Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Federal Programs”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

The Public Health Service guidelines. Governing research involving human subjects: An analysis of the policy-making process

The policy making process which led to development of the Public Health Service Guidelines governing research involving human subjects is outlined. Part 1 examines the evolution of PHS Guidelines, tracing (1) evolution of thought and legal interpretation regarding research using human subjects; (2) initial involvement of the Federal government; (3) development of the government's research program; (4) the social-political environment in which formal government policy was developed; and (5) various policy statements issued by the government. Part 2 analyzes the process by which PHS Guidelines were developed and examines the values and other underlying factors which contributed to their development. It was concluded that the evolution of the Guidelines is best understood within the context of a mixed-scanning strategy. In such a strategy, policy makers make fundamental decisions regarding the basic direction of policy and subsequent decisions are made incrementally and within the contexts set by the original fundamental decisions.

Frankel, M. S.↗

Combining total energy and energy industrial center concepts to increase utilization efficiency of geothermal energy

Integrating energy production and energy consumption to produce a total energy system within an energy industrial center which would result in more power production from a given energy source and less pollution of the environment is discussed. Strong governmental support would be required for the crash drilling program necessary to implement these concepts. Cooperation among the federal agencies, power producers, and private industry would be essential in avoiding redundant and fruitless projects, and in exploiting most efficiently our geothermal resources.

Bayliss, B. P.↗

Index of NASA prefixed forms

This Handbook sets forth information for the guidance of all users of the NASA Forms Management Program System. It is issued in accordance with the Federal Information Resources Management Regulation (FIRMR), Subpart 201-9.1. This Handbook sets forth an alpha-functional index of NASA-prefixed forms by title, identifying number, and unit of issue. The automated processing two-letter code (NF) has been substituted for the spelling out of the NASA form-prefix preceding the form number. To indicate a description in lieu of a distinct title, the entire reference under the Form Title/Description column has been enclosed in parentheses. A list of current forms, shown by number and page, is included for cross-reference and to preclude the ordering of those forms which have been deleted from the system. This Handbook will be updated, as appropriate. NHB 1420.2H dated July 1986, is cancelled.

Source record↗

A review of falconry as a bird control technique with recommendations for use at the Shuttle Landing Facility, John F. Kennedy Space Center, Florida, USA

Falconry has been proposed as a method of reducing the bird/aircraftstrike hazard, in addition to current bird control techniques, at the Shuttle Landing Facility (SLF), John F. Kennedy Space Center (KSC), Florida, U.S. Bird control programs using falconry have been employed at a number of military and commercial airfields in the U.S., Canada, and Europe. Most falconry programs have been discontinued. In most situations, falconry did not prove cost effective when compared to alternative bird control techniques. Available literature and documents, as well as several raptor specialists and military personnel, suggest that falconry may be useful only against certain problem species and when other bird control methods have been proven inadequate. Because many of the most commonly used falcons are protected species, acquisition of falcons will complicate their use in bird control programs. Many avian species found at the SLF are federally and state protected or of conservation concern, therefore, environmental impacts may also result from the use of falcons.

Larson, Vickie L.↗

Significance of shock structure on supersonic jet mixing noise of axisymmetric nozzles

One of the key technical elements in NASA's high speed research program is reducing the noise level to meet the federal noise regulation. The dominant noise source is associated with the supersonic jet discharged from the engine exhaust system. Whereas the turbulence mixing is largely responsible for the generation of the jet noise, a broadband shock-associated noise is also generated when the nozzle operates at conditions other than its design. For both mixing and shock noise components, because the source of the noise is embedded in the jet plume, one can expect that jet noise can be predicted from the jet flowfield computation. Mani et al. developed a unified aerodynamic/acoustic prediction scheme by applying an extension of Reichardt's aerodynamic model to compute turbulent shear stresses which are utilized in estimating the strength of the noise source. Although this method produces a fast and practical estimate of the jet noise, a modification by Khavaran et al. has led to an improvement in aerodynamic solution. The most notable feature in this work is that Reichardt's model is replaced with the computational fluid dynamics (CFD) solution of Reynolds-averaged Navier-Stokes equations. The major advantage of this work is that the essential, noise-related flow quantities such as turbulence intensity and shock strength can be better predicted. The predictions were limited to a shock-free design condition and the effect of shock structure on the jet mixing noise was not addressed. The present work is aimed at investigating this issue. Under imperfectly expanded conditions the existence of the shock cell structure and its interaction with the convecting turbulence structure may not only generate a broadband shock-associated noise but also change the turbulence structure, and thus the strength of the mixing noise source. Failure in capturing shock structures properly could lead to incorrect aeroacoustic predictions.

Kim, Chan M.↗

Towards the Development of a Global Precipitation Measurement (GPM) Mission Concept

The scientific success of the Tropical Rainfall Measuring Mission (TRMM) and additional satellite-focused precipitation retrieval projects have paved the way for a more advanced global precipitation mission. A comprehensive global measuring strategy is currently under study - Global Precipitation Measurement (GPM). The GPM study could ultimately lead to the development of the Global Precipitation Mission. The intent of GPM is to address looming scientific questions arising in the context of global climate-water cycle interactions, hydrometeorology, weather prediction and prediction of freshwater resources, the global carbon cycle, and biogeochemical cycles. This talk overviews the status and scientific agenda of this proposed mission currently planned for launch in the 2007-2008 time frame. GPM is planning to expand the scope of precipitation measurement through the use of a constellation of 6-10 satellites, one of which will be an advanced TRMM-like "core" satellite carry dual-frequency Ku-Ka band radar and a microwave radiometer (e.g. TMI-like). The other constellation members will likely include new lightweight satellites and co-existing operational/research satellites carrying passive microwave radiometers. The goal behind the constellation is to achieve no worse than 3-hour sampling at any spot on the globe. The constellation's orbit architecture will consist of a mix of sun-synchronous and non-su n -synchronous satellites with the "core" satellite providing measurement of cloud-precipitation microphysical processes plus "training calibrating" information to be used with the retrieval algorithms for the constellation satellite measurements. The GPM is organized internationally, currently involving a partnership between NASA in the US, NASDA in Japan, and ESA in Europe (representing the European community). The program is expected to involve additional international partners, other federal agencies, and a diverse collection of scientists from academia, government, and the private sector.

Shepherd, Marshall↗

Aerosol Wind Profiler (AWP) Doppler Wind Lidar Airborne Observations During the NOAA Joint Venture 3-D Wind Measurement Demonstration and NASA Active-Passive Profiling Experiment (APEX)

The NASA Langley Research Center (LaRC) has recently completed development of the Aerosol Wind Profiler (AWP) airborne Doppler wind lidar (DWL) instrument. AWP was supported by the NASA Earth Science Technology Office and the Earth Science Division, a project that adapted the Wind-Space Pathfinder (Wind-SP) DWL transceiver onto a structure for flight aboard a variety of NASA research aircraft. AWP demonstrates many technologies required for a space DWL mission, including a coherent-detection, optical heterodyne laser transmitter with high pulse energy (up to ~55 mJ) and repetition rate (200 Hz), electronic control of the beam path allowing for multiple viewing angles (allowing vector wind measurements) with no moving parts, compact highly-stable and tunable reference lasers allowing for high-precision measurement of velocity at long ranges while mitigating the impact of satellite platform velocity, and many others. AWP represents NASA’s only currently operational airborne 3-D wind profiling sensor. NASA LaRC was selected by the NOAA Joint Venture (JV) program to conduct a suborbital 3-D Wind measurement campaign demonstrate how data from a coherent-detection DWL like AWP could serve NOAA’s weather analysis and forecasting needs. The NOAA JV program is designed to work with the private sector, academia and other federal agencies to explore the feasibility and capability of emerging technologies spacecraft and other mission-specific tools to meet NOAA’s mission requirements. AWP was initially demonstrated on the NASA DC-8 within this JV program in October 2023, piggybacking on the NASA EcoDemonstrator mission focused on in-situ sampling of jet aircraft emissions and contrail formation from Everett, Washington. The in-situ sampling resulted in very frequent and rapid aircraft attitude changes which unfortunately degraded AWP data quality. But, during times with level flight and AVAPS dropsonde operations, AWP demonstrated excellent precision (< 2 m/s RMS) with high vertical (< 100 meter) resolution and 2 km spacing between profiles. AWP will be flown again on the NASA LaRC Gulfstream-3 from mid-September to mid-October 2024 out of Hampton, VA to complete the NOAA JV 3-D wind demonstration. Additional AWP flights will occur in early November from southern California during the NASA Active-Passive Profiling Experiment (APEX), focused on underflights of the NASA ER-2 equipped with many atmospheric profiling sensors. This presentation will summarize AWP measurements collected during these two fall 2024 flight campaigns, and how the AWP data compares with AVAPS dropsonde, NOAA weather prediction model, and GOES atmospheric motion vector data.

Kristopher Bedka↗

Public Outreach in FUSRAP - 16201

The U. S. Army Corps of Engineers (USACE) is the lead federal agency for the Formerly Utilized Sites Remedial Action Program (FUSRAP) which was initiated in 1974 to address contamination remaining from Manhattan Engineer District and early U.S. Atomic Energy Commission activities. As the lead agency, USACE follows the protocols set forth in the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) to address FUSRAP sites. During certain project milestones of the CERCLA process, community outreach initiatives occur to communicate the status and/or findings from site investigations and project decision documents. The style of public interaction is tailored to match the project milestone, technical complexity of a project, the stakeholder involvement level, or type of decision being made on a particular project. Community involvement is one of the most important aspects of environmental work, and proactive and transparent communication can build meaningful relationships with the community and between project stakeholders. The USACE Buffalo District has experience using different stakeholder interaction techniques and providing information on projects through a variety of media. Rather than simply distributing information, the goal of community outreach is to encourage participation in the process and to provide opportunities for the public to fully understand, ask questions about, and provide feedback on the complex technical issues involved in decision-making for each FUSRAP site. The frequency and method of interaction depends on the project, and the USACE Buffalo District has worked to promote openness and transparency and to ensure the community is provided with many opportunities for public participation. Project information has been provided to stakeholders using multiple techniques, such as formal project workshops, poster sessions, site tours, news releases, storybooks, and videos. Aside from project-specific community relations plans, the USACE Buffalo District has participated in Science, Technology, Engineering and Math (STEM) programs established to inspire current and future generations of young people to pursue careers in STEM fields. Each year, the USACE Buffalo District performs outreach in the community to share information on our projects as well as to introduce students to various disciplines associated with environmental careers. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Port Hope Area Initiative - Community Based Concepts Become Reality - 16538

The Port Hope Area Initiative (PHAI) involves the cleanup of historic low-level radioactive waste (LLRW) resulting from radium and uranium processing by the former Crown Corporation, Eldorado Nuclear Limited, and its predecessor companies, during the period between 1932 and 1988. The PHAI, which is based on a legal agreement between the Government of Canada and the adjacent municipalities of Port Hope and Clarington in Ontario, Canada, comprises two separate community-initiated projects for the long-term management of the historic LLRW located in each of these municipalities. The Port Hope Project involves the cleanup of approximately 1.2 million cubic metres of historic LLRW from various sites within the urban area of Port Hope, the construction and operation of an engineered aboveground mound where the waste will be safely contained, and the long-term maintenance and monitoring of the new waste management facility. The waste is currently located in 13 large-scale sites and an estimated 375 small-scale sites within the community. In contrast, the Port Granby Project involves the relocation of approximately 450,000 cubic metres of historic LLRW from the existing waste site on the north shore of Lake Ontario in rural Clarington, to a new engineered aboveground mound to be built 700 metres north of the shoreline. The work also involves the restoration of the existing site and long-term maintenance and monitoring the new facility. The PHAI entered Phase 2 (construction) of a three-phase program in early 2012, when $1.28 billion (Canadian) in federal funding was announced by the Minister of Natural Resources Canada. The funding, together with regulatory approval from the Canadian Nuclear Safety Commission (CNSC), which granted 10-year waste management licences to both projects, have permitted the PHAI to move forward with construction and remediation. Waste water treatment plants based on best-available technologies have been constructed for each project to remove a wide range of contaminants from groundwater, surface water and leachate collected during construction and operation of the aboveground mounds. Each treatment process has been designed to ensure the quality of treated water being discharged into Lake Ontario meets or exceeds stringent regulatory requirements, resulting in the enhanced protection of the Great Lakes Basin ecosystem. In 2015, the contract to build the Port Granby long-term waste management facility and remediate the existing waste site was awarded, and the long-awaited facility development will soon begin. The use of a dedicated internal waste transportation route along, which the LLRW will be trucked from the existing site to the new facility, is a key component of the design to minimize the impact on the local, rural community. In Port Hope, the removal of contaminated soil within the site for the new long-term management facility commenced in the fall of 2015. Over the next several years, multiple contracts will be awarded for construction and operation of the new waste management facility and remediation of the large and small-scale sites. In short, the Port Hope and Port Granby community-based concepts have matured into tangible projects with appropriate regulatory approvals and federal funding in place. Ongoing communications with the two communities have resulted in a well-informed public that understands the work to be done and is eager to see their projects take shape and become reality. As Canada's largest environmental remediation and restoration undertaking, the PHAI has never been closer to fulfilling its vision - working with the local communities to fulfil Canada's commitment for the cleanup of historic waste in Port Hope and Port Granby to leave an honourable legacy for future generations. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Weapons to widgets: Organic systems and public policy for tech transfer

Large cuts in defense spending cause serious repercussions throughout the American economy. One means to counter the negative effects of defense reductions is to redirect federal dollars to temporarily prop up defense industries and, over the longer-term, stimulate growth of new nondefense industries. The creation of non-defense products and industries by channeling ideas from public laboratories into the private sector manufacturing facilities, known as technology transfer, is being undertaken in a massive program that has high visibility, large amounts of money, and broad federal agency involvement. How effectively federal money can be directed toward stimulating the creation of non-defense products will define the strength of the economy, (i.e., tax base, employment level, trade balance, capital investments, etc.), over the next decade. Key functions of the tech transfer process are technology and market assessment, capital formation, manufacturing feasibility, sales and distribution, and business organization creation. Those, however, are not functions typically associated with the federal government. Is the government prepared to provide leadership in those areas? This paper suggests organic systems theory as a means to structure the public sector's actions to provide leadership in functional areas normally outside their scope of expertise. By applying new ideas in organization theory, can we design government action to efficiently and effectively transfer technologies?

Cargo, Russell A.↗

Hanford Site Sustainability Program, Richland, Washington - 12464

In support of implementation of Executive Order (EO) 13514, Federal Leadership in Environmental, Energy and Economic Performance, the Hanford Site Sustainability Plan [1] was developed to implement strategies and activities required to achieve the prescribed goals in the EO as well as demonstrate measurable progress in environmental stewardship at the Hanford Site. The Hanford Site has made significant progress in the area of environmental stewardship through multiple initiatives to reduce energy consumption and GHG emissions, despite increased demands in those areas due to accelerated cleanup work driven by ARRA funding. Future plans, contingent on available funding, include additional enhancements in the areas of fleet management, including installation of additional charging stations and continued acquisition of alternate fueled vehicles, implementation of one or more of the recommendations from the Feasibility Study on reducing GHG emissions from employee commuting, and potential diversion of solid waste from on-site landfills. (author)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Using Qualified Energy Conservation Bonds (QECBs) to Fund a Residential Energy Efficiency Loan Program: Case Study on Saint Louis County, MO

Qualified Energy Conservation Bonds (QECBs) are federally-subsidized debt instruments that enable state, tribal, and local government issuers to borrow money to fund a range of qualified energy conservation projects. QECBs offer issuers very attractive borrowing rates and long terms, and can fund low-interest energy efficiency loans for home and commercial property owners. Saint Louis County, MO recently issued over $\$$10 million of QECBs to finance the Saint Louis County SAVES residential energy efficiency loan program. The county's experience negotiating QECB regulations and restrictions can inform future issuers.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Annual Site Environmental Report: 2008 (ASER) for the SLAC National Accelerator Laboratory

This report provides information about environmental programs during the calendar year of 2008 at the SLAC National Accelerator Laboratory (SLAC), Menlo Park, California. Activities that span the calendar year, i.e., stormwater monitoring covering the winter season of 2008/2009 (October 2008 through May 2009), are also included. Production of an annual site environmental report (ASER) is a requirement established by the United States Department of Energy (DOE) for all management and operating (M&O) contractors throughout the DOE complex. SLAC is a federally-funded research and development center with Stanford University as the M&O contractor. Under Executive Order (EO) 13423, Strengthening Federal Environmental, Energy, and Transportation Management, and DOE Order 450.1A, Environmental Protection Program, SLAC effectively implements and integrates the key elements of an Environmental Management System (EMS) to achieve the site's integrated safety and environmental management system goals. For normal daily activities, SLAC managers and supervisors are responsible for ensuring that policies and procedures are understood and followed so that: (1) Worker safety and health are protected; (2) The environment is protected; and (3) Compliance is ensured. Throughout 2008, SLAC continued to improve its management systems. These systems provided a structured framework for SLAC to implement 'greening of the government' initiatives such as EO 13423 and DOE Orders 450.1A and 430.2B. Overall, management systems at SLAC are effective, supporting compliance with all relevant statutory and regulatory requirements. SLAC continues to demonstrate significant progress in implementing and integrating EMS into day-to-day operations and construction activities at SLAC. The annual management review and ranking of environmental aspects were completed this year by SLAC's EMS Steering Committee, the Environmental Safety Committee (ESC), and twelve objectives and targets were established for 2008. For each objective and target, a work plan, or Environmental Management Program (EMP) was completed and progress reports were routinely provided to SLAC senior management and the DOE SLAC Site Office (SSO). During 2008, there were no reportable releases to the environment from SLAC operations. In addition, many improvements in waste minimization, recycling, stormwater management, groundwater restoration, and SLAC's chemical management system (CMS) were continued during the year. The following are amongst SLAC's environmental accomplishments for 2008: a composting program at SLAC's onsite cafeteria was initiated, greater than 800 cubic feet of legacy radioactive waste were packaged and shipped from SLAC, a chemical redistribution program was developed, SLAC reduced the number of General Services Administration leased vehicles from 221 to 164, recycling of municipal waste was increased by approximately 140 tons during 2008, and site-wide releases of sulfur hexafluoride were reduced by 50 percent. In 2008, no radiological incidents occurred that increased radiation levels or released radioactivity to the environment. In addition to managing its radioactive wastes safely and responsibly, SLAC worked to reduce the amount of waste generated. SLAC has implemented programs and systems to ensure compliance with all radiological requirements related to the environment. Specifically, the Radiation Protection Radiological Waste Management Group developed a training course to certify Radioactive Waste Generators, conducted a training pilot, and developed a list of potential radioactive waste generators to train. Twenty eight generators were trained in 2008. As a best management practice, SLAC also reduced its tritium inventory by at least 95 percent by draining one of its accelerator cooling water systems; with the cooperation of the South Bayside System Authority, the West Bay Sanitary District and the DOE, SLAC discharged the cooling water to the sanitary sewer according to federal regulations and replenished the system with clean water. In 2008, the SLAC Environmental Restoration Program personnel continued work on site characterization and evaluation of remedial alternatives at four sites with volatile organic compounds in groundwater and several areas with polychlorinated biphenyls and low concentrations of lead in soil. SLAC is regulated under a site cleanup requirements order (board order) issued by the California Regional Water Quality Control Board (RWQCB), San Francisco Bay Region in May 2005 for the investigation and remediation of impacted soil and groundwater at SLAC. The board order lists specific tasks and deadlines for completion of groundwater and soil characterization and other remediation activities. All 2008 submittals to the RWQCB were completed and submitted on time.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

2011 Wind Technologies Market Report

The U.S. wind power industry is facing uncertain times. With 2011 capacity additions having risen from 2010 levels and with a further sizable increase expected in 2012, there are – on the surface – grounds for optimism. Key factors driving growth in 2011 included continued state and federal incentives for wind energy, recent improvements in the cost and performance of wind power technology, and the need to meet an end-of-year construction start deadline in order to qualify for the Section 1603 Treasury grant program. At the same time, the currently-slated expiration of key federal tax incentives for wind energy at the end of 2012 – in concert with continued low natural gas prices and modest electricity demand growth – threatens to dramatically slow new builds in 2013.

17 WIND ENERGY↗

SPACE/COHMEX data inventory document

During the period June to July 1986, NASA conducted the Satellite Precipitation and Cloud Experiment (SPACE) in the central Tennessee, northern Alabama, and northeastern Mississippi area. In addition to SPACE, the Microburst and Severe Thunderstorm (MIST) Program, sponsored by the National Science Foundation, and the FAA-Lincoln Laboratory Operational Weather Study (FLOWS) sponsored by the Federal Aviation Administration, operated concurrently under the acronym of COHMEX (Cooperative Huntsville Meteorological Experiment). The COHMEX field program incorporated measurements from remote sensors flown on high altitude aircraft (ER-2 and U-2), Doppler and conventional radars, rawinsondes, satellites, cloud physics research aircraft, and various surface observational systems.

Williams, S. F.↗

Midwest Nuclear Science and Engineering Consortium

The objective of the Midwest Nuclear Science and Engineering Consortium (MNSEC) is to enhance the scope, quality and integration of educational and research capabilities of nuclear sciences and engineering (NS/E) programs at partner schools in support of the U.S. nuclear industry (including DOE laboratories). With INIE support, MNSEC had a productive seven years and made impressive progress in achieving these goals. Since the past three years have been no-cost-extension periods, limited -- but notable -- progress has been made in FY10. Existing programs continue to be strengthened and broadened at Consortium partner institutions. The enthusiasm generated by the academic, state, federal, and industrial communities for the MNSEC activities is reflected in the significant leveraging that has occurred for our programs.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

German telecommunications satellite (Deutscher fernmelde satellit) (DFS-1 and -2)

The German Telecommunications Satellite (DFS) Program is to provide telecommunications service for high data rate transmission of text and video data to the Federal Republic of Germany within the 11-14 GHz and 20-30 GHz bands. The space segment of this program is composed of three satellites, DFS-1, DFS-2, and DFS-3, which will be located at 23.5 degrees E longitude of the geostationary orbit. The DFS will be launched from the Center Spatial Guyanis in French Giana on an Ariane launch vehicle. The mission follows the typical injection sequence: parking orbit, transfer orbit, and earth orbit. Attitude maneuvers will be performed to orient the spacecraft prior to Apogee Kick Motor (AKM) firing. After AKM firing, drift phase orbital and attitude maneuvers will be performed to place the spacecraft in its final geostationary position. The Deep Space Network (DSN) will support the transfer and drift orbit mission phases. Information is presented in tabular form for the following areas: DSN support, compatibility testing, frequency assignments, telemetry, command, and tracking support responsibilities.

Hiendlmeier, G.↗

Flight service evaluation of composite helicopter components

This paper presents the results of a NASA funded contract and Sikorsky research and development programs to evaluate structural composite components in flight service on Sikorsky Model S-76 helicopters. Selected components were removed and tested at prescribed intervals over a nine year time frame. Four horizontal stabilizers and thirteen tail rotor spars were returned from commercial service in West Palm Beach, Florida and in the Gulf Coast region of Louisiana to determine the long term effects of operations in hot and humid climates on component performance. Concurrent with the flight component evaluation, panels of materials used in their fabrication were exposed to the environment in ground racks. Selected panels were tested annually to determine the effects of exposure on physical and mechanical properties. The results of 55,741 component flight hours and 911 months of field exposure are reported and compared with initial Federal Aviation Administration (FAA) certification data. The findings of this program have provided increased confidence in the long term durability of advanced composite materials used in helicopter structural applications.

Mardoian, George H.↗