Study on main control room and human-system interface of generation III in China - 313

This paper focuses on the study on Main Control Room (MCR) and Human-System Interface (HSI) of Generation III in China. An intelligent HSI has been developed to enhance the safety and availability of Nuclear Power Plant (NPP) by improving operational reliability. The key elements of the proposed HSI such as Advanced Alarm System, State Oriented Procedures (SOP), Large Display Panel (LDP), Computerized-base procedures..., that affects what information the operator sees or the system's response to a control input must be empirically evaluated to ensure that the new design does not compromise HSI effectiveness. Based on CPR1000's experience in China, this paper presents the approach used as well as the most relevant aspects of this kind of project for the next generation. This approach will be used in new Generation III nuclear power plant, and also used in modernizing I and C system in currently operative nuclear power plants, in addition to meeting safety requirements and the plant's operational requirements, to improve cost-effective plant and human performance and to reduce likelihood of human errors, to gain maximum benefit of the implemented technology and to increase the performance, resulting in improved plant safety, availability, reliability, and cost-effective operation. The proposed HSI has been validated and demonstrated using the CPR1000 simulator of National Key Laboratory. After sufficient validation, the characteristic design features of the proposed HSI will be reflected in the design of the main control room of the next generation reactors in China. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Distributed Sensor Coordination for Advanced Energy Systems

Motivation: The ability to collect key system level information is critical to the safe, efficient and reliable operation of advanced power systems. Recent advances in sensor technology have enabled some level of decision making directly at the sensor level. However, coordinating large numbers of sensors, particularly heterogeneous sensors, to achieve system level objectives such as predicting plant efficiency, reducing downtime or predicting outages requires sophisticated coordination algorithms. Indeed, a critical issue in such systems is how to ensure the interaction of a large number of heterogenous system components do not interfere with one another and lead to undesirable behavior. Objectives and Contributions: The long-term objective of this work is to provide sensor deployment, coordination and networking algorithms for large numbers of sensors to ensure the safe, reliable, and robust operation of advanced energy systems. Our two specific objectives are to: 1. Derive sensor performance metrics for heterogeneous sensor networks. 2. Demonstrate effectiveness, scalability and reconfigurability of heterogeneous sensor network in advanced power systems. The key technical contribution of this work is to push the coordination step to the design of the objective functions of the sensors, allowing networks of heterogeneous sensors to be controlled. By ensuring that the control and coordination is not specific to particular sensor hardware, this approach enables the design and operation of large heterogeneous sensor networks. In addition to the coordination coordination mechanism, this approach allows the system to be reconfigured in response to changing needs (e.g., sudden external events requiring new responses) or changing sensor network characteristics (e.g., sudden changes to plant condition). Impact: The impact of this work extends to a large class of problems relevant to the National Energy Technology Laboratory including sensor placement, heterogeneous sensor coordination, and sensor network control in advanced power systems. Each application has specific needs, but they all share the one crucial underlying problem: how to ensure that the interactions of a large number of heterogenous agents lead to coordinated system behavior. This proposal describes a new paradigm that addresses that very issue in a systematic way. Key Results and Findings: All milestones have been completed. Our results demonstrate that by properly shaping agent objective functions, we can develop large (up to 10,000 devices) heterogeneous sensor networks with key desirable properties. The first milestone shows that properly choosing agent-specific objective functions increases system performance by up to 99.9% compared to global evaluations. The second milestone shows evolutionary algorithms learn excellent sensor network coordination policies prior to network deployment, and these policies can be refined online once the network is deployed. The third milestone shows the resulting sensor networks networks are extremely robust to sensor noise, where networks with up to 25% sensor noise are capable of providing measurements with errors on the order of 10 -3 . The fourth milestone shows the resulting sensor networks are extremely robust to sensor failure, with 25% of the sensors in the system failing resulting in no significant performance losses after system reconfiguration.

42 ENGINEERING↗

Load Control System Reliability

This report summarizes the results of the Load Control System Reliability project (DOE Award DE-FC26-06NT42750). The original grant was awarded to Montana Tech April 2006. Follow-on DOE awards and expansions to the project scope occurred August 2007, January 2009, April 2011, and April 2013. In addition to the DOE monies, the project also consisted of matching funds from the states of Montana and Wyoming. Project participants included Montana Tech; the University of Wyoming; Montana State University; NorthWestern Energy, Inc., and MSE. Research focused on two areas: real-time power-system load control methodologies; and, power-system measurement-based stability-assessment operation and control tools. The majority of effort was focused on area 2. Results from the research includes: development of fundamental power-system dynamic concepts, control schemes, and signal-processing algorithms; many papers (including two prize papers) in leading journals and conferences and leadership of IEEE activities; one patent; participation in major actual-system testing in the western North American power system; prototype power-system operation and control software installed and tested at three major North American control centers; and, the incubation of a new commercial-grade operation and control software tool. Work under this grant certainly supported the DOE-OE goals in the area of “Real Time Grid Reliability Management.”

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A hierarchical framework for aggregating grid-interactive buildings with thermal and battery energy storage

The behind-the-meter (BTM) thermal and battery energy storage can help improve energy efficiency, reduce energy costs, and enhance energy resilience, particularly in rural areas and for disadvantaged communities. Aggregating numerous BTM energy storage systems can act as a price influencer with a significant source of load shifting and peak demand reduction. An integrated and scalable control mechanism is required to effectively utilize energy storage systems and flexible building loads to maximize the economic benefits, considering various distribution system constraints. Here, this paper presents an innovative hierarchical coordination framework for energy storage and flexible load in buildings, considering various factors such as electricity prices, thermal comfort, and distribution system modeling and constraints. At the upper level, a distribution system operator optimizes the power flow to minimize its power procurement costs from the electricity wholesale market, while at the lower level, aggregators determine the optimal dispatch of battery and thermal energy storage systems in multiple buildings on behalf of end-users to minimize operating costs according to the power prices. These problems are solved using a game-theoretic approach through negotiations between the distribution system operator and aggregators as a bi-level decision model. Simulation case studies have been performed for a test distribution network with a number of building end-users using energy storage systems to quantify the performance of aggregators. The results demonstrate that the proposed strategy can reduce peak load for a reliable electricity distribution network while saving electricity bills for customers.

25 ENERGY STORAGE↗

Real-time Distribution Simulation and Application Development for Power Systems Education

To help bridge the gap between traditional power system engineering instruction and emerging industry needs, a new set of classroom and research tools are needed. Real-time simulation tools emulating power system control room software present an opportunity to introduce students to the array of operational considerations, technical challenges, and decision-making associated with power system operations. The GridAPPS-D platform is proposed to support coursework and academic research as it provides an open-source platform for simulation, application development, and software integration. The GridAPPS-D platform, simulation capabilities, development environment, and interactive training are discussed in the context of lessons-learned from implementation for undergraduate and graduate students in the US and India. A series of potential GridAPPS-D supported academic capabilities are introduced.

Active distribution networks, open educational res↗

Power system

A power system includes a prime mover, a transmission, and a fluid coupler having a selectively engageable lockup clutch. The fluid coupler may be drivingly connected between the prime mover and the transmission. Additionally, the power system may include a motor/generator drivingly connected to at least one of the prime mover and the transmission. The power-system may also include power-system controls configured to execute a control method. The control method may include selecting one of a plurality of modes of operation of the power system. Additionally, the control method may include controlling the operating state of the lockup clutch dependent upon the mode of operation selected. The control method may also include controlling the operating state of the motor/generator dependent upon the mode of operation selected.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Citadels Final Report (GMLC 2.2.1: Citadels)

This is the final project report for the Grid Modernization Laboratory Consortium (GMLC) Resilient Distribution System (RDS) Citadels project. The primary goal of this GMLC project was to increase the operational flexibly of power systems by engaging microgrids distributedly, coordinated using consensus algorithms. The primary goal was successfully achieved. The primary goal was divided into three areas: Implement peer-to-peer control between microgrid controllers using the Open Field Message Bus (OpenFMB) approach; Develop and implement consensus algorithms on commercially available hardware that allows a group of microgrids to distributedly implement operational controls; Develop the architectures and controls to enable groups of microgrids to coordinate their operations to support the bulk power system during abnormal events, and end-use loads in the event the bulk power systems fail.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Integrating Variable Renewable Energy - Russia

To foster sustainable, low-emission development, many countries are establishing ambitious renewable energy targets for their electricity supply. Because solar and wind tend to be more variable and uncertain than conventional sources, meeting these targets will involve changes to power system planning and operations. Grid integration is the practice of developing efficient ways to deliver variable renewable energy (VRE) to the grid. Good integration methods maximize the cost-effectiveness of incorporating VRE into the power system while maintaining or increasing system stability and reliability. When considering grid integration, policy makers, regulators, and system operators consider a variety of issues, which can be organized into four broad topics: New Renewable Energy Generation, New Transmission, Increased System Flexibility, Planning for a High RE Future. This is a Russian-language translation of Integrating Variable Renewable Energy into the Grid: Key Issues, Greening the Grid, originally published in English in May 2015.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Identifying and Characterizing Non-Convexities in the Feasible Spaces of Optimal Power Flow Problems

Optimal power flow (OPF) is an important problem in the operation of electric power systems. The solution to an OPF problem provides a minimum cost operating point that satisfies constraints imposed by both the non-linear power flow equations and engineering limits. These constraints can yield non-convex feasible spaces that result in significant computational challenges. This brief proposes an algorithm that identifies and characterizes non-convexities in OPF feasible spaces. This algorithm searches for a pair of feasible points whose connecting line segment contains an infeasible point. Such points certify the existence of a non-convexity in the OPF feasible space. Moreover, the constraint violations at the infeasible point along the connecting line segment physically characterize a cause of the non-convexity. Numerical demonstrations include a small illustrative example as well as applications to various test cases.

Molzahn, Daniel K.↗

Emergency Voltage Regulation in Power Systems via Ripple-Type Control

With increasing penetrations of volatile renewable generation and cyber-physical disruptions, ensuring the safe operation of bulk power systems has become unprecedentedly challenging. Because communication and computational costs restrict centralized system dispatch to being called upon every few minutes, and because purely local schemes are shown to be insufficient, distributed controls have been advocated for handling unanticipated system conditions in real time. The applicability of distributed control schemes, however, is fundamentally limited by their need for widespread communication and model cognizance. In this context, we put forth a hybrid, low-communication, saturation-driven protocol for the coordination of control agents that are distributed over a physical system and are allowed to communicate with peers over a "hotline" communication network. Under this protocol, when agents observe a constraint violation based on local measurements, they respond locally until their control resources saturate, in which case they send a beacon for assistance to peer agents. The scheme ensures that minor violations are efficiently mitigated via fast local controls, whereas severe violations can be handled by collaboration among a relatively small set of agents. We evaluate the performance of this scheme via numerical tests on the IEEE 14-bus test feeder, where agents act upon noisy measurements under diverse scenarios of load variations and severe low-/high-voltage events.

collaboration↗

Emergency Voltage Regulation in Power Systems via Ripple-Type Control: Preprint

With increasing penetration of volatile renewable generation and cyber-physical disruptions, ensuring safe operation of bulk power systems has become unprecedentedly challenging. Since communication and computational costs restrict centralized system dispatch to be called upon every few minutes; and purely local schemes are shown to be insufficient, distributed controls have been advocated for handling unanticipated system conditions in real time. However, the applicability of distributed control schemes is fundamentally limited by their need for widespread communication and model cognizance. In this con-text, we put forth a hybrid low-communication saturation-driven protocol for the coordination of control agents that are distributed over a physical system and are allowed to communicate with peers over a ‘hotline’ communication network. Under this protocol, when agents observe a constraint violation based on local measurements, they respond locally until their control resources saturate, in which case they send a beacon for assistance to peer agents. The scheme ensures that minor violations are efficiently mitigated via fast local controls, while severe violations may be handled by a collaboration of a relatively small set of agents. We evaluate the performance of this scheme via extensive numerical tests on the IEEE 14-bus test feeder, where agents act upon noisy measurements under diverse scenarios of random load variations and severe low/high voltage events.

distributed control↗

Direct FuelCell/Turbine Power Plant

This report summarizes the progress made in development of Direct FuelCell/Turbine (DFC/T{reg_sign}) power plants for generation of clean power at very high efficiencies. The DFC/T system employs an indirectly heated Turbine Generator to supplement fuel cell generated power. The concept extends the high efficiency of the fuel cell by utilizing the fuel cell's byproduct heat in a Brayton cycle. Features of the DFC/T system include: electrical efficiencies of up to 75% on natural gas, minimal emissions, reduced carbon dioxide release to the environment, simplicity in design, direct reforming internal to the fuel cell, and potential cost competitiveness with existing combined cycle power plants. Proof-of-concept tests using a sub-MW-class DFC/T power plant at FuelCell Energy's (FCE) Danbury facility were conducted to validate the feasibility of the concept and to measure its potential for electric power production. A 400 kW-class power plant test facility was designed and retrofitted to conduct the tests. The initial series of tests involved integration of a full-size (250 kW) Direct FuelCell stack with a 30 kW Capstone microturbine. The operational aspects of the hybrid system in relation to the integration of the microturbine with the fuel cell, process flow and thermal balances, and control strategies for power cycling of the system, were investigated. A subsequent series of tests included operation of the sub-MW Direct FuelCell/Turbine power plant with a Capstone C60 microturbine. The C60 microturbine extended the range of operation of the hybrid power plant to higher current densities (higher power) than achieved in initial tests using the 30kW microturbine. The proof-of-concept test results confirmed the stability and controllability of operating a fullsize (250 kW) fuel cell stack in combination with a microturbine. Thermal management of the system was confirmed and power plant operation, using the microturbine as the only source of fresh air supply to the system, was demonstrated. System analyses of 40 MW DFC/T hybrid systems, approaching 75% efficiency on natural gas, were carried out using CHEMCAD simulation software. The analyses included systems for near-term and long-term deployment. A new concept was developed that was based on clusters of one-MW fuel cell modules as the building blocks. The preliminary design of a 40 MW power plant, including the key equipment layout and the site plan, was completed. The process information and operational data from the proof-of-concept tests were used in the design of 40 MW high efficiency DFC/T power plants. A preliminary cost estimate for the 40 MW DFC/T plant was also prepared. Pilot-scale tests of the cascaded fuel cell concept for achieving high fuel utilizations were conducted. The tests demonstrated that the concept has the potential to offer higher power plant efficiency. Alternate stack flow geometries for increased power output and fuel utilization capabilities were also evaluated. Detailed design of the packaged sub-MW DFC/T Alpha Unit was completed, including equipment and piping layouts, instrumentation, electrical, and structural drawings. The lessons learned from the proof-of-concept tests were incorporated in the design of the Alpha Unit. The sub-MW packaged unit was fabricated, including integration of the Direct FuelCell{reg_sign} (DFC{reg_sign}) stack module with the mechanical balance-of-plant and electrical balance-of-plant. Factory acceptance tests of the Alpha DFC/T power plant were conducted at Danbury, CT. The Alpha Unit achieved an unsurpassed electrical efficiency of 58% (LHV natural gas) during the factory tests. The resulting high efficiency in conversion of chemical energy to electricity far exceeded any sub-MW class power generation equipment presently in the market. After successful completion of the factory tests, the unit was shipped to the Billings Clinic in Billings, MT, for field demonstration tests. The DFC/T unit accomplished a major achievement by successfully completing 8000 hours of operation at the Billings site. The Alpha sub-MW DFC/T power plant unit was returned to the factory for post-operation inspection and analysis. The success of the Alpha Unit operation in the field and achievement of the ultra-high efficiency of 58%, triggered the establishment of a MW-scale commercial product design and development program. Design of a 3 MW (nominal rating) DFC/T Power Plant was completed with an electrical efficiency approaching 60+% LHV of natural gas depending on the design and performance of the gas turbine. Development efforts incorporated lessons learned from the Alpha sub-MW DFC/T power plant demonstration, as well as design features from FCE's commercial product offerings, the DFC1500 and DFC3000 MW-class simple cycle power plants. The 3 MW DFC/T power plant is anticipated to be a superb alternative for large distributed generation applications in locations with high cost-of-electricity.

03 NATURAL GAS↗

Jettisoning system for a parachute's canister

Three-point automatically released suspension and jettisoning system operates independently of lander's power system and releases parachute on touchdown. The system is based on a ball-lock device operated by the shock of the parachute's opening and by the subsequent decay in the load on the main cord.

Lonborg, J. O.↗

A Framework to Support the Fusion of Operation and Planning

The management of the nation’s power system has progressed to the point where the boundary lines between operations and planning are becoming blurred. The dynamic behavior of smart grid technologies brings pressures of incorporating the predictive capability from planning to enhance operations. These needs are requiring a smoother, better integrated interplay between the functional roles of planning and operations. This paper presents a framework to support the fusion of operation and planning. A case study of predicting the intra-hour deficiency in generation capability and ramping capacity and presenting the outputs to operators was conducted. The study shows the benefits of the fusion and the effectiveness of the framework. All the function blocks used in the study were built upon GridOPTICS Software System (GOSS), a software system middleware platform that facilitates deployment of new applications for the future power grid.

Framework↗

Life Cycle Water Consumption and Water Resource Assessment for Utility-Scale Geothermal Systems: An In-Depth Analysis of Historical and Forthcoming EGS Projects

This report is the third in a series of reports sponsored by the U.S. Department of Energy Geothermal Technologies Program in which a range of water-related issues surrounding geothermal power production are evaluated. The first report made an initial attempt at quantifying the life cycle fresh water requirements of geothermal power-generating systems and explored operational and environmental concerns related to the geochemical composition of geothermal fluids. The initial analysis of life cycle fresh water consumption of geothermal power-generating systems identified that operational water requirements consumed the vast majority of water across the life cycle. However, it relied upon limited operational water consumption data and did not account for belowground operational losses for enhanced geothermal systems (EGSs). A second report presented an initial assessment of fresh water demand for future growth in utility-scale geothermal power generation. The current analysis builds upon this work to improve life cycle fresh water consumption estimates and incorporates regional water availability into the resource assessment to improve the identification of areas where future growth in geothermal electricity generation may encounter water challenges. This report is divided into nine chapters. Chapter 1 gives the background of the project and its purpose, which is to assess the water consumption of geothermal technologies and identify areas where water availability may present a challenge to utility-scale geothermal development. Water consumption refers to the water that is withdrawn from a resource such as a river, lake, or nongeothermal aquifer that is not returned to that resource. The geothermal electricity generation technologies evaluated in this study include conventional hydrothermal flash and binary systems, as well as EGSs that rely on engineering a productive reservoir where heat exists, but where water availability or permeability may be limited. Chapter 2 describes the approach and methods for this work and identifies the four power plant scenarios evaluated: a 20-MW EGS binary plant, a 50-MW EGS binary plant, a 10-MW hydrothermal binary plant, and a 50-MW hydrothermal flash plant. The methods focus on (1) the collection of data to improve estimation of EGS stimulation volumes, aboveground operational consumption for all geothermal technologies, and belowground operational consumption for EGS; and (2) the mapping of the geothermal and water resources of the western United States to assist in the identification of potential water challenges to geothermal growth. Chapters 3 and 4 present the water requirements for the power plant life cycle. Chapter 3 presents the results of the current data collection effort, and Chapter 4 presents the normalized volume of fresh water consumed at each life cycle stage per lifetime energy output for the power plant scenarios evaluated. Over the life cycle of a geothermal power plant, from construction through 30 years of operation, the majority of water is consumed by plant operations. For the EGS binary scenarios, where dry cooling was assumed, belowground operational water loss is the greatest contributor depending upon the physical and operational conditions of the reservoir. Total life cycle water consumption requirements for air-cooled EGS binary scenarios vary between 0.22 and 1.85 gal/kWh, depending upon the extent of belowground operational water consumption. The air-cooled hydrothermal binary and flash plants experience far less fresh water consumption over the life cycle, at 0.04 gal/kWh. Fresh water requirements associated with air- cooled binary operations are primarily from aboveground water needs, including dust control, maintenance, and domestic use. Although wet-cooled hydrothermal flash systems require water for cooling, these plants generally rely upon the geofluid, fluid from the geothermal reservoir, which typically has high salinity and total dissolved solids concentration and is much warmer than normal groundwater sources, for their cooling water needs; thus, while there is considerable geofluid loss at 2.7 gal/kWh, fresh water consumption during operations is similar to that of aircooled binary systems. Chapter 5 presents the assessment of water demand for future growth in deployment of utility-scale geothermal power generation. The approach combines the life cycle analysis of geothermal water consumption with a geothermal supply curve according to resource type, levelized cost of electricity (LCOE), and potential growth scenarios. A total of 17 growth scenarios were evaluated. In general, the scenarios that assumed lower costs for EGSs as a result of learning and technological improvements resulted in greater geothermal potential, but also significantly greater water demand due to the higher water consumption by EGSs. It was shown, however, that this effect could be largely mitigated if nonpotable water sources were used for belowground operational water demands. The geographical areas that showed the highest water demand for most growth scenarios were southern and northern California, as well as most of Nevada. In addition to water demand by geothermal power production, Chapter 5 includes data on water availability for geothermal development areas. A qualitative analysis is included that identifies some of the basins where the limited availability of water is most likely to affect the development of geothermal resources. The data indicate that water availability is fairly limited, especially under drought conditions, in most of the areas with significant near- and medium-term geothermal potential. Southern California was found to have the greatest potential for water-related challenges with its combination of high geothermal potential and limited water availability. The results of this work are summarized in Chapter 6. Overall, this work highlights the importance of utilizing dry cooling systems for binary and EGS systems and minimizing fresh water consumption throughout the life cycle of geothermal power development. The large resource base for EGSs represents a major opportunity for the geothermal industry; however, depending upon geology, these systems can require large quantities of makeup water due to belowground reservoir losses. Identifying potential sources of compatible degraded or low-quality water for use for makeup injection for EGS and flash systems represents an important opportunity to reduce the impacts of geothermal development on fresh water resources. The importance of identifying alternative water sources for geothermal systems is heightened by the fact that a large fraction of the geothermal resource is located in areas already experiencing water stress. Chapter 7 is a glossary of the technical terms used in the report, and Chapters 8 and 9 provide references and a bibliography, respectively.

15 GEOTHERMAL ENERGY↗

Spinning Reserve From Hotel Load Response: Initial Progress

This project was motivated by the fundamental match between hotel space conditioning load response capability and power system contingency response needs. As power system costs rise and capacity is strained demand response can provide a significant system reliability benefit at a potentially attractive cost. At ORNL s suggestion, Digital Solutions Inc. adapted its hotel air conditioning control technology to supply power system spinning reserve. This energy saving technology is primarily designed to provide the hotel operator with the ability to control individual room temperature set-points based upon occupancy (25% to 50% energy savings based on an earlier study [Kirby and Ally, 2002]). DSI added instantaneous local load shedding capability in response to power system frequency and centrally dispatched load shedding capability in response to power system operator command. The 162 room Music Road Hotel in Pigeon Forge Tennessee agreed to host the spinning reserve test. The Tennessee Valley Authority supplied real-time metering equipment in the form of an internet connected Dranetz-BMI power quality meter and monitoring expertise to record total hotel load during both normal operations and test results. The Sevier County Electric System installed the metering. Preliminary testing showed that hotel load can be curtailed by 22% to 37% depending on the outdoor temperature and the time of day. These results are prior to implementing control over the common area air conditioning loads. Testing was also not at times of highest system or hotel loading. Full response occurred in 12 to 60 seconds from when the system operator s command to shed load was issued. The load drop was very rapid, essentially as fast as the 2 second metering could detect, with all units responding essentially simultaneously. Load restoration was ramped back in over several minutes. The restoration ramp can be adjusted to the power system needs. Frequency response testing was not completed. Initial testing showed that the units respond very quickly. Problems with local power quality generated false low frequency signals which required testing to be stopped. This should not be a problem in actual operation since the frequency trip points will be staggered to generate a droop curve which mimics generator governor response. The actual trip frequencies will also be low enough to avoid power quality problems. The actual trip frequencies are too low to generate test events with sufficient regularity to complete testing in a reasonable amount of time. Frequency response testing will resume once the local power quality problem is fully understood and reasonable test frequency settings can be determined. Overall the preliminary testing was extremely successful. The hotel response capability matches the power system reliability need, being faster than generation response and inherently available when the power system is under the most stress (times of high system and hotel load). Periodic testing is scheduled throughout the winter and spring to characterize hotel response capability under a full range of conditions. More extensive testing will resume when summer outdoor temperatures are again high enough to fully test hotel response.

24 POWER TRANSMISSION AND DISTRIBUTION↗

Experimental Investigation of a Direct-drive Hall Thruster and Solar Array System at Power Levels up to 10 kW

As NASA considers future exploration missions, high-power solar-electric propulsion (SEP) plays a prominent role in achieving many mission goals. Studies of high-power SEP systems (i.e. tens to hundreds of kilowatts) suggest that significant mass savings may be realized by implementing a direct-drive power system, so NASA recently established the National Direct-Drive Testbed to examine technical issues identified by previous investigations. The testbed includes a 12-kW solar array and power control station designed to power single and multiple Hall thrusters over a wide range of voltages and currents. In this paper, single Hall thruster operation directly from solar array output at discharge voltages of 200 to 450 V and discharge powers of 1 to 10 kW is reported. Hall thruster control and operation is shown to be simple and no different than for operation on conventional power supplies. Thruster and power system electrical oscillations were investigated over a large range of operating conditions and with different filter capacitances. Thruster oscillations were the same as for conventional power supplies, did not adversely affect solar array operation, and were independent of filter capacitance from 8 to 80 ?F. Solar array current and voltage oscillations were very small compared to their mean values and showed a modest dependence on capacitor size. No instabilities or anomalous behavior were observed in the thruster or power system at any operating condition investigated, including near and at the array peak power point. Thruster startup using the anode propellant flow as the power 'switch' was shown to be simple and reliable with system transients mitigated by the proper selection of filter capacitance size. Shutdown via cutoff of propellant flow was also demonstrated. A simple electrical circuit model was developed and is shown to have good agreement with the experimental data.

Snyder, John S.↗

Insulation Requirements of High-Voltage Power Systems in Future Spacecraft

The scope, size, and capability of the nation's space-based activities are limited by the level of electrical power available. Long-term projections show that there will be an increasing demand for electrical power in future spacecraft programs. The level of power that can be generated, conditioned, transmitted, and used will have to be considerably increased to satisfy these needs, and increased power levels will require that transmission voltages also be increased to minimize weight and resistive losses. At these projected voltages, power systems will not operate satisfactorily without the proper electrical insulation. Open or encapsulated power supplies are currently used to keep the volume and weight of space power systems low and to protect them from natural and induced environmental hazards. Circuits with open packaging are free to attain the pressure of the outer environment, whereas encapsulated circuits are imbedded in insulating materials, which are usually solids, but could be liquids or gases. Up to now, solid insulation has usually been chosen for space power systems. If the use of solid insulation is continued, when voltages increase, the amount of insulation for encapsulation also will have to increase. This increased insulation will increase weight and reduce system reliability. Therefore, non-solid insulation media must be examined to satisfy future spacecraft power and voltage demands. In this report, we assess the suitability of liquid, space vacuum, and gas insulation for space power systems.