Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “MAINTENANCE”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Integrating Survival Analysis with Bayesian Statistics to Forecast the Remaining Useful Life of a Centrifugal Pump Conditional to Multiple Fault Types

To improve the viability of nuclear power plants, there is a need to reduce their operational costs. Operational costs account for a significant portion of a plant’s yearly budget, due to their scheduled-based maintenance approach. In order to reduce these costs, proactive methods are required that estimate and forecast the state of a machine in real time to optimize maintenance schedules. In this research, we use Bayesian networks to develop a framework that can forecast the remaining useful life of a centrifugal pump. To do so, we integrate survival analysis with Bayesian statistics to forecast the health of the pump conditional to its current state. We complete our research by successfully using the Bayesian network on a case study. This solution provides an informed probabilistic viewpoint of the pumping system for the purpose of predictive maintenance.

42 ENGINEERING↗

Technical Language Processing of Nuclear Power Plants Equipment Reliability Data

Operating nuclear power plants (NPPs) generate and collect large amounts of equipment reliability (ER) element data that contain information about the status of components, assets, and systems. Some of this information is in textual form where the occurrence of abnormal events or maintenance activities are described. Analyses of NPP textual data via natural language processing (NLP) methods have expanded in the last decade, and only recently the true potential of such analyses has emerged. So far, applications of NLP methods have been mostly limited to classification and prediction in order to identify the nature of the given textual element (e.g., safety or non-safety relevant). In this paper, we target a more complex problem: the automatic generation of knowledge based on a textual element in order to assist system engineers in assessing an asset’s historical health performance. The goal is to assist system engineers in the identification of anomalous behaviors, cause–effect relations between events, and their potential consequences, and to support decision-making such as the planning and scheduling of maintenance activities. “Knowledge extraction” is a very broad concept whose definition may vary depending on the application context. In our particular context, it refers to the process of examining an ER textual element to identify the systems or assets it mentions and the type of event it describes (e.g., component failure or maintenance activity). In addition, we wish to identify details such as measured quantities and temporal or cause–effect relations between events. This paper describes how ER textual data elements are first preprocessed to handle typos, acronyms, and abbreviations, then machine learning (ML) and rule-based algorithms are employed to identify physical entities (e.g., systems, assets, and components) and specific phenomena (e.g., failure or degradation). A few applications relevant from an NPP ER point of view are presented as well.

97 MATHEMATICS AND COMPUTING↗

Investigation of Fe-Ni Battery/Module for Grid Service Duty Cycles

Iron–nickel (Fe-Ni) batteries are renowned for their durability and resilience against overcharging and operating temperatures. However, they encounter challenges in achieving widespread adoption for energy storage applications due to their low efficiency and the need for regular maintenance and electrolyte replacement, which adds to maintenance costs. This study evaluates and demonstrates the capabilities of Fe-Ni batteries for participating in grid energy storage applications. Stable performance was observed frequency regulation (FR) testing at 100% and 50% state of charge (SOC)s, while at 50% SOC, there was a 14% increase in efficiency compared to 100% SOC. Although 25% SOC achieved higher efficiency, limited cyclability was observed due to reaching the discharge cutoff voltage. Optimal SOC selection, battery monitoring, maintenance, and appropriate charging strategies of Fe-Ni batteries seem to be crucial for their FR applications. Fe-Ni batteries exhibit stable peak shaving (PS) results, indicating their suitability and reliability under various load conditions for PS testing. Extended cycling tests confirm their potential for long-term grid-scale energy storage, enhancing their appeal for PS and FR applications.

25 ENERGY STORAGE↗

Development of Short-Term Forecasting Models Using Plant Asset Data and Feature Selection

Nuclear power plants collect and store large volumes of heterogeneous data from various components and systems. With recent advances in machine learning (ML) techniques, these data can be leveraged to develop diagnostic and short-term forecasting models to better predict future equipment condition. Maintenance operations can then be planned in advance whenever degraded performance is predicted, thus resulting in fewer unplanned outages and the optimization of maintenance activities. This enables lower maintenance costs and improves the overall economics of nuclear power. This paper focuses on developing a short-term forecasting process that leverages a feature selection process to distill large volumes of heterogeneous data and predict specific equipment parameters. A variety of feature selection methods, including Shapley Additive Explanations (SHAP) and variance inflation factor (VIF), were used to select the optimal features as inputs for three ML methods: long short-term memory (LSTM) networks, support vector regression (SVR), and random forest (RF). Each combination of model and input features was used to predict a pump bearing temperature both 1 and 24 hours in advance, based on actual plant system data. The optimal inputs for the LSTM and SVR were selected using the SHAP values, while the optimal input for the RF consisted solely of the response variable itself. Each model produced similar 1-hour-ahead predictions, with root mean square errors (RMSEs) of roughly 0.006. For the 24-hour-ahead predictions, differences could be seen between LSTM, SVR, and RF, as reflected by model performances of 0.036 +- 0.014, 0.0026 +- 0, and 0.063 +- 0.004 RMSE, respectively. As big data and continuous online monitoring become more widely available, the proposed feature selection process can be used for many applications beyond the prediction of process parameters within nuclear infrastructure.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

A Comprehensive Assessment Tool for Low-TRL Current Energy Converters

Along with a market-competitive levelized cost of energy, a current energy converter technology strongly benefits from an extensive consideration of socioeconomic, environmental, and regulatory factors early in the design process. As part of a technology performance level assessment, a series of assessment questions and guidance are developed and presented to evaluate an early-stage current energy technology on holistic criteria considering the entire device lifecycle. The assessment represents an accumulation of industry and research experience to date and relies on regular updates to ensure alignment with industry best-practices, regulatory requirements, and up-to-date technical understanding. A cradle-to-grave (materials, manufacturing, installation and deployment, operations and maintenance, and end-of-life) assessment of capabilities and functional requirements (i.e., high, medium, and low) performance criteria for current energy converters deployed in tidal, ocean current, and/or river applications. Key considerations related to manufacturing and installation include supply chain robustness, manufacturability and related job creation in the end-user and/or adjacent communities, and the time-to-repayment of the embodied energy debt. During deployment and maintenance operations, the safety of the device and subsystems during disconnect or grid failure, the difficulty and frequency of offshore heavy-lift activities, the avoidance or mitigation of area-use conflicts, the sea-states and weather conditions that permit maintenance access, and the availability of contingency plans (should conditions change unexpectedly) are a portion of the considered assessment criteria. Results include the potential impact of early-stage design decisions on the socioeconomic, environmental, and regulatory performance of a technology that allows developers to increase the product value and probability of success, and minimize costly late-stage design iterations through early and broad consideration of factors affecting overall performance and acceptability.

life cycle analysis↗

Refurbishment cost study of the thermal protection system of a space shuttle vehicle, phase 2

The labor costs and techniques associated with the refurbishment and maintenance of representative thermal protection system (TPS) components and their attachment concepts suitable for space shuttle application are defined, characterized, and evaluated from the results of an experimental test program. This program consisted of designing selected TPS concepts, fabricating and assembling test hardware, and performing a time and motion study of specific maintenance functions of the test hardware on a full-scale- mockup. Labor requirements and refurbishment techniques, as they relate to the maintenance functions of inspection, repair, removal, and replacement were identified.

Haas, D. W.↗

Space tools and support equipment - Current technology and future requirements.

Space tools and supporting equipment developed for past and current missions are summarized, along with projected tool and powered maneuvering aid requirements for future earth orbital missions. These tools, designed for functions such as general maintenance, replacement and repair, are reviewed and classified according to their intended application. A synopsis of the Skylab on-orbit maintenance requirements is presented, and the tools necessary for accomplishing the maintenance functions are listed. The proposed missions for future Earth Orbital Systems are summarized, and the potential functions (e.g., Remove/Replace, Cargo Transfer, etc.) are outlined. The current tool and support technology status is compared with future requirements for crew equipment to determine if these future requirements can be adequately satisfied. Of particular interest is a discussion of the augmentation of the astronaut with teleoperators (remote manipulator systems).

Brown, N. E.↗

Lower payload costs through refurbishment and module replacement.

Payload benefits to be derived from refurbishment can be related to individual spacecraft programs directly and for planning purposes to the entire shuttle mission model. In the case of the large space telescope program, cost savings obtained through the use of the shuttle for maintenance operations have been estimated to be in the range from 30 to 40%. This saving is realized over an operational lifetime of 15 years by reducing, through refurbishment on orbit, the number of flight units along with 'optimized' reliability goals commensurate with periodic maintenance revisits at one-year intervals. Shuttle-era payload implications are discussed together with a pressurized on-orbit maintenance configuration, an earth observation satellite, and some typical teleoperator-serviced spacecraft.

Murphy, J. T.↗

Economic effects of propulsion system technology on existing and future transport aircraft

The results of an airline study of the economic effects of propulsion system technology on current and future transport aircraft are presented. This report represents the results of a detailed study of propulsion system operating economics. The study has four major parts: (1) a detailed analysis of current propulsion system maintenance with respect to the material and labor costs encountered versus years in service and the design characteristics of the major elements of the propulsion system of the B707, b727, and B747. (2) an analysis of the economic impact of a future representative 1979 propulsion system is presented with emphasis on depreciation of investment, fuel costs and maintenance costs developed on the basis of the analysis of the historical trends observed. (3) recommendations concerning improved methods of forecasting the maintenance cost of future propulsion systems are presented. A detailed method based on the summation of the projected labor and material repair costs for each major engine module and its installation along with a shorter form suitable for quick, less detailed analysis are presented, and (4) recommendations concerning areas where additional technology is needed to improve the economics of future commercial propulsion systems are presented along with the suggested economic benefits available from such advanced technology efforts.

Sallee, G. P.↗

The roles of body mass and gravity in determining the energy requirements of homoiotherms

Studies by Kleiber and by Brody in the 1930's established the 3/4 power of body weight as the unit of metabolic size for homoiotherms. Later Kleiber conceived of the energy requirement as a composite function, with a thermoregulatory component that is proportional to heat loss, and an antigravity component that is directly proportional to body weight. Maintenance feed requirements (F) have been measured with groups of small animals chronically exposed to several acceleration fields (G). Analysis of the results leads to an arithmetic relationship between the maintenance requirement and acceleration field strength: F sub G = F sub 0 + kG. When the equations are compared for groups of different body size, F sub 0 tends to vary between the 0.4 and 0.5 power of body mass - and k tends to be the same, irrespective of body mass. These findings tend to confirm the Kleiber concept of a composite nature of homoiotherm maintenance requirements.

Smith, A. H.↗

Flight control electronics reliability/maintenance study

Collection and analysis of data are reported that concern the reliability and maintenance experience of flight control system electronics currently in use on passenger carrying jet aircraft. Two airlines B-747 airplane fleets were analyzed to assess the component reliability, system functional reliability, and achieved availability of the CAT II configuration flight control system. Also assessed were the costs generated by this system in the categories of spare equipment, schedule irregularity, and line and shop maintenance. The results indicate that although there is a marked difference in the geographic location and route pattern between the airlines studied, there is a close similarity in the reliability and the maintenance costs associated with the flight control electronics.

Dade, W. W.↗

The dynamics of oceanic fronts. I - The Gulf Stream

The establishment and maintenance of the mean hydrographic properties of large-scale density fronts in the upper ocean is considered. The dynamics is studied by posing an initial value problem starting with a near-surface discharge of buoyant water with a prescribed density deficit into an ambient stationary fluid of uniform density; full time dependent diffusion and Navier-Stokes equations are then used with constant eddy diffusion and viscosity coefficients, together with a constant Coriolis parameter. Scaling analysis reveals three independent scales of the problem including the radius of deformation of the inertial length, buoyancy length, and diffusive length scales. The governing equations are then suitably scaled and the resulting normalized equations are shown to depend on the Ekman number alone for problems of oceanic interest. It is concluded that the mean Gulf Stream dynamics can be interpreted in terms of a solution of the Navier-Stokes and diffusion equations, with the cross-stream circulation responsible for the maintenance of the front; this mechanism is suggested for the maintenance of the Gulf Stream dynamics.

Kao, T. W.↗

Aerojet advanced engine concept

The future orbit transfer vehicle (OTV) requirements which dictate the need for a highly versatile, highly reliable, reusable propulsion module are discussed. To attain maximum operational economy, space-basing is essential. This requires a reusable, maintenance free engine. The design features of this space based engine are defined. A new engine cycle and its advantages allow all the maintenance goals to be attained. Rubbing contact and interpropellant seals and purges are eliminated when GO2 is used to drive the LO2 pump. The TPA design has only one moving part. The use of both GH2 and GO2 to drive the turbines lowers the turbine temperatures in addition lower GH2 temperatures and pressures improve chamber cooling and longer life. The use of GO2 as a turbine drive fluid is addressed. Space based engines require an integrated control and health monitoring system to improve system reliability and eliminate all scheduled maintenance. It is concluded that all OTV propulsion requirements can be fulfilled with a single engine. The technological developments required to demonstrate that engine are outlined.

Schoenman, L.↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

A flight service evaluation of composite inboard ailerons on the L-1011 is discussed. This is the second annual report of the maintenance evaluation program, and covers the period from July 1983 when the first yearly inspections were completed, through July 1984. Four shipsets of graphite/epoxy composite ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta aircraft and two TWA aircraft. A fifth shipset of composite ailerons were installed in 1980 on Lockheed's flight test L-1011. A visual inspection was also conducted on these components. No visible damage was observed on any of the composite ailerons, and no maintenance action has occurred on any of the composite parts except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 6318 to 6989 hours, after approximately 2 years of service.

Stone, R. H.↗

Orbit Transfer Rocket Engine Technology Program: Advanced engine study, task D.1/D.3

Concepts for space maintainability of OTV engines were examined. An engine design was developed which was driven by space maintenance requirements and by a failure mode and effects (FME) analysis. Modularity within the engine was shown to offer cost benefits and improved space maintenance capabilities. Space operable disconnects were conceptualized for both engine change-out and for module replacement. Through FME mitigation the modules were conceptualized to contain the least reliable and most often replaced engine components. A preliminary space maintenance plan was developed around a controls and condition monitoring system using advanced sensors, controls, and condition monitoring concepts. A complete engine layout was prepared satisfying current vehicle requirements and utilizing projected component advanced technologies. A technology plan for developing the required technology was assembled.

Martinez, A.↗

Space Station crew workload - Station operations and customer accommodations

The features of the Space Station which permit crew members to utilize work time for payload operations are discussed. The user orientation, modular design, nonstressful flight regime, in space construction, on board control, automation and robotics, and maintenance and servicing of the Space Station are examined. The proposed crew size, skills, and functions as station operator and mission specialists are described. Mission objectives and crew functions, which include performing material processing, life science and astronomy experiments, satellite and payload equipment servicing, systems monitoring and control, maintenance and repair, Orbital Maneuvering Vehicle and Mobile Remote Manipulator System operations, on board planning, housekeeping, and health maintenance and recreation, are studied.

Shinkle, G. L.↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

This report covers flight evaluation of composite inboard ailerons on the L-1011 under Contract NAS 1-15069 for a period of five years. This is the fourth annual report of the maintenance evaluation program, and covers the period from May 1985 when the third yearly inspections were completed, through July 1986. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta aircraft and two TWA aircraft. A fifth shipset of composite ailerons was installed in 1980 on Lockheed's flight test L-1011. One instance of minor damage was observed on one of the composite ailerons and was repaired. No other maintenance actions have occurred on any of the composite parts except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 12,051]en1] to 14,046 hours, after approximately 4 years of service.

Stone, R. H.↗

Flight service evaluation of advanced composite ailerons on the L-1011 transport aircraft

This report covers flight service evaluation of composite inboard ailerons on the L-1011 under contract NAS1-15069 for a period of five years. This is the fifth and final annual report of the maintenance evaluation program, and covers the period from July 1986 when the fourth yearly inspections were completed, through May 1987. Four shipsets of graphite/epoxy composite inboard ailerons were installed on L-1011 aircraft for this maintenance evaluation program. These include two Delta and two TWA aircraft. A fifth shipset of composite ailerons was installed in 1980 on Lockheed's flight test L-1011. The previous four annual inspections had been visual exterior inspections only. For this final inspection, the lower covers were removed for access and both interior and exterior surfaces, spars and ribs, and fastener holes were inspected. No damage or defects were observed on any of the composite ailerons, and no maintenance actions had occurred except for repainting of areas with paint loss. Flight hours on the airline components at the time of inspection ranged from 14,597 to 17,180 hours, after approximately 5 years of service.

Stone, R. H.↗