Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Operator learning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

GLOBE Observer Data: 2016-2019

This technical report summarizes the GLOBE Observer dataset from 1 April 2016 to 1 December 2019. GLOBE Observer is an ongoing NASA-sponsored international citizen science project that is part of the larger Global Learning & Observations to Benefit the Environment (GLOBE) Program, which has been in operation since 1995. GLOBE Observer has the greatest number of participants and geographic coverage of the citizen science projects in the Earth Science Division at NASA. Participants use the GLOBE Observer mobile app (launched in 2016) to collect atmospheric, hydrologic, and terrestrial observations. The app connects participants to satellite observations from Aqua, Terra, CALIPSO, and MODIS. 38,000 participants have contributed 320,000 observations worldwide, including 1,000,000 georeferenced photographs. It would take an individual more than 13 years to replicate this effort. The GLOBE Observer app has substantially increased the spatial extent and sampling density of GLOBE measurements and more than doubled the number of measurements collected through the GLOBE Program. GLOBE Observer data are publicly available at observer.globe.gov.

Helen M Amos↗

Attitude control system for the Mars Cube One spacecraft

The paper begins with a discussion of the hardware that was selected for the two systems as well as descriptions of the interface between the attitude control and propulsion systems and the interface between these systems and the rest of the spacecraft’s command and data handling system. Next, the paper summarizes the different types of tests that were performed at the system and spacecraft levels. Test data is included for some of these tests which helped define the methods by which the spacecraft is operated in space. Lastly, the paper lists a series of lessons-learned for developing attitude control and propulsion systems for interplanetary CubeSats.

Krajewski, Joel↗

Robotics Verification and Validation Strategies for Perseverance Rover Sampling and Caching

The Mars 2020 Sampling and Caching Subsystem(SCS) is the most complex robotic system ever fielded on a MarsRover. It includes a 5 degree-of-freedom Robotic Arm, coringdrill, gas Dust Removal Tool, interfaces for two turret-mountedinstruments, and an Adaptive Caching Assembly (ACA). TheACA is itself a complex robotic system, containing hardware tosupport docking and bit exchange, a 3 degree-of-freedomSample Handling Assembly for manipulating sample tubes,storage for several drill bits and sample tubes, and mechanismsto support observing and sealing samples collected by the drill.To successfully verify and validate the SCS hardware andsoftware and its integration with the Mars 2020 flight systemseveral key strategies were employed.The SCS Verification and Validation (V&V) program utilizedmultiple test venues with tiered levels of fidelity. These includedsimulation and visualization software environments, low fidelitydevelopment testbeds, testbeds with high fidelity SCS hardwareand commercial off-the shelf avionics, integrated systemtestbeds with flight-like avionics, and environmental testbedscapable of simulating Martian surface temperature andpressure. Multiple units of each SCS hardware componentmoved fluidly between test venues to accomplish myriadstandalone and coordinated test objectives. Test preparationand executions were performed by a diverse team of engineerswith training and technical ownership tailored for individualexperience and role. Despite significant differences between testvenues, the SCS V&V team established efficient and consistentprocesses and tools for procedure development, test execution,and data review that enabled personnel, as well as technicalproducts such as sequences and parameter configurations, toflow between venues effectively. A series of benchmark testsprovided evidence of performance consistency as elements weretransferred between venues and as system capability evolved.This paper provides an overview of the SCS V&V program andexplores several overarching strategies that enabled successfuloperation in the face of unprecedented complexity. Keyoutcomes of the SCS validation effort are summarized, alongwith lessons learned and beneficial integrations of validationtool and process innovations into Mars surface operations.

Brooks, Sawyer↗

LBFD X-59 Propulsion Overview

The LBFD X-59 Propulsion Overview is prepared in support of a panel session at the 2026 AIAA Aviation Conference. The overview covers highlights of the X-59 propulsion system, a short history of propulsion testing at NASA GRC, A summary of X-59 ground testing, a summary of X-59 flight testing, and finally some lessons learned.

Aerodynamic↗

ISS Payload Operations Training Throughout the COVID-19 Pandemic: Impacts, Opportunities and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station (ISS) were forced to rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, training and certifying flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted during the pandemic. From orientation and introductory classes for new controllers, simulations, and advanced lessons, On the Job Training (OJT) and final evaluations; all aspects faced challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama were forced to become more efficient with trainees and resources to continue supporting ISS payload operations. The pandemic arrived in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100% remote learning. In the short term, this was not a problem. However, instructors discovered lessons they were accustomed to delivering in a classroom environment often did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to Information Technology (IT) restrictions and public internet limitations. With simulations essentially halted, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found efficient techniques to provide realistic training experiences. Communication and coordination with management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper discusses the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

NASA Electronic Library System (NELS): The system impact of security

This paper discusses security issues as they relate to the NASA Electronic Library System which is currently in use as the repository system for AdaNET System Version 3 (ASV3) being operated by MountainNET, Inc. NELS was originally designed to provide for public, development, and secure collections and objects. The secure feature for collections and objects was deferred in the initial system for implementation at a later date. The NELS system is now 9 months old and many lessons have been learned about the use and maintenance of library systems. MountainNET has 9 months of experience in operating the system and gathering feedback from the ASV3 user community. The user community has expressed an interest in seeing security features implemented in the current system. The time has come to take another look at the whole issue of security for the NELS system. Two requirements involving security have been put forth by MountainNET for the ASV3 system. The first is to incorporate at the collection level a security scheme to allow restricted access to collections. This should be invisible to end users and be controlled by librarians. The second is to allow inclusion of applications which can be executed only by a controlled group of users; for example, an application which can be executed by librarians only. The requirements provide a broad framework in which to work. These requirements raise more questions than answers. To explore the impact of these requirements a top down approach will be used.

Mcgregor, Terry L.↗

Lessons Learned from the EMU Fire

In April 1980, a Space Shuttle Extravehicular Mobility Unit (EMU) was destroyed in a flash fire during a functional test in the Johnson Space Center's crew systems laboratory. During this lecture, retired Exploration Portable Life Support System (xPLSS) Operations Manager Joseph T. Nowetner Jr. discussed what happened to cause this failure, what safety message resulted from it, lessons learned from these mistakes, and how to leverage earned knowledge.

Joseph T Nowetner↗

Learning a trajectory using adjoint functions and teacher forcing

A new methodology for faster supervised temporal learning in nonlinear neural networks is presented which builds upon the concept of adjoint operators to allow fast computation of the gradients of an error functional with respect to all parameters of the neural architecture, and exploits the concept of teacher forcing to incorporate information on the desired output into the activation dynamics. The importance of the initial or final time conditions for the adjoint equations is discussed. A new algorithm is presented in which the adjoint equations are solved simultaneously (i.e., forward in time) with the activation dynamics of the neural network. We also indicate how teacher forcing can be modulated in time as learning proceeds. The results obtained show that the learning time is reduced by one to two orders of magnitude with respect to previously published results, while trajectory tracking is significantly improved. The proposed methodology makes hardware implementation of temporal learning attractive for real-time applications.

Toomarian, Nikzad B.↗

Reliability and Maintainability Engineering - A Major Driver for Safety and Affordability

The United States National Aeronautics and Space Administration (NASA) is in the midst of an effort to design and build a safe and affordable heavy lift vehicle to go to the moon and beyond. To achieve that, NASA is seeking more innovative and efficient approaches to reduce cost while maintaining an acceptable level of safety and mission success. One area that has the potential to contribute significantly to achieving NASA safety and affordability goals is Reliability and Maintainability (R&M) engineering. Inadequate reliability or failure of critical safety items may directly jeopardize the safety of the user(s) and result in a loss of life. Inadequate reliability of equipment may directly jeopardize mission success. Systems designed to be more reliable (fewer failures) and maintainable (fewer resources needed) can lower the total life cycle cost. The Department of Defense (DOD) and industry experience has shown that optimized and adequate levels of R&M are critical for achieving a high level of safety and mission success, and low sustainment cost. Also, lessons learned from the Space Shuttle program clearly demonstrated the importance of R&M engineering in designing and operating safe and affordable launch systems. The Challenger and Columbia accidents are examples of the severe impact of design unreliability and process induced failures on system safety and mission success. These accidents demonstrated the criticality of reliability engineering in understanding component failure mechanisms and integrated system failures across the system elements interfaces. Experience from the shuttle program also shows that insufficient Reliability, Maintainability, and Supportability (RMS) engineering analyses upfront in the design phase can significantly increase the sustainment cost and, thereby, the total life cycle cost. Emphasis on RMS during the design phase is critical for identifying the design features and characteristics needed for time efficient processing, improved operational availability, and optimized maintenance and logistic support infrastructure. This paper discusses the role of R&M in a program acquisition phase and the potential impact of R&M on safety, mission success, operational availability, and affordability. This includes discussion of the R&M elements that need to be addressed and the R&M analyses that need to be performed in order to support a safe and affordable system design. The paper also provides some lessons learned from the Space Shuttle program on the impact of R&M on safety and affordability.

Safie, Fayssal M.↗

Logistics: An integral part of cost efficient space operations

The logistics of space programs and its history within NASA are discussed, with emphasis on manned space flight and the Space Shuttle program. The lessons learned and the experience gained during these programs are reported on. Key elements of logistics are highlighted, and the problems and issues that can be expected to arise in relation to the support of long-term space operations and future space programs, are discussed. Such missions include the International Space Station program and the reusable launch vehicle. Possible solutions to the problems identified are outlined.

Montgomery, Ann D.↗

Lessons Learned and Technical Standards: A Logical Marriage for Future Space Systems Design

A comprehensive database of engineering lessons learned that corresponds with relevant technical standards will be a valuable asset to those engaged in studies on future space vehicle developments, especially for structures, materials, propulsion, control, operations and associated elements. In addition, this will enable the capturing of technology developments applicable to the design, development, and operation of future space vehicles as planned in the Space Launch Initiative. Using the time-honored tradition of passing on lessons learned while utilizing the newest information technology, NASA has launched an intensive effort to link lessons learned acquired through various Internet databases with applicable technical standards. This paper will discuss the importance of lessons learned, the difficulty in finding relevant lessons learned while engaged in a space vehicle development, and the new NASA effort to relate them to technical standards that can help alleviate this difficulty.

Gill, Paul S.↗

Achieving the Proper Balance Between Crew and Public Safety

A paramount objective of all human-rated launch and reentry vehicle developers is to ensure that the risks to both the crew onboard and the public are minimized within reasonable cost, schedule, and technical constraints. Past experience has shown that proper attention to range safety requirements necessary to ensure public safety must be given early in the design phase to avoid additional operational complexities or threats to the safety of people onboard. This paper will outline the policy considerations, technical issues, and operational impacts regarding launch and reentry vehicle failure scenarios where crew and public safety are intertwined and thus addressed optimally in an integrated manner. Historical examples and lessons learned from both the Space Shuttle and Constellation Programs will be presented. Using these examples as context, the paper will discuss some operational, design, and analysis approaches to mitigate and balance the risks to people onboard and in the public. Manned vehicle perspectives from the FAA and Air Force organizations that oversee public safety will also be summarized. Finally, the paper will emphasize the need to factor policy, operational, and analysis considerations into the early design trades of new vehicles to help ensure that both crew and public safety are maximized to the greatest extent possible.

Gowan, John↗

ISS Payload Operations Training During the COVID-19 Pandemic: Impacts and Solutions

The onset of the COVID-19 pandemic brought a dramatic and rapid transformation to almost every aspect of humanity in 2020. The world’s space agencies and their missions were not immune to the wide-sweeping changes. One discipline principally affected was mission operations and the various groups supporting that function. Mission support teams, especially for complex and crewed missions like the International Space Station were forced to rapidly rethink how and where control center staff performed their vital work. Operations training – an essential element to mission ops, had unique hurdles to overcome. Operations training is responsible for preparing astronaut crews for their missions, providing training to flight controllers, as well as ensuring that new team members are ready to join their colleagues. Every element of training was impacted by COVID restrictions. From orientation and introductory classes for new controllers, simulations and advanced lessons, On the Job Training and final evaluations; all aspects faced new challenges. Trainers at NASA’s Marshall Space Flight Center in Huntsville, Alabama, were forced to become more efficient with trainees and resources to continue supporting payload operations. The pandemic started in the USA in March 2020. Immediately, NASA mandated that the support for ISS real-time operations was critical. As a result, physical access to key facilities was restricted. Trainers and trainees had to quickly shift to 100 percent remote learning. In the short term, this was not a problem. However, instructors discovered lessons that they were accustomed to delivering in a classroom environment did not translate to remote teaching. Another hurdle to operations training was the mandate that all simulations could only be held remotely. The logistics of even small simulations proved to be challenging due to IT restrictions and public internet limitations. With simulations essentially stopped, as well as the restrictions on most OJT, trainees were essentially stopped in their advancement towards certification. Once limitations were identified, trainers prioritized new options. Transitioning to all electronic learning materials was a relatively easy fix. Teaching to large groups took additional shifts in the training paradigm. Methods for preparing astronauts for their missions were revised. Simulation supervisors found more efficient techniques to provide realistic training experience. Communication and approvals from management was essential. In every case, the payload operations instructors found novel solutions to all functions listed. This paper will discuss the factors and solutions payloads operations trainers found to keep scientific research on the ISS flying forward to mission success.

ISS↗

Application of Agile for Systems Engineering, Project Management and Modeling and Lessons Learned

The Systems Engineering team within the Human Research Program (HRP) Exploration Medical Capability (ExMC) Element has been transforming its development processes to be more efficient, robust,and responsive to change and to its stakeholders. To these ends, the Systems Engineering team trialed the integration of agile development techniques into existing and new processes. Agile development methods are well understood within the software development community. Outside ofsoftware development, however, how non-software project management (PM) and systems engineering (SE) teams implement agile development techniques is less well understood. In its transformation efforts, the ExMC SE team focused on three main areas: Improving the project communications among subsystem teams and stakeholders by adopting a scrum-like process, Changing the status and reporting mechanisms to improve schedule coordination between the subsystem team, SE leadership, and ExMC Element leadership, and Unifying the model-based SE workflow to improve understanding of Concepts of Operations across projects.This presentation highlights several of these transformations and what the SE team learned while undergoing the transformation.

S Lumpkins↗

Space Mission Operations Ground Systems Integration Customer Service

The facility, which is now the Huntsville Operations Support Center (HOSC) at Marshall Space Flight Center in Huntsville, AL, has provided continuous space mission and related services for the space industry since 1961, from Mercury Redstone through the International Space Station (ISS). Throughout the long history of the facility and mission support teams, the HOSC has developed a stellar customer support and service process. In this era, of cost cutting, and providing more capability and results with fewer resources, space missions are looking for the most efficient way to accomplish their objectives. One of the first services provided by the facility was fax transmission of documents to, then, Cape Canaveral in Florida. The headline in the Marshall Star, the newspaper for the newly formed Marshall Space Flight Center, read "Exact copies of Documents sent to Cape in 4 minutes." The customer was Dr. Wernher von Braun. Currently at the HOSC we are supporting, or have recently supported, missions ranging from simple ISS payloads requiring little more than "bentpipe" telemetry access, to a low cost free-flyer Fast, Affordable, Science and Technology Satellite (FASTSAT), to a full service ISS payload Alpha Magnetic Spectrometer 2 (AMS2) supporting 24/7 operations at three operations centers around the world with an investment of over 2 billion dollars. The HOSC has more need and desire than ever to provide fast and efficient customer service to support these missions. Here we will outline how our customer-centric service approach reduces the cost of providing services, makes it faster and easier than ever for new customers to get started with HOSC services, and show what the future holds for our space mission operations customers. We will discuss our philosophy concerning our responsibility and accessibility to a mission customer as well as how we deal with the following issues: initial contact with a customer, reducing customer cost, changing regulations and security, and cultural differences, to ensure an efficient response to customer issues using a small Customer Service Team (CST) and adaptability, constant communication with customers, technical expertise and knowledge of services, and dedication to customer service. The HOSC Customer Support Team has implemented a variety of processes, and procedures that help to mitigate the potential problems that arise when integrating ground system services for a variety of complex missions and the lessons learned from this experience will lead the future of customer service in the space operations industry.

Roth, Karl↗

Lessons learned: DC-X

The DC-X was conceived and developed specifically to lay the ground work for significantly lowering the cost of space operations. The system design was based on an initial set of program goals and a finite, limited set of resources. The goal in its simplest terms was to demonstrate vertical landing after rotation of the vehicle from a nose-first to an engines-first altitude. Finite resources actually drove the selection of a robust design to reduce fabrication and preflight testing costs. The result was a system with a large amount of flexibility which allowed expansion of the test goals as the system, and test program, evolved. The use of the vehicle flight computer interfacing with the ground control system for flight crew training was also not an initial concept. However, by defining an architecture for the system control modes which allowed additions and modifications as learning progressed, the 6 DOF codes used for flight controls software development were transported to the operating system to be used in a simulated flight mode. Flight data reduction was also greatly improved as the program progressed, and the data needs and presentation were refined. The software, avionics hardware, and the FOCC system development proceeded ahead of the vehicle, primarily because most of the hardware elements were existing at the outset of the program. The Built-in-Test (BIT) for avionics and propulsion systems were adequate. Particularly the flight readiness system which verified the vehicle health after engine start and before throttle-up for flight.

Steinmeyer, D. A.↗

Spitzer Pre Launch Mission Operations System - The Road to Launch

Spitzer Space Telescope was launched on 25 August 2003 into an Earth-trailing solar orbit to acquire infrared observations from space. Development of the Mission Operations System (MOS) portion prior to launch was very different from planetary missions from the stand point that the MOS teams and Ground Data System had to be ready to support all aspects of the mission at launch (i.e., no cruise period for finalizing the implementation). For Spitzer, all mission-critical events post launch happen in hours or days rather than months or years, as is traditional with deep space missions. At the end of 2000 the Project was dealt a major blow when the Mission Operations System (MOS) had an unsuccessful Critical Design Review (CDR). The project made major changes at the beginning of 2001 in an effort to get the MOS (and Project) back on track. The result for the Spitzer Space Telescope was a successful launch of the observatory followed by an extremely successful In Orbit Checkout (IOC) and operations phase. This paper describes how the project was able to recover the MOS to a successful Delta (CDR) by mid 2001, and what changes in philosophies, experiences, and lessons learned followed. It describes how projects must invest early or else invest heavily later in the development phase to achieve a successful operations phase.

observatory↗

Topic Modeling of NASA Space System Problem Reports: Research in Practice

Problem reports at NASA are similar to bug reports: they capture defects found during test, post-launch operational anomalies, and document the investigation and corrective action of the issue. These artifacts are a rich source of lessons learned for NASA, but are expensive to analyze since problem reports are comprised primarily of natural language text. We apply topic modeling to a corpus of NASA problem reports to extract trends in testing and operational failures. We collected 16,669 problem reports from six NASA space flight missions and applied Latent Dirichlet Allocation topic modeling to the document corpus. We analyze the most popular topics within and across missions, and how popular topics changed over the lifetime of a mission. We find that hardware material and flight software issues are common during the integration and testing phase, while ground station software and equipment issues are more common during the operations phase. We identify a number of challenges in topic modeling for trend analysis: 1) that the process of selecting the topic modeling parameters lacks definitive guidance, 2) defining semantically-meaningful topic labels requires nontrivial effort and domain expertise, 3) topic models derived from the combined corpus of the six missions were biased toward the larger missions, and 4) topics must be semantically distinct as well as cohesive to be useful. Nonetheless,topic modeling can identify problem themes within missions and across mission lifetimes, providing useful feedback to engineers and project managers.

Data Mining↗