Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “PROBABILISTIC ESTIMATION”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

HAMscope: a snapshot Hyperspectral Autofluorescence Miniscope for real-time molecular imaging

We introduce HAMscope, a compact, snapshot hyperspectral autofluorescence miniscope that enables real-time, label-free molecular imaging in a wide range of biological systems. By integrating a thin polymer diffuser into a widefield miniscope, HAMscope spectrally encodes each frame and employs a probabilistic deep learning framework to reconstruct 30-channel hyperspectral stacks (452-703 nm) or directly infer molecular composition maps from single images. A scalable multi-pass U-Net architecture with transformer-based attention and per pixel uncertainty estimation enables high spatio-spectral fidelity (mean absolute error ∼0.0048) at video rates. While initially demonstrated in plant systems, including lignin, chlorophyll, and suberin imaging in intact poplar and cork tissues, the platform is readily adaptable to other applications such as neural activity mapping, metabolic profiling, and histopathology. We show that the system generalizes to out-of-distribution tissue types and supports direct molecular mapping without the need for spectral unmixing. HAMscope establishes a general framework for compact, uncertainty-aware spectral imaging that combines minimal optics with advanced deep learning, offering broad utility for real-time biochemical imaging across neuroscience, environmental monitoring, and biomedicine.

59 BASIC BIOLOGICAL SCIENCES↗

Constraining the Galactic bar using the M92 stellar stream

Stellar streams are excellent probes of the gravitational potential in which they evolve. In the Milky Way (MW), globular cluster (GC) streams are routinely used to infer properties about time-dependent perturbations of the underlying potential. This implies that streams with Galactocentric radii small enough to be perturbed by the MW bar should offer constraints on it, such as its pattern speed, which currently has a wide range of values reported in the literature and is important when studying stellar kinematics. The GC M92 has a small pericentre and should be affected by the bar. It has a diffuse stellar stream, but confirming stream members has previously been hindered by a lack of spectroscopic data. In this paper, we use Dark Energy Spectroscopic Instrument (DESI) observations together with photometric and astrometric data to obtain spectroscopic members of the M92 stream for the first time. We identify a clear spatial distribution and gradients in distance moduli, proper motions, and radial velocities that confirm the stream's existence. We compare the observed stream to mock streams generated in different barred potentials and estimate the MW bar's pattern speed $Ω= 29.1^{+0.7}_{-0.4}$ km s$^{-1}$ kpc$^{-1}$ and $\dot Ω= 0.7^{+3.5}_{-2.3}$ km s$^{-1}$ kpc$^{-1}$ Gyr$^{-1}$. This is the first time a stellar stream is used to probabilistically infer these bar properties, and it opens up an exciting realm of inner Galactic potential characterisation using stellar streams.

Byström, Amanda [Edinburgh U., Inst. Astron.] (ORC↗

Probabilistic Programming for Transportable Source Characterization and Uncertainty Quantification of the North Korean Nuclear Tests 2006–2017

Here, we introduce a transportable technique to determine the yield and depth of burial (DOB) from seismic source spectra of underground nuclear explosions. We demonstrate this technique on the six declared North Korean nuclear tests. This approach derives source spectra in absolute units from regional phase (Pg) amplitudes by correcting the observations for geometric spreading, attenuation, and site amplification. We couple the source spectra and explosion source models with a probabilistic programming framework that integrates deep learning techniques and Bayesian modeling. This approach permits the exchange of information across various data categories to quantify both the data and model uncertainty. This technique stands out as an innovative use of broad‐area propagation models, making it transportable across various geologic settings. This method proves to be effective in scenarios with diverse and/or limited observational data, even when the source depth is unknown. We present new independent estimates of absolute yield and DOB that are consistent with the prior assessments, underscoring the potential of this method in enhancing transportable nuclear explosion monitoring capabilities.

58 GEOSCIENCES↗

Efficient Probabilistic Visualization of Local Divergence of 2D Vector Fields with Independent Gaussian Uncertainty

This work focuses on visualizing uncertainty of local divergence of two-dimensional vector fields. Divergence is one of the fundamental attributes of fluid flows, as it can help domain scientists analyze potential positions of sources (positive divergence) and sinks (negative divergence) in the flow. However, uncertainty inherent in vector field data can lead to erroneous divergence computations, adversely impacting downstream analysis. While Monte Carlo (MC) sampling is a classical approach for estimating divergence uncertainty, it suffers from slow convergence and poor scalability with increasing data size and sample counts. Thus, we present a two-fold contribution that tackles the challenges of slow convergence and limited scalability of the MC approach. (1) We derive a closed-form approach for highly efficient and accurate uncertainty visualization of local divergence, assuming independently Gaussian-distributed vector uncertainties. (2) We further integrate our approach into Viskores, a platform-portable parallel library, to accelerate uncertainty visualization. In our results, we demonstrate significantly enhanced efficiency and accuracy of our serial analytical (speed-up up to 1946×) and parallel Viskores (speed-up up to 19698×) algorithms over the classical serial MC approach. We also demonstrate qualitative improvements of our probabilistic divergence visualizations over traditional mean-field visualization, which disregards uncertainty. We validate the accuracy and efficiency of our methods on wind forecast and ocean simulation datasets.

Ouermi, Timbwaoga [University of Utah]↗

On the Language of Reliability: A System Engineer Perspective

In its classical definition, risk is defined by three elements: what can go wrong, what are its consequences, and how likely is it to occur? While this definition makes sense in a regulatory-based framework where for the current fleet of operating light water reactors (LWRs), the risks associated with nuclear power plants typically are characterized in terms of core damage and large early release frequency (LERF), this approach does not provide a useful snapshot of the health of the plant from a broader perspective. This is due to the very narrow context in which the term “risk” typically is defined as nuclear safety aspects that have the potential to impact public health. In this paper, we take the viewpoint of nuclear safety that is reflective of the current fleet of operating LWRs for which core damage frequency and LERF are appropriate metrics. For other advanced reactor designs, other more applicable technology neutral metrics of reactor safety metrics would be specified. A possible alternate path would start by redefining the word risk with a broader meaning that better reflects the needs of a system health and asset management decision-making process. Rather than asking how likely an event could occur (in probabilistic terms), we can ask how far this event is from occurring. Our approach starts by defining and quantifying component and system health in terms of a “distance” between its actual and limiting conditions, i.e., determination of the margin that exists between the current state/condition and the state where the component/system is no longer capable of achieving its intended function. A margin is a measure that is more reflective of the current state or performance of a component, and therefore more closely tied to decisions that are made on an ongoing basis. Further, we will show how, given the data available from plant equipment reliability and monitoring (e.g., pump vibration data) and prognostic (e.g., component remaining useful life estimation) data, a margin can be described and determined for all types of maintenance approaches (e.g., corrective or predictive maintenance). We show how classical reliability models (e.g., fault trees) can be used to quantify the system margin provided component margin values. In the approach described in this paper, the propagation of margin values through classical reliability models are not performed using classical probabilistic calculations applied to sets (as performed in a typical plant probabilistic risk assessment). Instead, we show how it is possible to propagate margin values through Boolean logic gates (i.e., AND and OR operators) through distance-based operations.

97 MATHEMATICS AND COMPUTING↗

Markov Decision Processes for Intelligent, Risk-Informed Asset-Management Decision-Making

Advanced nuclear reactors are a promising option for aiding the world in achieving its net-zero carbon emission goals, however, there are significant challenges to attaining and maintaining economic competitiveness with other sources of electricity. To improve the economic competitiveness of advanced reactor designs, a project was initiated to explore the use of Markov Decision Processes (MDPs) to guide asset-management decision-making during advanced reactor operation. MDPs are a powerful tool for optimizing decision-making in complex environments and their application to advanced reactors can aid in planning maintenance and repair activities to minimize downtime and maximize generation. The described approach expands on previous work regarding the use of MDPs for operational decision-making through the direct incorporation of real-time plant information. The integral MDP analysis includes information from online component diagnostic tools and the plant’s real-time generation risk assessment (GRA) and probabilistic risk assessment (PRA), which evaluate plant risk from both an economic and safety perspective. The result is an asset-management optimization framework that is based on real-time data regarding plant component status and the current best-estimate of plant risk. The paper presents an overview of the theoretical framework to incorporate the different information pathways into an integral MDP analysis, along with example analyses.

Grabaskas, David↗

Statistical aspects of carbon fiber risk assessment modeling

The probabilistic and statistical aspects of the carbon fiber risk assessment modeling of fire accidents involving commercial aircraft are examined. Three major sources of uncertainty in the modeling effort are identified. These are: (1) imprecise knowledge in establishing the model; (2) parameter estimation; and (3)Monte Carlo sampling error. All three sources of uncertainty are treated and statistical procedures are utilized and/or developed to control them wherever possible.

Gross, D.↗

Tracking Object Existence From an Autonomous Patrol Vehicle

An autonomous vehicle patrols a large region, during which an algorithm receives measurements of detected potential objects within its sensor range. The goal of the algorithm is to track all objects in the region over time. This problem differs from traditional multi-target tracking scenarios because the region of interest is much larger than the sensor range and relies on the movement of the sensor through this region for coverage. The goal is to know whether anything has changed between visits to the same location. In particular, two kinds of alert conditions must be detected: (1) a previously detected object has disappeared and (2) a new object has appeared in a location already checked. For the time an object is within sensor range, the object can be assumed to remain stationary, changing position only between visits. The problem is difficult because the upstream object detection processing is likely to make many errors, resulting in heavy clutter (false positives) and missed detections (false negatives), and because only noisy, bearings-only measurements are available. This work has three main goals: (1) Associate incoming measurements with known objects or mark them as new objects or false positives, as appropriate. For this, a multiple hypothesis tracker was adapted to this scenario. (2) Localize the objects using multiple bearings-only measurements to provide estimates of global position (e.g., latitude and longitude). A nonlinear Kalman filter extension provides these 2D position estimates using the 1D measurements. (3) Calculate the probability that a suspected object truly exists (in the estimated position), and determine whether alert conditions have been triggered (for new objects or disappeared objects). The concept of a probability of existence was created, and a new Bayesian method for updating this probability at each time step was developed. A probabilistic multiple hypothesis approach is chosen because of its superiority in handling the uncertainty arising from errors in sensors and upstream processes. However, traditional target tracking methods typically assume a stationary detection volume of interest, whereas in this case, one must make adjustments for being able to see only a small portion of the region of interest and understand when an alert situation has occurred. To track object existence inside and outside the vehicle's sensor range, a probability of existence was defined for each hypothesized object, and this value was updated at every time step in a Bayesian manner based on expected characteristics of the sensor and object and whether that object has been detected in the most recent time step. Then, this value feeds into a sequential probability ratio test (SPRT) to determine the status of the object (suspected, confirmed, or deleted). Alerts are sent upon selected status transitions. Additionally, in order to track objects that move in and out of sensor range and update the probability of existence appropriately a variable probability detection has been defined and the hypothesis probability equations have been re-derived to accommodate this change. Unsupervised object tracking is a pervasive issue in automated perception systems. This work could apply to any mobile platform (ground vehicle, sea vessel, air vehicle, or orbiter) that intermittently revisits regions of interest and needs to determine whether anything interesting has changed.

Wolf, Michael↗

ProbabilisticRecalibration of Forecasts

In this work, we present a scheme by which a probabilistic forecasting system whose predictions have a poor probabilistic calibration may be recalibrated through the incorporation of past performance information in order to produce a new forecasting system that is demonstrably superior to the original, inasmuch as one may use it to win wagers consistently against someone who is using the original system. The scheme utilizes Gaussian process (GP) modeling to estimate a probability distribution over the probability integral transform (PIT) of a scalar predictand. The GP density estimate gives closed-form access to information entropy measures that are associated with the estimated distribution, which allows the prediction of winnings in wagers against the base forecasting system. A separate consequence of the procedure is that the recalibrated forecast has a uniform expected PIT distribution. One distinguishing feature of the procedure is that it is appropriate even if the PIT values are not i.i.d. The recalibration scheme is formulated in a framework that exploits the deep connections among information theory, forecasting, and betting. We demonstrate the effectiveness of the scheme in two case studies: a laboratory experiment with a nonlinear circuit and seasonal forecasts of the intensity of the El Nino-Southern Oscillation phenomenon.

54 ENVIRONMENTAL SCIENCES↗

Private Tabular Survey Data Products through Synthetic Microdata Generation

We propose two synthetic microdata approaches to generate private tabular survey data products for public release. We adapt a pseudo posterior mechanism that downweights by-record likelihood contributions with weights ∈[0,1] based on their identification disclosure risks to producing tabular products for survey data. Our method applied to an observed survey database achieves an asymptotic global probabilistic differential privacy guarantee. Our two approaches synthesize the observed sample distribution of the outcome and survey weights, jointly, such that both quantities together possess a privacy guarantee. The privacy-protected outcome and survey weights are used to construct tabular cell estimates (where the cell inclusion indicators are treated as known and public) and associated standard errors to correct for survey sampling bias. Through a real data application to the Survey of Doctorate Recipients public use file and simulation studies motivated by the application, we demonstrate that our two microdata synthesis approaches to construct tabular products provide superior utility preservation as compared to the additive noise approach of the Laplace Mechanism. Moreover, our approaches allow the release of microdata to the public, enabling additional analyses at no extra privacy cost.

Mathematical Methods In Social Sciences↗

An Integrated Framework for Risk Assessment of Safety-related Digital Instrumentation and Control Systems in Nuclear Power Plants: Methodology Refinement and Exploration

This report documents activities performed by Idaho National Laboratory (INL) during Fiscal Year (FY) 2023 for the U.S. Department of Energy (DOE) Light Water Reactor Sustainability (LWRS) Program, Risk Informed Systems Analysis (RISA) Pathway, digital instrumentation and control (DI&C) risk assessment project. In FY 2019, the RISA Pathway initiated a project to develop a risk assessment strategy for delivering a technical basis to support effective, and secure DI&C technologies for digital upgrades/designs. A risk assessment-informed framework was proposed for this strategy, which aims to (1) provide a best-estimate, risk informed capability to quantitatively estimate the safety margin obtained from plant modernization, especially for safety-related DI&C systems, (2) support and supplement existing risk informed DI&C design guides by providing quantitative risk information and evidence, (3) offer a capability of design architecture evaluation of various DI&C systems, (4) assure the long-term safety and reliability of safety-related DI&C systems, and (5) reduce uncertainty in costs and support integration of DI&C systems in the plant. To achieve these technical goals, the LWRS-developed framework provides a means to address relevant technical issues by: (1) defining a risk informed analysis process for DI&C upgrade that integrates hazard analysis, reliability analysis, and consequence analysis, (2) applying risk informed tools to address common cause failures (CCFs) and quantify corresponding failure probabilities for DI&C technologies, particularly software CCFs, (3) evaluating the impact of digital failures at the component level, system level, and plant level, and (4) providing insights and suggestions on designs to manage the risks, thus to support the development and deployment of advanced DI&C technologies in nuclear power plants (NPPs). Adding diversity within a system or components is the primary means to eliminate and mitigate CCFs, but diversity also increases system complexity and may not address all sources of systematic failures. Optimization of diversity and redundancy applications for the safety-critical DI&C systems remains a challenge. To deal with the technical issues in addressing potential software CCFs in safety-related DI&C systems of NPPs and supporting relevant design optimization, the proposed framework provides: (a) A best-estimate, risk informed capability to address new technical digital issues quantitatively, focusing on software CCFs in safety-related DI&C systems of NPPs; (b) A common and a modularized platform for DI&C designers, software developers, cybersecurity analysts, and plant engineers to predict and prevent risk in the early design stage of DI&C systems; (c) Technical bases and risk informed insights to assist users address the risk informed alternatives for evaluation of CCFs in safety-related DI&C systems of NPPs; and (d) A risk informed tool that offers a capability of design architecture evaluation of various DI&C systems to support system design decisions in diversity and redundancy applications. The research and development efforts of this project in FY 2023 are focused on refining current methods on software CCF modeling and estimation and exploring additional innovative approaches to risk assessment of DI&C systems to enable a more comprehensive and complete assessment of various safety-related DI&C design architectures. The primary audience of this report are DI&C designers, engineers, and probabilistic risk assessment (PRA) practitioners. This includes stakeholders, such as the nuclear utilities and regulators who consider the deployment and upgrade of DI&C systems, DI&C software developers and reviewers, and cybersecurity specialists. It should be noted that all the analyses are performed for the demonstration of the methodology, not for the evaluation of an actual digital control system. Results are obtained based on limited design information and testing data.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

The engineering analysis of solar radiation

A necessary precursor to construction of well-designed, efficient, and economically viable solar energy systems is the engineering analysis not only of the systems themselves but also of the solar radiation that will drive them. This paper presents the first steps in such an analysis to support the design of solar thermal power systems. A rationale for development of an integrated approach to this analysis is outlined, and elements of the approach are described. A dynamic computer simulation of a conceptual system was employed in an initial sensitivity analysis to explore how performance estimates might be affected by the precision and amount of detail in solar radiation data used as model input. A measurement program, including instrumentation, used to characterize precisely and in detail the solar resource at one location is described as is a probabilistic model derived from it, for predicting insolation as a function of time.

Reid, M. S.↗

Operations and support cost modeling using Markov chains

Systems for future missions will be selected with life cycle costs (LCC) as a primary evaluation criterion. This reflects the current realization that only systems which are considered affordable will be built in the future due to the national budget constaints. Such an environment calls for innovative cost modeling techniques which address all of the phases a space system goes through during its life cycle, namely: design and development, fabrication, operations and support; and retirement. A significant portion of the LCC for reusable systems are generated during the operations and support phase (OS). Typically, OS costs can account for 60 to 80 percent of the total LCC. Clearly, OS costs are wholly determined or at least strongly influenced by decisions made during the design and development phases of the project. As a result OS costs need to be considered and estimated early in the conceptual phase. To be effective, an OS cost estimating model needs to account for actual instead of ideal processes by associating cost elements with probabilities. One approach that may be suitable for OS cost modeling is the use of the Markov Chain Process. Markov chains are an important method of probabilistic analysis for operations research analysts but they are rarely used for life cycle cost analysis. This research effort evaluates the use of Markov Chains in LCC analysis by developing OS cost model for a hypothetical reusable space transportation vehicle (HSTV) and suggests further uses of the Markov Chain process as a design-aid tool.

Unal, Resit↗

Performance-based earthquake early warning for tall buildings

The ShakeAlert Earthquake Early Warning (EEW) system aims to issue an advance warning to residents on the West Coast of the United States seconds before the ground shaking arrives, if the expected ground shaking exceeds a certain threshold. However, residents in tall buildings may experience much greater motion due to the dynamic response of the buildings. Therefore, there is an ongoing effort to extend ShakeAlert to include the contribution of building response to provide a more accurate estimation of the expected shaking intensity for tall buildings. Currently, the supposedly ideal solution of analyzing detailed finite element models of buildings under predicted ground-motion time histories is not theoretically or practically feasible. The authors have recently investigated existing simple methods to estimate peak floor acceleration (PFA) and determined these simple formulas are not practically suitable. Instead, this article explores another approach by extending the Pacific Earthquake Engineering Research Center (PEER) performance-based earthquake engineering (PBEE) to EEW, considering that every component involved in building response prediction is uncertain in the EEW scenario. Additionally, while this idea is not new and has been proposed by other researchers, it has two shortcomings: (1) the simple beam model used for response prediction is prone to modeling uncertainty, which has not been quantified, and (2) the ground motions used for probabilistic demand models are not suitable for EEW applications. In this article, we address these two issues by incorporating modeling errors into the parameters of the beam model and using a new set of ground motions, respectively. We demonstrate how this approach could practically work using data from a 52-story building in downtown Los Angeles. Using the criteria and thresholds employed by previous researchers, we show that if peak ground acceleration (PGA) is accurately estimated, this approach can predict the expected level of human comfort in tall buildings.

58 GEOSCIENCES↗

ENSEMBLE KALMAN FILTERS FOR RELIABILITY ESTIMATION IN PERFUSION INFERENCE

We consider the solution of inverse problems in dynamic contrast–enhanced imaging by means of ensemble Kalman filters. Our quantity of interest is blood perfusion, i.e., blood flow rates in tissue. While existing approaches to compute blood perfusion parameters for given time series of radiological measurements mainly rely on deterministic, deconvolution–based methods, we aim at recovering probabilistic solution information for given noisy measurements. To this end, we model radiological image capturing as a sequential data assimilation process and solve it by an ensemble Kalman filter. Thereby, we recover deterministic results as an ensemble–based mean and are able to compute reliability information such as probabilities for the perfusion to be in a given range. Our target application is the inference of blood perfusion parameters in the human brain. A numerical study shows promising results for artificial measurements generated by a digital perfusion phantom.

Engineering↗

Ground Heat Flux Reconstruction Using Bayesian Uncertainty Quantification Machinery and Surrogate Modeling

Ground heat flux (G 0 ) is a key component of the land-surface energy balance of high-latitude regions. Despite its crucial role in controlling permafrost degradation due to global warming, G 0 is sparsely measured and not well represented in the outputs of global scale model simulation. In this study, an analytical heat transfer model is tested to reconstruct G 0 across seasons using soil temperature series from field measurements, Global Climate Model, and climate reanalysis outputs. The probability density functions of ground heat flux and of model parameters are inferred using available G 0 data (measured or modeled) for snow-free period as a reference. When observed G 0 is not available, a numerical model is applied using estimates of surface heat flux (dependent on parameters) as the top boundary condition. These estimates (and thus the corresponding parameters) are verified by comparing the distributions of simulated and measured soil temperature at several depths. Aided by state-of-the-art uncertainty quantification methods, the developed G 0 reconstruction approach provides novel means for assessing the probabilistic structure of the ground heat flux for regional permafrost change studies.

54 ENVIRONMENTAL SCIENCES↗

Developing a Methodology for Eliciting Subjective Probability Estimates During Expert Evaluations of Safety Interventions: Application for Bayesian Belief Networks

The NASA Aviation Safety Program (AvSP) has defined several products that will potentially modify airline and/or ATC operations, enhance aircraft systems, and improve the identification of potential hazardous situations within the National Airspace System (NAS). Consequently, there is a need to develop methods for evaluating the potential safety benefit of each of these intervention products so that resources can be effectively invested to produce the judgments to develop Bayesian Belief Networks (BBN's) that model the potential impact that specific interventions may have. Specifically, the present report summarizes methodologies for improving the elicitation of probability estimates during expert evaluations of AvSP products for use in BBN's. The work involved joint efforts between Professor James Luxhoj from Rutgers University and researchers at the University of Illinois. The Rutgers' project to develop BBN's received funding by NASA entitled "Probabilistic Decision Support for Evaluating Technology Insertion and Assessing Aviation Safety System Risk." The proposed project was funded separately but supported the existing Rutgers' program.

Wiegmann, Douglas A.a↗

NE-COST plug-in: Expanding ACCERT's Capabilities for Life-Cycle Cost Modeling

The Algorithm for the Capital Cost Estimation of Reactor Technologies (ACCERT) is a structured methodology and software tool designed to simplify and standardize cost estimation for nuclear reactor technologies [1]. By utilizing a relational database structure and modular cost estimation algorithms, ACCERT delivers a robust, flexible, and scalable framework for evaluating costs across various reactor types and configurations [2]. The recent integration of the NE-COST plugin further expands ACCERT’s scope by introducing detailed life-cycle cost modeling and probabilistic analysis of uncertainties. This addition enables users to evaluate costs across front-end processes such as uranium enrichment and fabrication, as well as back-end activities including waste disposal and geologic storage. Through Monte Carlo statistical cost simulations, the plugin provides probabilistic insights into cost ranges, offering critical decision-making support for stakeholders including reactor developers, policymakers, and researchers.

Zhou, Jia↗