Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Implementation Plan”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Examining the Feasibility of Identifying Tau Neutrino Charged Current Events in the DUNE Far Detector

Neutrinos began as theoretical, massless particles, and since their first detection they have continued to be the subject of various experiments. One such experiment is DUNE, which is a long baseline neutrino experiment with the goal of studying neutrino properties, such as neutrino oscillation parameters. In this work, two projects were completed, one dealing with the hardware of DUNE and the other dealing with neutrino simulations. For the hardware project, we designed a quality control method for testing adaptor boards which make up part of the Far Detector circuit boards. This method was completed and prototyped, however was not implemented as planned due to funding changes. For the simulation project, we simulated ντ , νµ, and νe CC interactions using two simulation methods (stand alone GENIE and a full detector simulation) in order to begin to understand what a ντ CC event would look like in the Far Detector and create an initial list of kinematic properties that can be used for this purpose. We found that there is not a complete understanding of what is occurring in the full detector simulation. We also found that there is promise in using kinematic properties to be able to differentiate ντ CC events, however properties beyond those covered here, as well as a more accurate simulation, will be required for any definitive statistical statements.

Choate, Sarah↗

Machine-Protection System for the PIP-II Linear Accelerator: Architecture and Data Processing Schemes

PIP-II at Fermilab features a brand-new, 800 MeV leading-edge Linear Accelerator (Linac) that will enable the Fermilab complex to deliver more than a megawatt of beam power to the Long Base-line Neutrino Facility (LBNF), requiring a robust Machine Protection System (MPS) to prevent beam-induced damage to delicate cryomodules and vacuum components. Signals in various accelerator components, in both analog and digital format, are collected and processed to assest the operating conditions of the accelerator. In the situation a potential damage is foreseen, the beam permit signal will be drop. A critical element of this system is the fast Analog Machine Protection System, a high-bandwidth platform designed for real-time beam loss monitoring. The system utilizes a modular, FPGA-based architecture to digitize signals from beam-sensing devices, such as AC Current Transformers (ACCTs), non-invasive Ring Pickups (RPUs) and beam scrapers. To eliminate both high frequency as well as 60 Hz noise that might be picked up in the industrial environment, data processing schemes beyond regular digital filtering are planned and implemented.

Wu, Jinyuan [Fermilab] (ORCID:0000000344329521)↗

Reinforcing of QA/QC programs in radiotherapy departments in Croatia: Results of treatment planning system verification

Implementation of advanced techniques in clinical practice can greatly improve the outcome of radiation therapy, but it also makes the process much more complex with a lot of room for errors. An important part of the quality assurance program is verification of treatment planning system (TPS). Dosimetric verifications in anthropomorphic phantom were performed in 4 centers where new systems were installed. A total of 14 tests for 2 photon energies and multigrid superposition algorithms were conducted using the CMS XiO TPS. Evaluation criteria as specified in the International Atomic Energy Agency Technical Reports Series (IAEA TRS) 430 were employed. Results of measurements are grouped according to the placement of the measuring point and the beam energy. The majority of differences between calculated and measured doses in the water-equivalent part of the phantom were in tolerance. Significantly more out-of-tolerance values were observed in “nonwater-equivalent” parts of the phantom, especially for higher-energy photon beams. This survey was done as a part of continuous effort to build up awareness of quality assurance/quality control (QA/QC) importance in the Croatian radiotherapy community. Understanding the limitations of different parts of the various systems used in radiation therapy can systematically improve quality as well.

61 RADIATION PROTECTION AND DOSIMETRY↗

Rooftop Unit Replacement: adidas RTU Planned Replacement Program

This case study describes adidas’ successful implementation of a planned RTU replacement program designed to standardize equipment features and reduce costs, enabling the company to streamline acquisitions and ensure each location had the required equipment.

rooftop unit, RTU, replacement, retail, HVAC, air ↗

HSI in NASA: From Research to Implementation

As NASA plans to send human explorers beyond low Earth orbit, onward to Mars and other destinations in the solar system, there will be new challenges to address in terms of HSI. These exploration missions will be quite different from the current and past missions such as Apollo, Shuttle, and International Space Station. The exploration crew will be more autonomous from ground mission control with delayed, and at times, no communication. They will have limited to no resupply for much longer mission durations. Systems to deliver and support extended human habitation at these destinations are extremely complex and unique, presenting new opportunities to employ HSI practices. In order to have an effective and affordable HSI implementation, both research and programmatic efforts are required. Currently, the HSI-related research at NASA is primarily in the area of space human factors and habitability. The purpose is to provide human health and performance countermeasures, knowledge, technologies, and tools to enable safe, reliable, and productive human space exploration beyond low Earth orbit, and update standards, requirements, and processes to verify and validate these requirements. In addition, HSI teams are actively engaged in technology development and demonstration efforts to influence the mission architecture and next-generation vehicle design. Finally, appropriate HSI references have been added to NASA' s systems engineering documentation, and an HSI Practitioner's Guide has been published to help design engineers consider HSI early and continuously in the acquisition process. These current and planned HSI-related activities at NASA will be discussed in this panel.

Whitmore, Mihriban↗

Monte Carlo implementation, validation, and characterization of a 120 leaf MLC

Purpose: Recently, the new high definition multileaf collimator (HD120 MLC) was commercialized by Varian Medical Systems providing high resolution in the center section of the treatment field. The aim of this work is to investigate the characteristics of the HD120 MLC using Monte Carlo (MC) methods. Methods: Based on the information of the manufacturer, the HD120 MLC was implemented into the already existing Swiss MC Plan (SMCP). The implementation has been configured by adjusting the physical density and the air gap between adjacent leaves in order to match transmission profile measurements for 6 and 15 MV beams of a Novalis TX. These measurements have been performed in water using gafchromic films and an ionization chamber at an SSD of 95 cm and a depth of 5 cm. The implementation was validated by comparing diamond measured and calculated penumbra values (80%-20%) for different field sizes and water depths. Additionally, measured and calculated dose distributions for a head and neck IMRT case using the DELTA{sup 4} phantom have been compared. The validated HD120 MLC implementation has been used for its physical characterization. For this purpose, phase space (PS) files have been generated below the fully closed multileaf collimator (MLC) of a 40 x 22 cm{sup 2} field size for 6 and 15 MV. The PS files have been analyzed in terms of energy spectra, mean energy, fluence, and energy fluence in the direction perpendicular to the MLC leaves and have been compared with the corresponding data using the well established Varian 80 leaf (MLC80) and Millennium M120 (M120 MLC) MLCs. Additionally, the impact of the tongue and groove design of the MLCs on dose has been characterized. Results: Calculated transmission values for the HD120 MLC are 1.25% and 1.34% in the central part of the field for the 6 and 15 MV beam, respectively. The corresponding ionization chamber measurements result in a transmission of 1.20% and 1.35%. Good agreement has been found for the comparison between transmission profiles resulting from MC simulations and film measurements. The simulated and measured values for the penumbra agreed within <0.5 mm for all field sizes, depths, and beam energies, and a good agreement has been found between the measured and the calculated dose distributions for the IMRT case. The total energy spectra are almost identical for the three MLCs. However, the mean energy, fluence and energy fluence are significantly different. Due to the different leaf widths of the MLCs, the shape of these distributions is different, each representing its leave structure. Due to the increase in width from the inner to the outer HD120 MLC leaves, the fluence and energy fluence clearly decrease below the outer leaves. The MLC80 and the M120 MLC resulted in an increase of the fluence and energy fluence compared with those resulted for the HD120 MLC. The dose reduction can exceed 20% compared with the dose of the open field due to the tongue and groove design of the HD120 MLC. Conclusions: The HD120 MLC has been successfully implemented into the SMCP. Comparisons between MC calculations and measurements show very good agreement. The SMCP is now able to calculate accurate dose distributions for treatment plans using the HD120 MLC.

61 RADIATION PROTECTION AND DOSIMETRY↗

Overview of the DOE nuclear fuels storage and transportation planning project - 15444

The US Department of Energy (DOE) Office of Nuclear Energy is conducting planning activities within the Nuclear Fuels Storage and Transportation Planning Project (NFST) to lay the groundwork for implementing interim storage, including associated transportation, per the Administration's Strategy for the Management and Disposal of Used Nuclear Fuel and High-Level Radioactive Waste, and to develop a foundation for a new nuclear waste management organization. The purpose of the NFST is to make progress on this important national issue within existing legislative and budgetary authorizations. The objective of the NFST is to develop and begin implementation of an integrated plan to (1) implement interim storage; (2) improve the overall integration of storage as a planned part of the waste management system; (3) prepare for the large-scale transportation of spent nuclear fuel and high-level radioactive waste, with an initial focus on removing SNF from the shutdown reactor sites; and (4) develop foundational information, resources, and capabilities needed to support the aforementioned objectives and future implementation decisions and actions. An over-arching goal is to develop options for decision-makers on the design of an integrated waste management system. The planning activities are divided into four major topical areas: (1) Consent-Based Siting, (2) Storage, (3) Transportation, and (4) Strategic Crosscuts. This paper provides an overview of the NFST and its activities. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan For Groundwater Monitoring Wells At The U.S. Department Of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted "active" status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted "inactive" status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans. This plan applies to groundwater wells associated with Y-12 and related waste management areas and facilities located within three hydrogeologic regimes.

54 ENVIRONMENTAL SCIENCES↗

Y-12 Groundwater Protection Program Monitoring Optimization Plan for Groundwater Monitoring Wells at the U.S. Department of Energy Y-12 National Security Complex, Oak Ridge, Tennessee

This document is the monitoring optimization plan for groundwater monitoring wells associated with the U.S. Department of Energy (DOE) Y-12 National Security Complex (Y-12) in Oak Ridge, Tennessee. The plan describes the technical approach that is implemented under the Y-12 Groundwater Protection Program (GWPP) to focus available resources on the monitoring wells at Y-12 that provide the most useful hydrologic and groundwater quality monitoring data. The technical approach is based on the GWPP status designation for each well. Under this approach, wells granted “active” status are used by the GWPP for hydrologic monitoring and/or groundwater quality sampling, whereas wells granted “inactive” status are not used for either purpose. The status designation also defines the frequency at which the GWPP will inspect applicable wells, the scope of these well inspections, and extent of any maintenance actions initiated by the GWPP. Details regarding the ancillary activities associated with implementation of this plan (e.g., well inspection) are deferred to the referenced GWPP plans.

54 ENVIRONMENTAL SCIENCES↗

Automating the U.S. Space Station's electrical power system

NASA's Lewis Research Center is developing a highly automated system for the generation, storage and distribution of electrical power aboard the projected Space Station. This autonomous power system will employ conventional algorithms, enhanced by expert systems, to schedule power, allocate energy, diagnose causes of failure, propose goals, prepare plans for their implementation, evaluate their consequences, and select optimum plans for their execution. While crew-interactive expert systems will be ready for the initial Space Station, total system autonomy is expected to require additional development time.

Dolce, James L.↗

Facility Upgrade/Replacement Tasks ('planned') at the NASA Glenn Research Center 10x10 Supersonic Wind Tunnel

Facility upgrades and large maintenance tasks needed at the NASA Glenn 10x10 Supersonic Wind Tunnel requires significant planning to make sure implementation proceeds in an efficiently and cost effective manner. Advanced planning to secure the funding, complete design efforts and schedule the installation needs to be thought out years in advance to avoid interference with wind tunnel testing. This presentation describes five facility tasks planned for implementation over the next few years. The main focus of the presentation highlights the efforts on possible replacement of the diesel generator and the rationale behind the effort.

Giriunas, Julius A.↗

Successful Implementation of a Natural Resource Restoration Plan at the Fernald Preserve - 19568

The Fernald Preserve, Ohio, Site is a former uranium-processing plant that underwent extensive remediation pursuant to the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA). It is situated on a 425-hectare (ha) (1050-acre) tract of land, approximately 29 kilometers (km) (18 miles) northwest of Cincinnati, Ohio. The US Department of Energy (DOE) Office of Legacy Management is responsible for management of the site. Site remediation and subsequent ecological restoration have converted the site from an industrial production facility to an undeveloped park, encompassing a series of wetlands, prairies, and forested communities. The remediation of buildings and contaminated soil was completed in 2006, but aquifer remediation is ongoing. Portions of the site are open to the public, including approximately 11 km (7 miles) of walking trails that are open year-round and a Fernald Preserve Visitors Center open four days a week. Stakeholders were instrumental in providing recommendations for final land use of the site as an undeveloped park with an emphasis on wildlife. Final land use decisions were also instrumental in the resolution of a CERCLA natural resource damage claim. The State of Ohio sued DOE in 1986 for damages to state natural resources under Section 107 of CERCLA. The suit was stayed until completion of all Records of Decision (RODs) for the site. The last ROD was signed in 1996. DOE, which was both a Natural Resource Trustee (NRT) and a potentially responsible party (PRP) under CERCLA, initiated consultation with other site NRTs in 1993. A Trustee Council was formed that included DOE, Ohio Environmental Protection Agency (representing the State of Ohio), and the US Fish and Wildlife Service (representing the US Department of the Interior). The NRTs agreed collectively to conduct sitewide ecological restoration, consistent with the stakeholder vision of final land use. A conceptual restoration plan was drafted in 1998. This Natural Resource Restoration Plan (NRRP) developed goals for site restoration, as well as provisions for monitoring and maintenance of restored areas. The NRTs signed a Memorandum of Understanding in 2001, and DOE integrated ecological restoration design and construction into remediation and closure activities for the site. The NRT relationship became contentious in the following years as a result of a disagreement over monitoring commitments and compensation for groundwater injury. Final settlement was reached in 2008. As part of the settlement, DOE paid $13.75 million into the NRT fund as compensation for natural resource damages. In addition, the NRRP was finalized, and long-term commitments for monitoring and maintenance of ecologically restored areas were put in place. An Environmental Covenant was established and recorded with Hamilton and Butler Counties that ensures site activity and use limitations remain in place. The NRTs used a portion of the settlement funds to initiate the Paddys Run Conservation Project. This effort is a means to secure development rights and conservation easements within the Paddys Run watershed. Paddys Run is a third-order stream located on the western side of the Fernald Preserve. The NRTs partnered with Three Valley Conservation Trust to obtain assistance with land acquisition and conservation easement management, and since the program's inception in the Fall of 2012, more than 1820 ha (4500 acres) have been permanently protected via easement or purchase. Future decisions by the NRTs regarding monitoring and maintenance of restored areas will be negotiated in 2020. The site Restored Area Maintenance Plan (RAMP) was developed in 2010. The RAMP is a requirement within the NRRP and is scheduled for review following 10 years of implementation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

SU-E-T-644: QuAArC: A 3D VMAT QA System Based On Radiochromic Film and Monte Carlo Simulation of Log Files

Purpose: VMAT involves two main sources of uncertainty: one related to the dose calculation accuracy, and the other linked to the continuous delivery of a discrete calculation. The purpose of this work is to present QuAArC, an alternative VMAT QA system to control and potentially reduce these uncertainties. Methods: An automated MC simulation of log files, recorded during VMAT treatment plans delivery, was implemented in order to simulate the actual treatment parameters. The linac head models and the phase-space data of each Control Point (CP) were simulated using the EGSnrc/BEAMnrc MC code, and the corresponding dose calculation was carried out by means of BEAMDOSE, a DOSXYZnrc code modification. A cylindrical phantom was specifically designed to host films rolled up at different radial distances from the isocenter, for a 3D and continuous dosimetric verification. It also allows axial and/or coronal films and point measurements with several types of ion chambers at different locations. Specific software was developed in MATLAB in order to process and evaluate the dosimetric measurements, which incorporates the analysis of dose distributions, profiles, dose difference maps, and 2D/3D gamma index. It is also possible to obtain the experimental DVH reconstructed on the patient CT, by an optimization method to find the individual contribution corresponding to each CP on the film, taking into account the total measured dose, and the corresponding CP dose calculated by MC. Results: The QuAArC system showed high reproducibility of measurements, and consistency with the results obtained with the commercial system implemented in the verification of the evaluated treatment plans. Conclusion: A VMAT QA system based on MC simulation and high resolution dosimetry with film has been developed for treatment verification. It shows to be useful for the study of the real VMAT capabilities, and also for linac commissioning and evaluation of other verification devices.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

MO-G-304-04: Generating Well-Dispersed Representations of the Pareto Front for Multi-Criteria Optimization in Radiation Treatment Planning

Purpose: To present a novel multi-criteria optimization (MCO) solution approach that generates well-dispersed representation of the Pareto front for radiation treatment planning. Methods: Different algorithms have been proposed and implemented in commercial planning software to generate MCO plans for external-beam radiation therapy. These algorithms consider convex optimization problems. We propose a grid-based algorithm to generate well-dispersed treatment plans over Pareto front. Our method is able to handle nonconvexity in the problem to deal with dose-volume objectives/constraints, biological objectives, such as equivalent uniform dose (EUD), tumor control probability (TCP), normal tissue complication probability (NTCP), etc. In addition, our algorithm is able to provide single MCO plan when clinicians are targeting narrow bounds of objectives for patients. In this situation, usually none of the generated plans were within the bounds and a solution is difficult to identify via manual navigation. We use the subproblem formulation utilized in the grid-based algorithm to obtain a plan within the specified bounds. The subproblem aims to generate a solution that maps into the rectangle defined by the bounds. If such a solution does not exist, it generates the solution closest to the rectangle. We tested our method with 10 locally advanced head and neck cancer cases. Results: 8 objectives were used including 3 different objectives for primary target volume, high-risk and low-risk target volumes, and 5 objectives for each of the organs-at-risk (OARs) (two parotids, spinal cord, brain stem and oral cavity). Given tight bounds, uniform dose was achieved for all targets while as much as 26% improvement was achieved in OAR sparing comparing to clinical plans without MCO and previously proposed MCO method. Conclusion: Our method is able to obtain well-dispersed treatment plans to attain better approximation for convex and nonconvex Pareto fronts. Single treatment plan can be achieved when given bounds on the objectives.

60 APPLIED LIFE SCIENCES↗

A Community for Polar Early Career Researchers Engaging With the Interagency Arctic Research Policy Committee

The Interagency Arctic Research Policy Committee (IARPC) is tasked with implementation of the Arctic Research Plan (ARP) by coordinating representatives from federal and state agencies, academic, industry, and Indigenous partners with interests in Arctic research. IARPC is organized into several collaboration teams and discipline-specific communities of practice that interface on the IARPC Collaborations website. The Early Career Community of Practice (ECCoP) is one such community that was established to promote the research of early career researchers (ECR) and increase ECR engagement with the ARP, program managers, collaboration teams, and communities of practice. The ECCoP has grown to develop regular newsletters promoting recent ECR research publications ad sharing training, job, funding, and collaboration opportunities relevant to community members at all life stages that self-identify as ECRs. Within IARPC, the ECCoP continues to promote ECR participation in monthly community of practice meetings and webinars and to report on ECR efforts that contribute to deliverables of the ARP Biennial Implementation Plan. Recent activity of the ECCoP includes developing an annual survey of the ECR cohort on IARPC to follow change in demographics over time and to identify community needs to improve diversity and inclusion in the polar research space and to address gaps in training needs for ECRs.

Katy Smith↗

Planning Hybrid Intensity Modulated Radiation Therapy for Whole-breast Irradiation

Purpose: To test tangential and not-tangential hybrid intensity modulated radiation therapy (IMRT) for whole-breast irradiation. Methods and Materials: Seventy-eight (36 right-, 42 left-) breast patients were randomly selected. Hybrid IMRT was performed by direct aperture optimization. A semiautomated method for planning hybrid IMRT was implemented using Pinnacle scripts. A plan optimization volume (POV), defined as the portion of the planning target volume covered by the open beams, was used as the target objective during inverse planning. Treatment goals were to prescribe a minimum dose of 47.5 Gy to greater than 90% of the POV and to minimize the POV and/or normal tissue receiving a dose greater than 107%. When treatment goals were not achieved by using a 4-field technique (2 conventional open plus 2 IMRT tangents), a 6-field technique was applied, adding 2 non tangential (anterior-oblique) IMRT beams. Results: Using scripts, manual procedures were minimized (choice of optimal beam angle, setting monitor units for open tangentials, and POV definition). Treatment goals were achieved by using the 4-field technique in 61 of 78 (78%) patients. The 6-field technique was applied in the remaining 17 of 78 (22%) patients, allowing for significantly better achievement of goals, at the expense of an increase of low-dose ({approx}5 Gy) distribution in the contralateral tissue, heart, and lungs but with no significant increase of higher doses ({approx}20 Gy) in heart and lungs. The mean monitor unit contribution to IMRT beams was significantly greater (18.7% vs 9.9%) in the group of patients who required 6-field procedure. Conclusions: Because hybrid IMRT can be performed semiautomatically, it can be planned for a large number of patients with little impact on human or departmental resources, promoting it as the standard practice for whole-breast irradiation.

62 RADIOLOGY AND NUCLEAR MEDICINE↗

Integrated Facilities and Infrastructure Plan.

Our facilities and infrastructure are a key element of our capability-based science and engineering foundation. The focus of the Integrated Facilities and Infrastructure Plan is the development and implementation of a comprehensive plan to sustain the capabilities necessary to meet national research, design, and fabrication needs for Sandia National Laboratories’ (Sandia’s) comprehensive national security missions both now and into the future. A number of Sandia’s facilities have reached the end of their useful lives and many others are not suitable for today’s mission needs. Due to the continued aging and surge in utilization of Sandia’s facilities, deferred maintenance has continued to increase. As part of our planning focus, Sandia is committed to halting the growth of deferred maintenance across its sites through demolition, replacement, and dedicated funding to reduce the backlog of maintenance needs. Sandia will become more agile in adapting existing space and changing how space is utilized in response to the changing requirements. This Integrated Facilities & Infrastructure (F&I) Plan supports the Sandia Strategic Plan’s strategic objectives, specifically Strategic Objective 2: Strengthen our Laboratories’ foundation to maximize mission impact, and Strategic Objective 3: Advance an exceptional work environment that enables and inspires our people in service to our nation. The Integrated F&I Plan is developed through a planning process model to understand the F&I needs, analyze solution options, plan the actions and funding, and then execute projects.

99 GENERAL AND MISCELLANEOUS↗

Lessons Learned from the Development of the DGR Konrad - 19619

The Federal Republic Germany builds the deep geological repository Konrad. The repository is suitable for low- and intermediate-level radioactive waste (LAW and MAW) and it is the first German repository site, which is not located in a salt geological formation. Konrad is a former iron ore mine in Salzgitter (in southeast Lower Saxony) with an active production time between 1961 and 1976. In 2007, the BGE started with the conversion of the mine infrastructure above and underground to build the repository while using the shafts and some roadways of the former mine. The experiences gained from ten years project progress with its complexities and difficulties can be used for similar repository projects in the future. The Konrad repository is designed for 303,000 m{sup 3} of LAW and MAW, which will be emplaced in chambers. The emplacement chambers are located outside of the existing mine, so an impairment by the old mine workings can be excluded. So far, the first area with emplacement chambers has been excavated. In order to be able to start repository operations in 2027, a wide range of work in building construction, civil engineering, shaft sinking and infrastructure development above and below ground has been necessary and will be completed in the next years. The main activities are focused on the Konrad 1 and 2 sites and the part of the infrastructure located in the future control area, which is used for repository operations. There are still many challenges to overcome in the Konrad repository project, although many processes have been put on the right track in recent years. Looking back on past activities and in the cautious preview, this paper gives some indications from which lessons can be drawn and should be applied to similar projects in the future. - Prefer small dimensions for the infrastructure, such as insets and roadway cross-section, and the appropriate machinery and handling equipment; - Detailed process planning for construction in existing infrastructure in the run-up to implementation; - Intensive communication with contracted partners on the preparation of planning documents for nuclear examination procedures and ensuring an excellent contract management; - Early start of the implementation planning for projects under nuclear law, taking into account the relevant boundary conditions; - Ensuring the support of the project by the local community and other stakeholders. Overall, the use of parts of the existing above and underground infrastructure for the construction of a new repository is more difficult than for a complete new construction. But using the shafts of an existing mine delivers the advantage of very good knowledge about the underground environment. In addition, the areas necessary for the construction and operation of the buildings and facilities are already available and secured and do not compete with other projects.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗