Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “FEASIBILITY STUDIES”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Strategic Energy Plan, Town of Cranberry Isles

This report details the strategic energy plan for the Town of Cranberry Isles, Maine. This project was spearheaded by the Cranberry Isles Community Solar Association (CICSA), and supported by Island Institute and Sandia National Laboratories, in partnership with the National Laboratory of the Rockies and Versant Power. The plan details the energy vision, goals, and focus areas for the community, provides technical analysis of the current energy system, and outlines potential projects to support community energy. Throughout the energy planning process, the project team engaged with members of the community to gather input and ideas to shape the plan. The project team and Versant also completed an extensive data collection to better inform the project. Sandia National Laboratories completed baseline technical assessments and feasibility studies to better understand potential feasible options for future projects. These potential projects, high-level costs, and next steps are a key output of this report.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A preliminary study of containment concepts for aircraft landing on elevated STOL-ports

A preliminary study of containment systems for aircraft landing on elevated STOL-ports was conducted as part of an overall study of human acceptance problems associated with STOL operations. The study included a survey and feasibility study of different concepts and a computer analysis of four arrestment systems. The principal conclusion was that a system referred to as the FAA system appears to offer the greatest promise. In this system, standard arresting gear cables are stretched across the roof-top, at roughly 100-foot intervals, but are shielded over the 100-foot-wide primary landing strip. Thus a pilot can land with an arresting hook down, but will not contact the cable unless he swerves off the landing strip, either because he has made a bad landing, or because his landing gear has failed. It was also noted that a suitable curb or guard rail should be developed. Presently available arresting gears and nylon net barriers were considered satisfactory for the overshoot problem.

Haviland, J. K.↗

Engine system assessment study using Martian propellants

A top-level feasibility study was conducted that identified and characterized promising chemical propulsion system designs which use two or more of the following propellant combinations: LOX/H2, LOX/CH4, and LOX/CO. The engine systems examined emphasized the usage of common subsystem/component hardware where possible. In support of this study, numerous mission scenarios were characterized that used various combinations of Earth, lunar, and Mars propellants to establish engine system requirements to assess the promising engine system design concept examined, and to determine overall exploration leverage of such systems compared to state-of-the-art cryogenic (LOX/H2) propulsion systems. Initially in the study, critical propulsion system technologies were assessed. Candidate expander and gas generator cycle LOX/H2/CO, LOX/H2/CH4, and LOX/CO/CH4 engine system designs were parametrically evaluated. From this evaluation baseline, tripropellant Mars Transfer Vehicle (MTV) LOX cooled and bipropellant Lunar Excursion Vehicle (LEV) and Mars Excursion Vehicle (MEV) engine systems were identified. Representative tankage designs for a MTV were also investigated. Re-evaluation of the missions using the baseline engine design showed that in general the slightly lower performance, smaller, lower weight gas generator cycle-based engines required less overall mission Mars and in situ propellant production (ISPP) infrastructure support compared to the larger, heavier, higher performing expander cycle engine systems.

Pelaccio, Dennis↗

Ni coating on 316L stainless steel using cage plasma treatment: Feasibility and swelling studies

A modified cage plasma nitriding technique is used to coat a Ni film onto a 316L substrate as a protective layer for austenitic steels in molten fluoride salts. The coating is achieved by deposition of Ni atoms sputtered from a Ni cage with a 316L substrate floated at the same potential as the cage to reduce plasma sputtering on the substrate. The Ni coating is porosity-free and precipitation-free and forms a γ-(Fe, Ni) phase due to interdiffusion from the substrate. Beneath the interdiffusion layer exists a thick γ-phase layer mainly affected by long-range nitrogen diffusion along the grain boundary. This layer develops grain boundary Cr nitride precipitates. Ion irradiation on the polished cross-section of the plasma-treated sample shows no void swelling in the surface-deposited Ni layer, very limited void formation in N diffusion layer, and significant void swelling in bulk unaffected by nitrogen. The studies demonstrate the feasibility of the technique for Ni coating and show good swelling resistance of the coating layer and N diffusion-affected layer. Mechanisms are discussed in this paper.

36 MATERIALS SCIENCE↗

The remote measurement of trace atmospheric species by correlation interferometry. I - Carbon monoxide and methane

A correlation interferometer has been developed for the measurement of carbon monoxide and methane at 2.35 micrometers in the troposphere and in the stratosphere. This instrument has been tested in laboratory tests, solar-looking outdoor tests, and downward-looking airplane-based tests. The aircraft tests were flown on a Falcon fanjet provided by The Canada Centre for Remote Sensing over both polluted and unpolluted regions of North America. The results of these various tests are discussed. Based on the results obtained for carbon monoxide and methane, a study was undertaken to investigate the feasibility of measuring other atmospheric trace species by correlation interferometry. Results of the feasibility study for carbon dioxide, water vapor, ammonia, nitrous oxide, nitric oxide, nitrogen dioxide, sulfur dioxide, and several hydrocarbons are presented.

Goldstein, H. W.↗

Development Concepts for Mars Ascent Vehicle (MAV) Solid and Hybrid Vehicle Systems

Mars Ascent Vehicle (MAV) Study Introduction: Previous Studies -Solid, liquid and hybrid rocket propulsion feasibility studies since 2011 -Focus on hybrid rocket propulsion since 2016; Reassessing Propulsion Systems for Risk Reduction - Liquid propulsion vehicle found to not be feasible; Challenges -An autonomous return mission has never been done -Mars surface environments -Platform packaging limitations -Performance and trajectory requirements; Study Team -MSFC’s Advanced Concepts Office (ACO) -MSFC propulsion and vehicle design engineering expertise -JPL MAV team.

McCollum, Lisa Tunstill↗

Validation of Fitness for Duty Standards Using Pre- and Post-Flight Capsule Egress and Suited Functional Performance Tasks in Simulated Reduced Gravity

The transition between gravity environments will involve one of the most complex, high-risk phases of any mission. For example, the reduced functional capacity caused by physiological deconditioning adaptations in microgravity coupled with the stressors of re-entry into partial gravity environments will increase risks to crew, even with rigorous adherence to inflight countermeasures. Quantification of the astronauts’ post-landing functional performance is necessary to design ConOps for exploration missions. Specifically, these two high-risk scenarios may be required to be performed soon after gravity transitions: • Nominal and/or emergency unassisted capsule egress task after return to Earth • Planetary extravehicular activity (EVA) soon after landing on Mars or the Moon This study is broken down into two phases. Phase 1: A feasibility study that will assess the overall feasibility and demonstrate the capability to do these tasks shortly after landing. Phase 2: the full Egress Fitness study, which is part of the CIPHER complement. This study uses a task-based approach to characterize functional performance of these high-risk scenarios in long-duration ISS crewmembers before flight and shortly after return to Earth. Prior to any testing, each astronaut subject completes a suit fit check to ensure adequate sizing and a mobility assessment to confirm completion of the EVA tasks. Pilot Egress Fitness pre-flight and post-flight testing includes an Earth-based emergency egress out of a functional capsule mockup and a short Mars gravity EVA simulation including suit donning, hatch egress, ladder descent, task board cable operations, baggage transfer over sand/rocky regolith, alignment with a rear entry port, and suit egress. Pre-flight testing will occur at any time point prior to flight. Post-flight assessment is much more critical with the capsule egress test that will occur 1–4 hours after landing and the planetary EVA approximately 18–36 hours after landing. The CIPHER study will incorporate additional pre-flight sessions, longer EVA tasks that include traverse and geology sampling, and post-flight sessions on R+1, 4, and 8 to characterize the timeframe of recovery. Data collected for both tasks include task completion time, photo, and video. The EVA portion also includes collection of metabolic and heart rate. Pilot Egress Fitness study has completed both baseline and post-flight testing on four astronaut subjects, with all four able to complete post-flight EVA testing and three able to complete postflight capsule egress testing. Preliminary results observe individual physiological variations, which were to be expected but also suggest the need to carefully track the timeline from undock to landing to testing. Furthermore, some task performance instructions and equipment may need to be adjusted to ensure results are primarily physiological. These and other lessons learned will be addressed with minor protocol changes in the full CIPHER Egress Fitness study.

J R Norcross↗

Integrated Hydrogen Energy Storage System (IHESS) for Power Generation (Final Report)

GTI Energy partnered with Praxair Inc., a subsidiary of Linde PLC (Praxair), the Center for Electromechanics at the University of Texas at Austin (CEM), Entergy Corporation (Entergy), Quanta Services (Quanta) and Mitsubishi Heavy Industries (MHI) to perform a feasibility study that determines the economic and technical feasibility of low-carbon hydrogen energy storage integrated with a site-specific fossil fuel asset to decarbonize electricity production using the Integrated Hydrogen Energy Storage System (IHESS). The proposed IHESS concept is novel, as it sought to leverage the existing natural gas infrastructure, hydrogen production and pipelines, existing underground hydrogen storage system and power plants in the Gulf Coast region to reduce carbon emissions and generate lowcarbon electricity. This study has shown that IHESS has a promising commercial outlook as the concept leverages existing natural gas infrastructure assets and hydrogen production and storage that are unique to the Texas gulf coast region. A key hurdle with hydrogen supply and transportation has been capital investment. By storing hydrogen in underground storage and delivering it as a fuel source during peak demand using the existing infrastructure minimizes the capital investment. Regional petrochemical producers who are actively seeking opportunities to reduce costs and lower emissions should find the IHESS concept very appealing.

03 NATURAL GAS↗

An overview on development of neural network technology

The study has been to obtain a bird's-eye view of the current neural network technology and the neural network research activities in NASA. The purpose was two fold. One was to provide a reference document for NASA researchers who want to apply neural network techniques to solve their problems. Another one was to report out survey results regarding NASA research activities and provide a view on what NASA is doing, what potential difficulty exists and what NASA can/should do. In a ten week study period, we interviewed ten neural network researchers in the Langley Research Center and sent out 36 survey forms to researchers at the Johnson Space Center, Lewis Research Center, Ames Research Center and Jet Propulsion Laboratory. We also sent out 60 similar forms to educators and corporation researchers to collect general opinions regarding this field. Twenty-eight survey forms, 11 from NASA researchers and 17 from outside, were returned. Survey results were reported in our final report. In the final report, we first provided an overview on the neural network technology. We reviewed ten neural network structures, discussed the applications in five major areas, and compared the analog, digital and hybrid electronic implementation of neural networks. In the second part, we summarized known NASA neural network research studies and reported the results of the questionnaire survey. Survey results show that most studies are still in the development and feasibility study stage. We compared the techniques, application areas, researchers' opinions on this technology, and many aspects between NASA and non-NASA groups. We also summarized their opinions on difficulties encountered. Applications are considered the top research priority by most researchers. Hardware development and learning algorithm improvement are the next. The lack of financial and management support is among the difficulties in research study. All researchers agree that the use of neural networks could result in cost saving. Fault tolerance has been claimed as one important feature of neural computing. However, the survey indicates that very few studies address this issue. Fault tolerance is important in space mission and aircraft control. We believe that it is worthy for NASA to devote more efforts into the utilization of this feature.

Lin, Chun-Shin↗

Excavation Volume Growth Factors at Environmental Remediation Sites - 20318

The U.S. Army Corps of Engineers (USACE) manages numerous environmental remediation projects in accordance with the Comprehensive Environmental Response, Compensation, and Liability Act, otherwise known as CERCLA. These include projects for the Formerly Utilized Sites Remedial Action Program (FUSRAP). Utilizing the CERCLA framework to address these projects requires detailed cost estimates and a significant portion of costs are associated with the volume of material to be excavated and that material's final disposition. Accordingly, understanding the expected volumes and uncertainty associated with those volumes is vital to project cost estimating. These estimates are completed at various stages of the CERCLA process, thus the project team has varying degrees of information available from which to develop these estimates depending on how far along the project is. Understanding the factors contributing to volume growth (increase in volume of material from that originally estimated) is a crucial element to determining volume and cost uncertainty. This paper presents a case study of a FUSRAP site which involves excavation and offsite disposal of contaminated soils from complex commercial, industrial, and residential properties. Original volume estimates were compared to post excavation volumes on a property by property basis. Reasons for differences are determined along with magnitude of impacts to cost estimating. For both residential and commercial property types, volume estimating factors, uncertainty considerations, and methods to account for each are discussed with emphasis on volume growth considerations. Cost estimating model input considerations are discussed with specific emphasis on accounting for volume uncertainty at the Feasibility Study (FS) phase of CERCLA. Underestimating or overestimating costs at the FS phase has repercussions under CERCLA that may impact project close out or completion schedule. Discussions presented will be helpful to both reviewers and preparers of cost estimates involving excavations. Additionally, project planners may be able to use the information to plan for volume growth contingencies. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Endoscopic surgery and telemedicine in microgravity: developing contingency procedures for exploratory class spaceflight

OBJECTIVES: The risk of a urinary calculus during an extended duration mission into the reduced gravity environment of space is significant. For medical operations to develop a comprehensive strategy for the spaceflight stone risk, both preventive countermeasures and contingency management (CM) plans must be included. METHODS: A feasibility study was conducted to demonstrate the potential CM technique of endoscopic ureteral stenting with ultrasound guidance for the possible in-flight urinary calculus contingency. The procedure employed the International Space Station/Human Research Facility ultrasound unit for guide wire and stent localization, a flexible cystoscope for visual guidance, and banded, biocompatible soft ureteral stents to successfully stent porcine ureters bilaterally in zero gravity (0g). RESULTS: The study demonstrated that downlinked endoscopic surgical and ultrasound images obtained in 0g are comparable in quality to 1g images, and therefore are useful for diagnostic clinical utility via telemedicine transmission. CONCLUSIONS: In order to be successful, surgical procedures in 0g require excellent positional stability of the operating surgeon, assistant, and patient, relative to one another. The technological development of medical procedures for long-duration spaceflight contingencies may lead to improved terrestrial patient care methodology and subsequently reduced morbidity.

Parabolic Flight↗

System Study for Axial Vane Engine Technology

The purpose of this engine feasibility study was to determine the benefits that can be achieved by incorporating positive displacement axial vane compression and expansion stages into high bypass turbofan engines. These positive-displacement stages would replace some or all of the conventional compressor and turbine stages in the turbine engine, but not the fan. The study considered combustion occurring internal to an axial vane component (i.e., Diesel engine replacing the standard turbine engine combustor, burner, and turbine); and external continuous flow combustion with an axial vane compressor and an axial vane turbine replacing conventional compressor and turbine systems.

Badley, Patrick R.↗

Life-Cycle Baseline Customization for the Formerly Utilized Sites Remedial Action Program - 20304

One of the responsibilities of the federal government is to estimate sound and defensible life-cycle baseline costs for use in federal budget estimates and to meet federal financial reporting requirements. To accomplish this, the US Department of Energy (DOE) Office of Legacy Management (LM) and the US Army Corps of Engineers (USACE) have partnered together to ensure that the liabilities documented in each Formerly Utilized Sites Remedial Action Program (FUSRAP) site's life-cycle baseline are specifically tailored. FUSRAP was created in the mid-1970's to clean up radiological contamination resulting from the early development of nuclear weapons. DOE was responsible for FUSRAP until October 1997, when Congress transferred the administration and execution of FUSRAP site cleanups to USACE. By 1997, DOE had completed the cleanup of 25 of the 46 sites that were active within the program and had begun cleanup at 13 additional sites. USACE was assigned responsibility for the cleanup of the 21 remaining FUSRAP sites, and at 8 additional sites that had since been referred for cleanup. The LM mission for the FUSRAP sites is to perform long-term surveillance and maintenance (LTS and M). Currently, LM provides long-term stewardship for 34 completed FUSRAP sites. Another 20 sites are under active remediation by USACE. Within the last 5 years, USACE has completed the cleanup at five FUSRAP sites and the LTS and M responsibility has been transferred to LM. By 2029, USACE will compete remediation at eight additional sites and LTS and M for those sites will transfer to LM. Because responsibilities for the FUSRAP sites transfer between USACE and LM upon completion of remedial actions, both agencies maintain life-cycle baselines for different stages of the project and both must have a strong understanding of the needs and requirements for each site. This understanding ensures that the life-cycle baselines form a complete and accurate picture of what is required for the site and for the FUSRAP program. LM focuses on several things when customizing the life-cycle baseline estimates for the FUSRAP sites, including (1) Understanding the unique requirements for each site. By reviewing site-specific documents prepared by USACE, such as Feasibility Studies and Records of Decision, and partnering with USACE to gain additional insight about site conditions and requirements for stewardship, as well as potential risks, LM can better develop the life-cycle baselines. (2) Developing site-specific labor breakdowns. This ensures the required labor mix is baselined for specific activities by comparing the labor mix required to perform activities at (a) other LM-managed FUSRAP sites and (b) non-FUSRAP LM sites and (c) by USACE at active FUSRAP sites. (3) Taking a tiered approach to life-cycle baseline planning. Estimates for sites transferring to LM in the near term (5 years) are more definitive than for sites transferring in the out-year period. Remedial actions at the near-term sites are at or near completion, providing LM a strong understanding of the LTS and M requirements and remaining liabilities. This in turn allows for site-specific customization of the baseline. (4) Using a robust risk management approach to ensure that liabilities specific to each site are identified, evaluated by probability and severity, and documented in relation to the impact to cost or schedule. To ensure the most accuracy within all the baselines, the FUSRAP life-cycle baselines are updated as needed to support program, project, and contract management needs. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The lunar space communications architecture from the KARI-NASA joint study

This paper covers the lunar space communications architecture defined by the feasibility study jointly conducted by the KARI and NASA during October 2014 – April 2015. From the KARI perspective, a formalized space communications architecture, while crucial to its first lunar mission, the Korea Pathfinder Lunar Orbiter (KPLO), has many long-term ramifications to the entire lunar exploration program that the KARI will undertake during the next decade. To NASA, in spite of its multitude of lunar missions, past and present, taking another new, fresh look at the architecture with a newcomer, who can bring new ideas and concept, is a precious opportunity to address some important issues for the future lunar exploration.

Rew, Dong Young↗