Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system planning”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Design of a cooperative problem-solving system for enroute flight planning: An empirical study of its use by airline dispatchers

In a previous report, an empirical study of 30 pilots using the Flight Planning Testbed was reported. An identical experiment using the Flight Planning Testbed (FPT), except that 27 airline dispatchers were studied, is described. Five general questions were addressed in this study: (1) under what circumstances do the introduction of computer-generated suggestions (flight plans) influence the planning behavior of dispatchers (either in a beneficial or adverse manner); (2) what is the nature of such influences (i.e., how are the person's cognitive processes changed); (3) how beneficial are the general design concepts underlying FPT (use of a graphical interface, embedding graphics in a spreadsheet, etc.); (4) how effective are the specific implementation decisions made in realizing these general design concepts; and (5) how effectively do dispatchers evaluate situations requiring replanning, and how effectively do they identify appropriate solutions to these situations.

Smith, Philip J.↗

Bantam System Technology Project Ground System Operations Concept and Plan

The Low Cost Booster Technology Program, also known as the Bantam Booster program, is a NASA sponsored initiative to establish a viable commercial technology to support the market for placing small payloads in low earth orbit. This market is currently served by large boosters which orbit a number of small payloads on a single launch vehicle, or by these payloads taking up available space on major commercial launches. Even by sharing launch costs, the minimum cost to launch one of these small satellites is in the 6 to 8 million dollar range. Additionally, there is a shortage of available launch opportunities which can be shared in this manner. The goal of the Bantam program is to develop two competing launch vehicles, with launch costs in the neighborhood of 1.5 million dollars to launch a 150 kg payload into low earth orbit (200 nautical mile sun synchronous). Not only could the cost of the launch be significantly less than the current situation, but the payload sponsor could expect better service for his expenditure, the ability to specify his own orbit, and a dedicated vehicle. By developing two distinct launch vehicles, market forces are expected to aid in keeping customer costs low.

Moon, Jesse M.↗

Six-Degree-of-Freedom Dynamic Test System (SDTS) User Test Planning Guide

Test process, milestones and inputs are unknowns to first-time users of the SDTS. The User Test Planning Guide aids in establishing expectations for both NASA and non- NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

Stokes, LeBarian↗

Tailoring of NASA-STD-3001 to Lunar Gateway Program Requirements

The Gateway Program must meet NASA's Agency-level human rating requirements, which are intended to accommodate human capabilities and limitations while protecting the safety of the crew, and providing to the maximum extent practical, the capability to safely recover the crew from hazardous situations. Human systems integration represents a key human rating component of Moon to Mars systems to support the execution of Artemis missions, including compliance with mandatory standards for Health and Medical, Safety and Mission Assurance, and Engineering. The human system requirements, together with the human systems integration plan, medical operations requirements, and Gateway sub-system specifications, represent the flow-down of NASA Health and Medical Standards (NASA-STD-3001, Volumes 1 and 2) into the Gateway system. This paper discusses how these documents and other human systems integration activities provide full consideration of human capabilities and limitations as part of the total system design trade space, serving as an example on how the human must be effectively integrated as part of the system in order to achieve mission success. At a bigger scale, the paper con-tributes to the application of systems engineering standards to cutting-edge space exploration initiatives and to the dialogue on how systems engineering can continue to evolve to meet the needs of such ambitious projects.

Systems engineering↗

A Plan for Revolutionary Change in Gas Turbine Engine Control System Architecture

The implementation of Distributed Engine Control technology on the gas turbine engine has been a vexing challenge for the controls community. A successful implementation requires the resolution of multiple technical issues in areas such as network communications, power distribution, and system integration, but especially in the area of high temperature electronics. Impeding the achievement has been the lack of a clearly articulated message about the importance of the distributed control technology to future turbine engine system goals and objectives. To resolve these issues and bring the technology to fruition has, and will continue to require, a broad coalition of resources from government, industry, and academia. This presentation will describe the broad challenges facing the next generation of advanced control systems and the plan which is being put into action to successfully implement the technology on the next generation of gas turbine engine systems.

Culley, Dennis E.↗

Goodrich Electro-Optical Systems AMSD Progress Update and Test Plans

The goal of the Advanced Mirror System Demonstrator (AMSD) program is to develop and demonstrate technology for low mass primary mirror systems that can be produced at low cost and with short manufacturing times. In addition, specific performance objectives must be demonstrated at ambient and cryogenic temperatures. The Goodrich approach for AMSD is based on a thin facesheet supported through an array of figure-control actuators by a passive, stiff reaction structure. The facesheet is fused silica figured to the desired sphere by a novel process referred to as Stressed Mirror Polishing and light-weighted by water jet milling. The mirror facesheet and the reaction structure are CTE-matched For cryogenic operation. Progress update on the design, the fabrication and the test plans, both ambient and cryogenic, will be presented.

Garcia, Enrique↗

Planning and Operations in Electricity Markets Under System Transformation

United States electricity markets, planning mechanisms, and operational procedures are currently evolving in concert with three key trends. First, a range of new resources—solar, wind, energy storage, hybrid co-located storage, and distributed energy—are coming online and require new solutions to ensure they are efficiently integrated into existing systems. Second, consumers now face more opportunities to participate in markets by providing demand response and engaging in two-way interactions with the grid. Third, there is an increasing need for enhanced coordination between generation and transmission planning as well as across transmission and distribution systems.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

A Generalized Timeline Representation, Services, and Interface for Automating Space Mission Operations

Numerous automated and semi-automated planning & scheduling systems have been developed for space applications. Most of these systems are model-based in that they encode domain knowledge necessary to predict spacecraft state and resources based on initial conditions and a proposed activity plan. The spacecraft state and resources as often modeled as a series of timelines, with a timeline or set of timelines to represent a state or resource key in the operations of the spacecraft. In this paper, we first describe a basic timeline representation that can represent a set of state, resource, timing, and transition constraints. We describe a number of planning and scheduling systems designed for space applications (and in many cases deployed for use of ongoing missions) and describe how they do and do not map onto this timeline model.

Chien, Steve A.↗

Space Transportation System Cargo projects: inertial stage/spacecraft integration plan. Volume 1: Management plan

The Kennedy Space Center (KSC) Management System for the Inertial Upper Stage (IUS) - spacecraft processing from KSC arrival through launch is described. The roles and responsibilities of the agencies and test team organizations involved in IUS-S/C processing at KSC for non-Department of Defense missions are described. Working relationships are defined with respect to documentation preparation, coordination and approval, schedule development and maintenance, test conduct and control, configuration management, quality control and safety. The policy regarding the use of spacecraft contractor test procedures, IUS contractor detailed operating procedures and KSC operations and maintenance instructions is defined. Review and approval requirements for each documentation system are described.

Source record↗

Space VLBI telecommunication characteristics, protection criteria, and frequency sharing

A brief description of the technical characteristics of space VLBI is made, emphasizing the VLBI cross-correlation process. The signal-to-noise ratio of the cross-correlation process should be maintained as large as possible for the duration of the observation. Protection of this process from unwanted interference is a primary objective. The telecommunication radio links required in a space VLBI system are identified and characterized. Maximum bandwidths are suggested, as well as the minimum carrier frequencies required for the telemetering and the phase-transfer radio links. Planned space VLBI system models-Radioastron (Russia), VLBI Space Observatory Project (VSOP) (Japan), and the DSN orbiting VLBI subnet. (United States)--are taken as a baseline to determine the interference criteria. It is concluded that existing interference criteria for near-Earth research satellites are suitable for the protection of the space VLBI systems planned.

Gutierrez-Luaces, B. O.↗

Beginner's Guide to Understanding Power System Model Results for Long-Term Resource Plans

This presentation summarizes a recently published beginner's guide for understanding power system model results for long-term resource plans. This guide is designed to improve decision-making in the electricity planning process by strengthening dialogue between system planners and relevant stakeholders. It focuses on interpreting scenario results generated by power system planning models. These results are often used to inform integrated resource plans, which are long-term plans for a utility to meet future electricity requirements. Whether you are a state utility commissioner, commission staff, part of a state energy office, an intervenor in the planning process, or another stakeholder, this guide is designed to help you better weigh in on the modeling methods or interpret the model results to improve decision-making. This guide can enhance your understanding to ask the right questions, which can enable better understanding of results and key assumptions, data, and methods.

ENERGY PLANNING, POLICY, AND ECONOMY↗

MAPGEN: Mixed-Initiative Activity Planning for the Mars Exploration Rover Mission

This document describes the Mixed initiative Activity Plan Generation system MAPGEN. This system is one of the critical tools in the Mars Exploration Rover mission surface operations, where it is used to build activity plans for each of the rovers, each Martian day. The MAPGEN system combines an existing tool for activity plan editing and resource modeling, with an advanced constraint-based reasoning and planning framework. The constraint-based planning component provides active constraint and rule enforcement, automated planning capabilities, and a variety of tools and functions that are useful for building activity plans in an interactive fashion. In this demonstration, we will show the capabilities of the system and demonstrate how the system has been used in actual Mars rover operations. In contrast to the demonstration given at ICAPS 03, significant improvement have been made to the system. These include various additional capabilities that are based on automated reasoning and planning techniques, as well as a new Constraint Editor support tool. The Constraint Editor (CE) as part of the process for generating these command loads, the MAPGEN tool provides engineers and scientists an intelligent activity planning tool that allows them to more effectively generate complex plans that maximize the science return each day. The key to the effectiveness of the MAPGEN tool is an underlying constraint-based planning and reasoning engine.

Ai-Chang, Mitchell↗

Long Duration Exposure Facility (LDEF) Archive System

The Long Duration Exposure Facility (LDEF) Archive System is designed to provide spacecraft designers and space environment researchers single point access to all available resources from LDEF. These include data, micrographs, photographs, technical reports, papers, hardware and test specimens, as well as technical expertise. Further, the LDEF Archive System is planned such that it could be the foundation for a NASA Space Environments and Effects (SEE) Archive System, with the addition of other spaceflight, laboratory and theoretical space environments and effects data and associated materials. This paper describes the current status and plans of the LDEF Archive System.

Wilson, Brenda K.↗

Transport aircraft loading and balancing system: Using a CLIPS expert system for military aircraft load planning

The requirement for improving aircraft utilization and responsiveness in airlift operations has been recognized for quite some time by the Canadian Forces. To date, the utilization of scarce airlift resources has been planned mainly through the employment of manpower-intensive manual methods in combination with the expertise of highly qualified personnel. In this paper, we address the problem of facilitating the load planning process for military aircraft cargo planes through the development of a computer-based system. We introduce TALBAS (Transport Aircraft Loading and BAlancing System), a knowledge-based system designed to assist personnel involved in preparing valid load plans for the C130 Hercules aircraft. The main features of this system which are accessible through a convivial graphical user interface, consists of the automatic generation of valid cargo arrangements given a list of items to be transported, the user-definition of load plans and the automatic validation of such load plans.

Richardson, J.↗

Energy Systems Test Area (ESTA) Electrical Power Systems Test Operations: User Test Planning Guide

Test process, milestones and inputs are unknowns to first-time users of the ESTA Electrical Power Systems Test Laboratory. The User Test Planning Guide aids in establishing expectations for both NASA and non-NASA facility customers. The potential audience for this guide includes both internal and commercial spaceflight hardware/software developers. It is intended to assist their test engineering personnel in test planning and execution. Material covered includes a roadmap of the test process, roles and responsibilities of facility and user, major milestones, facility capabilities, and inputs required by the facility. Samples of deliverables, test article interfaces, and inputs necessary to define test scope, cost, and schedule are included as an appendix to the guide.

Salinas, Michael J.↗