Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “system performance”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Using Time Series Data Products to Support ASHRAE’s Historic and Future Climate Data Needs through NASA’s POWER Web Services

To address the data needs for resilience and sustainability of building systems within ASHRAE, the NASA Prediction of Worldwide Energy Resource (POWER) project facilitates the use of NASA Earth Science data on a long-term, global scale. Solar data from several NASA projects and meteorological data from NASA assimilation models have been reformatted and disseminated to the public via a user friendly web GIS-enabled based data portal (https://power.larc.nasa.gov) in selectable data formats, immediately amenable to key industry wide decision support tools such as EnergyPlus. Time series of potential climate conditions from downscaled climate simulations are being made available for similar statistics and formats. An emphasis is placed upon obtaining and utilizing time series data to conduct analysis of building system performance for current and planning building systems for energy savings and greenhouse gas emissions. This presentation has the learning following learning objectives for the ASHRAE community: 1) Learn how NASA POWER’s web service suite can provide supplementary solar and surface meteorological data parameters, including a discussion of uncertainty. 2) Learn how downscaled climate scenario information can be provided to evaluate potential future requirements. The presentation is part of a forum entitled, "Weather Data for Large-Scale Building Energy Modeling".

time series↗

Propulsion system design trade-offs for space stations

The primary function of the propulsion system of a space station in LEO is to provide altitude maintenance to compensate for the effects of atmospheric drag. The paper investigates the trade-offs in the propulsion system design as a function of the propulsion system performance measured in terms of the on-orbit resources available to the propulsion system. Five low-thrust propulsion systems were analyzed, ranging from those that can use on-board waste products to state-of-the-art high-performance electric propulsion systems (mixed waste gas resistojet, water resistojet, hydrogen oxygen thruster, hydrazine arc-jet, and plasma thruster). The results of the analysis indicate that the average optimal altitude strategy decreases with increasing specific impulse of the propulsion system and increases with increasing costs of propellant resupply.

Jones, Jeffrey D.↗

Control systems of the large millimeter telescope

The paper presents the analysis results (in terms of settling time, bandwidth, and servo error in wind disturbances) of four control systems designed for the Large Millimeter Telescope (LMT). The first system, called PI’, consists of the proportional and integral (PI) controllers in the rate and position loops, and is widely used in the antenna and radiotelescope industry. The analysis shows that the PP control system performance is remarkably good when compared to similar control systems applied to typical antennas. This performance is achieved because the LMT structure is exceptionally rigid, however, it does not meet the stringent LMT pointing requirements. The second system, called PL, consists of the PI controller in the rate loop, and the Linear-Quadratic-Gaussian (LQG) controller in the position loop. This type of controller is implemented in the NASA Deep Space Network antennas, where pointing accuracy is twice that of PP control system. The third system, called LP, consists of the LQG controller in the rate loop, and the propositional-integral-derivative (PID) controller in the position loop. This type of loop has not been yet implemented at known antennas or radiotelescopes, but the analysis shows that its pointing accuracy is the ten times better than PP control system. The fourth system, called LL, consists of the LQG controller in both the rate loop, and the position loop. It is the best of the four, with accuracy 250 better than the PP system, thus is worth further investigations, to identify implementation challenges for the telescopes of high pointing requirements.

Souccar, Kainal↗

Provider of Services for Urban Air Mobility (PSU) Prototype Simulation (X5) Final Report

Urban Air Mobility (UAM) is a new air transportation service concept to carry passengers or cargo in metropolitan areas, leveraged by innovative aircraft and air traffic automation technologies. NASA has conducted a series of simulations, called the X-series simulation, to evaluate the UAM concept of operations and support the development of airspace procedures and services for UAM operations. The simulation called “X5” was conducted in 2023 to test a Provider of Services for UAM (PSU) prototype developed by NASA for UAM flight planning, strategic conflict management support, and data exchange between UAM operators. In this simulation, two strategic conflict management capabilities, Demand-Capacity Balancing and Sequencing and Scheduling, were further investigated. This document describes the UAM system architecture modeled, the X5 simulation environment to be executed (e.g., traffic scenario and UAM airspace construct), and the strategic conflict management processes developed and evaluated in this study. Then, the simulation results are provided using several system performance metrics, such as the number of operations planned and activated, demand-capacity imbalances detected and resolved, and pre-departure delays. Based on these metrics, the test findings and lessons learned from this simulation are discussed. NASA developed a PSU prototype as part of a reference implementation of UAM system architecture and evolved strategic conflict management capabilities for UAM operations from the previous collaborative simulations with industry partners. Below is the summary of the achievements: - Aligned NASA’s UAM reference architecture with the FAA’s UAM ConOps notional architecture - Extended UAM airspace management capabilities to include 1) Demand-Capacity Balancing (DCB) to ensure operators coordinate planned usage of shared vertiports, and 2) Sequencing and Scheduling (S&S) at UAM corridor entry and exit points to help facilitate an orderly flow of traffic - Defined the PSU information exchange APIs and requirements towards informing industry standards - Developed and tested a NASA PSU prototype as reference implementation to validate the requirements and APIs - Developed a prototype service connecting NASA’s PSU and the FAA system for testing future PSU-ATM interface requirements - Tested NASA-developed assumptions for UAM operations such as airspace design, procedures, vehicle performance, and strategic conflict management methods to inform future Cooperative Operating Practices (COPs) development with industry - Evaluated system performance metrics such as number of simultaneous operations and ground delays that can help define system-level requirements. The simulation results showed that the UAM traffic demand could be managed to minimize the needs of tactical separation provision with ground delays assigned by DCB and S&S. These accomplishments and the lessons learned from the PSU Prototype X5 simulation activities will be valuable inputs for the Air Mobility Pathfinders (AMP) project, which is NASA’s new project to create and evaluate a reference architecture for safe, secure, and scalable UAM operations.

Simulation↗

On the development of system-theoretic tools for the design of integrated health monitoring and controls for rocket propulsion systems

As NASA continues to develop various advanced propulsion technologies for space exploration, two factors are becoming increasingly dominant in design specifications: increase operational reliability and decrease operational cost. One approach that has been proposed to meet these challenges is to incorporate into current and future rocket propulsion systems some sort of diagnostic/monitoring capability in the form of a Health Monitoring System (HMS). HMS technology offers the promise of increased operational reliability through its ability to assess system performance, detect and isolate degradations and/or failures, and modify system operation so as to minimize negative effects on performance. The purpose of this research is to study, from a systems engineering perspective, the particular issues of analysis and synthesis for generic HMS's.

Helmicki, Arthur J.↗

Paint and Oil Locker SWMU 067 Southern Treatment Area Air Sparge System Year 2 Performance Monitoring and Paint and Oil Locker Northern Area (SWMU 067) and Supply Warehouse #3, SWMU 088 Long-Term Monitoring Kennedy Space Center, Florida

This Year 2 Air Sparge (AS) System Performance Monitoring (PM) Report for Paint and Oil Locker (POL) Solid Waste Management Unit (SWMU) 067 Southern Treatment Area and Long- Term Monitoring (LTM) Report for POL Northern Area (SWMU 067) and Supply Warehouse #3 (SW3) SWMU 088 documents ongoing remedial efforts at the POL and SW3 sites at Kennedy Space Center (KSC), Florida. The overall goal for these sites is to reduce concentrations of groundwater contaminants of concern (COCs), specifically trichloroethene (TCE), cis-1,2-dichloroethene (cDCE), trans-1,2-dichloroethene (tDCE) and vinyl chloride (VC), to below the State of Florida Groundwater Cleanup Target Levels (GCTLs). Remediation and reporting of POL and SW3 have been streamlined over the years due to the proximity of the two sites. The scope for these sites currently includes two main components: (1) LTM at SW3 and the POL Northern Area, where an AS system began operation in May 2009 (with expansion in December 2012) and June 2013, respectively, and subsequently turned off for both sites in March 2018 (NASA, 2019a); and (2) Active AS operations and PM in the POL Southern Treatment Area where an AS system was installed and began operation in 2021. The timeframe for activities covered under this report is from September 2022 to July 2023. Based on Year 2 system operation and PM results, the AS system at POL operated as designed and successfully met the performance objective of reducing VOCs to concentrations that support transition of the site from active remediation to long-term monitoring. The results from the samples collected from performance monitoring wells within the AS system ROI showed a significant decrease in COC concentrations since the baseline sampling event conducted in April 2020. Based on the Year 2 OM&M and monitoring results obtained from the POL Southern Treatment Area, the IM objective to reduce concentrations to below the LTM transition target concentrations for TCE, cDCE, tDCE, and VC has been achieved. LTM sampling events at SW3 were conducted in October 2022 and July 2023. LTM sampling was conducted at the POL Northern Area in October 2022, December 2022, March 2023, and July 2023. Analytical results from October 2022 and July 2023 generally indicate that concentrations of COCs have been stable or decreasing compared to the previous year. TCE remains greater than the NADC in one monitoring well (POL-MW0034S) and greater than the GCTL in one monitoring well (POL-MW0009S). Concentrations of cDCE were greater than the GCTL in one monitoring well (POL-MW0026S), and tDCE was non-detect or less than the GCTL in all monitoring wells sampled. VC was greater than the GCTL in four monitoring wells (MW0024, MW0025, MW0027, and MW0028) at SW3 and one monitoring well (MW0026S) at the POL Northern Area.

remediation↗

Optimizing Input/Output Using Adaptive File System Policies

Parallel input/output characterization studies and experiments with flexible resource management algorithms indicate that adaptivity is crucial to file system performance. In this paper we propose an automatic technique for selecting and refining file system policies based on application access patterns and execution environment. An automatic classification framework allows the file system to select appropriate caching and pre-fetching policies, while performance sensors provide feedback used to tune policy parameters for specific system environments. To illustrate the potential performance improvements possible using adaptive file system policies, we present results from experiments involving classification-based and performance-based steering.

Madhyastha, Tara M.↗

Model Error Budgets

An error budget is a commonly used tool in design of complex aerospace systems. It represents system performance requirements in terms of allowable errors and flows these down through a hierarchical structure to lower assemblies and components. The requirements may simply be 'allocated' based upon heuristics or experience, or they may be designed through use of physics-based models. This paper presents a basis for developing an error budget for models of the system, as opposed to the system itself. The need for model error budgets arises when system models are a principle design agent as is increasingly more common for poorly testable high performance space systems.

error budgets↗

Performance test for a solar water heater

Two reports describe procedures and results of performance tests on domestic solar powered hot water system. Performance tests determine amount of energy collected by system, amount of energy delivered to solar source, power required to operate system and maintain proper tank temperature, overall system efficiency, and temperature distribution in tank.

Source record↗

Design and Analysis of Morpheus Lander Flight Control System

The Morpheus Lander is a vertical takeoff and landing test bed vehicle developed to demonstrate the system performance of the Guidance, Navigation and Control (GN&C) system capability for the integrated autonomous landing and hazard avoidance system hardware and software. The Morpheus flight control system design must be robust to various mission profiles. This paper presents a design methodology for employing numerical optimization to develop the Morpheus flight control system. The design objectives include attitude tracking accuracy and robust stability with respect to rigid body dynamics and propellant slosh. Under the assumption that the Morpheus time-varying dynamics and control system can be frozen over a short period of time, the flight controllers are designed to stabilize all selected frozen-time control systems in the presence of parametric uncertainty. Both control gains in the inner attitude control loop and guidance gains in the outer position control loop are designed to maximize the vehicle performance while ensuring robustness. The flight control system designs provided herein have been demonstrated to provide stable control systems in both Draper Ares Stability Analysis Tool (ASAT) and the NASA/JSC Trick-based Morpheus time domain simulation.

Jang, Jiann-Woei↗

Validation of Transient Spacecraft Refueling Model with Gateway Breadboard Test Data

The ability to refuel spacecraft on-orbit is a key enabling technology for deep space human exploration. On-orbit refueling requires priming a pressurized liquid propellant from a source tank into fluid transfer lines at vacuum conditions, which could result in excessive surge pressures beyond the system’s qualified operating limits and potentially damage hardware. Another source of potentially damaging surge pressures is the water hammer transient that occurs when the isolation valves are closed to pause or end the refueling operation. Therefore, it is imperative to employ numerical models during the development of flight hardware to parametrically characterize system performance over a wide range of operating conditions to minimize the risk of exceeding pressure limits during flight. Since rapid pressure transients can be difficult to model accurately, it is important to validate those models with test data. As part of the Gateway bipropellant refueling system development, a simplified fluidic breadboard system was created using water as a simulant for fuel to support early program risk reduction of refueling operations. The objectives of breadboard testing were to gather performance data to characterize and demonstrate critical refueling operations and to validate numerical models that can be extended to predicting flight system performance. A description of the breadboard test article and the results of numerical model validation is presented. The model is shown to have very good agreement with test data.

Refueling↗

Robotic and Human-Tended Collaborative Drilling Automation for Subsurface Exploration

Future in-situ lunar/martian resource utilization and characterization, as well as the scientific search for life on Mars, will require access to the subsurface and hence drilling. Drilling on Earth is hard - an art form more than an engineering discipline. Human operators listen and feel drill string vibrations coming from kilometers underground. Abundant mass and energy make it possible for terrestrial drilling to employ brute-force approaches to failure recovery and system performance issues. Space drilling will require intelligent and autonomous systems for robotic exploration and to support human exploration. Eventual in-situ resource utilization will require deep drilling with probable human-tended operation of large-bore drills, but initial lunar subsurface exploration and near-term ISRU will be accomplished with lightweight, rover-deployable or standalone drills capable of penetrating a few tens of meters in depth. These lightweight exploration drills have a direct counterpart in terrestrial prospecting and ore-body location, and will be designed to operate either human-tended or automated. NASA and industry now are acquiring experience in developing and building low-mass automated planetary prototype drills to design and build a pre-flight lunar prototype targeted for 2011-12 flight opportunities. A successful system will include development of drilling hardware, and automated control software to operate it safely and effectively. This includes control of the drilling hardware, state estimation of both the hardware and the lithography being drilled and state of the hole, and potentially planning and scheduling software suitable for uncertain situations such as drilling. Given that Humans on the Moon or Mars are unlikely to be able to spend protracted EVA periods at a drill site, both human-tended and robotic access to planetary subsurfaces will require some degree of standalone, autonomous drilling capability. Human-robotic coordination will be important, either between a robotic drill and humans on Earth, or a human-tended drill and its visiting crew. The Mars Analog Rio Tinto Experiment (MARTE) is a current project that studies and simulates the remote science operations between an automated drill in Spain and a distant, distributed human science team. The Drilling Automation for Mars Exploration (DAME) project, by contrast: is developing and testing standalone automation at a lunar/martian impact crater analog site in Arctic Canada. The drill hardware in both projects is a hardened, evolved version of the Advanced Deep Drill (ADD) developed by Honeybee Robotics for the Mars Subsurface Program. The current ADD is capable of 20m, and the DAME project is developing diagnostic and executive software for hands-off surface operations of the evolved version of this drill. The current drill automation architecture being developed by NASA and tested in 2004-06 at analog sites in the Arctic and Spain will add downhole diagnosis of different strata, bit wear detection, and dynamic replanning capabilities when unexpected failures or drilling conditions are discovered in conjunction with simulated mission operations and remote science planning. The most important determinant of future 1unar and martian drilling automation and staffing requirements will be the actual performance of automated prototype drilling hardware systems in field trials in simulated mission operations. It is difficult to accurately predict the level of automation and human interaction that will be needed for a lunar-deployed drill without first having extensive experience with the robotic control of prototype drill systems under realistic analog field conditions. Drill-specific failure modes and software design flaws will become most apparent at this stage. DAME will develop and test drill automation software and hardware under stressful operating conditions during several planned field campaigns. Initial results from summer 2004 tests show seven identifi distinct failure modes of the drill: cuttings-removal issues with low-power drilling into permafrost, and successful steps at executive control and initial automation.

Glass, Brian↗

Master timing system measurements

The test results indicate that the system performs within the specifications established. The overall system appears to be well designed and built to a good commercial grade. The triple redundant time code generators, whose outputs are majority voted, performed adequately as far as could be determined on an operational situation.

Endsley, E. F.↗