Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “upgrades”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Synchrotron Radiation Beam Diagnostics at IOTA - Commissioning Performance and Upgrade Efforts

The Integrable Optics Test Accelerator is a research electron and proton storage ring recently commissioned at the Fermilab Accelerator Science and Technology facility. A key part of its beam diagnostics suite are synchrotron radiation monitors, used for measuring transverse beam profile, position, and intensity. In this paper, we report on the performance and uses of this system during the year 1 run. We demonstrate sub-100nm statistical beam position uncertainty and high dynamic range from 10⁹ electrons down to a single electron. Commissioning challenges and operational issues are discussed. We conclude by outlining current upgrade efforts, including improved modularity, small emittance measurements, and a multi-anode photomultiplier system for turn-by-turn acquisition.

43 PARTICLE ACCELERATORS↗

Vertical Septum Magnet Design for the APS Upgrade

The vertical injection scheme proposed for the APS Upgrade (APS-U) Project requires a challenging septum magnet that must meet stringent beam physics, magnetic field leakage, and vacuum requirements. The current iteration of this magnet design includes an enlarged stored-beam chamber aperture of 9 mm x 12 mm and a reduction of the septum thickness to 1.5 mm. The enlarged aperture accommodates a non-evaporable getter (NEG)-coated stored beam chamber to better achieve the required vacuum. A prototype septum magnet has been built and measurements confirm the cancellation of a peak leakage field even though the value is six times larger than the design. The leakage field measured at the upstream (US) end cancels the downstream (DS) end as was expected by design. The measured and simulated leakage field and the stored beam trajectories are reported.

43 PARTICLE ACCELERATORS↗

Design of a 10 MeV beamline at the Upgraded Injector Test Facility for e-beam irradiation

Electron beam irradiation near 10 MeV is suitable for wastewater treatment. The Upgraded Injector Test Facility (UITF) at Jefferson Lab is a CW superconducting linear accelerator capable of providing an electron beam of energy up to 10 MeV and up to 100 µA current. This contribution presents the beam transport simulations for a beamline to be used for the irradiation of wastewater samples at the UITF. The simulations were done using the code General Particle Tracer with the goal of obtaining an 8 MeV electron beam of radius (3-σ) of ~2.4 cm. The achieved energy spread is ~74.5 keV. The space charge effects were investigated when the bunch charge is varied to be up to 1000 times and the results showed that they do not affect the beam quality significantly.

Li, X.↗

Current Status of the FFA@CEBAF Energy Upgrade Study

This work will describe the current status of the FFA@CEBAF energy upgrade feasibility studies. Technical updates are given, but more specific details are left to separate contributions. Specifically, this work will discuss improvements to the FFA arcs, a new recirculating injector proposal, and numerous modifications to the current 12 GeV CEBAF which will be required, such as the spreaders and recombiners architecture, splitters (time-of-flight chicanes), the extraction system, and the hall lines.

Bodenstein, R. M.↗

CEBAF 22 GeV FFA energy upgrade

Extending the energy reach of CEBAF by increasing the number of recirculations, while using the existing linacs is explored. This energy upgrade is based on the multi-pass acceleration of electrons in a single non-scaling Fixed Field Alternating Gradient (FFA) beam line, using Halbach-style permanent magnets. Encouraged by the recent successful demonstration of CBETA, a proposal was formulated to nearly double the energy of CEBAF from 12 to 22~GeV by replacing the highest energy arcs with FFA transport. The new FFA arcs would support simultaneous transport of an additional 6 passes spanning roughly a factor of two in energy. One of the challenges of the multi-pass (11) linac optics is to assure uniform focusing over a wide range of energies. Here, we propose a triplet lattice that provides a stable periodic solution covering an energy ratio of 1:33. The current CEBAF injection at 123 MeV, makes optical matching in the first linac impossible due to the extremely high energy ratio (1:175). Replacement of the current injector with a 650 MeV recirculating injector will alleviate this issue. Orbital and optical matching from the FFA arcs to the linacs is implemented as a compact non-adiabatic insert. The design presented here is anticipated to deliver a 22 GeV beam with normalized emittance of 76 mm·mrad and a relative energy spread of 1×10\textsuperscript{-3}. Further recirculation beyond 22 GeV is limited by the large (974 MeV per electron) energy loss due to synchrotron radiation.

Benesch, J.↗

RESONANT MATCHING SECTION FOR CEBAF ENERGY UPGRADE

Thomas Jefferson National Accelerator Facility (Jeffer- son Lab) currently studies the feasibility of upgrading its energy to 22 GeV. It considers addition of six more linac passes. The highest energy passes will share two new arcs designed using the Fixed-Field Alternating Gradient (FFA) technology. The FFA arcs are built using permanent combined-function magnets. They will be connected to the linacs through transition sections that will match the optics of all six passes to the linacs. With the high number of con- straints and the limited space available, we are investigating a parametric resonance technique to match the optics quasi- independently at each energy. A resonance is excited at each individual energy to selectively control its optics. The reso- nant dipole and quadrupole kick harmonics are imposed for all energies simultaneously using Panofsky corrector mag- nets placed throughout the FFA arcs. This paper presents the current progress on that transition section design

Deitrick, K.↗

Horizontal Splitter Design For FFA@CEBAF Energy Upgrade: Current Status

Thomas Jefferson National Accelerator Facility (Jefferson Lab) is currently studying the feasibility of an energy upgrade based upon Fixed-Field Alternating Gradient (FFA) permanent magnet technology. The current plan is to replace the highest-energy recirculation arcs with FFA arcs, increasing the total number of beam recirculations, thus the energy. In order to accommodate multiple passes in the FFA arcs, horizontal splitters are being designed to control the beam parameters entering the FFA arcs, as well as the time of flight and R_56. In the current design, six passes will recirculate through the FFA arcs, necessitating the design of six independent beamlines to control the optics and beam dynamics matching into the arcs. These beamlines must fit into the current CEBAF tunnel, while allowing for personnel and equipment access. They must also be flexible enough to accommodate the beam under realistic operational conditions and fluctuations. The constraints on the system are highly restrictive, complicating the design. This document will describe the current state of the design, and indicate the work remaining for a complete conceptual design.

Benesch, Jay↗

Current status of conceptual horizontal splitter design for FFA@CEBAF energy Upgrade

Jefferson Lab’s Continuous Electron Beam Accelerator Facility (CEBAF) is currently investigating the feasibility of upgrading its maximum operating energy using Fixed-Field Alternating-gradient (FFA) recirculating arcs to increase the total number of recirculations of the beam through the pair of LINACs. These FFA arcs will be composed of permanent magnets, with small Panofsky-style multipole correctors. In order to control the beam parameters through these FFA arcs, horizontal splitters must be used. The geometrical and physical constraints, as well as the beam matching requirements are very restrictive, complicating the design. This work will show the current status of the most mature design, which includes matching solutions, as well as options for extraction of the beam.

Accelerator Physics↗

An extraction scheme for future CEBAF FFA based energy upgrade

Jefferson lab is considering an energy increase from current 12 GeV to 22 GeV for its CEBAF accelerator. This will be accomplished by recirculating 5-6 additional turns through two parallel CEBAF LINACs using an FFA arc at each end of the racetrack. The total recirculation turns would be 10 times, the first four turns use present conventional arcs to make the 180-degree bends from one LINAC to the other. However, the last 5-6 turns will all share a single beam line inside two FFA arcs. This reduces the footprint and the cost of the project significantly. On the other hand, having the trajectories of last 5-6 recirculating beams close to each other makes it challenging to extract beams from different passes with different energies. In this paper we will explain our present extraction system for 12 GeV, our challenges and limitations, and a possible extraction solution for the 22 GeV upgrade with the goal of extracting beam at different turns/energies to different experimental halls.

Accelerator Physics↗

Resonance Control System for the CEBAF Separator Upgrade

Abstract The Continuous Electron Beam Accelerator Facility (CEBAF) energy upgrade from 6 GeV to 12 GeV includes the installation of four new 748.5 MHz normal conducting deflecting cavities in the 5th pass extraction region. The RF system employs two digital LLRF systems controlling four normal conducting cavities in a vector sum setting. Cavity tune information of the individual cavities is obtained using a multiplexing scheme of the forward and reflected RF signals. Water skids equipped with heaters and valves are used to control resonance. A new FPGA-based hardware and EPICS-based predictive control algorithm has been developed to support reliable operation of the beam extraction process. This paper presents the architecture design of the existing hardware and software as well as a plan to develop a model predictive control system.

Plawski, Tomasz↗

Developments Towards FRIB Upgrade to 400 MeV/u for Heaviest Uranium Ions

High-Q₀ medium-velocity (beta opt = 0.6) 5-cell elliptical cavities for superconducting linacs are critical technology for advancing current and future projects such as the Proton Improvement Plan II linac and the proposed energy upgrade of Michigan State University’s Facility For Rare Isotope Beams linac, FRIB400. Previous work established the validity of the novel geometry of the FRIB400 prototype 644 MHz 5-cell elliptical β = 0.65 cavities for future high Q₀ development. In collaboration with FNAL, two leading-edge high-Q₀ recipes, N-doping and Mid-T baking, were tested in the 5-cell format. 2/0 N-doping + cold electropolishing was successful at achieving FRIB400 and PIP-II Q₀ requirements, achieving an unprecedented 3.8 x 10¹⁰ at 17.5 MV/m, satisfying the FRIB400 Q₀ requirements by 1.75 times in a low-gauss environment. Mid-T baking exceeded FRIB400 Q₀ requirements by 1.4 times, and benefitted from decreased residual resistance compared to the N-doped cavity test. Systematic ultrasonic thickness measurements in single-cell revealed bulk (150 microns) EP with the modified EP tool is consistent across the inner surfaces of the cavity walls.

43 PARTICLE ACCELERATORS↗

Modeling of Dipole and Quadrupole Fringe-Field Effects for the Advanced Photon Source Upgrade Lattice

The proposed upgrade of the Advanced Photon Source (APS) to a multibend-achromat lattice requires shorter and much stronger quadrupole magnets than are present in the existing ring. This results in longitudinal gradient profiles that differ significantly from a hard-edge model. Additionally, the lattice assumes the use of five-segment longitudinal gradient dipoles. Under these circumstances, the effects of fringe fields and detailed field distributions are of interest. We evaluated the effect of soft-edge fringe fields on the linear optics and chromaticity, finding that compensation for these effects is readily accomplished. In addition, we evaluated the reliability of standard methods of simulating hardedge nonlinear fringe effects in quadrupoles.

Borland, M.↗

Fermilab Switchyard Resonant Beam Position Monitor Electronics Upgrade Results

The readout electronics for the resonant beam position monitors (BPMs) in the Fermilab Switchyard (SY) have been upgraded, utilizing a low noise amplifier transition board and Fermilab designed digitizer boards. The stripline BPMs are estimated to have an average signal output of between -110 dBm and -80 dBm, with an esti-mated peak output of -70 dBm. The external resonant circuit is tuned to the SY machine frequency of 53.10348 MHz. Both the digitizer and transition boards have vari-able gain in order to accommodate the large dynamic range and irregularity of the resonant extraction spill. These BPMs will aid in auto-tuning of the SY beamline as well as enabling operators to monitor beam position through the spill.

43 PARTICLE ACCELERATORS↗

SIMULATIONS OF BOOSTER INJECTION EFFICIENCY FOR THE APS-UPGRADE

The APS-Upgrade will require the injector chain to provide high single bunch charge for swap-out injection. One possible limiting factor to achieving this is an observed reduction of injection efficiency into the booster synchrotron at high charge. We have simulated booster injection using the particle tracking code elegant, including a model for the booster impedance and beam loading in the RF cavities. The simulations point to two possible causes for reduced efficiency: energy oscillations leading to losses at high dispersion locations, and a vertical beam size blowup caused by ions in the Particle Accumulator Ring. We also show that the efficiency is much higher in an alternate booster lattice with smaller vertical beta function and zero dispersion in the straight sections.

APS-U↗

Lower Emittance Lattice for the Advanced Photon Source Upgrade Using Reverse Bending Magnets

The Advanced Photon Source (APS) is pursuing an upgrade to the storage ring to a hybrid seven-bend-achromat design [1]. The nominal design provides a natural emittance of 67 pm [2]. By adding reverse dipole fields to several quadrupoles [3, 4] we can reduce the natural emittance to 41 pm while simultaneously providing more optimal beta functions in the insertion devices and increasing the dispersion function at the chromaticity sextupole magnets. The improved emittance results from a combination of increased energy loss per turn and a change in the damping partition. At the same time, the nonlinear dynamics performance is very similar, thanks in part to increased dispersion in the sextupoles. This paper describes the properties, optimization, and performance of the new lattice.

Borland, M.↗

Magnetic Measurements of Storage Ring Magnets for the APS Upgrade Project

Extensive prototyping of storage ring magnets is ongoing at the Advanced Photon Source (APS) in support of the APS Multi-Bend Achromat (MBA) upgrade project (APS-U) [1]. As part of the R&D activities four quadrupole magnets with slightly different geometries and pole tip materials, and one sextupole magnet with vanadium permendur (VP) pole tips were designed, built and tested. Magnets were measured individually using a rotating coil and a Hall probe for detailed mapping of the magnetic field. Magnets were then assembled and aligned relative to each other on a steel support plate and concrete plinth using precision machined surfaces to gain experience with the alignment method chosen for the APS-U storage ring magnets. The required alignment of magnets on a common support structure is 30 μm rms. Measurements of magnetic field quality, strength and magnet alignment after subjecting the magnets and assemblies to different tests are presented.

Doose, C.↗

Field Quality from Tolerance Stack-up In R&D Quadrupoles for the Advanced Photon Source Upgrade

The Advanced Photon Source (APS) at Argonne National Laboratory (ANL) is considering upgrading the current double-bend, 7-GeV, 3rd generation storage ring to a 6-GeV, 4th generation storage ring with a Multibend Achromat (MBA) lattice. In this study, a novel method is proposed to determine fabrication and assembly tolerances through a combination of magnetic and mechanical tolerance analyses. Mechanical tolerance stackup analyses using Teamcenter Variation Analysis are carried out to determine the part and assembly level fabrication tolerances. Finite element analyses using OPERA are conducted to estimate the effect of fabrication and assembly errors on the magnetic field of a quadrupole magnet and to determine the allowable tolerances to achieve the desired magnetic performance. Finally, results of measurements in R&D quadrupole prototypes are compared with the analysis results.

Quadrupole, Field quality, tolerance, Finite Eleme↗

Beam Loss Simulation and Collimator System Configurations for the Advanced Photon Source Upgrade

The proposed multi-bend achromat lattice for the Advanced Photon Source upgrade (APS-U) has a design emittance of less than 70 pm. The Touschek loss rate is high: compared with the current APS ring, which has an average beam lifetime ~ 10 h, the simulated beam lifetime for APS-U is only ~2 h when operated in the high flux mode (I=200 mA in 48 bunches). An additional consequence of the short lifetime is that injection must be more frequent, which provides another potential source of particle loss. In order to provide information for the radiation shielding system evaluation and to avoid particle loss in sensitive locations around the ring (for example, insertion device straight sections), simulations of the detailed beam loss distribution have been performed. Several possible collimation configurations have been simulated and compared.

43 PARTICLE ACCELERATORS↗