At least 937 records · Page 52

Integration of Pumped Heat Energy Storage with Fossil-Fired Power Plant (Final Report)

The project team of Southwest Research Institute ® (SwRI ® ), Malta Inc. (Malta), and Luminant Generation Company LLC (Luminant) completed a feasibility study for the integration of a 100-MW, 10-hour (1000-MWh) Malta Pumped Heat Energy Storage (MPHES) system with multiple full-sized fossil-fired electricity generation units (EGU) in Luminant portfolio. MPHES is a long-duration, molten-salt-energy storage technology that uses turbomachinery and heat exchangers to transfer energy to a thermal storage media when charging, and removes the heat in a similar fashion when discharging. With high round trip efficiency (60-65%) and long lifespan (30+ years), MPHES provides economic benefits to the fossil-asset owners that can be scaled to integrate with assets across their portfolio. This technology uses hardware components, workforce personnel, and skillsets similar to those used by fossil EGUs, allowing for synergy when co-locating the two technologies. Luminant has approximately 39,000 megawatts of generation across 12 states, operating in six of the seven competitive markets in the U.S. and powered by a diverse portfolio of natural gas, nuclear, coal, and solar facilities. The DeCordova plant in Granbury, Texas, a simple cycle natural gas peaker power plant, was used as the fossil-fired asset in this project. The local market in Granbury, Texas has many influences, including several nearby power plants, a Luminant-owned nuclear plant (Comanche Peak), and substantial wind energy, which causes both negative pricing at night and high market volatility. Reducing false starts of the DeCordova plant and better responding to market volatility would be an economic advantage. Luminant is currently integrating battery storage plant on site to begin addressing these challenges. Integrating long-duration storage, like MPHES, would expand this capability beyond one hour of storage and have the potential to greatly reduce the total number of gas turbine starts. The MPHES charging requirement could help offset the overnight operating costs of Comanche Peak, which cannot load follow, and the nearby Luminant-owned Wise County combined cycle plant that cycles too often. Following the assessment of Luminant’s ERCOT-based portfolio for integration compatibility with Malta’s PHES system and the project tasks of conceptual study, technoeconomic analysis, technology gap assessment, and commercialization plan, the project team effort has resulted in several key outcomes: (1) Identification of market trends in a high-wind penetration market outside a major metropolitan area; (2) Creation of a dispatching model for the MPHES system and the pairing of Li-ion battery with a gas turbine in a real time market; (3) Revenue and cost estimations for operating MPHES alongside a gas peaker plant with real dispatching considerations and comparison with variations in the Malta implementation, including doubling the storage capacity and using two discharge drivetrains; (4) Potential carbon emission reductions possible by replacing gas turbine operation with Malta PHES operation; and (5) Summary of literature-based future market predictions for Texas.

20 FOSSIL-FUELED POWER PLANTS↗

Status of the NEAMS and ARC fast reactor tools integration to the NEAMS Workbench

The Workbench initiative was launched in FY-2017 within the Nuclear Energy Advanced Modeling and Simulation (NEAMS) program to facilitate the transition from conventional tools to high-fidelity tools. The NEAMS Workbench provides a common user interface for model creation, real-time validation, execution, output processing, and visualization for integrated codes. The integration of the Argonne Reactor Computation (ARC) suite of codes into the NEAMS Workbench through the PyARC module was initiated in FY-2017. The ARC codes, which focus on fast reactor multiphysics analysis, contain both legacy codes like DIF3D and REBUS-3 that were developed with over 30 years of experience, and newer NEAMS additions like MC 2 -3, PERSENT, and PROTEUS. Recent work expended this integration to other tools to support the U.S. fast reactor community such as DASSH for sub-channel thermal-hydraulics, Griffin for high-fidelity deterministic transport calculations, and OpenMC for Monte Carlo simulations (with Shift integration planned for FY-2023). The integration of the “extended ARC” suite of codes into the NEAMS Workbench interface relies on the PyARC and PyGriffin modules to handles the pre- and post-processing of these codes input, and the runtime environment. The PyARC module together with the NEAMS Workbench interface are both released under Open Source Software licenses.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Development of Microreactor Automated Control System (MACS): Surrogate Plant-level Modeling and Control Algorithms Integration

This report discusses progress on the modeling and integration task as part of the development of Microreactor Automated Control System (MACS). What follows is a discussion of the software tools used to develop a surrogate microreactor plant-level model, MACS module development, and a summary of the findings from integration with a hardware-in-the-loop (HIL) setup at Idaho National Laboratory (INL). Oak Ridge National Laboratory worked with INL to understand available hardware at INL (such as existing control platforms). With this information and using a preliminary framework for MACS with software interfaces defined, surrogate models and initial automated control algorithms were created for integration into the hardware to provide a HIL demonstration platform for MACS. Available reduced order reactor models that leverage existing microreactor neutronics and thermal hydraulics models have been integrated in the surrogate plant-level model. The surrogate model has been evaluated for sensitivity of all parameters and the MACS software modules (including the surrogate model) have been demonstrated to interact with the hardware. The integration, however, pointed to the need for further improvements to the framework—and specifically improvements to the interfaces to ensure that the HIL simulator is capable of longer-term stable operation with MACS in the loop. These improvements will be the focus of future research.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Design, Development and Testing Plan for Energy Efficiency Algorithms Related to Building-Integrated Cooling, Heating, and Power Systems

Building-integrated cooling, heating and power (CHP) systems are more efficient than conventional systems at providing local power and thermal energy, and favorable fuel prices are bound to spur their increased adoption. It is estimated that the total CHP technical potential in the commercial building sector is approximately 76 GW, but only a small fraction of it is actually deployed. Advanced control and monitoring systems that realize the full potential of these CHP systems can transform this capacity into an asset for both the owner and the grid and also accelerate the adoption of these systems in the building sector. However, to realize the full benefit of the CHP systems, we must ensure persistence of energy efficient operations. It has been demonstrated by several studies that as much as 30% of building energy use is wasted. Much of the waste results from the inability to anticipate load variations (design day vs. non-design day operations; diurnal variation of loads), identify improper operation, and efficiently operate, control and maintain building systems. Moreover, many buildings, even those with adequate control infrastructure, lack knowledgeable staff to operate and maintain energy systems. Operators of buildings with CHP systems will constantly need to make tradeoffs (economic dispatch) between onsite power generation and purchasing power, between onsite heat production from distributed generation versus heating/cooling from conventional systems, and different passive and active load management measures. Much of the inefficiency in the current building operations can be eliminated by use of automated performance monitoring (PM), real-time commissioning verification (CxV) and automated fault detection and diagnostic (AFDD) tools. Automation can help system operators make intelligent decisions. Remote and continuous monitoring of system conditions and performance will enable better management and integration of CHP with existing building systems. Continuous PM, real-time CxV and AFDD could alleviate burdens for operations staff, enhance operations and maintenance (O&M), and improve reliability of building and CHP systems. To address the O&M challenges and to provide a means to maximize the rate-of-return of building-integrated CHP systems, the Building Technologies Office (BTO) within the U.S. Department of Energy’s (DOE’s) Office of Energy Efficiency and Renewable Energy (EERE) initiated a project to design, develop, and field test a VOLTTRON™-based supervisory controller and associated open-source algorithms. These algorithms will ensure real-time optimal operation of a building-integrated CHP system, support electric grid reliability, and lead to achieving the goal of a clean, efficient, reliable and affordable next-generation integrated energy systems. This report lists the components for which PM, real-time CxV and AFDD algorithms will be developed, how the algorithms will be tested, and metrics that will be used to validate the algorithms and easy of deployment. Deployment of these algorithms in the field will result in savings reduction in energy consumption of between 10% and 20%.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

BUILD: Binary Understanding and Integration Logic for Dependencies (Final Report)

Increasingly diverse mission needs, the emergence of AI and cloud, and increasing hardware diversity are driving HPC software to be more complex. Modern codes are built from hundreds of small, complex components, and much of the software development process involves integrating these components rather than developing new components from scratch. The goal of the BUILD project was to ease the task of software integration for developers across LLNL’s programs. The project focused on (1) modeling software compatibility, (2) modeling ABI compatibility with binary analysis, (3) developing solver techniques to reason about compatibility, and (4) developing AI/ML models to fill gaps in our understanding of software compatibility. The project has developed several key technologies that help developers—by accelerating development workflows, removing the need for rebuilds, and enabling faster, automatic, and less error-prone code sharing. These technologies are used in LLNL codes and will be ready for the new El Capitan Exascale system in Livermore Computing. Many of these technologies have been hardened and integrated with LLNL’s Spack package manager, and they are already in use by production code teams. Results of BUILD have laid the groundwork for future advances in software integration—the ML and binary modification techniques developed in this project still need to be operationalized but have great potential to further speed up software integration.

97 MATHEMATICS AND COMPUTING↗

Performance Demonstration of an Occupancy Sensor-enabled Integrated Solution for Commercial Buildings

Traditionally, a single-loop fixed-gain controller is applied to supply fan (SF) and cooling coil (CC) valve controls while a fixed-damper position control is applied to outdoor air (OA) damper control at air handling units (AHUs) in commercial buildings. With the increasing application of occupancy sensors, the information generated by occupancy sensors is applied to not only reduce the electricity loads from lighting and controllable plug loads, but also reset OA intake and minimum supply airflow setpoints. Meanwhile, these intermittent operation actions greatly elevate the dynamics of AHU systems, which may introduce unstable SF and CC valve operations and inaccurate OA flow control at AHUs and consequently degrade maximum energy efficiency gains. With virtual fan and valve flow meter technologies, two advanced controls, including cascade control and gain scheduling control, can be implemented on both the SF and CC valve, and an advanced control using a virtual OA flow meter can be implemented on OA damper integrated with occupancy sensors. The goal of this project is to demonstrate the savings, cost, and performance of an integrated solution that integrates the three advanced HVAC controls with occupancy sensors to allow accurate and stable AHU operations in real buildings. The project objectives are to: 1) develop and validate an advance SF control algorithm; 2) develop and validate an advanced CC valve control algorithm; 3) validate an algorithm to implement a virtual OA flow meter; and 4) demonstrate the savings, cost, and performance of the integrated solution in real buildings. The technical approaches are to: 1) select a test system at the University of Oklahoma; 2) develop and implement the algorithms of advanced SF and CC valve controls and validate the performance; 3) develop and implement the advanced OA control using a virtual OA flow meter and validate the performance; 4) demonstrate the savings, cost, and performance of the proposed integrated solution with and without three advanced HVAC controls; and 5) disseminate the project results through publications and presentations. For the SF control, both the gain scheduling and cascade controls can improve the fan energy performance by reducing the fan power during the transient period and the fan control performance at lower speeds by reducing fan speed variation. Moreover, the gain scheduling control provides a simple and low-cost solution and is recommended. The fan power savings can reach 30% in a transient period. For the CC valve control, the gain scheduling control can considerably reduce the supply air temperature oscillation range and frequency under both higher and lower load conditions and the control valve response is much more stable. As a result, the gain scheduling control is recommended. The projected pump energy consumption can be reduced by 68.5%. With the developed virtual OA flow meter, the OA can be accurately controlled at its setpoint, which is determined based on the actual number of occupants in the building provided by occupancy sensors. The RMSE of the proposed OA control is 15.9 L/s. The energy data shows that the fan power and CC cooling energy were significantly reduced. On the other hand, the energy savings majorly results from the occupancy sensors and the energy savings by the advanced HVAC controls is minimal because that the controllers in the test AHU were tuned with very slow response. An annual technical savings potential is estimated as 0.5 quads in the commercial sector.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation

This is the final scientific / technical report for Front End Engineering Design (FEED) study “Retrofittable Advanced Combined Cycle Integration for Flexible Decarbonized Generation” funded by the US Department of Energy (DOE), Office of Fossil Energy and Carbon Management (FECM), Carbon Capture R&D Program under award DE-FE0032131. The prime recipient is General Electric Company working through its Gas Power division (GEGP) with subrecipients Southern Company and Linde Engineering plus subcontractor Kiewit. Southern Company’s Plant Barry, a 2x1 7F.04 CCGT, is the host site. GEGP led the overall integration of the carbon capture system (CCS) with the existing natural gas combined cycle (NGCC) facility. Linde provided the detailed process engineering and equipment costing for the carbon capture island. Kiewit focused on plant layout, constructability, and installation. With the FEED study finished, the engineering is approximately 50% complete towards the detailed design package needed to proceed to procure, install, build, commission, and operate the integrated NGCC+CCS facility. This FEED study focuses on retrofitting a 95% CO 2 capture system with attention on plant integration. The study was particularly challenging due to unique and substantial cost impacts related to global sourcing challenges associated with COVID. Additional incentives, regulatory support, and dispatch certainty are needed to move forward with implementing CCS at this or other sites in the US. This FEED study highlights the value of integrating NGCC+CCS and is a template for future CCS retrofit studies.

42 ENGINEERING↗

Data Integration Aggregated Model and Ontology for Nuclear Deployment (DIAMOND): Preliminary Model and Ontology

The data of a nuclear utility or plant are stored in various isolated forms in different systems. These data have different structures and tools and are, therefore, used independently. The integration of data sources is often performed manually and on an as-needed basis to achieve a targeted cost saving. A holistic approach to the integration of the data would enable creating a data warehouse for a single nuclear power plant (NPP) or multiple plants. A data warehouse results in direct and indirect cost saving because it automates the manual search for data, enables sharing and comparison of data from various tools of a single or multiple plants, enable digital transformation of data, increase frequencies of needed data that are sparse in nature (such as failures signatures), reduces the need for training on various tools for plant staff, enables a holistic staff perception of plant activities, reveals cost-saving opportunities, and improves the visual perception of all parts a plant necessary for operations and maintenance. One of the main challenges to deploy a data warehouse is associated with the integration of data sources into a consistent data model using a standard ontology that is developed by and for the nuclear power industry. This model is non-existent and is a necessity to enable the nuclear data warehouse role. A data model contains objects that make up a given domain along with their attributes and relationships. It provides domain standardization and maintainability, setting forth the objects, attributes, and relationships within that domain and acting as the guide by which the various applications within that domain will structure their data and interchange. An ontology is defined as “a set of concepts and categories in a subject area or domain that shows their properties and the relations between them”. Ontologies consist of a taxonomy or directed rooted tree. A survey of the models and ontologies available to support a data integration aggregated model and ontology for nuclear deployment (DIAMOND) was performed and different standards that address specific aspects of the needed model and ontology were leveraged and integrated in this effort. In specific, the Basic Formal Ontology (BFO) and Lifecycle Modeling Language (LML) were leveraged for the base ontology. The ISO 4224 and 15926 were leveraged in the development of the overlapping nuclear and fossil data aspects. The electric power research institute (EPRI) power distribution common information model (CIM) was also reviewed and the experience gained was leveraged in the power generation scope of DIAMOND. The initial aim targeted by this effort was to develop the ontology definitions and model structure. This report documents the resulting model and ontology to develop DIAMOND. The report describes the various elements of the model development based on a growing tree development approach, i.e. DIAMOND’s tree structure is established with the core data aspects and is populated with a preliminary level of details. Fifteen sources of data in a nuclear power plant were considered and incorporated into DIAMOND at this stage of development, representing the majority of operations data sources in nuclear power plants. Additional data sources, scope, and a higher level of fidelity will be incorporated into DIAMOND next in collaboration with the nuclear industry and relevant stakeholders.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Integrated Energy Systems

Leveraging the synergies among different energy technologies, Integrated Energy Systems (IES) can achieve greater efficiency, higher flexibility, and better CO2 removal concurrently. However, system integration in reality faces various challenges and difficulties. To integrate with other components, off-the-shelf equipment needs case-by-case modifications and redesigns. This presentation will use two integrated systems as examples to reveal the challenges in system integration.

Zhou, Nana↗

SIREN: Scaling Ion-Traps by REquiring iNnovative Heterogenous Integration

The SIREN (Scaling Ion Traps by Requiring iNnovative heterogenous integration) project explores the feasibility of heterogeneous integration (HI) as a transformative approach to scaling ion traps, a critical technology for advancing quantum computers and atomic clocks. Traditional ion trap architectures face significant challenges in scalability due to limitations in optical access, fabrication techniques, and material constraints. SIREN addresses these challenges by leveraging HI, which combines different materials and fabrication processes to create more complex and efficient ion trap structures. HI integrated structures can be manufactured without compromising the process to maintain compatibility to ion traps. This project focuses on integrating a separately fabricated waveguide with a fully functional ion trap. The respective alignment between the pieces needs to be accurate to less than 2 µm to ensure that the light from the waveguide can overlap with the trapping region. The fine alignment must also be maintained through an ultra-high vacuum bake, a critical step in preparing an ion trap experiment. The project's outcomes suggest that heterogeneous integration is a promising pathway for overcoming current scalability barriers, paving the way for the next generation of quantum technologies. SIREN's findings contribute significantly to the field, offering a scalable solution that could accelerate the development of practical quantum computers and highly accurate atomic clocks.

42 ENGINEERING↗

Integrated Methane Monitoring Platform Design (Final Report)

As the urgency for understanding methane emissions and the number of methane monitoring technologies being deployed have increased in the last two decades, there is an opportunity and a need to integrate the numerous disparate data sources to enable the detection, quantification, contextualization, and reporting of methane emissions along the oil and gas supply chain. Such an integration would enable emissions reductions through early detection of super emitters, data-driven mitigation strategies, and improved greenhouse gas inventories. The GTI Energy (“GTI”) project team (“the team”) worked with a multitude of industry experts, stakeholders, and subject matter experts (SMEs) to collect guidance, insights, and information to inform the requirements and subsequent engineering, design, deployment, and operations of an integrated methane monitoring platform (IMMP). This final report describes the results of the team’s effort to execute the Integrated Methane Monitoring Platform Design project, ultimately providing an engineering, design, deployment, and operating plan (EDDOP) for the IMMP. This final report summarizes and integrates the project tasks' results and outputs.

03 NATURAL GAS↗

Scoping Study of Integrated Geothermal CO 2 Heat Pump and Water Well System in Cold Climate Region (CRADA Final Report)

This study evaluates the feasibility of using ground-source heat pumps (GSHPs) integrated with water wells for residential heating demands in cold regions of the United States. Four different heat pump systems were evaluated and compared: a CO 2 air-source heat pump (ASHP), a R-410A ASHP, a CO 2 GSHP integrated with well water, and a R-410A GSHP integrated with well water. Simulations were conducted at both equipment and building integration levels, followed by a nationwide analysis across 10 selected cities. Results indicate that integrating GSHP technology with existing water wells (e.g., artesian, bedrock, drilled, and collector wells) is a feasible heating solution because of their high flow rates, good water quality, stable temperatures, and low environmental impact. Although R-410A systems demonstrate higher efficiency, CO 2 systems are more suitable for heating from contamination-free and energy security perspective. The CO 2 GSHPs maintain better performance in colder climates compared with that of ASHPs, providing higher coefficient of performance and environmental benefits because CO 2 refrigerant leakage would not contaminate well water. A national analysis confirms that CO 2 GSHPs outperform furnaces, especially in cold climates, making them a promising solution for residential heating.

15 GEOTHERMAL ENERGY↗

Modular Staged Pressurized Oxy-Combustion (SPOC) Power Plant for Coal and Biomass – Integration of Combustor Boiler and DCC

Utilities and grid operators worldwide are under significant pressure to incorporate intermittent renewable sources while strategizing on how to maintain the necessary stability and reliability of the grid. The development of a power plant which will be capable of flexible operation to meet the needs of the grid as more intermittent sources like wind and solar energy are incorporated is key to maintain the reliability of the grid. Through the use of innovative and cutting-edge technologies that improve efficiency and reduce carbon emissions, and being small compared to today's conventional utility-scale power plants, the modular Staged, Pressurized Oxy-Combustion (SPOC) process envisioned by and under development at Washington University in St. Louis (WUSTL) has the potential to achieve these goals. Specifically, the process offers: 1) a modular plant design that allows for better operational flexibility; 2) the utilization of fuel-staging and pressurized oxy-combustion, resulting in smaller plant size, improved plant efficiency, and reduced costs for pollutant and CO2 removal compared to traditional power plants with post-combustion capture technology; and 3) the use of small modular boilers and pollutant removal units that can be constructed off-site leading to reduced capital costs for the plant. WUSTL is advancing the development of the critical components for the SPOC power plant, including the integrated combustor-boiler system and the direct contact cooler. To demonstrate the boiler convective section and to obtain critical data for commercial-scale pressurized boiler design, a simulated convective heat transfer boiler test section was designed and integrated with the combustor (radiant section). A direct contact cooler (DCC) was integrated with the combustor-boiler to demonstrate the dynamic operation of the integrated system and the performance of the DCC, including the efficiency for simultaneous removal of NOx and SOx. This talk will present an update on the evaluation of the critical components for system integration, including heat transfer data from the simulated boiler, scrubbing efficiency for the DCC under different operating conditions, and CFD modeling and validation for burner and boiler development.

Magalhaes, Duarte↗

Green Methanol via an Integrated Direct Air Capture, CO 2 Electrolyzer, and Hydrogenation Reactor

This project pioneered a groundbreaking reactor design to produce green methanol by harnessing the electrochemical CO 2 reduction reaction (eCO 2 RR), a cornerstone of power-to-fuels technology. The effort integrated three innovative technologies to achieve carbon-neutral methanol production at a target cost of under $\$$800/ton: 1. Direct Air Capture (DAC): Using a cutting-edge sorbent material developed at Holocene, scalable models were developed to integrate captured atmospheric CO₂ into the reactor system. 2. Intermediate-Temperature CO 2 Electrolyzer: Developed by the University of Tennessee (UTK), this electrolyzer utilizes a cost-effective, proton-conducting solid acid electrolyte (CsH 2 PO 4 , CDP) and a mixed-metal oxide cathode. It achieves high faradaic efficiencies (>98%) by effectively suppressing hydrogen evolution at high current densities, converting CO 2 to CO with remarkable selectivity. 3. Catalysis and Reactor Engineering: Oak Ridge National Laboratory (ORNL) contributed world-class expertise in heterogeneous catalysis and reactor design. Their advanced ASPEN modeling drove systems integration and supported techno-economic and life cycle analyses. This effort was further bolstered by partnerships with industry leaders Air Company and Plug Power, who provided critical guidance on scaling, systems engineering, and the integration of water electrolyzers into large-scale operations. During Phase 1, the team focused on modeling and validating a lab-scale reactor demonstrating the feasibility of the integrated approach. Key accomplishments include a 52% increase in current density at 0.8 V while maintaining >98% CO faradaic efficiency, successful 10× scale-up of the electrolyzer with performance within 5% of coin-cell results, best-in-class durability (168-hour test at 0.6 V with 0.14 mA/cm 2 -h degradation), validated TEA confirming the $\$$800/ton methanol target, and completed preliminary LCA showing potential for net-negative GHG emissions under renewable energy scenarios.

10 SYNTHETIC FUELS↗

Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project) is to provide technical and integration support to Fluor Hanford, Inc., including operable unit investigations at 300-FF-5 and other groundwater operable units, strategic integration, technical integration and assessments, remediation decision support, and science and technology. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the Fluor Hanford, Inc. Groundwater and Technical Integration Support (Master Project).

54 ENVIRONMENTAL SCIENCES↗

Development of an Integrated Residential Heating, Ventilation, Cooling, and Dehumidification System for Residences

The Need and the Opportunity Codes such as ASHRAE 90.2 and IECC, and programs such as Energy Star and Builders Challenge, are causing new homes to be built to higher performance standards. As a result sensible cooling loads in new homes are going down, but indoor air quality prerogatives are causing ventilation rates and moisture loads to increase in humid climates. Conventional air conditioners are unable to provide the low sensible heat ratios that are needed to efficiently cool and dehumidify homes since dehumidification potential is strongly correlated with cooling system operating hours. The project team saw an opportunity to develop a system that is at least as effective as a conventional air conditioner plus dehumidifier, removes moisture without increasing the sensible load, reduces equipment cost by integrating components, and simplifies installation. Project Overview Prime contractor Davis Energy Group led a team in developing an Integrated Heating, Ventilation, Cooling, and Dehumidification (I-HVCD) system under the DOE SBIR program. Phase I and II SBIR project activities ran from July 2003 through December 2007. Tasks included: (1) Mechanical Design and Prototyping; (2) Controls Development; (3) Laboratory and Field Testing; and (4) Commercialization Activities Technology Description. Key components of the prototype I-HVCD system include an evaporator coil assembly, return and outdoor air damper, and controls. These are used in conjunction with conventional components that include a variable speed air handler or furnace, and a two-stage condensing unit. I-HVCD controls enable the system to operate in three distinct cooling modes to respond to indoor temperature and relative humidity (RH) levels. When sensible cooling loads are high, the system operates similar to a conventional system but varies supply airflow in response to indoor RH. In the second mode airflow is further reduced, and the reheat coil adds heat to the supply air. In the third mode, the reheat coil adds additional heat to maintain the supply air temperature close to the return air temperature (100% latent cooling). Project Outcomes Key Phase II objectives were to develop a pre-production version of the system and to demonstrate its performance in an actual house. The system was first tested in the laboratory and subsequently underwent field-testing at a new house in Gainesville, Florida. Field testing began in 2006 with monitoring of a 'conventional best practices' system that included a two stage air conditioner and Energy Star dehumidifier. In September 2007, the I-HVCD components were installed for testing. Both systems maintained uniform indoor temperatures, but indoor RH control was considerably better with the I-HVCD system. The daily variation from average indoor humidity conditions was less than 2% for the I-HVCD vs. 5-7% for the base case system. Data showed that the energy use of the two systems was comparable. Preliminary installed cost estimates suggest that production costs for the current I-HVCD integrated design would likely be lower than for competing systems that include a high efficiency air conditioner, dehumidifier, and fresh air ventilation system. Project Benefits This project verified that the I-HVCD refrigeration compacts are compact (for easy installation and retrofit) and can be installed with air conditioning equipment from a variety of manufacturers. Project results confirmed that the system can provide precise indoor temperature and RH control under a variety of climate conditions. The I-HVCD integrated approach offers numerous benefits including integrated control, easier installation, and reduced equipment maintenance needs. Work completed under this project represents a significant step towards product commercialization. Improved indoor RH control and fresh air ventilation are system attributes that will become increasingly important in the years ahead as building envelopes improve and sensible cooling loads continue to fall. Technologies like I-HVCD will be instrumental in meeting goals set by Building America and other programs to reduce energy use while improving the indoor environment. Next Steps The following steps are needed to bring the product to commercialization: (1) Value engineering to reduce costs; (2) Addition of zoning capability to improve marketability; (3) Fabrication and testing of additional prototypes; and (4) Identification of a manufacturer. Initial efforts to interest large air conditioner manufacturers has shown some interest, but the preferred path to market may be to employ a boutique manufacturer that markets to HVAC contractors. Distribution of the results of this work will improve opportunities for attracting manufacturers. Additional funding is needed to prepare the product for this final step.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

The CHPRC Groundwater and Technical Integration Support (Master Project) Quality Assurance Management Plan

The scope of the CH2M Hill Plateau Remediation Company, LLC (CHPRC) Groundwater and Technical Integration Support (Master Project) is for Pacific Northwest National Laboratory staff to provide technical and integration support to CHPRC. This work includes conducting investigations at the 300-FF-5 Operable Unit and other groundwater operable units, and providing strategic integration, technical integration and assessments, remediation decision support, and science and technology. The projects under this Master Project will be defined and included within the Master Project throughout the fiscal year, and will be incorporated into the Master Project Plan. This Quality Assurance Management Plan provides the quality assurance requirements and processes that will be followed by the CHPRC Groundwater and Technical Integration Support (Master Project) and all releases associated with the CHPRC Soil and Groundwater Remediation Project. The plan is designed to be used exclusively by project staff.

300 FF-5 Operable Unit↗

Development of an Integrated Distribution Management System

This final report details the components, functionality, costs, schedule and benefits of developing an Integrated Distribution Management System (IDMS) for power distribution system operation. The Distribution Automation (DA) and Supervisory Control and Data Acquisition (SCADA) systems used by electric power companies to manage the distribution of electric power to retail energy consumers are vital components of the Nation’s critical infrastructure. Providing electricity is an essential public service and a disruption in that service, if not quickly restored, could threaten the public safety and the Nation’s economic security. Our Nation’s economic prosperity and quality of life have long depended on the essential services that utilities provide; therefore, it is necessary to ensure that electric utilities are able to conduct their operations safely and efficiently. A fully integrated technology of applications is needed to link various remote sensing, communications and control devices with other information tools that help guide Power Distribution Operations personnel. A fully implemented IDMS will provide this, a seamlessly integrated set of applications to raise electric system operating intelligence. IDMS will enhance DA and SCADA through integration of applications such as Geographic Information Systems, Outage Management Systems, Switching Management and Analysis, Operator Training Simulator, and other Advanced Applications, including unbalanced load flow and fault isolation/service restoration. These apps are capable of utilizing and obtaining information from appropriately installed DER, and by integrating disparate systems, the Distribution Operators will benefit from advanced capabilities when analyzing, controlling and operating the electric system.

24 POWER TRANSMISSION AND DISTRIBUTION↗