analysis, analyzed the potential visual impacts of solar energy development in the SEZs on nearby visually sensitive areas (VSAs), and, based on the impact analyses, made recommendations for or against regional compensatory mitigation. VSAs are locations for which some type of visual sensitivity has been identified, either because the location is an area of high scenic value or because it is a location from which people view the surrounding landscape and attach some level of importance or sensitivity to what is seen from the location. The VSA analysis included both BLM-administered lands in Colorado and in the Taos FO in New Mexico. The second analysis, referred to as the SEZ Analysis, used BLM visual resource inventory (VRI) and other data on visual resources in the former Saguache and La Jara Field Offices (FOs), now contained within the San Luis Valley FO (SLFO), to determine whether the changes in scenic values that would result from the development of utility-scale solar energy facilities in the SEZs would affect the quality and quantity of valued scenic resources in the SLV region as a whole. If the regional effects were judged to be significant, regional compensatory mitigation was recommended. VRI data was not available for the Taos FO and it was not included in the SEZ analysis; the SEZ analysis includes BLM-administered lands in Colorado only.

14 SOLAR ENERGY↗

Distributed Energy Resource (DER) Reliability for Backup Electric Power Systems

Hospitals, emergency services, military bases, ports, airports, industries, commercial facilities, and others rely on backup power systems to provide electricity for their critical loads during grid outages. The purpose of this report it to provide accurate reliability information on commonly deployed distributed energy resources (DERs) to improve quantitative estimates for the reliability of these backup power systems during a grid outage. A backup power system consists of DERs, an electric distribution system with its associated switches and other devices, and mechanisms to control and manage the flow of electricity. Too often, facilities and campuses fail to properly quantify the reliability of their backup power systems. DERs are assumed to be 100% reliable, with the only concern being the availability of fuel. Such assumptions can lead to gross errors in the backup system's reliability estimates, particularly for long-duration outages. This report provides a set of estimates for reliability of emergency diesel generators (EDGs), natural gas prime generators and combined heat and power (CHP) prime movers, solar photovoltaics (PV), wind turbines, and Li-ion battery energy storage systems (BESS). The estimates are derived from empirical data when available and supplemented by modeling results when needed. These reliability estimates are for the DERs ability to provide power during a grid outage, ranging from an hour to 2 weeks.

14 SOLAR ENERGY↗

2015 HPC Annual Report

Center 9300 is very proud to provide a wide range of computing and networking resources ranging from desktop support to high performance computing that enable Sandia’s national security mission needs. Our goal is to provide these services in the most efficient, secure, user friendly, and agile means necessary. High performance computing is one example of how we are delivering on this goal. Thanks to investments from NNSA’s Advanced Simulation and Computing program, coupled with Sandia’s Institutional Computing program, a wide variety of computing resources are available and used to support national security needs. This year we are expanding our high performance computing infrastructure with the procurement of institutional resources for information computing or analytics. Big data analytics has been the buzzword in the computing industry for over a decade now and industries in finance, food and drug, business, and security organizations have been leading the charge. Much like how scientific computing has changed the way science and engineering are performed, data analytics is changing just about every aspect of our lives and more especially our ability to contribute to the national security mission of Sandia. This third edition of our HPC Annual Report continues our commitment to communicate the details and impact of Sandia’s large-scale computing resources that support missions work across Sandia. The Laboratories’ and NNSA’s strategic investments in high performance computing demonstrate our commitment to keeping mission-related research on the cutting edge of science, at pace with technology advances, and at a scale that meets the toughest demands of the nation we so proudly serve.

97 MATHEMATICS AND COMPUTING↗

Updated System-Availability and Resource-Allocation Program

A second version of the Availability, Cost and Resource Allocation (ACARA) computer program has become available. The first version was reported in an earlier tech brief. To recapitulate: ACARA analyzes the availability, mean-time-between-failures of components, life-cycle costs, and scheduling of resources of a complex system of equipment. ACARA uses a statistical Monte Carlo method to simulate the failure and repair of components while complying with user-specified constraints on spare parts and resources. ACARA evaluates the performance of the system on the basis of a mathematical model developed from a block-diagram representation. The previous version utilized the MS-DOS operating system and could not be run by use of the most recent versions of the Windows operating system. The current version incorporates the algorithms of the previous version but is compatible with Windows and utilizes menus and a file-management approach typical of Windows-based software.

Viterna, Larry↗

Clearance Analysis of Node 3 Aft CBM to the Stowed FGB Solar Array

In early 2011, the ISS Vehicle Configuration Office began considering the relocation of the Permanent Multipurpose Module (PMM) to the aft facing Common Berthing Mechanism (CBM) on Node 3 to open a berthing location for visiting vehicles on the Node 1 nadir CBM. In this position, computer-aided design (CAD) models indicated that the aft end of the PMM would be only a few inches from the stowed Functional Cargo Block (FGB) port solar array. To validate the CAD model clearance analysis, in the late summer of 2011 the Image Science and Analysis Group (ISAG) was asked to determine the true geometric relationship between the on-orbit aft facing Node 3 CBM and the FGB port solar array. The desired measurements could be computed easily by photogrammetric analysis if current imagery of the ISS hardware were obtained. Beginning in the fall of 2011, ISAG used the Dynamic Onboard Ubiquitous Graphics (DOUG) program to design a way to acquire imagery of the aft face of Node 3, the aft end-cone of Node 1, the port side of pressurized mating adapter 1 (PMA1), and the port side of the FGB out to the tip of the port solar array using cameras on the Space Station Remote Manipulator System (SSRMS). This was complicated by the need to thread the SSRMS under the truss, past Node 3 and the Cupola, and into the space between the aft side of Node 3 and the FGB solar array to acquire more than 100 images from multiple positions. To minimize the number of SSRMS movements, the Special Purpose Dexterous Manipulator (SPDM) would be attached to the SSRMS. This would make it possible to park the SPDM in one position and acquire multiple images by changing the viewing orientation of the SPDM body cameras using the pan/tilt units on which the cameras are mounted. Using this implementation concept, ISAG identified four SSRMS/SPDM positions from which all of the needed imagery could be acquired. Based on a photogrammetric simulation, it was estimated that the location of the FGB solar array could be measured within an accuracy of about 1 in. in each axis relative to the ISS Analysis Coordinate System (ISSACS). In October 2011, a proposed image-acquisition plan was drafted by ISAG and released for review. The ISS Robotics flight control team (ROBO) proposed minor changes to SPDM positions 1 and 4 to meet ISS proximity requirements. The updated image acquisition plan and draft chit were presented to and approved by the Systems Working Group (SWG) November 18 and were sent to the Vehicle Configuration Board (VCB) in early December 2011. Working with ROBO on 3 successive days (February 21, 22, and 23), ISAG collected 161 images of the ISS. Approximately 40 images were collected from each of the four different SSRMS/SPDM positions, with each set mapping the region from the Node 3 end cone, across Node 1, along the forward port side portion of the FGB, and out the port side FGB solar arrays. From this imagery, the best 80 images were selected for use in the analysis. The images were radiometrically enhanced to improve color and contrast and loaded into the FotoG analysis software along with the camera parameters and control data, which consisted of the coordinates for 54 handrail attachment bolts on the aft face of Node 3, in the ISSACS coordinate system. The results of this analysis produced the measured coordinates of 116 points distributed across the face of the FGB solar array panels (see figure 3) along with propagated uncertainty estimates in each coordinate axis. These results were sent to the ISS Vehicle Configuration Office, which sent them to the Configuration Analysis Modeling and Mass Properties (CAMMP) team for comparison with the Russian-provided CAD model for the retracted FGB solar arrays. The CAMMP analysis unexpectedly showed that the measured location of the port FGB solar array was up to 41-in. further outboard than the design and was slightly twisted about its rotational axis. The unexpected comparison results produced some initial concern regarding the accuracy of the photogrammetric measurements. To verify the measured results, ISAG personnel conducted a second analysis using just the imagery of the solar arrays in an arbitrary coordinate system defined by the three corner points of the inboard-most panel, with the design distance between points A1 and A10 as the only scale. The new measurements agreed with the original results to within less than 1 in. RMS in each axis, confirming the original solar array measurements. ISAG produced a final report for the ISS Vehicle Configuration Office documenting an apparent anomaly in the retracted configuration of the port FGB solar arrays. A copy of the measurement report was translated and sent to the Russian Space Agency. During a Vehicle Integrated Performance and Resources (VIPeR) teleconference September 24, 2012, the Russians acknowledged receipt of a translated copy of the ISAG report. The Russian representative stated that the head of the solar array design team claimed that the measured configuration was impossible unless the structure was physically broken. The Russians acknowledged that they had no expertise in photogrammetry, so the analysis technique employed was a "black box" to them, and they did not know how to use the ISAG results. They asked for a single image in which the overextension of the port solar array could be obviously seen. On November 10, 2012, during a face-to-face meeting with their Russian counterparts at JSC, ISAG presented nadir-view imagery of the FGB acquired during Space Shuttle rendezvous. Using the known width of the pressurized portion of the FGB as a scale, this analysis clearly showed that the port FGB solar array was extended outboard further than the Russian design for the retracted solar array.

Liddle, Donn↗

Cyber Security Primer for DER Vendors Aggregators and Grid Operators

This report provides an introduction to cyber security for distributed energy resources (DER) - such as photovoltaic (PV) inverters and energy storage systems (ESS). This material is motivated by the need to assist DER vendors, aggregators, grid operators, and broader PV industry with cyber security resilience and describe the state-of-the-art for securing DER communications. The report outlines basic principles of cyber security, encryption, communication protocols, DER cyber security recommendations and requirements, and device-, aggregator-, and utility-level security best practices to ensure data confidentiality, integrity, and availability. Example cyber security attacks, including eavesdropping, masquerading, man-in-the-middle, replay attacks, and denial-of-service are also described. A survey of communication protocols and cyber security recommendations used by the DER and power system industry are included to elucidate the cyber security standards landscape. Lastly, a roadmap is presented to harden end-to-end communications for DER with research and industry engagement.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Science of Scale-Up: Accelerating chemical manufacturing technology development workshop report

The Science of Scale-Up: Accelerating chemical manufacturing technology development workshop report outlines key insights and actionable recommendations for accelerating the scale-up of disruptive chemical manufacturing technologies. Convened in October 2024, the workshop brought together approximately fifty experts from academia, industry, national laboratories, and government agencies to address the barriers and solutions for maturing technologies from proof-of-concept to commercialization. The report identifies seven critical themes for enabling faster scale-up. These themes were explored through general discussions and breakout sessions focused on three specific chemical manufacturing technologies—electrochemical, thermochemical, and biological conversion processes. The findings emphasize the importance of interdisciplinary collaboration, robust funding mechanisms, and shared resources to overcome technical barriers and accelerate technology deployment. The report also highlights technology-specific challenges and opportunities, including the need for advanced materials, scalable manufacturing processes, and integrated testing environments. For electrochemical manufacturing processes, durability and material optimization are key priorities, while thermochemical processes require novel reactor designs and better supply chain integration. Biological conversion processes face hurdles in strain engineering, reactor design, and process integration. Across all technologies, the workshop emphasized the importance of leveraging computational tools, standardized protocols, and collaborative networks to address knowledge gaps and technical barriers. By acting on these insights, stakeholders can reduce the timeline for scaling up critical chemical manufacturing technologies, ensuring their timely impact on manufacturing competitiveness, and environmental sustainability.

37 INORGANIC, ORGANIC, PHYSICAL, AND ANALYTICAL CH↗

National Aeronautics and Space Administration Fiscal Year 2001 Accountability Report

The National Aeronautics and Space Administration (NASA) is an independent Agency established to plan and manage the future of the Nation's civil aeronautics and space program. This Accountability Report covers Federal Fiscal Year (FY) 2001 (October 1, 2000, through September 30, 2001), with discussion of some subsequent events. The Report contains an overview addressing the Agency's critical programs and financial performance and includes highlights of performance organized by goals and objectives of the Enterprises and Crosscutting Processes. The Report also summarizes NASA's stewardship over budget and financial resources, including audited financial statements and footnotes. The financial statements reflect an overall position of offices and activities, including assets and liabilities, as well as results of operations, pursuant to requirements of Federal law (31 U.S.C. 3515(b)). The auditor's opinions on NASA's financial statements, reports on internal controls, and compliance with laws and regulations are included in this report.

Source record↗