Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “Closure”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 937 records · Page 52

Vadose Zone Model for BC Cribs and Trenches for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B Plant Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B Plant Area vadose zone model. The B Plant Area model encompasses the region around B Plant (221-B) in the western part of 200 East Area. The plant was used to separate plutonium from irradiated fuel using the bismuth-phosphate process from 1945 to 1956, and for strontium and cesium recovery from 1968 to 1985.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for U-10 West Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Transport Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3 Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3 Pond vadose zone model. The B-3 Pond model covers the main lobe of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for S Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chloiine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thmium-230 (Th-230). The simulation time struts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator, officially named the exascale Subsurface Transport Over Multiple Phases ( eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user's guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User 's Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3A/B Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort; carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP) simulator officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP), is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain. The Hanford Site Central Plateau was subdivided into 26 individual vadose zone models, with 13 in the 200 East Area and 13 in the 200 West Area. Waste sites that have a completed performance assessment (PA) or past-leak analysis were not included as sources of radionuclides. Instead the vadose zone to groundwater transfer rates of the Environmental Restoration Disposal Facility, Integrated Disposal Facility, US Ecology, and Waste Management Area C (WMA C) PAs and the past-leak analysis for WMA C were used as direct input to the P2R model. Each of the vadose zone models is documented in separate environmental calculation files (ECFs). This ECF describes the B-3A/B Ponds model. The scope of this ECF is to document the development and results of the B-3 A/B Ponds vadose zone model. CP-63515, Model Package Report: Central Plateau Vadose Zone Models, describes the approach, assumptions, process of determining the number of models required and domain of each model, input data, and processing common to all the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for B-3C Pond for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3. Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The scope of this ECF is to document the development and results of the B-3C Pond vadose zone model. The B-3C Pond model covers the 216-B-3C Expansion Pond of the 216-B-3 Pond System located in a topographic low east of the 200 East Area. The pond system operated from 1945 to 1997 and received effluents from the Plutonium Uranium Extraction Plant, B Plant, 284-E Powerhouse, and other 200 East Area facilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for REDOX Ponds Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vadose Zone Model for T Farms Area for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-51031,Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed "dry" in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (1-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

AX Farm and A Farm Third Retrieval Technology Chemical Dissolution Options Evaluation

In response to DOE-ORP direction to prepare a Practicability Evaluation for Waste Tank AX-102, and to address the Washington State Department of Ecology recommendation to evaluate the use of acid reagents for chemical dissolution, an Integrated Project Team (IPT) consisting of retrieval, process chemistry, corrosion, closure and laboratory subject matter experts was assembled to evaluate chemical dissolution options. This document provides a summary of these efforts and is intended to aid in the evaluation and third retrieval technology decision process not only for AX-102, but for all the AX and A Farm tanks, since the tanks contain similar waste and are flat-bottomed with uneven bottom plates.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Verification and Validation of High Explosive Reactive Burn Models Implemented in LANL's EAP and LAP Code Base (FY2020 L2 Milestone MRT 7129) [Slides]

Advanced reactive burn models enable phenomena to be modeled that aren’t possible with programmed burn. Programmed burn propagates a burn front at a prescribed speed from a prescribed initiation point. Reactive burn uses the hydro variables (pressure, temperature, etc.) to determine when, how rapidly, and to what extent a zone detonates. This enables a completely new set of problems to be simulated. Our goal in this milestone has been to improve the usability of reactive burn modes. Thus, the closure criteria are: 1. Perform code and solution verification of the reactive burn models using appropriate solutions and simplified HE setups. 2. Perform validation assessments using small-scale experiments. 3. Evaluate sensitivities and quantify uncertainties due to model form variations and mesh dependencies.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗

Vadose Zone Model for SALDS for Composite Analysis

The objectives of the vadose modeling for the updated Hanford Site composite analysis (CA) are to simulate the flow and transport of water and radionuclide releases from the surface to the water table and to provide radionuclide transfer rates for the plateau to river (P2R) model, version 8.3 (CP-57037, Model Package Report: Plateau to River Groundwater Model, Version 8.3). Water additions include natural recharge and water discharged to the ground as a result of industrial processes associated with Hanford Site operations. Contaminant sources include radionuclides in water discharged to the ground during operations and radionuclides disposed “dry” in solid waste burial grounds or other means. The following 16 radionuclides were selected for this modeling effort: carbon-14 (C-14), chlorine-36 (Cl-36), tritium (H-3), iodine-129 (I-129), neptunium-237 (Np-237), rhenium-187 (Re-187), strontium-90 (Sr-90), technetium-99 (Tc-99), uranium-232 (U-232), uranium-233 (U-233), uranium-234 (U-234), uranium-235 (U-235), uranium-236 (U-236), uranium-238 (U-238), radium-226 (Ra-226), and thorium-230 (Th-230). The simulation time starts in 1943 and ends at 12070, which is 10,000 years after assumed Hanford Site closure in 2070. The parallel version of the Subsurface Transport Over Multiple Phases (STOMP1) simulator, officially named the exascale Subsurface Transport Over Multiple Phases (eSTOMP) is used to simulate flow and transport for the vadose models. The documentation for the STOMP code is comprehensive. The theoretical and numerical approaches applied in the STOMP code are documented in a published theory guide (PNNL-12030, STOMP Subsurface Transport Over Multiple Phases Version 2.0 Theory Guide). The code has undergone a rigorous verification procedure against analytical solutions, laboratory-scale experiments, and field-scale demonstrations. The application guide (PNNL-11216, STOMP Subsurface Transport Over Multiple Phases Application Guide) provides instructive examples in the application of the code to classical groundwater problems. The user’s guide (PNNL-15782, STOMP: Subsurface Transport Over Multiple Phases Version 4.0: User’s Guide) describes the general use, input file formatting, compilation, and execution of the code. The primary output of the vadose zone modeling is radionuclide transfer rates to the groundwater for input into the P2R model. The rates will be summed over the 100 by 100 m P2R grid cells that fall within the vadose zone model source domain. The Hanford Site Central Plateau was subdivided into 26 individual vadose zone models, with 13 in the 200 East Area and 13 in the 200 West Area. Waste sites that have a completed performance assessment (PA) or past-leak analysis were not included as sources of radionuclides. Instead the vadose zone to groundwater transfer rates of the Environmental Restoration Disposal Facility, Integrated Disposal Facility, US Ecology, and Waste Management Area C (WMA C) PAs and the past-leak analysis for WMA C were used as direct input to the P2R model. Each of the vadose zone models is documented in separate environmental calculation files (ECFs). This ECF describes the State-Approved Land Disposal Site (SALDS) model. The scope of this ECF is to document the development and results of the SALDS vadose zone model. CP-63515, Model Package Report: Central Plateau Vadose Zone Models, describes the approach, assumptions, process of determining the number of models required and domain of each model, input data, and processing common to all the models.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating and Improving Convective Parameterization for GCMs Using ARM Observations. Final report

This technical report summarizes the achievements during the project period funded by the Atmospheric System Research (ASR) program. The general goal of the project is to improve the representation of atmospheric deep convection in global climate models. By using DOE Atmospheric Radiation Measurement (ARM) program observations and a hierarchy of models from cloud-resolving to global climate models, we evaluated and improved many aspects of convection parameterization schemes, such as the trigger function for convection and closure condition to determine the amount of convection. We also incorporated the stochasticity of convection into a convection scheme. These improvements, when implemented into the National Center for Atmospheric Research (NCAR) Community Earth System Model (CESM) and the DOE Exascale Energy Earth System Model (E3SM), led to improved simulation of precipitation characteristics, including precipitation intensity, Intertropical Convergence Zone, and Madden-Julian oscillation. The project also improved the representation of microphysical processes in convective clouds. It enables the interaction of cloud microphysics with aerosols in weather and climate models.

54 ENVIRONMENTAL SCIENCES↗

Shear Behavior of Artificial Clay Seams within Bedded Salt Structures

Bedded salt contains thin layers of clay, also known as clay seams, in-between far thicker layers of salt. These inhomogeneities are thought to have first-order effects on the closure of nearby drifts and potential roof collapses. Despite their importance, characterizations of the peak shear strength and residual shear strength of clay seams in salt are extremely rare in the published literature. A previous paper reported results from laboratory direct shear experiments on clay seam samples from the Permian Basin in New Mexico. These clay seams behaved similar to intact salt, which was attributed to the abundance of salt crystals intersecting the clay seams. None of those specimens contained a distinct ¼" - ½" (6 -12 mm) thick clay seam, as has been observed in drifts at the Waste Isolation Pilot Plant (WIPP). Due to the difficulty in obtaining WIPP samples with these types of clay seams, artificial seams of bentonite and brine sandwiched between sections of salt were created and shear tested. Eight 4" diameter samples were created with either a ¼" or ½" a thick seam and then consolidated at 3000 psi prior to shear testing. The direct shear tests on these samples were performed at nominal normal stresses representative of expected WIPP in-situ conditions (500 to 1500 psi). The resulting shear stress vs. shear displacement curves exhibited a peak followed by a gradual decay of shear strength. The shear stress never transitioned to a true residual shear stress plateau, so the final shear strength at the end of each test (0.75" of shear displacement) was analyzed instead. Both the peak shear strength and the final shear strength conformed to Mohr- Coulomb behavior with friction angles and cohesion strengths consistent with a saturated, highly consolidated, clay. These new artificial clay seam results and the previous clay-interspersed-with-salt results likely bound the expected shear behavior of WIPP clay seams.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

DECOVALEX-2019 (Task C Final Report)

The DECOVALEX Project is an on-going international research collaboration, established in 1992, to advance the understanding and modeling of coupled Thermal (T), Hydrological (H), Mechanical (M) and Chemical (C) processes in geological in geological systems. This document is the final report of Task C which was proposed and coordinated by the Japan Atomic Energy Agency (JAEA), presenting the technical definitions of the problems studied, approaches applied, achievements made and outstanding issues for future research. DECOVALEX-2019 Task C aims to develop modelling and prediction methods using numerical simulation based on the water-filling experiment to examine the post-driftclosure environment recovery processes. Three research teams, JAEA, Sandia National Laboratories in the United States (SNL), and the Technical University of Liberec in the Czech Republic (TUL) were challenged to simulate the observed environmental changes. The Task consisted of following three main steps. The simulation targets were the water pressure drawdown/recovery and the variation of water chemistry during the tunnel excavation and closure, as observed in the monitoring boreholes and the CTD.

58 GEOSCIENCES↗

Reinforced Ammo Can Validation Test Report for Lawrence Livermore National Laboratory

A research effort was conducted to investigate the effects of an unintentional internal detonation of energetic materials on a small transportation container called the “Reinforced Ammo Can” (RAC), which is currently approved for the transport of energetic materials up to 2 grams net explosive weight (NEW) onsite at Lawrence Livermore National Laboratory (LLNL). The project used experimental testing of the containers based on simulated results conducted by a Missouri S & T explosives engineering graduate student while on an internship working in explosives safety at LLNL. The proposed experimental testing consisted of 20 central detonation tests in separate Reinforced Ammo Can containers to verify their high explosive (HE) containment capability. RAC containers are required for transporting secondary explosives on site at LLNL Site 200 in quantities between 300 mg and 2 grams of Trinitrotoluene (TNT) equivalent NEW. Currently, the LLNL Environmental Safety and Health (ES&H) Manual states that the RAC containers are permissible for on-site transportation of secondary explosives up to 2 grams NEW by approved HE handlers with the approval of an Explosives Safety Expert (ESE). Simulated results indicated that tensile failure of the closure mechanism on the container is the most likely failure mode, and showed potential occurrence at the 2 gram NEW threshold. Experimental validation tests were conducted indicating failure/rupture of the containers lid with venting of the detonation products at the 2 gram NEW test threshold with an explosive mass safety factor of 1.3. Failure consisted of impact opening the container latch mechanism resulting in potential ejection of the lid depending on the orientation of the charge within the confinement. This analysis solely is an evaluation of the response of the containment if a detonation were to occur, it does NOT consider the probability of such an event.

42 ENGINEERING↗

NTS-SS-SNL-NMSITE-2017-0004 "Contamination Monitor Left in Service After Inadequate Calibration" Causes Not Fully Addressed (Causal Analysis Report)

On June 5th, 2020 Sandia National Laboratories signed and recommended for closure the evidence package for the Noncompliance Tracking System NTS—SS-SNL-NMSITE-2017-0004, Contamination Monitor Left in Service After Inadequate Calibration. On July 16th, 2020 the Sandia Field Office sent a follow-up question list to the Radiation Protection Instrumentation Program Lead to clarify some points while reviewing the evidence package. The follow-up questions readily identified deficiencies with all three calibrations of the iPCM12 systems. On July 30th, 2020 Radiation Protection hosted a meeting to better understand the exact nature of the concerns, determine if the iPCM12 machines were out of calibration and therefore would have to be taken out of service. One result of this meeting was to determine if SNL could withdraw the evidence package. SNL transmitted a letter on August 26th, 2020 recalling the evidence package and committed to performing a thorough causal analysis and invoke the required issues management processes to ensure that corrective actions are sustained.

54 ENVIRONMENTAL SCIENCES↗

Plutonium workers get a new level of education in the actinide mission

The Associate Laboratory Directorate for Weapons Production (ALDWP) and the National Security Education Center (NSEC) have teamed to develop a new Nuclear Enterprise Science and Technology (NEST) Academic Certificate program offered through the University of New Mexico – Los Alamos (UNM-LA). The pilot program, which virtually kicked off on January 19 even amidst snow closures, received accreditation by the State Higher Education Department (HED) in FY20 and is designed for LANL’s existing fissile material handler technician and technologist employee workforce. It will provide essential science, operations, and business education on all aspects of working in modern nuclear materials handling and processing facilities. The first course for the certificate program is called “Nuclear Facility Fundamentals.” A call for nominations went out to the directorate and a cohort of 15 individuals has been established to start the program.

61 RADIATION PROTECTION AND DOSIMETRY↗