Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DECOMMISSIONING”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

GIF sodium fast reactor project R and D on safety and operation

The 'Safety and Operation' project is started in 2009 within the framework of Generation-IV International Forum (GIF) Sodium Fast Reactor (SFR) research and development program. In the safety area, the project involves R and D activities on phenomenological model development and experimental programs, conceptual studies in support of the design of safety provisions, preliminary assessment of safety systems, framework and methods for analysis of safety architecture. In the operation area, the project involves R and D activities on fast reactors safety tests and analysis of reactor operations, feedback from decommissioning, in-service inspection technique development, under-sodium viewing and sodium chemistry. This paper presents a summary of such activities and the main achievements. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

The Phenix ultimate natural convection test

The French sodium cooled fast reactor Phenix was shut down in 2009 after 35 years of operation. Before decommissioning, a final set of tests were performed by the CEA during 9 months. Several topics were involved such as thermal hydraulics, core physics and fuel behaviour. Among these ultimate experiments, two thermal hydraulic tests were performed: an asymmetrical test consisting in a trip of one secondary pump and a natural convection test in the primary circuit. Recognizing the unique opportunity offered by these Phenix ultimate tests, IAEA decided in 2007 to launch a Coordinated Research Project (CRP) devoted to benchmarking analyses with system codes on the Phenix natural convection test. One objective of the natural convection test in Phenix reactor is the assessment of the CATHARE system code for safety studies on future and advanced sodium cooled fast reactors. The aim of this paper is to describe this test, which was performed on June 22-23, 2009, and the associated benchmark specifications for the CRP work. The paper reminds briefly the Phenix reactor with the main physical parameters and the instrumentation used during the natural convection test. After that, the test scenario is described: - initial state at a power of 120 MWth, - test beginning resulting from a manual dry out of the two steam generators, - manual scram, - manual trip on the three primary pumps without back-up by pony motors, - setting and development of natural convection in the primary circuit, in a first phase without significant heat sink in the secondary circuits and in a second phase with significant heat sink in the secondary circuits, by opening the casing of steam generators to create an efficient heat sink, by air natural circulation in the steam generators casing. The benchmark case ends after this second phase, which corresponds to the experimental test duration of nearly 7 hours. The paper presents also the benchmark specifications data supplied by the CEA to all participants of this CRP in order to perform calculations (core, primary circuit, primary pumps, IHX, shutdown system, operating parameters, test scenario and real test conditions). Finally, main test results and analyses are presented including the evolution of the core and of the heat exchangers inlet and outlet temperatures, and some local temperature measurements. The natural convection has been easily set up in the pool type reactor Phenix with different boundary conditions at the secondary side, with or without heat sink. The data obtained during this unique test represent some very useful and precious results for the development of SFR in a wide range of thematic such as numerical methods dedicated to thermal-hydraulics safety analyses (system codes, CFD codes and coupling system and CFD codes) and instrumentation. (authors)

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Post service examination of a tritium permeator and a turbomolecular pump from the CAPER Facility at the Tritium Laboratory Karlsruhe

After 8 years of operation at the CAPER facility at the Tritium Laboratory Karlsruhe, a permeator used to separate hydrogen species from processed gases ceased operation due to multiple heater failures. This was subjected to post service examination to find the cause of the failures. This paper describe the methods used to locate the failures in the heaters and the likely cause. It was also necessary to determine the tritium inventory embedded in the structure for safe disposal. Destructive examination, adapted from a full combustion technique, was used on sections of the permeator. A fine black powder deposit, presumed to be mostly carbon, coated the surfaces of the inlet section of the feed side. This powder contained nearly half of the tritium within the permeator. The likely source of the powder and the consequences for the operation and eventual decommissioning of the ITER Tritium Plant are discussed. A failed turbomolecular pump from CAPER was also examined. There was evidence of wear on the emergency support bearing, but more importantly, when the pump internals were exposed to the glove box atmosphere (dry air) large quantities of tritium were rapidly released, this despite the isotopic swamping before removal from the CAPER glove box. Significant uptake of tritium in electrical insulation was also found. (authors)

42 ENGINEERING↗

Building upon Historical Competencies: Next-generation Clean-up Technologies for World-Wide Application - 13368

The Department of Energy's Savannah River Site has a 60-year history of successfully operating nuclear facilities and cleaning up the nuclear legacy of the Cold War era through the processing of radioactive and otherwise hazardous wastes, remediation of contaminated soil and groundwater, management of nuclear materials, and deactivation and decommissioning of excess facilities. SRS recently unveiled its Enterprise.SRS (E.SRS) strategic vision to identify and facilitate application of the historical competencies of the site to current and future national and global challenges. E.SRS initiatives such as the initiative to Develop and Demonstrate Next generation Clean-up Technologies seek timely and mutually beneficial engagements with entities around the country and the world. One such ongoing engagement is with government and industry in Japan in the recovery from the devastation of the Fukushima Daiichi Nuclear Power Station. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Back from the Brink with Something for Everyone - The Final Executed Memorandum of Agreement for Interpretation of the East Tennessee Technology Park and the K-25 Building - 13370

When the Environmental Management (EM) Program at the Oak Ridge Office of the Department of Energy (DOE) began its major decontamination and decommissioning (D and D) program activities in the mid-1990's, it was understood that the work to demolish the gaseous diffusion process buildings at the K-25 Site, as it was then known, would be challenging. Nothing of that size and breadth had ever been done within the DOE complex and the job brought about a full menu of unique attributes: radiological contamination with enriched materials entrained in certain areas of the system, a facility that was never designed not to operate but had been shut down since 1964, and a loyal following of individuals and organizations who were committed to the physical preservation of at least some portion of the historic Manhattan Project property. DOE was able to solve and resolve the issues related to nuclear materials management, contamination control, and determining the best way to safely and efficiently deconstruct the massive building. However, for a variety of reasons, resolution of the historic preservation questions - what and how much to preserve, how to preserve it, where to preserve it, how to interpret it, how much to spend on preservation, and by and for whom preservation should occur - remained open to debate for over a decade. After a dozen years, countless meetings, phone calls, discussions and other exchanges, and four National Historic Preservation Act (NHPA) [1] Memoranda of Agreement (MOA), a final MOA [2] has been executed. The final executed MOA's measures are robust, creative, substantive, and will be effective. They include a multi-story replica of a portion of the K-25 Building, the dedication of the K-25 Building footprint for preservation purposes, an equipment building to house authentic Manhattan Project and Cold War equipment, a virtual museum, an on-site history center, a grant to preserve a historically-significant Manhattan Project-era hotel in Oak Ridge, and more. The MOA was designed to offer something for everyone. The MOA for the K- 25 Building and interpretation of the East Tennessee Technology Park (ETTP; formerly the K-25 Site) was executed by all of the signatory parties on August 7, 2012 - almost 67 years to-the-day after the 'product' of the K-25 process building became known to more than just a small group of scientists and engineers working on a secret project for the Army Corps of Engineers Manhattan District. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Issues and Recommendations Arising from the Idaho National Laboratory Remote-Handled Low-Level Waste Disposal Facility Composite Analysis - 13374

Development of the composite analysis (CA) for the Idaho National Laboratory's (INLs) proposed remote-handled (RH) low-level waste (LLW) disposal facility has underscored the importance of consistency between analyses conducted for site-specific performance assessments (PAs) for LLW disposal facilities, sites regulated by the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) [1], and residual decontamination and decommissioning (D and D) inventories. Consistency is difficult to achieve because: 1) different legacy sources and compliance time-periods were deemed important for each of the sites evaluated at INL (e.g., 100 years for CERCLA regulated facilities vs. 1,000 years for LLW disposal facilities regulated under U.S. Department of Energy (DOE) Order 435.1 [2]); 2) fate and transport assumptions, parameters, and models have evolved through time at the INL including the use of screening-level parameters vs. site-specific values; and 3) evaluation objectives for the various CERCLA sites were inconsistent with those relevant to either the PA or CA including the assessment of risk rather than effective dose. The proposed single site-wide CA approach would provide needed consistency, allowing ready incorporation of new information and/or facilities in addition to being cost effective in terms of preparation of CAs and review by the DOE. A single site-wide CA would include a central database of all existing INL sources, including those from currently operating LLW facilities, D and D activities, and those from the sites evaluated under CERCLA. The framework presented for the INL RH-LLW disposal facility allows for development of a single CA encompassing air and groundwater impacts. For groundwater impacts, a site-wide MODFLOW/MT3D-MS model was used to develop unit-response functions for all potential sources providing responses for a grid of receptors. Convolution and superposition of the response functions are used to compute groundwater concentrations. A similar approach could be applied for the air pathway where air emissions are stored in a central database and air concentrations for unit releases could be scaled to actual releases. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Stranded Fuel, Orphan Sites, Dead Plants: Transportation Planning Considerations After the BRC Report - 13393

The author explores transportation, packaging and storage questions related to a primary recommendation of the Blue Ribbon Commission on America's Nuclear Future; i.e., that fuel from shutdown plants be removed to consolidated storage as soon as possible to enable final decommissioning and beneficial re-use of those sites. The paper discusses the recommendations of the BRC, the implications and challenges that implementing those recommendations present, and provides recommended solutions for beginning the multi-year planning, coordination, material acquisition, and communications processes that will be needed to move fuel from shutdown plants when a destination site becomes available. Removal of used nuclear fuel from shutdown reactor sites (which are serving no other purpose other than storing SNF and GTCC, at considerable expense) was a central recommendation of the BRC, for a number of reasons. This recommendation was one of the most widely acclaimed that the Commission put forward. However, there are significant challenges (such as availability of fuel canister overpacks, lack of infrastructure, handling constraints and others) that will need to be addressed, apart from the critically important identification of a suitable and workable storage destination site. Resolving these logistical challenges will need to begin even before a destination site is identified, given the long lead-times required for planning and procurement. Based on information available today, it is possible to make informed predictions about what will be needed to modify existing contractual arrangements with utilities, address equipment and infrastructure needs, and begin working with states, tribes and local governments to start initial preparation needs. If DOE, working with industry and other experienced parties, can begin planning and acquisition activities in the near term, overall schedule risk can be reduced and potential cost avoidance achieved. The most immediate benefit will accrue to the operators of the shutdown plants, but beginning to accept fuel as required under the NWPA will reduce the liability to the federal government, and also offer some assurance to other utilities and the public that DOE (or another entity if one is established) is capable of meeting its obligations under the NWPA. The indirect benefits, therefore, will be quite broad. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Characterization Using Gamma Ray Spectrometry with Automated Efficiency Optimization - 13404

Gamma ray spectrometry using High Purity Germanium (HPGe) detectors is commonly employed in assaying radioactive waste streams from a variety of sources: nuclear power plants, Department of Energy (DOE) laboratories, medical facilities, decontamination and decommissioning activities etc. The radioactive material is typically packaged in boxes or drums (for e.g. B-25 boxes or 208 liter drums) and assayed to identify and quantify radionuclides. Depending on the origin of the waste stream, the radionuclides could be special nuclear materials (SNM), fission products, or activation products. Efficiency calibration of the measurement geometry is a critical step in the achieving accurate quantification of radionuclide content. Due to the large size of the waste items, it is impractical and expensive to manufacture gamma ray standard sources for performing a measurement based calibration. For well over a decade, mathematical efficiency methods such as those in Canberra's In Situ Object Counting System (ISOCS) have been successfully employed in the efficiency calibration of gamma based waste assay systems. In the traditional ISOCS based calibrations, the user provides input data such as the dimensions of the waste item, the average density and fill height of the matrix, and matrix composition. As in measurement based calibrations, the user typically defines a homogeneous matrix with a uniform distribution of radioactivity. Actual waste containers can be quite nonuniform, however. Such simplifying assumptions in the efficiency calibration could lead to a large Total Measurement Uncertainty (TMU), thus limiting the amount of waste that can be disposed of as intermediate or low activity level waste. To improve the accuracy of radionuclide quantification, and reduce the TMU, Canberra has developed the capability to optimize the efficiency calibration using the ISOCS method. The optimization is based on benchmarking the efficiency shape and magnitude to the data available in the analyzed gamma ray spectra. Data from measurements of a given item in multiple counting geometries are among the powerful benchmarks that could be used in the optimization. Also, while assaying a waste stream with fission products and activation products emitting gamma lines of multiple energies, optimizing the efficiency on the basis of line activity consistency is very effective. In the present paper, the ISOCS- based optimization methodology is applied to measurement scenarios involving multiple counting geometries, and multi-gamma-line radionuclides. Results will be presented along with accuracy and precision estimates for each measurement. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Management of the Radioactive Waste Generated by Cernavoda NPP, Romania, an Example of International Cooperation - 13449

The design criteria and constraints for the development of the management strategy for radioactive waste generated from operating and decommissioning of CANDU Nuclear Units from Cernavoda NPP in Romania, present many specific aspects. The main characteristics of CANDU type waste are its high concentrations of tritium and radiocarbon. Also, the existing management strategy for radioactive waste at Cernavoda NPP provides no treatment or conditioning for radioactive waste disposal. These characteristics embodied a challenging effort, in order to select a proper strategy for radioactive waste management at present, when Romania is an EU member and a signatory country of the Joint Convention on the Safety of Spent Fuel Management and on the Safety of Radioactive Waste Management. The helping of advanced countries in radioactive waste management, directly or into the frame of the international organizations, like IAEA, become solve the aforementioned challenges at adequate level. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improvement of Radwaste Management System at Bilibinskaya NPP in the Far North Conditions - 13456

Since 2009 Bilibinskaya NPP is getting started to prepare to the decommissioning in the Far North conditions. Bilibinskaya NPP is located in the Far North of Russian Federation in Chukotka region. Since 1974 it operates 4 units EGP-6 with the capacity of 48 MW each. According to the contract, SIA Radon has performed the following works: - LLRW disposal safety analysis, - The technology of spent ion-exchanger and salt residue solidification is proposed, - Expected radwaste (till 2027) management economical analysis, - Technical proposals for LLRW and IRW management. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The US DOE-EM International Program - 13004

The U.S. Department of Energy (DOE) Office of Environmental Management (EM) conducts international collaboration activities in support of U.S. policies and objectives regarding the accelerated risk reduction and remediation of environmental legacy of the nations' nuclear weapons program and government sponsored nuclear energy research. The EM International Program supported out of the EM Office of the Associate Principal Deputy Assistant Secretary pursues collaborations with foreign government organizations, educational institutions and private industry to assist in identifying technologies and promote international collaborations that leverage resources and link international experience and expertise. In fiscal year (FY) 2012, the International Program awarded eight international collaborative projects for work scope spanning waste processing, groundwater and soil remediation, deactivation and decommissioning (D and D) and nuclear materials disposition initiatives to seven foreign organizations. Additionally, the International Program's scope and collaboration opportunities were expanded to include technical as well as non-technical areas. This paper will present an overview of the on-going tasks awarded in FY 2012 and an update of upcoming international activities and opportunities for expansion into FY 2013 and beyond. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Long-Term Assessment of Critical Radionuclides and Associated Environmental Media at the Savannah River Site - 13038

During the operational history of the Savannah River Site (SRS), many different radionuclides have been released from site facilities. However, only a relatively small number of the released radionuclides have been significant contributors to doses and risks to the public. At SRS dose and risk assessments indicate tritium oxide in air and surface water, and Cs-137 in fish and deer have been, and continue to be, the critical radionuclides and pathways. In this assessment, statistical analyses of the long-term trends of tritium oxide in atmospheric and surface water releases and Cs-137 concentrations in fish and deer are provided. Correlations also are provided with 1) operational changes and improvements, 2) geopolitical events (Cold War cessation), and 3) recent environmental remediation projects and decommissioning of excess facilities. For example, environmental remediation of the F- and H-Area Seepage Basins and the Solid Waste Disposal Facility have resulted in a measurable impact on the tritium oxide flux to the onsite Fourmile Branch stream. Airborne releases of tritium oxide have been greatly affected by operational improvements and the end of the Cold War in 1991. However, the effects of SRS environmental remediation activities and ongoing tritium operations on tritium concentrations in the environment are measurable and documented in this assessment. Controlled hunts of deer and feral hogs are conducted at SRS for approximately six weeks each year. Before any harvested animal is released to a hunter, SRS personnel perform a field analysis for Cs-137 concentrations to ensure the Hunter's dose does not exceed the SRS administrative game limit of 0.22 milli-sievert (22 mrem). However, most of the Cs-137 found in SRS onsite deer is not from site operations but is from nuclear weapons testing fallout from the 1950's and early 1960's. This legacy source term is trended in the SRS deer, and an assessment of the 'effective' half-life of Cs-137 in deer (including the physical decay half-life and the environmental dispersion half-life) is provided. The 'creek mouth' fisherman is the next most critical pathway at SRS. On an annual basis, three species of fish (panfish, catfish, and bass) are sampled from the mouths of the five SRS streams. Three composites of up to five fish of each species are analyzed from each sampling location. Long-term trending of the Cs-137 concentrations in fish and the subsequent doses from consumption of SRS fish is provided. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Opportunities for Cost Effective Disposal of Radioactively Contaminated Solid Waste on the Oak Ridge Reservation, Oak Ridge, TN - 13045

Department of Energy (DOE) requirements for the release of non-real property, including solid waste, containing low levels of residual radioactive materials are specified in DOE Order 458.1 and associated guidance. Authorized limits have been approved under the requirements of DOE Order 5400.5, predecessor to DOE Order 458.1, to permit disposal of solid waste containing low levels of residual radioactive materials at solid waste landfills located within the DOE Oak Ridge Reservation (ORR). Specifically, volumetric concentration limits for disposal of solid waste at Industrial Landfill V and at Construction/Demolition Landfill VII were established in 2003 and 2007, respectively, based on the requirements in effect at that time, which included: an evaluation to ensure that radiation doses to the public would not exceed 25 mrem/year and would be as low as reasonably achievable (ALARA), with a goal of a few mrem/year or less (in fact, these authorized limits actually were derived to meet a dose constraint of 1 mrem/year); an evaluation of compliance with groundwater protection requirements; and reasonable assurance that the proposed disposal is not likely to result in a future requirement for remediation of the landfill. Prior to approval as DOE authorized limits, these volumetric concentration limits were coordinated with the Tennessee Department of Environment and Conservation (TDEC) and documented in a Memorandum of Understanding (MOU) between the TDEC Division of Radiological Health and the TDEC Division of Solid Waste Management. These limits apply to the disposal of soil and debris waste generated from construction, maintenance, environmental restoration, and decontamination and decommissioning (D and D) activities on the DOE Oak Ridge Reservation. The approved site-specific authorized limits were incorporated in the URS/CH2M Oak Ridge LLC (UCOR) waste profile system that authorizes disposal of special wastes at either of the RCRA Subtitle D landfills. However, a recent DOE assessment found that implementation of the site-specific authorized limits for volumetrically contaminated waste was potentially limited due in part to confusion regarding the applicability of volumetric concentration limits and/or surface activity limits to specific wastes. This paper describes recent efforts to update the authorized limits for Industrial Landfill V and Construction/Demolition Landfill VII and to improve the procedures for implementation of these criteria. The approved authorized limits have been evaluated and confirmed to meet the current requirements of DOE Order 458.1, which superseded DOE Order 5400.5 in February 2011. In addition, volumetric concentration limits have been developed for additional radionuclides, and site-specific authorized limits for wastes with surface contamination have been developed. Implementing procedures have been revised to clarify the applicability of volumetric concentration limits and surface activity limits, and to allow the use of non-destructive waste characterization methods. These changes have been designed to promote improved utilization of available disposal capacity of the onsite disposal facilities within the DOE Oak Ridge Reservation. In addition, these changes serve to bring the waste acceptance requirements at these DOE onsite landfills into greater consistency with the requirements for commercial/ public landfills under the TDEC Bulk Survey for Release (BSFR) program, including two public RCRA Subtitle D landfills in close proximity to the DOE Oak Ridge Reservation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Method to Assess the Radionuclide Inventory of Irradiated Graphite from Gas-Cooled Reactors - 13072

About 17,000 t of irradiated graphite waste will be produced from the decommissioning of the six French gas-cooled nuclear reactors. Determining the radionuclide (RN) content of this waste is of relevant importance for safety reasons and in order to determine the best way to manage them. For many reasons the impurity content that gave rise to the RNs in irradiated graphite by neutron activation during operation is not always well known and sometimes actually unknown. So, assessing the RN content by the use of traditional calculation activation, starting from assumed impurity content, leads to a false assessment. Moreover, radiochemical measurements exhibit very wide discrepancies especially on RN corresponding to precursor at the trace level such as natural chlorine corresponding to chlorine 36. This wide discrepancy is unavoidable and is due to very simple reasons. The level of impurity is very low because the uranium fuel used at that very moment was not enriched, so it was a necessity to have very pure nuclear grade graphite and the very low size of radiochemical sample is a simple technical constraint because device size used to get mineralization product for measurement purpose is limited. The assessment of a radionuclide inventory only based on few number of radiochemical measurements lead in most cases, to a gross over or under-estimation that is detrimental for graphite waste management. A method using an identification calculation-measurement process is proposed in order to assess a radiological inventory for disposal sizing purpose as precise as possible while guaranteeing its upper character. This method present a closer approach to the reality of the main phenomenon at the origin of RNs in a reactor, while also incorporating the secondary effects that can alter this result such as RN (or its precursor) release during reactor operation. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The National Nuclear Laboratory's Approach to Processing Mixed Wastes and Residues - 13080

The National Nuclear Laboratory (NNL) treats a wide variety of materials produced as by-products of the nuclear fuel cycle, mostly from uranium purification and fuel manufacture but also including materials from uranium enrichment and from the decommissioning of obsolete plants. In the context of this paper, treatment is defined as recovery of uranium or other activity from residues, the recycle of uranium to the fuel cycle or preparation for long term storage and the final disposal or discharge to the environment of the remainder of the material. NNL's systematic but flexible approach to residue assessment and treatment is described in this paper. The approach typically comprises up to five main phases. The benefits of a systematic approach to waste and residue assessments and processing are described in this paper with examples used to illustrate each phase of work. Benefits include early identification of processing routes or processing issues and the avoidance of investment in inappropriate and costly plant or processes. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Knowledge Framework Implementation with Multiple Architectures - 13090

Multiple kinds of knowledge management systems are operational in public and private enterprises, large and small organizations with a variety of business models that make the design, implementation and operation of integrated knowledge systems very difficult. In recent days, there has been a sweeping advancement in the information technology area, leading to the development of sophisticated frameworks and architectures. These platforms need to be used for the development of integrated knowledge management systems which provides a common platform for sharing knowledge across the enterprise, thereby reducing the operational inefficiencies and delivering cost savings. This paper discusses the knowledge framework and architecture that can be used for the system development and its application to real life need of nuclear industry. A case study of deactivation and decommissioning (D and D) is discussed with the Knowledge Management Information Tool platform and framework. D and D work is a high priority activity across the Department of Energy (DOE) complex. Subject matter specialists (SMS) associated with DOE sites, the Energy Facility Contractors Group (EFCOG) and the D and D community have gained extensive knowledge and experience over the years in the cleanup of the legacy waste from the Manhattan Project. To prevent the D and D knowledge and expertise from being lost over time from the evolving and aging workforce, DOE and the Applied Research Center (ARC) at Florida International University (FIU) proposed to capture and maintain this valuable information in a universally available and easily usable system. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Waste Management Improvement Initiatives at Atomic Energy of Canada Limited - 13091

Atomic Energy of Canada Limited's (AECL) Chalk River Laboratories (CRL) has been in operation for over 60 years. Radioactive, mixed, hazardous and non-hazardous wastes have been and continue to be generated at CRL as a result of research and development, radioisotope production, reactor operation and facility decommissioning activities. AECL has implemented several improvement initiatives at CRL to simplify the interface between waste generators and waste receivers: - Introduction of trained Waste Officers representing their facilities or activities at CRL; - Establishment of a Waste Management Customer Support Service as a Single-Point of Contact to provide guidance to waste generators for all waste management processes; and - Implementation of a streamlined approach for waste identification with emphasis on early identification of waste types and potential disposition paths. As a result of implementing these improvement initiatives, improvements in waste management and waste transfer efficiencies have been realized at CRL. These included: 1) waste generators contacting the Customer Support Service for information or guidance instead of various waste receivers; 2) more clear and consistent guidance provided to waste generators for waste management through the Customer Support Service; 3) more consistent and correct waste information provided to waste receivers through Waste Officers, resulting in reduced time and resources required for waste management (i.e., overall cost); 4) improved waste minimization and segregation approaches, as identified by in-house Waste Officers; and 5) enhanced communication between waste generators and waste management groups. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Environmental Cost Analysis System (ECAS) Status and Compliance Requirements for EM Consolidated Business Center Contracts - 13204

The Department of Energy (DOE) Office of Environmental Management (EM) has developed a web-accessible database to collect actual cost data from completed EM projects to support cost estimating and analysis. This Environmental Cost Analysis System (ECAS) database was initially deployed in early 2009 containing the cost and parametric data from 77 decommissioning, restoration, and waste management projects completed under the Rocky Flats Closure Project. In subsequent years we have added many more projects to ECAS and now have a total of 280 projects from 8 major DOE sites. This data is now accessible to DOE users through a web-based reporting tool that allows users to tailor report outputs to meet their specific needs. We are using it as a principal resource supporting the EM Consolidated Business Center (EMCBC) and the EM Applied Cost Engineering (ACE) team cost estimating and analysis efforts across the country. The database has received Government Accountability Office review as supporting its recommended improvements in DOE's cost estimating process, as well as review from the DOE Office of Acquisition and Project Management (APM). Moving forward, the EMCBC has developed a Special Contract Requirement clause or 'H-Clause' to be included in all current and future EMCBC procurements identifying the process that contractors will follow to provide DOE their historical project data in a format compatible with ECAS. Changes to DOE O 413.3B implementation are also in progress to capture historical costs as part of the Critical Decision project closeout process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗