Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Reliability Testing”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

International Round-Robin Testing of Bulk Thermoelectrics

Two international round-robin studies were conducted on transport properties measurements of bulk thermoelectric materials. The study discovered current measurement problems. In order to get ZT of a material four separate transport measurements must be taken. The round-robin study showed that among the four properties Seebeck coefficient is the one can be measured consistently. Electrical resistivity has +4-9% scatter. Thermal diffusivity has similar +5-10% scatter. The reliability of the above three properties can be improved by standardizing test procedures and enforcing system calibrations. The worst problem was found in specific heat measurements using DSC. The probability of making measurement error is great due to the fact three separate runs must be taken to determine Cp and the baseline shift is always an issue for commercial DSC. It is suggest the Dulong Petit limit be always used as a guide line for Cp. Procedures have been developed to eliminate operator and system errors. The IEA-AMT annex is developing standard procedures for transport properties testing.

36 MATERIALS SCIENCE↗

Impact of Accelerated Stress-Tests on SiC MOSFET Precursor Parameters

Integrating SiC power MOSFETs is very attractive for advancing power electronic system performance, yet the system reliability with new devices remains in question. This work presents an overview of accelerated lifetime tests and the packaging and semiconductor failure mechanisms they excite. The experiments explained here includes High Temperature Gate Bias (HTGB), Switching Cycling, Power Cycling, and Thermal Cycling. These experiments stress different failure mechanisms, that show degradation in different device parameters including, but not limited to, threshold voltage and on-resistance. These four experiments help illustrate the spectrum between device and package degradation that can be used to design more reliable power electronic circuits.

33 ADVANCED PROPULSION SYSTEMS↗

Heat Transfer Coefficient from the Sheet-Piped Light-Absorbing Panels of the Flat-Plate Solar Water-Heating Collectors to the Heat Transfer Fluid in Their Heat-Removing Channels

It has been proposed to introduce a new parameter into the practice of the heat calculation and testing of the flat-plate solar water-heating collectors (FSWHCs)—the coefficient of heat transfer from the light-absorbing panel (LAP) to the heat transfer fluid in its internal heat-exchange channels (HECs) reduced to the unit area of the frontal surface of their cases. The mechanism of the formation of this parameter is studied, the design expression is derived, and a practical example of the calculation to define its value is performed. The structures of the flowing LAPs of a sheet-piped thin parallelepiped form are selected as the objects of the investigation. The reliability of the results of the investigations is proved by comparing the values of the specific (relative to the area unit of the frontal surface of the case) heating efficiency of the collector obtained based on the various formulas.

14 SOLAR ENERGY↗

Reliability enhancement of APR + diverse protection system regarding common cause failures

The Advanced Power Reactor Plus (APR +) nuclear power plant design has been developed on the basis of the APR1400 (Advanced Power Reactor 1400 MWe) to further enhance safety and economics. For the mitigation of Anticipated Transients Without Scram (ATWS) as well as Common Cause Failures (CCF) within the Plant Protection System (PPS) and the Emergency Safety Feature - Component Control System (ESF-CCS), several design improvement features have been implemented for the Diverse Protection System (DPS) of the APR + plant. As compared to the APR1400 DPS design, the APR + DPS has been designed to provide the Safety Injection Actuation Signal (SIAS) considering a large break LOCA accident concurrent with the CCF. Additionally several design improvement features, such as channel structure with redundant processing modules, and changes of system communication methods and auto-system test methods, are introduced to enhance the functional reliability of the DPS. Therefore, it is expected that the APR + DPS can provide an enhanced safety and reliability regarding possible CCF in the safety-grade I and C systems as well as the DPS itself. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

DEVELOPMENT OF A ROTARY MICROFILTER FOR RADIOACTIVE WASTE APPLICATIONS

The processing rate of Savannah River Site (SRS) high-level waste decontamination processes are limited by the flow rate of the solid-liquid separation. The baseline process, using a 0.1 micron cross-flow filter, produces {approx}0.02 gpm/sq. ft. of filtrate under expected operating conditions. Savannah River National Laboratory (SRNL) demonstrated significantly higher filter flux for actual waste samples using a small-scale rotary filter. With funding from the U. S. Department of Energy Office of Cleanup Technology, SRNL personnel are evaluating and developing the rotary microfilter for radioactive service at SRS. The authors improved the design for the disks and filter unit to make them suitable for high-level radioactive service. They procured two units using the new design, tested them with simulated SRS wastes, and evaluated the operation of the units. Work to date provides the following conclusions and program status: (1) The authors modified the design of the filter disks to remove epoxy and Ryton{reg_sign}. The new design includes welding both stainless steel and ceramic coated stainless steel filter media to a stainless steel support plate. The welded disks were tested in the full-scale unit. They showed good reliability and met filtrate quality requirements. (2) The authors modified the design of the unit, making installation and removal easier. The new design uses a modular, one-piece filter stack that is removed simply by disassembly of a flange on the upper (inlet) side of the filter housing. All seals and rotary unions are contained within the removable stack. (3) While it is extremely difficult to predict the life of the seal, the vendor representative indicates a minimum of one year in present service conditions is reasonable. Changing the seal face material from silicon-carbide to a graphite-impregnated silicon-carbide is expected to double the life of the seal. Replacement of the current seal with an air seal could increase the lifetime to 5 years and is undergoing testing in the current work. (4) The bottom bushing showed wear due to a misalignment during the manufacture of the filter tank. Replacing the graphite bushing with a more wear resistant material such as a carbide material will increase the lifetime of the bushing. This replacement requires a more wear resistant part or coating to prevent excessive wear of the shaft. The authors are currently conducting testing with the more wear resistant bushing. (5) The project team plans to use the rotary microfilter as a filter in advance of an ion exchange process under development for potential deployment in SRS waste tank risers.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Insights into Methodologies and Operational Details of Resource Adequacy Assessment: A Case Study with Application to a Broader Flexibility Framework

Assessing and maintaining resource adequacy (RA) is a core pillar of power systems. However, recent changes in the physical makeup of these systems and the conditions under which these systems must operate have yielded a renewed interest in the methods, metrics, and assumptions that underpin RA assessments. In this paper, we systematically explore a wide range of RA modeling dimensions, including: the objective function and level of operational detail in the underlying model formulation; the quantity (look-ahead) and quality (accuracy) of data that is available for making operational decisions within those models; and the physical configuration of solar photovoltaics (PV) with battery storage hybrid resources. We apply a set of probabilistic RA tools and production cost modeling tools to a realistic test system based loosely on a future Electric Reliability Council of Texas power system dominated by solar PV resources. Under the assumptions of our system and models, we find that multi-stage probabilistic assessments may provide a more robust evaluation of RA by capturing a wider range of operational and system interactions, but this comes at a computational cost of 1-2 orders of magnitude longer run time depending on the specific configuration. In addition, the information on thermal generator availability impacts RA performance by an order of magnitude more than solar resource forecasts, which is driven by the comparatively larger magnitude of thermal outages than solar forecast errors within our test system. Lastly, the flexibility provided by hybrid and other resources can help reduce system load-shedding event frequencies and enable the system to be more robust to inaccurate forecast information, and alternative hybrid inverter sizes can impact RA levels by 1-2 orders of magnitude. Our results point to the importance of a broader flexibility framework to describe the interaction between (1) flexibility "supply" from both physical resource capabilities and operational constraints considered in the modeling, and (2) flexibility "demand" from forecast errors, thermal generator outages, and other sources of uncertainty, as well as their RA impacts. Results are likely sensitive to the system buildout explored; future work could consider additional system configurations and conditions.

ENERGY PLANNING, POLICY, AND ECONOMY,POWER TRANSMI↗

Cross‐Cultural Validation of the Binge Eating Disorder Screener‐7 ( BEDS ‐7) Across 42 Countries

ABSTRACT Objective This study aimed to evaluate the reliability and validity of the Binge Eating Disorder Screener‐7 (BEDS‐7) across 42 countries and 26 languages, assessing its reliability and validity as a screening tool for binge‐eating disorder (BED) in diverse cultural contexts. Specifically, it sought to enhance early recognition of BED symptoms in primary care settings globally, contributing to a standardized framework for assessing BED. Method The International Sex Survey, a cross‐sectional online study, was conducted in 42 countries and 26 languages. A diverse community sample of 82,243 participants, aged 18 years or older, completed the BEDS‐7 and measures of sexuality, mental health, substance use, and sociodemographic characteristics. Confirmatory factor analyses and tests of measurement invariance were employed to evaluate the reliability and validity of the BEDS‐7 across languages, countries, genders, and sexual orientations. Results The BEDS‐7 demonstrated scalar factorial invariance across languages and countries, indicating consistent factor loadings and item intercepts. In contrast, the screener showed residual invariance across gender and sexual orientation groups, supporting its robustness across these demographics. Kruskal–Wallis tests revealed significant differences in BED symptoms across languages, countries, genders, and sexual orientations, with the highest BED scores observed among queer, pansexual, and gender‐diverse individuals. The BEDS‐7 also demonstrated adequate reliability (Cronbach's alpha > 0.80) and moderate criterion validity. Discussion The findings provide further evidence of the reliability and validity of the BEDS‐7 as a potential screening tool for identifying probable cases of BED globally, facilitating early intervention in primary care settings.

Gewirtz‐Meydan, Ateret [School of Social Work, Fac↗

Aging Infrastructure: Application of System Health Monitoring at the Defense Waste Processing Facility - 16069

The disposition of high level waste (HLW) into borosilicate glass canistered waste forms began at SRS in 1996. Since that time, the Defense Waste Processing Facility (DWPF) has produced nearly four thousand HLW canisters. The DWPF is now approaching 20 years of radioactive service and 25 years of operation since the commencement of nonradioactive testing in 1990. Many facility systems are challenged by equipment or component obsolescence, which places a premium on proper work planning, engineering, and maintenance resource allocation to ensure facility reliability. To this end, Savannah River Remediation (SRR) implements programs and procedures for performance monitoring of structures, systems, and components (SSCs) within all of its processing facilities. As these programs have matured, they have helped to identify vulnerabilities within facility systems and provided a framework for ranking system assets to ensure correct priority is established and maintained. This paper provides an overview of how SRR structures and implements system performance monitoring with specific focus on the recent replacement of the DWPF Safety Grade Purge Flowmeters. This case study will discuss: 1) How the performance monitoring process identified an availability risk due to the minimal vendor support for the in-use flow transmitters, 2) The design changes developed as part of the project to transition to a different measurement technology, which includes operational lessons learned from the original installation, 3) The execution of the replacement effort, which was complicated by the fact that the purge system is a Vital Safety System (VSS) and not easily taken out of service for extended maintenance, and 4) The need to consider future maintainability, particularly given that continued acceleration in technical innovation will likely increase the frequency of equipment obsolescence. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Repowering: The Other Side of the Reliability Coin

Extreme weather, cracked backsheets, severe PID, poorly built modules, and installation flaws - all can compromise a solar plant's health and force repowering long before end of life. With more than 70% of U.S. PV capacity less than seven years old, the fleet is young, but its rapid expansion has introduced new materials and system designs that are still being tested under real-world conditions. As a result, reliability - not economics - is what most often drives repowering decisions. Repowering is frequently assumed to be an economically motivated choice, but our work shows that reliability concerns are the real trigger. Drawing from industry interviews, case studies, and modeling, we highlight the physical, electrical, and policy barriers owners face when deciding whether to repair, repower, or decommission. At the same time, repowering can create opportunities: renewed interconnection periods, improved energy yields, and strategic upgrades to extend system value. We present a quantitative framework using NLR's System Advisor Model (SAM) and PV in Circular Economy (PV ICE) tool to evaluate trade-offs across financial, material, and energy impacts. These findings provide practical guidance for navigating the realities of repowering today and underscore the critical role of reliability in shaping the future performance and sustainability of the PV fleet.

14 SOLAR ENERGY↗

Measuring System for Use in Radar-System Development

A new system for the analysis and monitoring of radar equipment at the development stage is described. In the verification of radar systems, it is of particular interest to check the reliability of programs that permit the identification of flight test data. In practice, that improves the interpretation of flight data. Practical results are presented.

42 ENGINEERING↗

Extending Component Lifetime And Improving Inverter Reliability (ECLAIIR)

Inverter reliability remains one of the most persistent challenges limiting the performance, availability, and economic viability of utility‑scale photovoltaic (PV) plants. Industry data consistently show that inverters account for the highest share of corrective maintenance events and unplanned outages across PV fleets. These failures result in energy losses, increased O&M costs, and reduced confidence in long‑term solar asset performance. Motivated by these challenges, this project—Extending Component Lifetime and Improving Inverter Reliability (ECLAIIR)—was undertaken to systematically investigate inverter degradation and failure mechanisms, develop predictive maintenance capabilities, and establish data‑driven pathways to improve service life and reduce the Levelized Cost of Energy (LCOE) for large‑scale PV systems. The primary goal of the project was to identify pre‑failure signatures in string inverters using both lab‑based accelerated lifetime testing and field‑based data and to develop predictive maintenance algorithms that can anticipate inverter faults before they occur. Through collaboration with inverter testing laboratory, solar PV plant owner, and failure‑analysis experts, the project advanced the technical understanding of inverter reliability. By instrumenting inverters with thermistors, humidity sensors, power‑quality meters, and acoustic sensors, the research established how multiple sensing modalities can reliably detect deviations from normal behavior hours to days before failure. These findings substantially enhance scientific understanding of inverter failure kinetics and provide the PV industry with the most comprehensive cross‑OEM characterization of early‑stage failure indicators reported to date. Technically, the project demonstrated the effectiveness of predictive maintenance by developing and validating the PreDICT (Predictive Diagnostics of PV Inverters Using Condition Monitoring and Trend Analysis) framework—a multi‑layer diagnostic architecture combining peer‑to‑peer analytics, historical trend modeling, and advanced machine‑learning techniques such as the Sequential Conditional Variational Autoencoder (SCVAE). This predictive model achieved more than 90% accuracy in detecting pre‑failure conditions and provided up to four days of lead time before inverter failure in field scenarios. Economically, the project’s LCOE analysis showed that predictive maintenance can reduce lifetime energy losses and minimize corrective maintenance interventions. Modeling indicated that, depending on inverter failure rates and replacement timelines, predictive maintenance can significantly reduce LCOE impacts associated with inverter downtime: from as high as 19.4% under conventional maintenance strategies to 0.1%–10.17% when predictive analytics are adopted. These results confirm that predictive maintenance is both technically feasible and economically advantageous for utilities and plant operators. The project’s findings also have broad public benefit. By improving inverter reliability and reducing downtime, predictive maintenance directly increases electricity generation from existing PV assets. Enhanced reliability lowers operational costs for utilities, which can translate over time into lower energy costs for consumers. Furthermore, the project’s technical publications, conference presentations, and industry workshops ensure that knowledge gained is shared broadly across the solar industry, supporting workforce development and enabling utilities of all sizes to adopt modern asset‑health monitoring practices. The retrofitting case study and service‑life prediction framework further support informed decision‑making for aging PV fleets, helping operators extend system life and reduce electronic waste. In summary, the ECLAIIR project significantly advanced the state of knowledge on inverter degradation, demonstrated the technical and economic value of predictive maintenance, and delivered actionable tools and insights that support more reliable, cost‑effective, and sustainable PV plant operation. The outcomes of this project will continue to inform utility practices, guide inverter design improvements, and strengthen the long‑term performance of solar assets nationwide.

14 SOLAR ENERGY↗

OPERATIONAL EXPERIENCE OF THE UPGRADED CRYOGENIC SYSTEMS AT THE NSCL

The National Superconducting Cyclotron Laboratory (NSCL) is a NSF-supported facility, with additional support from Michigan State University (MSU) for conducting research in nuclear and accelerator science. The facility consists of two superconducting cyclotrons and over fifty individual cryostats, each containing several superconducting magnets that are used in the beam transport system. Beginning in 1999 a major facility upgrade was started. New, larger magnets were added, increasing the total 4.5 K loads, necessitating an increase of the cryogenic capacity. A helium plant (nominal 1750-Watt at 4.5 K) was acquired from the United States Bureau of Mines where it had been operating as a pure liquefier since the early 1980's. It was refurbished for the NSCL with extensive support from the cryogenics group at Thomas Jefferson National Laboratory. The new cryogenic system came online early in 2001. The cold-mass is relatively high in relation to the installed capacity, presenting challenges during cool downs. Reliability over the last five years has been greater than 99%. An overview of the last seven years of operations of our cryogenic systems is presented that includes normal operations, testing of new equipment, noteworthy breakdowns, routine maintenance, and system reliability.

43 PARTICLE ACCELERATORS↗

Accelerated Irradiation and Qualification of Ceramic Nuclear Fuels

Accelerated neutron irradiation testing is an component of accelerated qualification of new nuclear fuels for light water reactor (LWRs), microreactors, and other special purpose reactors. The qualification and licensing of nuclear fuel is a lengthy process that can take 20-25 years to bring a new fuel into service. Accelerated fuel qualification combines both experimental and modeling work to expedite the total qualification time to 5-10 years timeframe. The experimental aspect of this is accelerated irradiation aims to reduce the total time needed for neutron irradiation to achieve targeted burnup, which can take years using conventional irradiation profiles. The data that results from this irradiation testing can then be entered into BISON models to develop robust and reliable performance simulations to ensure safe operation under normal and off normal conditions. This milestone focused on the fabrication of test articles for accelerated irradiation testing at the Advance Test Reactor (ATR).

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Evaluation of the DC bus link capacitors and power transistor modules in the qualification testing of PV inverters

To achieve useful, fair, and cost-effective design qualification and type approval testing for PV inverters, two procedures were developed and demonstrated to evaluate the bus link capacitors and power transistor—and where applicable, its module—for long-term reliability. We evaluate the inverter under simulated use conditions with heat run tests to find the highest operating temperatures reached by these components. The procedures are demonstrated in this study with a 4-kVA class string inverter. The maximum temperature of the DC bus link capacitors was determined to be 76.4°C when the ambient temperature was at the inverter's maximum rated temperature of 60°C with derating occurring. On the other hand, the power transistor module's maximum temperature using the heat sink temperature as the index, 92.6°C, occurred in an ambient of 40.8°C when derating was not occurring. The conditions found for upper temperatures exhibited by these components are, respectively, proposed for implementation in the dry heat and thermal cycling tests in the IEC 62093 “Power conversion equipment for photovoltaic systems – Design qualification testing” international standard draft so that the levels applied in the tests are in proportion to those experienced in the field. Finally as a result, fairer evaluation of inverter reliability is realized.

14 SOLAR ENERGY↗

Improvements of PKU PMECRIS for continuous hundred hours CW proton beam operation

In order to improve the source stability, a long term continuous wave (CW) proton beam experiment has been carried out with Peking University compact permanent magnet 2.45 GHz ECR ion source (PKU PMECRIS). Before such an experiment a lot of improvements and modifications were completed on the source body, the Faraday cup and the PKU ion source test bench. At the beginning of 2015, a continuous operation of PKU PMECRIS for 306 h with more than 50 mA CW beam was carried out after success of many short term tests. No plasma generator failure or high voltage breakdown was observed during that running period and the proton source reliability is near 100%. Total beam availability, which is defined as 35-keV beam-on time divided by elapsed time, was higher than 99% [S. X. Peng et al., Chin. Phys. B 24(7), 075203 (2015)]. A re-inspection was performed after another additional 100 h operation (counting time) and no obvious sign of component failure was observed. Counting the previous source testing time together, this PMECRs longevity is now demonstrated to be greater than 460 h. This paper is mainly concentrated on the improvements for this long term experiment.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

EVALUATION OF SPRING OPERATED RELIEF VALVE MAINTENANCE INTERVALS AND EXTENSION OF MAINTENANCE TIMES USING A WEIBULL ANALYSIS WITH MODIFIED BAYESIAN UPDATING

The Savannah River Site (SRS) spring operated pressure relief valve (SORV) maintenance intervals were evaluated using an approach provided by the American Petroleum Institute (API RP 581) for risk-based inspection technology (RBI). In addition, the impact of extending the inspection schedule was evaluated using Monte Carlo Simulation (MCS). The API RP 581 approach is characterized as a Weibull analysis with modified Bayesian updating provided by SRS SORV proof testing experience. Initial Weibull parameter estimates were updated as per SRS's historical proof test records contained in the Center for Chemical Process Safety (CCPS) Process Equipment Reliability Database (PERD). The API RP 581 methodology was used to estimate the SORV's probability of failing on demand (PFD), and the annual expected risk. The API RP 581 methodology indicates that the current SRS maintenance plan is conservative. Cost savings may be attained in certain mild service applications that present low PFD and overall risk. Current practices are reviewed and recommendations are made for extending inspection intervals. The paper gives an illustration of the inspection costs versus the associated risks by using API RP 581 Risk Based Inspection (RBI) Technology. A cost effective maintenance frequency balancing both financial risk and inspection cost is demonstrated.

02 PETROLEUM↗

Commercialization of New Lattice-Matched Multi-Junction Solar Cells Based on Dilute Nitrides: July 8, 2010 - March 7, 2012

All the milestones for this program were achieved and in most cases, particularly those related to cell performance, more samples were supplied than was required, and the deliverables substantially exceed the performance milestones. Moreover, the cell deliverables sent to NREL for evaluation were cells 4 mm or 5.5 mm, nearly 5 to 10 times larger in area than the 2 mm cells called for in the subcontract, and one of the most common sizes in the CPV industry. For the entire program there were 12 separate cell performance milestones, the most important of which was the 3J cell efficiency. Phase 1 had 2 3J efficiency milestones and Phase 2 had three. For the Phase 1 milestone calling for 38% efficiency, NREL measured a peak efficiency of 41.1%, about 2% higher than the data sheet values of commercial cells at that time. The efficiencies measured in Phase 1 exceed the Phase 2 cell performance milestones in the subcontract’s original Statement of Work. Cells submitted to NREL as part of this subcontract, although not as deliverables, were measured to have a new World Record cell efficiency of 43.5%, breaking the previous World Record by 1.2% absolute. In addition to improved cell performance, during Phase 1 a modeling capability for designing ARCs was developed and verified by comparing the measured current from a cell using a specific ARC with the current predicted by the model. This model was then used to design a new ARC giving lower reflectivity and a corresponding higher cell current. Again the prediction of the model was verified by measured cell properties. In Phase 2, the modeling capability was used to design a glass matched ARC, the type most in use in the CPV industry, which was tuned to the band structure of a 3J cell with a dilute nitride bottom cell. Finally, tools and test methodologies were developed that enable HALT to be applied to cells to determine the operating and destruct limits and to determine or set bounds on the lifetime of the cells in typical CPV operating conditions. As part of this effort a novel HALT system was built that enabled cells to be subjected to light at concentrations up to 80 W/cm 2 , (800 suns) while the cell temperature could be held or cycled between -100C and +180C. As part of the Phase 2 effort the system was modified to enable the light to the cell to be interrupted at a maximum rate of 10 times/second. Tests using interrupted light at >500 suns on cells held at 180C showed no evidence of failure after a total of >22 sun-years of operation at 100C. Another key outcome of the reliability efforts of the program was from high temperature storage tests done independently of the HALT test. There were two key outcomes of this activity: 1) single junction GaInNAs cells showed no evidence of failure under the equivalent of at least 100 years of on-sun time operating at 100C and 2) we can conclude with 95% confidence that the probability of device failure after 30 sun-years of operation at 100C is less than 1.5%, and mostly less than 0.5%. Based on these results there is no reason to believe that dilute nitrides in and of themselves pose a reliability problem for CPV applications and that 3J cells using dilute nitrides have very low probability of failure during the expected 20-30 year life of a CPV power plant.

14 SOLAR ENERGY↗

Simulation and characterization of a laterally-driven inertial micro-switch

A laterally-driven inertial micro-switch was designed and fabricated using surface micromachining technology. The dynamic response process was simulated by ANSYS software, which revealed the vibration process of movable electrode when the proof mass is shocked by acceleration in sensitive direction. The test results of fabricated inertial micro-switches with and without anti-shock beams indicated that the contact process of micro-switch with anti-shock beams is more reliable than the one without anti-shock beams. The test results indicated that three contact signals had been observed in the contact process of the inertial switch without anti-shock beams, and only one contact signal in the inertial switch with anti-shock beams, which demonstrated that the anti-shock beams can effectively constrain the vibration in non-sensitive direction.

36 MATERIALS SCIENCE↗