Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Mission Control”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Artemis II Mission Performance of the Orion Active Thermal Control System

The Orion spacecraft has recently completed Artemis II, the first crewed mission around the moon in 54 years. This test flight demonstrated vehicle capability as the foundation for all future missions under the Artemis program. As a major system of Orion, the Active Thermal Control System (ATCS) successfully managed crew and vehicle heat loads to provide adequate cooling and thermal comfort for the duration of the Artemis II mission. Thermal control on the Orion vehicle is managed through two redundant cooling loops in the Crew Module (CM) that absorb heat loads from the cabin and Air Revitalization System (ARS) heat exchangers, the Liquid Cooling Garment (LCG) heat exchanger, and the avionics cold plates, and then transfer those heat loads to the Service Module (SM) radiator loops and/or the Phase Change Material (PCM) and ammonia boilers when required through thermal configuration or mission phase. During Artemis II, Orion did not necessitate any supplemental cooling from ammonia boilers until service module separation, allowing the maximum availability of ammonia cooling prior to entry. This presentation will provide an overview of the Orion ATCS major subsystems, highlight the performance during key mission phases, and comment on the applicability of the observed thermal response to future Artemis missions.

Ellie Thurston↗

Orbit Control Operations for the Cassini-Huygens Mission

The Cassini-Huygens spacecraft was launched in 1997 as an international and collaborative mission to study Saturn and its many moons. After a seven-year cruise, Cassini began orbiting Saturn for a four- year tour. This tour consists of 157 planned maneuvers, and their back-up locations, designed to target 52 encounters, mostly of Saturn's largest moon Titan. One of the mission's first activities was to release the Huygens probe to Titan in December 2004. Currently in its last year of the prime mission, Cassini-Huygens continues to obtain valuable data on Saturn, Titan, and Saturn's other satellites. Return of this information is in large part due to a healthy spacecraft and successful navigation. A two-year extended mission, beginning July 2008, will offer the opportunity to continue science activities. With a demanding navigation schedule that compares with the prime tour, the Cassini Navigation team relies on operations procedures developed during the prime mission to carry-out the extended mission objectives. Current processes for orbit control operations evolved from the primary navigational requirement of staying close to predetermined targeting conditions according to Cassini science sequence planning. The reference trajectory is comprised of flyby conditions to be accomplished at minimal propellant cost. Control of the planned reference trajectory orbit, and any trajectory updates, is achieved with the execution of Orbit Trim Maneuvers (OTMs). The procedures for designing, processing, and analyzing OTMs during Cassini operations is presented. First, a brief overview of the Cassini-Huygens Mission is given, followed by a general description of navigation. Orbit control and maneuver execution methods are defined, along with an outline of the orbit control staffing and operations philosophy. Finally, an example schedule of orbit control operations is shown.

navigation↗

The attitude control of a solar electric propulsion /SEP/ spacecraft for an out-of-the-ecliptic mission

A computer-controlled attitude and articulation control system is proposed for a spacecraft of extremely soft structure that uses two 8-kW solar arrays with an area of nearly 100 sq m each to power six electric propulsion thrusters. The purpose of the articulation control is to point the scientific instruments, to orient the antenna toward the earth, and to reorient the thrust vector as required for trajectory control. The attitude control system provides control both during the low-thrust phase of the mission and during long-term spinning modes.

Marsh, E. L.↗

Real-time optimal guidance for orbital maneuvering.

A new formulation for soft-constraint trajectory optimization is presented as a real-time optimal feedback guidance method for multiburn orbital maneuvers. Control is always chosen to minimize burn time plus a quadratic penalty for end condition errors, weighted so that early in the mission (when controllability is greatest) terminal errors are held negligible. Eventually, as controllability diminishes, the method partially relaxes but effectively still compensates perturbations in whatever subspace remains controllable. Although the soft-constraint concept is well-known in optimal control, the present formulation is novel in addressing the loss of controllability inherent in multiple burn orbital maneuvers. Moreover the necessary conditions usually obtained from a Bolza formulation are modified in this case so that the fully hard constraint formulation is a numerically well behaved subcase. As a result convergence properties have been greatly improved.

Cohen, A. O.↗

A Mars Rover Mission Simulation on Kilauea Volcano

A field experiment to simulate a rover mission on Mars was performed using the Russian Marsokhod rover deployed on Kilauea Volcano HI in February, 1995. A Russian Marsokhod rover chassis was equipped with American avionics equipment, stereo cameras on a pan and tilt platform, a digital high resolution body-mounted camera, and a manipulator arm on which was mounted a camera with a close-up lens. The six wheeled rover is 2 meters long and has a mass of 120 kg. The imaging system was designed to simulate that used on the planned "Mars Together" mission. The rover was deployed on Kilauea Volcano HI and operated from NASA Ames by a team of planetary geologists and exobiologists. Two modes of mission operations were simulated for three days each: (1) long time delay, low data bandwidth (simulating a Mars mission), and (2) live video, wide-bandwidth data (allowing active control simulating a Lunar rover mission or a Mars rover mission controlled from on or near the Martian surface). Simulated descent images (aerial photographs) were used to plan traverses to address a detailed set of science questions. The actual route taken was determined by the science team and the traverse path was frequently changed in response to the data acquired and to unforeseen operational issues. Traverses were thereby optimized to efficiently answer scientific questions. During the Mars simulation, the rover traversed a distance of 800 m. Based on the time delay between Earth and Mars, we estimate that the same operation would have taken 30 days to perform on Mars. This paper will describe the mission simulation and make recommendations about incorporating rovers into the Mars surveyor program.

Stoker, Carol↗

Optical Communications Operations Concept for the Artemis II Crewed Mission to the Moon

NASA’s Artemis II mission will fly a human crew of 4 to the Moon aboard the Orion spacecraft for the first time since the Apollo missions. The Orion spacecraft includes an optical communication payload, known on board as “OpCom,” which is part of NASA’s Orion Artemis II Optical Communications (O2O) demonstration. OpCom will be controlled directly from the Mission Control System (MCC) in Houston and will support forward links up to 20 Mbps and return links up to 250 Mbps for at least 1 hour per mission day. It will be used to transfer files and provide real-time video SD and HD video to/from MCC. We describe the OpCom system architecture and operations concept.

optical communications↗

Gravity Probe-B (GP-B) Mission and Tracking, Telemetry and Control Subsystem Overview

The National Aeronautics and Space Administration's (NASA) Marshall Space Flight Center (MSFC) in Huntsville, Alabama will launch the Gravity Probe B (GP-B) space experiment in the Fall of 2002. The GP-B spacecraft was developed to prove Einstein's theory of General Relativity. This paper will provide an overview of the GPB mission and will discuss the design, and test of the spacecraft Tracking, Telemetry and Control (TT&C) subsystem which incorporates NASA's latest generation standard transponder for use with the NASA Tracking and Data Relay Satellite System (TDRSS).

Kennedy, Paul↗

Robust control for large space antennas

A brief description of program objectives and the space based radar application is given. General characteristics of the 100 m diameter reflector spacecraft are described along with the intended mission and associated requirements, and dynamic characteristics relevant to that mission. Preliminary control analyses are carried out for the critical rapid slew and settle maneuver to establish feedback control requirements and fundamental limitations in meeting those requirements with control hardware for a baseline reaction control system (RCS) jet placement assumed for the open loop bang-bang slew limitations. Control moment gyros (CMGs), angular position sensors, and linear translation sensors are placed for feedback control. Control laws are designed for the improved sensor and actuator placement and evaluated for performance and robustness to unstructured model uncertainty. The robustness of the control design is assessed with respect to modal parameter uncertainty. Results of the control designs analyses are summarized, conclusions are drawn, and recommendations made for future studies.

Barrett, M. F.↗

Multi-Objective Hybrid Optimal Control for Multiple-Flyby Interplanetary Mission Design Using Chemical Propulsion

Preliminary design of high-thrust interplanetary missions is a highly complex process. The mission designer must choose discrete parameters such as the number of flybys and the bodies at which those flybys are performed. For some missions, such as surveys of small bodies, the mission designer also contributes to target selection. In addition, real-valued decision variables, such as launch epoch, flight times, maneuver and flyby epochs, and flyby altitudes must be chosen. There are often many thousands of possible trajectories to be evaluated. The customer who commissions a trajectory design is not usually interested in a point solution, but rather the exploration of the trade space of trajectories between several different objective functions. This can be a very expensive process in terms of the number of human analyst hours required. An automated approach is therefore very desirable. This work presents such an approach by posing the impulsive mission design problem as a multiobjective hybrid optimal control problem. The method is demonstrated on several real-world problems.

Trajectory↗

Treatment of Launch Vehicle Flight Control Stability Margin Reductions for Crewed Missions with Emphasis on Slosh Dynamics

NESC’s perspective for crewed spaceflight: Acceptance of flight control gain/phase stability margin reductions from industry standards should be accompanied by an adequately extensive technical treatment, including: •Analyzing the fundamental physics involved, with applicable simulation tool verification (particularly if results are dissimilar among rules of thumb, linear tools, nonlinear analysis, and flight data) •Conducting sensitivity studies in time and frequency domains to analyze effects of possible parameter and system variations •Studying the effects of the consequence of instability associated with offending modes by running stressing cases in time domain •Assessing alternative flight control designs to demonstrate that present design appropriately balances overall vehicle risk (i.e., quantitatively delineate chosen tradeoffs between various stability margins and vehicle performance in the context of risk/consequence) Work presented here represents an example summary of expected engineering work to flight-certify crewed missions with unstable slosh modes and reduced stability margins

Launch Vehicle Flight Control↗

Development of a Simulated Data Set for the SeaWiFS Mission

A realistic simulated data set is essential for mission readiness preparations and can potentially assist in all phases of ground support for a future mission. Such a data set was created for the Sea-viewing Wide Field-of-view Sensor (SeaWiFS), a global ocean color mission due for launch in 1997. This data set incorporates a representation of virtually every known aspect of the flight mission. Thus, it provides a high fidelity data set for testing most phases of the ground system, Including data processing, data transfers, calibration and validation, quality control, and mission operations. The data set is constructed for a seven-day period, March 25-31, 1994. Specific features of the data set: it includes Global Area Coverage (GAC), recorded Local Area Coverage (LAC), and real-time High Resolution Picture Transmission (HRFIT) data for the seven-day period; it includes a realistic orbit which is propagated using a Brouwer-Lyddane model with drag; the data correspond to a command schedule based on the orbit for this seven-day period; it includes total (at-satellite) radiances for ocean, land, clouds, and ice; it utilizes a high-resolution land/sea mask; it includes actual SeaWiFS spectral responses; it includes the actual sensor saturation responses; it is formatted according to current onboard data structures; and it includes corresponding telemetry (instrument and spacecraft) data. The methods are described and some examples of the output are given.

Gregg, Watson W.↗

SPECS: The Submillimeter Probe of the Evolution of Cosmic Structures

The idea for the Submillimeter Probe of the Evolution of Cosmic Structure (SPECS) was investigated through NASA Vision Missions Program. In the course of this study, a compelling need for high spatial-resolution far-infrared/submillimeter observations with high angular resolution (50 milliarcseconds) was identified. In order to achieve these scientific goals, a kilometer-baseline FIR/SMM Michelson stellar interferometer is required, operating in the 40-640 micron range with fully cryogenically cooled optics and photon-limited detectors. There are significant technological challenges to developing this mission, including controllable tethered flight, detector equipment, and large cryogenic mechanisms. We present here a concept for SPECS and discuss some of the relevant technical aspects of the mission.

Rinehart, Stephen↗

Implementation of a Point Algorithm for Real-Time Convex Optimization

The primal-dual interior-point algorithm implemented in G-OPT is a relatively new and efficient way of solving convex optimization problems. Given a prescribed level of accuracy, the convergence to the optimal solution is guaranteed in a predetermined, finite number of iterations. G-OPT Version 1.0 is a flight software implementation written in C. Onboard application of the software enables autonomous, real-time guidance and control that explicitly incorporates mission constraints such as control authority (e.g. maximum thrust limits), hazard avoidance, and fuel limitations. This software can be used in planetary landing missions (Mars pinpoint landing and lunar landing), as well as in proximity operations around small celestial bodies (moons, asteroids, and comets). It also can be used in any spacecraft mission for thrust allocation in six-degrees-of-freedom control.

Acikmese, Behcet↗

Command and control of the Voyager spacecraft

The Voyager Mission was designed to be conducted using reprogrammable onboard computers. This decision was based on the need for highly reliable semi-autonomous operations of the spacecraft and the lengthy two-way communication times envisioned during the mission. Command and control of the spacecraft is effected by the process through which the programs for these computers are developed. While this results in a relatively passive real-time command and control function, provisions exist for intervention to occur in order to modify or augment the programs or respond to spacecraft anomalies.

Adamski, Terrence P.↗

Industrial Protocols for Spacecraft Command and Control

A standard data interface for spacecraft and intelligent spacecraft devices will have a major impact on the cost of building and flying satellites. The Space Messaging Service is a key element in a proposed 'open' standard for Space Project Mission Operations Control Architecture. The rationale for a messaging service is examined. Selection of specifications are discussed. Modifications are proposed.

Spacecraft Ground Systems Command and Control Mess↗

Potential Biofilm Control Strategies for Extended Spaceflight Missions

Biofilms, surface-adherent microbial communities, are associated with microbial fouling and corrosion in terrestrial water-distribution systems. Biofilms are also present in human spaceflight, particularly in the Water Recovery System (WRS) on the International Space Station (ISS). The WRS is comprised of the Urine Processor Assembly (UPA) and the Water Processor Assembly (WPA) which together recycles wastewater from human urine and recovered humidity from the ISS atmosphere. These wastewaters and various process streams are continually inoculated with microorganisms primarily arising from the space crew microbiome. Biofilm-related fouling has been encountered and addressed in spacecraft in low Earth orbit, including ISS and the Russian Mir Space Station. However, planned future missions beyond low Earth orbit to the Moon and Mars present additional challenges, as resupplying spare parts or support materials would be impractical and the mission timeline would be in the order of years in the case of a mission to Mars. In addition, future missions are expected to include a period of dormancy in which the WRS would be unused for an extended duration. The concepts developed in this review arose from a workshop including NASA personnel and representatives with biofilm expertise from a wide range of industrial and academic backgrounds. Here, we address current strategies that are employed on Earth for biofilm control, including antifouling coatings and biocides and mechanisms for mitigating biofilm growth and damage. These ideas are presented in the context of their applicability to spaceflight and identify proposed new topics of biofilm control that need to be addressed in order to facilitate future extended, crewed, spaceflight missions.

Luis Zea↗

SeaWiFS technical report series. Volume 15: The simulated SesWiFS data set, version 2

This document describes the second version of the simulated SeaWiFS data set. A realistic simulated data set is essential for mission readiness preparations and can potentially assist in all phases of ground support for a future mission. The second version improves on the first version primarily through additional realism and complexity. This version incorporates a representation of virtually every aspect of the flight mission. Thus, it provides a high-fidelity data set for testing several aspects of the ground system, including data acquisition, data processing, data transfers, calibration and validation, quality control, and mission operations. The data set is constructed for a seven-day period, 25-31 March 1994. Specific features of the data set include Global Area coverage (GAC), recorded Local Area Coverage (LAC), and realtime High Resolution Picture Transmission (HRPT) data for the seven-day period. A realistic orbit, which is propagated using a Brouwer-Lyddane model with drag, is used to simulate orbit positions. The simulated data corresponds to the command schedule based on the orbit for this seven-day period. It includes total (at-satellite) radiances not only for ocean, but for land, clouds, and ice. The simulation also utilizes a high-resolution land-sea mask. It includes the April 1993 SeaWiFS spectral responses and sensor saturation responses. The simulation is formatted according to July 1993 onboard data structures, which include corresponding telemetry (instrument and spacecraft) data. The methods are described and some examples of the output are given. The instrument response functions made available in April 1993 have been used to produce the Version 2 simulated data. These response functions will change as part of the sensor improvements initiated in July-August 1993.

Hooker, Stanford B.↗