Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “DAMS”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Feasibility of Using Additive Manufacturing to Produce Axial Flow Hydropower Turbine Housing, Runner, and Draft Tube

Oak Ridge National Laboratory (ORNL) worked with AMJET Turbine Systems, LLC (ATS), to demonstrate additive manufacturing of components for low head hydro turbine/generator applications. Several different types of additive manufacturing systems were used. Components were finished and assembled for testing in a turbine. However, one of the processes, Big Area Additive Manufacturing (BAAM),produced components that did not adequately perform due to persistent leaks that were caused by porosity in the parts produced. Therefore, the BAAM system was eliminated from contention. Vacuum infusion of rein into the parts eventually solved the porosity problem.Components were installed in anATS-8 turbine to be tested on the Keokuk Dam for operationally testing the unit.

13 HYDRO ENERGY↗

Evaluation of Modular and Scalable Downstream Passage Systems for Silver American Eels

Implementation of effective downstream passage for silver-phase American Eel (Anguilla rostrata) at hydropower dams using methods that are economically feasible has been a challenge for many project owners. Due to the potential for high mortality rates during turbine passage, resource agencies have focused on mandatory prescriptions that prevent entrainment by physically excluding eels (i.e., narrow trash rack bar spacing) or eliminating turbines as a passage route (i.e., unit shutdowns at night when eel movement is greatest). Both of these options can significantly impact the economic viability of a project. Consequently, there is a need for alternative technologies that can provide safe and effective downstream passage for silver eels without having a major impact on the ability of a project to generate power during the eel downstream migration period. This need is of particular concern now because about 300 hydropower projects within the range of American Eel freshwater habitats are scheduled to be relicensed by the Federal Energy Regulatory Commission (FERC) in the next 15 years

13 HYDRO ENERGY↗

Improving Discovery, Sharing, and Use of Water Data: Initial Findings and Suggested Future Work

Collaborative management of water resources requires a broad suite of “water data” that extends beyond basic information about water quantity and quality to other related topics such as water infrastructure, aquatic ecosystem health, socioeconomic factors, and power generation. Water data are disparate in nature because they are collected and provided by many entities, and in some cases, remain challenging to access and use. The U.S. Department of Energy’s Water Power Technologies Office initiated a project to characterize relevant categories of water data; describe the current state of accessing, using, and visualizing water data; and outline investigatory pathways for future efforts aimed at improving the discovery, sharing, and use of water data. Input on these topics was solicited from a small but diverse cross section of members of the water resources community. Fourteen broad categories of water data were identified: dams; ecology; flood control; hydroclimatology; hydrography; hydrology; hydropower; management landscape; migratory barriers; recreation and aesthetic importance; socioeconomic; water quality; water availability and use; and weather. Stakeholder perspectives on the accessibility and usability of water data indicate these aspects are affected by a complex set of technical and social factors. However, stakeholders generally agreed that better access to water data can provide a range of benefits to water management, and they stressed the need to generate broad support from water data users and producers. Two investigatory pathways were outlined that, taken together, provide a logical progression toward the goals of the project. The first pathway emphasizes further investigation to better define target audiences and data needs, identify opportunities for collaboration between related efforts, and conduct value demonstration activities to generate further support for improving discovery and access of water data. The second pathway focuses on creating a comprehensive vision for potential solutions that improve the discovery of water data. Several activities that align with the first pathway are suggested for the next phase of the project.

13 HYDRO ENERGY↗

Making a Deal with the Devilfish: Biometric-Informed Screening Technology – Fish Protection Prize (CRADA 514)

In FY20, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams.

13 HYDRO ENERGY↗

Umida AG Fish Protection Prize, Cooperative Research and Development Agreement (CRADA) PNNL CRADA 487 (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

13 HYDRO ENERGY↗

Biological Response Models: Predicting Injury and Mortality of Fish During Downstream Passage through Hydropower Facilities

This report describes the U.S. Department of Energy’s HydroPASSAGE project efforts to develop and collect biological response models for integration into the Biological Performance Assessment (BioPA) toolset and the Hydropower Biological Evaluation Toolset (HBET). These models help understand how fish are likely to respond during dam passage when exposed to hydraulic and physical stressors associated with turbines and other hydropower structures. When fish pass through hydropower facilities, they may encounter several stressors, of which the three most common are collision, rapid decompression, and fluid shear. Specialized equipment has been used to develop 99 biological response models for exposure to blade strike, rapid decompression, or fluid shear. The models were gathered from the literature or developed as part of this effort and include models for 31 different species of fish that have various predicted endpoints (i.e., injury or mortality). Among these models, considerable variation in susceptibility to the stressors has been observed from one species to another, and a species’ susceptibility to one stressor does not necessarily indicate similar susceptibility to another. Although several species have been examined, it is still unclear how many other species, which may have different morphological traits, may respond to these stressors, so further examination of the different species is needed. These models can and have been applied in several different cases, often using the BioPA toolset and HBET, to better understand the potential for injury and mortality that may occur during fish passage at hydropower facilities, including specific applications, such as turbine replacement, the installation of new turbines, or changing operations of currently installed turbines. As hydropower is continually developed to meet the electricity needs of society, tools such as HBET and BioPA, used with the integrated biological response models, will aid in the development of technologies and strategies that avoid, minimize, mitigate, or manage environmental effects.

13 HYDRO ENERGY↗

Effects of Intrusive Confining Units on Groundwater Flow at Pahute Mesa, Nevada National Security Site

Geological, geophysical, hydrogeological, and hydrological evidence indicates that feeder dikes to lava flows play a role as confining units in the groundwater flow system underlying the Pahute Mesa area of underground nuclear testing at the Nevada National Security Site (NNSS). Of geological significance, the Pahute Mesa testing area is largely situated within the Silent Canyon caldera, which includes both tuffs and lavas that were fed by (and are connected to) intrusive rock units such as feeder dikes prior to and during volcanic eruptions (Orkild et al., 1968; Byers et al., 1976). Groundwater modeling results presented in this report support extension of “pool-dam” and “breach scenario” concepts presented in Jackson and Fenelon (2018) and Jackson et al. (2021) to low-permeability intrusive confining units (ICUs) such as feeder dikes that are expected to dissect and ring the caldera. As laterally extensive, steeply-dipping, and sub-parallel planar structures, ICUs can be expected to further compartmentalize groundwater flow in the volcanic aquifers systems at Pahute Mesa beyond the stratigraphically-defined tuff confining units (TCUs). ICUs provide an explanation for changes in water levels before and after the Cheshire test, detonated 2/14/76 (USDOE, 2015), and the unusually high horizontal gradient southwest of Cheshire. These ICU concepts are supported by groundwater modeling results presented in this report. The evidence and groundwater modeling results indicate that the downgradient extent of radionuclide contamination in some areas of Pahute Mesa could be overestimated by ignoring the confining effects of ICUs. On the other hand, contaminant extent could be underestimated by not considering transient flow effects and/or the re-equilibrated flow field caused by breaching of an ICU by an underground nuclear test.

54 ENVIRONMENTAL SCIENCES↗

Hydropower Capital and O&M Costs: An Exploration of the FERC Form 1 Data

This report explores the potential for using responses from the Federal Energy Regulatory Commission’s (FERC’s) “Electric Utility Annual Report,” also known as FERC Form 1, as a cost database for conventional and pumped storage hydropower (PSH). The report outlines the process used to compile an easy-to-access database from the original FERC Form 1 data and discusses the historical cost/performance data. The steps for developing the database include downloading the annual FoxPro files from the FERC website (FERC, 2020), reading them into an Excel format, and reconciling naming issues across years, repeated entries, and shared assets, among others. The cleaned and compiled Form 1 database is available on Oak Ridge National Laboratory’s (ORNL’s) HydroSource website. For this report, the compiled Form 1 database was linked to two other hydropower databases, the National Inventory of Dams and the ORNL Existing Hydropower Assets, that provide additional information on the characteristics and other features of plants in the Form 1 data. Explorations of the plant characteristics, performance, capital costs, and operation and maintenance (O&M) cost data in the combined database were presented separately for conventional hydropower and PSH projects. Form 1 has several advantages as a hydropower cost database. First, the cost data is reported directly by plant owners. Second, Form 1 provides cost breakdowns of capital and operating costs for large conventional and PSH plants enabling more detailed tracking of hydropower costs compared with typical total cost estimates. Third, although the Form 1 data is not reported by all operational hydropower plants in the United States, the available data represents a wide range of plant characteristics and a sizable proportion of the hydropower fleet (61% of PSH plants and 22% of conventional hydropower plants by capacity). The lower proportion of the conventional hydropower fleet is because Form 1 reporting requirements apply only to private utilities that meet given size thresholds, leaving out federally owned facilities and many smaller hydropower plants. Overall, the Form 1 cost database represents a unique, publicly available database on hydropower asset capital and O&M costs. This report leads to a compiled database for the reporting years 1994 to 2020 that helps resolve issues with accessibility and use of the FERC Form 1 data by hydropower plant owners, project developers, technology developers, and regulators.

13 HYDRO ENERGY↗

Effects of Intrusive Confining Units on Groundwater Flow at Pahute Mesa, Nevada National Security Site

Geological, geophysical, hydrogeological, and hydrological evidence indicates that feeder dikes to rhyolitic lava flows may play a role as confining units in the groundwater flow system underlying the Pahute Mesa (PM) area of underground nuclear testing at the Nevada National Security Site (NNSS) (Figure 1). Of geological significance, the PM testing area is largely situated within the Silent Canyon caldera complex (SCCC), which includes both tuffs and lavas that were fed by (and are connected to) intrusive rock units such as feeder dikes prior to and during volcanic eruptions (Orkild et al., 1968; Byers et al., 1976a). Groundwater modeling results presented in this report support extension of “pool-dam” and “breach scenario” concepts presented in Jackson and Fenelon (2018) and Jackson et al. (2021) to low-permeability intrusive confining units (ICUs) such as feeder dikes that are expected to dissect and ring silicic calderas. As laterally extensive, steeply-dipping, and sub-parallel planar structures, ICUs may further compartmentalize groundwater flow in some areas of the volcanic aquifer system at PM. ICUs may explain unusually high horizontal hydraulic gradient southwest of Cheshire. Breaching of an ICU within which the Cheshire test was emplaced may explain changes in water levels before and after the Cheshire test was detonated in the U-20n emplacement hole on 2/14/76 (USDOE, 2015b). This analysis of the effects of ICUs on groundwater flow at PM addresses a need to evaluate uncertainty in the conceptual model or structural aspects of hydrologic source term (HST) or corrective action unit (CAU) models for groundwater flow and contaminant transport (FFACO, 1996, as amended). At Cheshire and possibly other test locations at PM, downgradient extent of radionuclide contamination may be overpredicted by not including the confining effects of ICUs. On the other hand, contaminant extent may be underpredicted by not considering transient flow effects and/or the re-equilibrated flow field caused by breaching of an ICU by an underground nuclear test. Near Cheshire, the effects of ICUs may be most apparent and impactful to the groundwater flow system at PM because of an unusual combination of thickness, extent, and frequency of dikes transecting the saturated CHLFA4 aquifer and feeding into the overlying unsaturated rhyolite lava of Windy Wash. Chapters 2, 3, and 4 present geological, geophysical, hydrogeological, and hydrological evidence for ICUs at PM. Chapters 5 and 6 examine effects of ICUs on groundwater flow including analysis by groundwater modeling.

54 ENVIRONMENTAL SCIENCES↗

Geologic Modeling and Simulation Report for the Aquistore Project

The Plains CO 2 Reduction (PCOR) Partnership, through the Energy & Environmental Research Center (EERC), is collaborating with the Petroleum Technology Research Centre (PTRC) on site characterization; modeling and simulation; risk assessment; public outreach; and monitoring, verification, and accounting (MVA) activities for the Aquistore project. The Aquistore project is a carbon capture, utilization, and storage (CCUS) project situated near the town of Estevan, Saskatchewan, Canada, and the U.S.–Canada border. This project is managed by PTRC and will serve as buffer storage of carbon dioxide (CO 2 ) from the SaskPower Boundary Dam CCUS project, the world’s first commercial-scale postcombustion CCUS project from a coal-fired electric generating facility. To date, an injection well and an observation research well (~500 ft apart) have been drilled and completed at the Aquistore site, with injection anticipated to begin in 2014. Using a combination of site characterization data provided by PTRC and independently acquired information, the PCOR Partnership has constructed a static geologic model to assess the potential storage capacity of the Aquistore site and provide the foundation for dynamic simulation. The geologic model and the results of the predictive simulations will be used in the risk assessment process to help define an overall monitoring plan for the project and to assure stakeholders that the injected CO 2 will remain safely stored at the Aquistore site.

54 ENVIRONMENTAL SCIENCES↗

Irrigation Modernization Task 4: Accelerating Energy Solutions (FY2022 Final Report)

This report offers insights on energy solutions for irrigation modernization that serve the needs of farmers as well as residents and industry in the local community. Solutions are found in the irrigation districts where local generation from renewable energy sources – solar, hydro, and wind – can be combined with energy storage and customer loads. These combined resources configured in microgrids can lower costs during peak loads and provide resiliency by maintaining electricity supply during outages. The goal of this project, as stated in the FY2022 AOP, is to promote realization of energy solutions that are tailored to physical location, community, infrastructure, and energy value streams. Further, it is to develop examples of how to increase value of, and overcome barriers to, energy solutions in the context of irrigation modernization. In pursuit of that goal, the project looked at options for: 1) Reducing the cost of energy consumed in irrigation systems, 2) Increasing the revenue from surplus power generation, and 3) Deploying new power generation configured as part of a local microgrid. Potential solutions to reducing energy costs and increasing surplus power revenue revolve around addressing regulatory and legal constraints tied to how power is purchased by and sold to the irrigator or irrigation district. Some headway was made in identifying barriers and ways to push utilities to be more accommodating to distributed energy sources; however, for the most part, real progress hinges on changes at the regulatory and legislative level. Deployment of local, renewable generation systems can be implemented provided the economics of the project and the location are favorable. In concert with Famers Conservation Alliance and Energy Trust of Oregon, a number of approaches were studied in the past year, including off-grid solar powered pumps, grid-tied community solar projects, and in-conduit canal hydropower systems. Ultimately three viable projects were identified: 1) North Unit Irrigation District/City of Redmond, Oregon Critical Facility Microgrid – offers combined in-conduit hydro and solar power generation. 2) Wallowa County/Joseph, Oregon Irrigation System Upgrades – centered on upgrades to a non-powered dam that will add a turbine as well as in-conduit power in canal feeders downstream. 3) Medford, Oregon Wastewater Treatment Plant Biogas Cogeneration System – centered on building out biogas storage and grid upgrades to power the plant, sell excess power, and provide emergency backup power (supplanting a diesel generator). Each of these projects has characteristics that broaden the understanding of the value of microgrids employing renewable energy to achieve resiliency and net-zero carbon goals. The first two projects are centered on new hydropower systems. Although the Medford project is only tangentially tied to an irrigation district, it was selected for study analysis as it was the only one mature enough (with sufficient data) to complete an analysis within this project year. Thus, we chose to move forward developing a case study, in concert with the Community Water-Power Resilience project, to demonstrate a method for evaluating such projects. Essentially, this case study serves as a template for studies to be carried out next year that more directly involve irrigation system hydropower, e.g., the project at the Wallowa County/Joseph, Oregon Irrigation System. Lastly, it is recognized that the locations and case studies in this report are all located in Oregon. We recognize this as a limitation. While the intent is not to ignore other states or regions, this result is driven by the fact that we have cultivated a collaboration with non-profit entities in Oregon that focus on these topics – Farmers Conservation Alliance and Energy Trust of Oregon. These partners were central to identifying projects that may be good fits for this program. A goal in the coming year is to establish collaboration with entities in other states/regions that, similarly, can connect us to potential projects in their geographic area. The potential benefits from the WPTO’s support for demonstration projects as energy solutions in irrigation districts include: (1) Alternative power supplies for communities and farms using renewable, carbon-free energy resources, (2) Cost savings for electricity for communities and farms, (3) Resiliency of power supplies for critical loads when electricity from the grid is not available, (4) Resiliency of power supplies for critical infrastructure in the event of catastrophic events, and (5) Demonstration of irrigation modernization projects that provide resilience and a reduced carbon footprint to irrigation districts and nearby communities. These deployments can serve as vanguards/archetypes spurring similar projects in other districts and states.

13 HYDRO ENERGY↗

Needs and Opportunities for Testing of Hydropower Technology Innovations

Despite hydropower’s status as a well-established technology, changes in the global energy sector have prompted a variety of necessary hydropower technological innovations. Examples include efficient lowhead turbines, more flexible and dispatchable hydropower and pumped storage systems to complement variable and intermittent renewable resources, and technologies providing higher environmental performance. However, while innovative technologies are currently being proposed to meet these development challenges, small hydropower facility owners do not have sufficient risk-bearing capacity to adopt new, unvalidated technologies. This discourages manufacturers from bringing nascent technologies to market and stalls the technological growth of the sector. To reduce the risks associated with new technologies and promote further innovation, systemic (and sometimes unconventional) validation activities and new testing capabilities for hydropower are highly desired. These testing capabilities must demonstrate the safety, environmental acceptability, reliability, and performance of innovative technologies to quantify their value compared with existing technologies. Establishing these capabilities through dedicated testing facilities will be key to promoting hydropower growth in the United States. Following direction from the House Energy and Water Development Committee, the US Department of Energy’s Water Power Technologies Office (WPTO) has been tasked with understanding the state of hydropower testing in the United States. This scoping report discusses the needs and opportunities of hydropower testing in the United States, with a specific focus on small hydropower. Future developments will likely mostly target low-head sites with less than 30 ft (9.1 m) from new stream-reach developments, non-powered dam retrofits, and rehabilitation/upgrade of existing plants.

13 HYDRO ENERGY↗

Team Bingaman-Fish Friendly Gravitational Vortex Energy System - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Team Rackovan - Alden - Fish Entrainment Reduction Structure (FERS) - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Fisheries Technology Associates, Inc. - Sweeping CHIRPs, Looming Darkness: In-Sync Stimuli - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Neurotrophic Labs - Fish Exclusion Using a Floating Separator - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Team Hogan - Air Bubble Curtain for Physical Exclusion - Fish Protection Prize (Final Report)

In FY2020, the National Renewable Energy Laboratory (NREL) initiated a Prize competition with support from Pacific Northwest National Laboratory (PNNL), and sponsored by the U.S. Department of Energy Water Power Technologies Office (DOE WPTO), to support the development of innovative methods for excluding fish from water diversions and intakes: the Fish Protection Prize. Proposed solutions can include new ideas for addressing fish exclusion or improvements to existing technologies. Solutions can be applied to river and canal diversions, unscreened diversion pipes, or intakes at dams. In FY20 PNNL provided voucher support in the form of technical reviews and support, as well as graphics and presentation support, in helping the 9 finalists prepare for the Pitch Contest at the American Fisheries Society (AFS) virtual meeting. There were no subject inventions, patent applications, copyrights, and trademarks under this CRADA. The report herein provides an abstract of the presentation that the finalist presented at the American Fisheries Society virtual meeting in September 2020.

42 ENGINEERING↗

Fishway Entrance Palisade

This technical report summarizes work that was conducted by the University of Massachusetts Amherst and the U.S. Geological Survey, along with other project partners, on the Fishway Entrance Palisade, a project funded through the Department of Energy’s (DOE) funding opportunity titled ‘Innovative Solutions for Fish Passage at Hydropower Dams’ (DE-FOA-0001662). The period of performance spanned from September 1, 2018 through September 30, 2021. The Entrance Palisade is a novel fish passage engineering technology designed to provide more favorable entry conditions for fish into fishways and to reduce costs relative to conventional fishway auxiliary water systems.

59 BASIC BIOLOGICAL SCIENCES↗