Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MONTE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Development of GPU-based Monte Carlo code for fast CT imaging dose calculation on CUDA Fermi architecture

This paper describes the development of a Graphics Processing Unit (GPU) accelerated Monte Carlo photon transport code, ARCHER{sub GPU}, to perform CT imaging dose calculations with good accuracy and performance. The code simulates interactions of photons with heterogeneous materials. It contains a detailed CT scanner model and a family of patient phantoms. Several techniques are used to optimize the code for the GPU architecture. In the accuracy and performance test, a 142 kg adult male phantom was selected, and the CT scan protocol involved a whole-body axial scan, 20-mm x-ray beam collimation, 120 kVp and a pitch of 1. A total of 9 x 108 photons were simulated and the absorbed doses to 28 radiosensitive organs/tissues were calculated. The average percentage difference of the results obtained by the general-purpose production code MCNPX and ARCHER{sub GPU} was found to be less than 0.38%, indicating an excellent agreement. The total computation time was found to be 8,689, 139 and 56 minutes for MCNPX, ARCHER{sub CPU} (6-core) and ARCHER{sub GPU}, respectively, indicating a decent speedup. Under a recent grant funding from the NIH, the project aims at developing a Monte Carlo code with the capability of sub-minute CT organ dose calculations. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

On-the-fly generation of differential resonance scattering probability distribution functions for Monte Carlo codes

Current Monte Carlo codes use one of three models to model neutron scattering in the epithermal energy range: (1) the asymptotic scattering model, (2) the free gas scattering model, or (3) the S({alpha},{beta}) model, depending on the neutron energy and the specific Monte Carlo code. The free gas scattering model assumes the scattering cross section is constant over the neutron energy range, which is usually a good approximation for light nuclei, but not for heavy nuclei where the scattering cross section may have several resonances in the epithermal region. Several researchers in the field have shown that using the free gas scattering model in the vicinity of the resonances in the lower epithermal range can under-predict resonance absorption due to the up-scattering phenomenon. Existing methods all involve performing the collision analysis in the center-of-mass frame, followed by a conversion back to the laboratory frame. In this paper, we will present a new sampling methodology that (1) accounts for the energy-dependent scattering cross sections in the collision analysis and (2) acts in the laboratory frame, avoiding the conversion to the center-of-mass frame. The energy dependence of the scattering cross section was modeled with even-ordered polynomials to approximate the scattering cross section in Blackshaw's equations for the moments of the differential scattering PDFs. These moments were used to sample the outgoing neutron speed and angle in the laboratory frame on-the-fly during the random walk of the neutron. Results for criticality studies on fuel pin and fuel assembly calculations using these methods showed very close comparison to results using the reference Doppler-broadened rejection correction (DBRC) scheme. (authors)

97 MATHEMATICS AND COMPUTING↗

Improved convergence of Monte Carlo generated multi-group scattering moments

This paper introduces an improved method of obtaining multi-group scattering moments from a Monte Carlo neutron transport code for use in deterministic transport solvers. The new method increases the information obtained from scattering events and therefore has more useful convergence characteristics than the currently used analog techniques. A prototype of the improved method was implemented in the OpenMC Monte Carlo transport code to compare the accuracy and convergence characteristics of the new method. The prototype showed that accuracy was retained (or improved) while increasing the figure-of-merit for the generation of multi-group scattering moments. (authors)

97 MATHEMATICS AND COMPUTING↗

Development and validation of ALEPH2 Monte Carlo burn-up code

The ALEPH2 Monte Carlo depletion code has two principal features that make it a flexible and powerful tool for reactor analysis. First of all, its comprehensive nuclear data library ensures the consistency between steady-state Monte Carlo and deterministic depletion modules. It covers neutron and proton induced reactions, neutron and proton fission product yields, spontaneous fission product yields, radioactive decay data and total recoverable energies per fission. Secondly, ALEPH2 uses an advanced numerical solver for the first order ordinary differential equations describing the isotope balances, namely a Radau IIA implicit Runge-Kutta method. The versatility of the code allows using it for time behavior simulation of various systems ranging from single pin model to full-scale reactor model. The code is extensively used for the neutronics design of the MYRRHA research fast spectrum facility which will operate in both critical and sub-critical modes. The code has been validated on the decay heat data from JOYO experimental fast reactor. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Integrated Cost and Schedule using Monte Carlo Simulation of a CPM Model - 12419

This discussion of the recommended practice (RP) 57R-09 of AACE International defines the integrated analysis of schedule and cost risk to estimate the appropriate level of cost and schedule contingency reserve on projects. The main contribution of this RP is to include the impact of schedule risk on cost risk and hence on the need for cost contingency reserves. Additional benefits include the prioritizing of the risks to cost, some of which are risks to schedule, so that risk mitigation may be conducted in a cost-effective way, scatter diagrams of time-cost pairs for developing joint targets of time and cost, and probabilistic cash flow which shows cash flow at different levels of certainty. Integrating cost and schedule risk into one analysis based on the project schedule loaded with costed resources from the cost estimate provides both: (1) more accurate cost estimates than if the schedule risk were ignored or incorporated only partially, and (2) illustrates the importance of schedule risk to cost risk when the durations of activities using labor-type (time-dependent) resources are risky. Many activities such as detailed engineering, construction or software development are mainly conducted by people who need to be paid even if their work takes longer than scheduled. Level-of-effort resources, such as the project management team, are extreme examples of time-dependent resources, since if the project duration exceeds its planned duration the cost of these resources will increase over their budgeted amount. The integrated cost-schedule risk analysis is based on: - A high quality CPM schedule with logic tight enough so that it will provide the correct dates and critical paths during simulation automatically without manual intervention. - A contingency-free estimate of project costs that is loaded on the activities of the schedule. - Resolves inconsistencies between cost estimate and schedule that often creep into those documents as project execution proceeds. - Good-quality risk data that are usually collected in risk interviews of the project team, management and others knowledgeable in the risk of the project. The risks from the risk register are used as the basis of the risk data in the risk driver method. The risk driver method is based in the fundamental principle that identifiable risks drive overall cost and schedule risk. - A Monte Carlo simulation software program that can simulate schedule risk, burn WM2012 rate risk and time-independent resource risk. The results include the standard histograms and cumulative distributions of possible cost and time results for the project. However, by simulating both cost and time simultaneously we can collect the cost-time pairs of results and hence show the scatter diagram ('football chart') that indicates the joint probability of finishing on time and on budget. Also, we can derive the probabilistic cash flow for comparison with the time-phased project budget. Finally the risks to schedule completion and to cost can be prioritized, say at the P-80 level of confidence, to help focus the risk mitigation efforts. If the cost and schedule estimates including contingency reserves are not acceptable to the project stakeholders the project team should conduct risk mitigation workshops and studies, deciding which risk mitigation actions to take, and re-run the Monte Carlo simulation to determine the possible improvement to the project's objectives. Finally, it is recommended that the contingency reserves of cost and of time, calculated at a level that represents an acceptable degree of certainty and uncertainty for the project stakeholders, be added as a resource-loaded activity to the project schedule for strategic planning purposes. The risk analysis described in this paper is correct only for the current plan, represented by the schedule. The project contingency reserve of time and cost that are the main results of this analysis apply if that plan is to be followed. Of course project managers have the option of re-planning and re-scheduling in the face of new facts, in part by mitigating risk. This analysis identifies the high-priority risks to cost and to schedule, which assist the project manager in planning further risk mitigation. Some project managers reject the results and argue that they cannot possibly be so late or so overrun. Those project managers may be wasting an opportunity to mitigate risk and get a more favorable outcome. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A new cubic phantom for PET/CT dosimetry: Experimental and Monte Carlo characterization

In recent years, positron emission tomography (PET) associated with multidetector computed tomography (MDCT) has become a diagnostic technique widely disseminated to evaluate various malignant tumors and other diseases. However, during PET/CT examinations, the doses of ionizing radiation experienced by the internal organs of patients may be substantial. To study the doses involved in PET/CT procedures, a new cubic phantom of overlapping acrylic plates was developed and characterized. This phantom has a deposit for the placement of the fluorine-18 fluoro-2-deoxy-D-glucose ({sup 18}F-FDG) solution. There are also small holes near the faces for the insertion of optically stimulated luminescence dosimeters (OSLD). The holes for OSLD are positioned at different distances from the {sup 18}F-FDG deposit. The experimental results were obtained in two PET/CT devices operating with different parameters. Differences in the absorbed doses were observed in OSLD measurements due to the non-orthogonal positioning of the detectors inside the phantom. This phantom was also evaluated using Monte Carlo simulations, with the MCNPX code. The phantom and the geometrical characteristics of the equipment were carefully modeled in the MCNPX code, in order to develop a new methodology form comparison of experimental and simulated results, as well as to allow the characterization of PET/CT equipments in Monte Carlo simulations. All results showed good agreement, proving that this new phantom may be applied for these experiments. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Microcanonical Hamiltonian Monte Carlo

We develop Microcanonical Hamiltonian Monte Carlo (MCHMC), a class of models that follow fixed energy Hamiltonian dynamics, in contrast to Hamiltonian Monte Carlo (HMC), which follows canonical distribution with different energy levels. MCHMC tunes the Hamiltonian function such that the marginal of the uniform distribution on the constant-energy-surface over the momentum variables gives the desired target distribution. We show that MCHMC requires occasional energy-conserving billiard-like momentum bounces for ergodicity, analogous to momentum resampling in HMC. We generalize the concept of bounces to a continuous version with partial direction preserving bounces at every step, which gives energy-conserving underdamped Langevin-like dynamics with non-Gaussian noise (MCLMC). MCHMC and MCLMC exhibit favorable scalings with condition number and dimensionality. We develop an efficient hyperparameter tuning scheme that achieves high performance and consistently outperforms NUTS HMC on several standard benchmark problems, in some cases by orders of magnitude.

97 MATHEMATICS AND COMPUTING↗

Design of Removable Shield Modules for Nuclear Plant Applications Using Monte Carlo Modeling - 16264

A new modular shielding system has been designed and developed for nuclear plant applications as a replacement for traditional concrete blocks and plugs. The shield comprises interlocking modules that are custom designed using CAD and Monte Carlo modelling methods. The key benefit of these new modules is that they can be quickly removed and re-installed to allow temporary access to high radiation environments e.g. for maintenance and repair of plant equipment at nuclear power plants or waste handling facilities. The traditional method for construction of these removable concrete blocks and plugs was to cast them in place. Within the aging fleet of commercial reactors, some plants are experiencing concrete degradation of these shield blocks and plugs as well as failure of lifting points. Additionally, the existing plugs are difficult to remove and re-install. The new modular system comprises a rigid steel enclosure filled with lead that can be installed in a fraction of the normal time. This approach can accelerate outage times leading to reduced dose uptake to operators and provide significant long term cost savings. Use of Monte Carlo methods enables the shielding modules to be designed efficiently for neutron and gamma ray attenuation with the minimum necessary thickness of lead and steel. Furthermore, the modelling ensures the design is not compromised by streaming pathways, for example at the overlaps between modules or through internal structural components. Shielding modules were supplied to the Brunswick Nuclear Power station (BNP), operated by Duke Energy, located in southeast United States. These modules have been installed to replace concrete shield plugs that are located on the roof above a Feed Water Heaters (FWH) bay. While specific in application, this project demonstrates that the shield module design concept could be expanded to address vertical block walls routinely found in personnel and equipment access hatches. This approach is applicable to a wide variety of new and existing nuclear facilities and will lead to improved safety and reduced lifetime costs all the way through to future decommissioning and dismantling operations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An assessment of total depletion uncertainties for a GBC-32 dry storage cask with PLUS7 fuels using Monte Carlo sampling and two-way ANOVA F-test

It is important to accurately evaluate depletion uncertainties that exist due to the limitations of a computer code on accuracy in a nuclear depletion calculation for criticality safety analysis. In this work, the bias and bias uncertainty in the effective neutron multiplication factor (k{sub eff}) for the generic 32 PWR-assembly burnup credit (GBC-32) cask system were assessed using the Monte Carlo uncertainty sampling method for three different burnups and the isotopic biases and uncertainties obtained with the calculated and measured isotopic concentrations. The PLUS7 used nuclear fuel assemblies discharged from the Hanbit Nuclear Power Plant Unit 3 were assumed to be loaded into the GBC-32 cask. In addition, the statistical F-test in the two-way analysis of variance (ANOVA) was suggested to efficiently estimate the statistically converged total depletion uncertainty in k{sub eff}, with a significant reduction of computing efforts in the Monte Carlo criticality calculations, and it was applied to the GBC-32 cask system after a sensitivity analysis was performed to select the important nuclides having significant contributions to the total depletion uncertainty. With the statistical F-tests in the two-way ANOVA, 100 criticality calculations were needed to get a statistically converged total depletion uncertainty for 10 and 30 GWD/MTU, while 120 criticality calculations were needed for 50 GWD/MTU. (authors)

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

Multi-node and Multi-core Performance Studies of a Monte Carlo code RMC

Over the past 15 years the architecture of high-performance computing systems has become increasingly heterogeneous with individual computing cores being subdivided into nodes and even auxiliary co-processing units such as graphics processing units or the Intel many integrated core co-processors. In fact, future computer platforms is moving toward a larger number of nodes and cores with lower memory available per node. Today, several production Monte Carlo codes use some types of hybrid parallelism strategy that makes use of shared-memory parallelism within a computing node and message-passing parallelism between nodes, which enables the codes to utilize available computing resources as much as possible, both among and within computing nodes on a cluster. The so-called hybrid parallelization is also possible with Reactor Monte Carlo Code RMC by activating both MPI and OpenMP parallel algorithms together. On HPC' which typically consists of several or several-ten thousand nodes equipping 16-32 computing intra-cores per node, simulation of RMC can be carried out in the hybrid parallelization with the MPI inter-node parallelization and the OpenMP intra-node parallelization. RMC has adopted a hybrid message-passing and shared-memory approach to parallelism, which enables the code to utilize available computing resources, both among and within computing nodes on a cluster. Shared-memory parallelism is especially valuable for large-model simulations because it enables multiple compute cores within a node to share common model information such as the geometry description, material, cross section and tally data, thus reducing the memory usage per processor. The calculation on the Tianhe-2 supercomputer took 6144 cores, resulting in a rate of 173,314,000 neutrons/minute for BEAVRS benchmark. While pin-wise full core H-M benchmark burnup calculations with millions of depletion regions was selected using MPI/OpenMP parallelism, the speed of 6,144 cores reach 1,843,200 burnable regions per minute. Keeping up with the continuing trend for increases in the number of computing resources within modern HPC systems is a significant challenge for teams that develop and maintain high-performance MC radiation transport solvers. order to address this challenge, RMC has adopted a hybrid message-passing and shared-memory approach to parallelism, which enables the code to utilize available computing resources, both among and within computing nodes on a cluster. Shared-memory parallelism is especially valuable for large-model simulations because it enables multiple compute cores within a node to share common model information such as the geometry description, material and composition definitions, and cross section data, thus reducing the memory usage per processor. The parallel performance has been studied by using two complex and representative benchmarks, H-M and BEAVRS benchmark. All simulations were run on Intel Xeon E5-2692 12 core, 2.2 GHz processors at MilkyWay-2 Super Computer with up to 12,288 available computing cores. While employing MPI parallelism, excellent parallel efficiency is achieved even above 12,000 processors and RMC reaches the parallel efficiency of 96% on 12,288 cores for the pin-by-pin computation of the BEAVRS benchmark. While BEAVRS criticality benchmark was selected using MPI/OpenMP parallelism, the speed of 6,144 cores reach 173,314,000 particles per minute. While pin-wise full core H-M benchmark burnup calculations with millions of depletion regions was selected using MPI/OpenMP parallelism, the speed of 6,144 cores reach 1,843,200 burnable regions per minute. Results from these studies demonstrate that RMC, using the hybrid parallel model described in this paper, is able to handle pin-wise full core burnup calculations with millions of depletion regions and scales well through thousands of processors. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Algorithmic Improvements for Portable Event-Based Monte Carlo Transport Using the Nvidia Thrust Library

High performance computing environments are progressively moving towards many-core computing architectures. The Los Alamos National Laboratory Trinity machine, available in late 2016, will use both Intel Xeon Haswell processors and Intel Xeon Phi Knights Landing many integrated core (MIC) coprocessors. The Lawrence Livermore National Laboratory Sierra machine, available in 2018, will use an IBM PowerPC architecture along with Nvidia graphics processing units (GPUs). Applications that must work in this supercomputing environment must continue to adapt in order to take advantage of the diverse hardware architectures that are coming. A significant consideration is not only the performance of the application on a given platform but also the portability of the application to other platforms. The algorithmic improvements presented in this paper build upon recently-reported work on event-based Monte Carlo transport in the ALPSMC code that models particle transport in one-dimensional binary stochastic media. That paper discussed the lack of available vectorization in the traditional history-based algorithm used for Monte Carlo transport and presented a data parallel event-based algorithm implemented using the Nvidia Thrust library for portability. The performance of the data parallel event-based algorithm implemented using Thrust was compared to a native CUDA implementation. The conclusions from that work were that the Thrust library abstraction technique caused too significant a loss in performance but that the event-based method was a viable option that should be further investigated. In this paper, we describe algorithmic improvements to the data parallel event-based algorithm previously presented. We made further algorithmic optimizations to the event-based CUDA implementation, most notably: data structure changes, a new conditional particle removal scheme in the event-based process, and the use of multiple GPUs. In addition to improvements to the algorithm, we re-implemented the Thrust version from the now further optimized CUDA version, giving a greater chance for success at a performant abstraction. Finally, we revisited our previous assumptions about the inability of the history-based method to achieve performance on vector style architectures such as the MICs and GPUs, with surprising and promising results. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Comparison of the Performance of Various Correlated Fission Multiplicity Monte Carlo Codes

When measuring special nuclear material for a large array of national security needs, it is often important to accurately predict outcomes of the physical experiment using Monte Carlo radiation transport codes. Historically, radiation transport codes have uncorrelated fission emissions. In reality, both spontaneous and induced fissions release particles that are correlated in time, energy, and multiplicity. This work investigates the performance of various current Monte Carlo codes that take into account the correlated physics of fission neutrons. Only fission neutrons are of interest and the physics of gamma production in fission is ignored. Because of their large impact on correlated neutron results, underlying fission neutron multiplicity distributions utilized by the different codes are also compared. The codes currently being compared include MCNP{sup R}6, MCNP{sup R}6/FREYA, and MCNPX-PoliMi. By default, MCNP{sup R}6 uses a bounded integer treatment to sample the number of neutrons emitted from each fission event. The FMULT card, an optional input in MCNP that allows for user definition of spontaneous and induced fission parameters, can be utilized to call either built-in or user-specified multiplicities to replace the bounded integer treatment. Similarly, MCNPX-PoliMi utilizes one of a few different built-in multiplicity sets. MCNPX-PoliMi also models the multiplicity dependence of emitted neutron energy in spontaneous fission. It is possible to use an anisotropic model for emitted fission neutrons in MCNPXPoliMi, but this option was not used. For MCNP{sup R}6/FREYA, the FREYA fission event generator determines the number of particles emitted for each fission event and gives the results to MCNP{sup R}6 for transport. The fission event generator uses fission fragment mass and kinetic energy distributions, unbounded statistical evaporation models, and conservation of energy and momentum to generate the number, energy, and direction of neutrons released by each fission event. (authors)

73 NUCLEAR PHYSICS AND RADIATION PHYSICS↗

Spatially Continuous Depletion Algorithm for Monte Carlo Simulations

To correctly predict reactor behavior during cycle operations, the evolution of nuclide number densities throughout the core must be accurately modeled. The time-varying spatial distribution of nuclide number densities is typically resolved by discretizing the Monte Carlo geometry into smaller cells over which number densities are assumed to be spatially invariant. The nuclide number densities in these smaller cells are integrated through time using reaction rate tallies on the same discretized geometry. However, detailed distributions of nuclide number densities in a full three dimensional simulation can require a prohibitive amount of tallies, and the spatial discretization of the base geometry makes coupling to external multi-physics tools difficult. In this paper a method for solving for spatially continuous number density distributions during depletion calculations will be described. The spatially continuous number densities can be used in the transport method proposed by Brown and Martin which allows for transporting neutrons through a material with continuously varying properties such as temperature and nuclide number densities. Coupled with the ability of Functional Expansion Tallies (FETs) to represent tallied quantities as continuous functions, it is possible to both solve for and make use of spatially continuous nuclide number densities. The need for this capability was alluded to by Brown et. al., but no solution has yet been proposed. With a continuous depletion method, recent work which utilized FETs and continuous material tracking to incorporate multi-physics feedback in Monte Carlo simulations can be extended to simulations that include depletion analysis. (authors)

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Dynamic Monte Carlo Transient Analysis with Thermal-Hydraulic Feedback by McCARD/CUPID

The reactor core transient analysis requires neutronics calculations with the thermal-hydraulic (TH) feedback. Recently the dynamic Monte Carlo (DMC) neutron transport algorithm controlling delayed neutron precursors was developed and successfully applied for core transient problems with help of a sub-channel code. In the Seoul National University Monte Carlo (MC) code, McCARD, a DMC scheme for the core transient analysis has been implemented by coupling with a computational fluid dynamics code, CUPID using the TCP/IP socket communication. In the McCARD/CUPID transient calculations, temperature-dependent cross sections are produced by a built-in on-the-fly Doppler broadening (OTF DB) module. This paper presents McCARD/CUPID transient analysis results for a triangular unit cell problem in the IAEA coordinated research project (CRP) benchmark on the high temperature gas cooled reactor (HTGR) uncertainty analysis. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Implementation of Weighted Delta-Tracking with Scattering in the Serpent 2 Monte Carlo Code

Serpent 2, a continuous-energy Monte Carlo Reactor physics burnup code developed at the VTT Technical Research Centre of Finland, uses a common rejection sampling technique, known as Woodcock delta-tracking. This method improves the efficiency of Monte Carlo in the complicated geometric layout of nuclear reactors and is widely used despite drawbacks that make it inefficient in specific cases, such as in the presence of strong absorbers. At present, Serpent actively uses delta-tracking, falling back to a surface tracking option in situations where delta-tracking is inefficient to partially offset these weaknesses. Morgan and Kotlyar introduced a Weighted Delta Tracking (WDT) routine to address these issues, replacing the rejection sampling of absorption events with an implicit event. In this research, we examine the theoretical basis for rejection sampling and implicit events, and how they relate to WDT. We then discuss implementation of a routine that extends the WDT routine to include scattering events. The routine is implemented and tested within Serpent. We examine various test cases including a Boiling Water Reactor (BWR) pin cell, and homogenous fuel media based on the content of the fuel of the Transient Test Reactor (TREAT) at Idaho National Lab (INL)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Monte Carlo estimates of sensitivities to geometric perturbations for shielding problems using kernel density estimators - 25605

A Monte Carlo method to estimate the sensitivity of reaction rates like dose and flux spectra to geometric perturbations using kernel density estimators is demonstrated for shielding problems. The method is used to estimate the sensitivity of the spectrum emitted from a Cf-252 source at the center of an iron sphere as well as the sensitivity of the dose due to Cf-252 neutrons shielded using various materials. Results are compared against reference solutions obtained using Monte Carlo direct perturbations with central differences, with agreement within 5% and 3σ for the majority of results. The results indicate that a bandwidth that is 10-20% of the shielding thickness produces accurate results with statistically insignificant bias for the chosen test problems. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗

Monte Carlo neutronics analysis of the SNS STS monolith - 25684

Neutronics analysis for the Oak Ridge National Laboratory's Spallation Neutron Source second target station monolith conceptual design was performed entirely with the Monte Carlo method. It has been demonstrated that even though the monolith provides ∼peta-scale attenuation of the dose rates, Monte Carlo simulations are within reach of computing capabilities of relatively inexpensive Linux clusters. Several monolith configurations achieved or exceeded design requirements and provide basis for the final design. (authors)

43 PARTICLE ACCELERATORS↗

Uncertainty Quantification for Monte Carlo simulations - Paper 18

Uncertainty quantification (UQ) generally speaking refers to a wide variety of specific problems, also pertaining different scientific areas: then studies on Uncertainty Quantification involve many different methodologies, techniques and even terminologies: to be specific we are interested in studying how uncertainties on input physical data needed for Monte Carlo simulations transfer into uncertainties on the physical output of the simulation. We mention that other sources of uncertainty are be present in a simulation environment: they can be ascribed either to model inadequacy (for instance when one neglects atomic lattice at very low energies) or to the numerical procedure involved: for the case of MC simulation the latter corresponds to the statistical error affecting the simulation itself. So in general parameter uncertainties are mixed with other kind of uncertainties. The problem then remains seemingly quite complicated, even in this more specific domain: moreover we should better specify the meaning of the rather undetermined words physical data needed for Monte Carlo simulation. In fact they may refer both those data needed to specify the experimental setup that is going to be simulated - like, e.g., geometrical or composition data, but including also some external conditions applied to the system, like temperature, pressure, electromagnetic fields and so on - and physical data - cross sections or often physical models - required to describe particle transport. All these data are generally affected by uncertainties, which through the process of simulation transfer into uncertainty on its physical outcome. Then, from the MC user's own perspective, input data refers both to those that are under his direct experimental control and to many others, whose values and uncertainties will affect the result of the simulation. In this contribution we will summarize previous results, together with some new ones. (authors)

61 RADIATION PROTECTION AND DOSIMETRY↗