Integrating crystallographic and computational approaches to carbon-capture materials for the mitigation of climate change

Here, this article presents an overview of the current state of the art in the structure determination of microporous carbon-capture materials, as discussed at the recent NIST workshop “Integrating Crystallographic and Computational Approaches to Carbon-Capture Materials for the Mitigation of Climate Change”. The continual rise in anthropogenic CO 2 concentration and its effect on climate change call for the implementation of carbon capture technologies to reduce the CO 2 concentration in the atmosphere. Porous solids, including metal–organic frameworks (MOFs), are feasible candidates for gas capture and storage applications. However, determining the structure of these materials represents a significant obstacle in their development into advanced sorbents. The existing difficulties can be overcome by integrating crystallographic methods and theoretical modeling. The workshop gathered experimentalists and theorists from academia, government, and industry to review this field and identify approaches, including collaborative opportunities, required to develop tools for rapid determination of the structures of porous solid sorbents and the effect of structure on the carbon capture performance. We highlight the findings of that workshop, especially in the need for reference materials, standardized procedures and reporting of sorbent activation and adsorption measurements, standardized reporting of theoretical calculations, and round-robin structure determination.

36 MATERIALS SCIENCE↗

Southeast Regional Carbon Sequestration Partnership (SECARB) Revised Monitoring Plan

This report summarizes the revisions made after attainment of project metrics of monitoring 1.5 million metric tons stored which occurred at 1 ½ years and after the end of the period of accelerated injection rate (February 2011) to reach project metrics. Denbury continues downdip injection because of its impact on production, but has modified the rate of injection to meet its EOR objectives. Therefore this project will not have a post-injection “closure” period. Injected CO 2 is being recycled and the flow field is substantively controlled by production. However, a period of observation of this long duration storage has value to the program in terms of showing no impact on near-surface environments and monitoring any changes in the reservoir over the long term. In addition, observations made during the first two years of injection have raised a number of significant questions that can be addressed during the next stages of research. Lastly, budget readjustment is needed, as some tasks have gone over budget and some have been completed under budget, leaving some opportunities to address remaining issues. This report provides an overview of the revisions and supplements proposed to the modeling and monitoring plan to complete the project.

01 COAL, LIGNITE, AND PEAT↗

Overview of SNS accelerator shielding analyses

The Spallation Neutron Source is an accelerator driven neutron scattering facility for materials research. During all phases of SNS development, including design, construction, commissioning and operation, extensive neutronics work was performed in order to provide adequate shielding, to assure safe facility operation from radiation protection point of view, and to optimize performance of the accelerator and target facility. Presently, most of the shielding work is concentrated on the beam lines and instrument enclosures to prepare for commissioning, safe operation and adequate radiation background in the future. Although the accelerator is built and in operation mode, there is extensive demand for shielding and activation analyses. It includes redesigning some parts of the facility, facility upgrades, designing additional structures, storage and transport containers for accelerator structures taken out of service, and performing radiation protection analyses and studies on residual dose rates inside the accelerator. (authors)

43 PARTICLE ACCELERATORS↗

Major Achievements of the Springfields Decommissioning Program - 16512

Since the 1940's, Springfields has manufactured fuel products for the UK's nuclear power stations and for international customers. The early operations were in support of the atomic weapons program, closely followed by fuel manufacture for electricity generation via the Magnox power stations commencing in the late 1950's. In 2005, responsibility for the assets and liabilities of Springfields was transferred to the Nuclear Decommissioning Authority (NDA). A new company, Springfields Fuels Limited, was created to run the site, which was managed and operated by Westinghouse Electric UK Ltd on the NDA's behalf. On April 1, 2010, Westinghouse entered into an agreement with the NDA for a long-term lease of the Springfields site, which transferred responsibility for the commercial fuel manufacturing business and Springfields Fuels Limited to Westinghouse. Today, the main Springfields activities include: - Oxide fuels for Advanced Gas-cooled and Light Water Reactors, as well as intermediate fuel products, such as powders, granules and pellets, - Manufacture of Uranium Hexafluoride (now in Care and Maintenance), - Processing and recovery of Uranium residues, - Decommissioning and demolition of redundant plants and buildings. Some 120 plant buildings and support facilities have been successfully decommissioned and demolished in the period 1996 to date. These range from 1940's buildings, subsequently converted for nuclear fuel manufacture, together with some of the formerly sealed chemical agent manufacture and storage facilities. Decommissioning of the now redundant Magnox manufacturing facilities is ongoing at Springfields without compromising the other site operations. Westinghouse is managing all activities related to the whole lifecycle, planning, design, safety case, radiation protection, Post Operational Clean Out (POCO), service diversions, characterization, decommissioning all phases through to ground remediation, waste disposal and agreed end states. Decommissioning of process plants starts with the removal of the majority of radiological activity or hazard contained within the plant. This is known as Post Operational Clean Out. Once this is complete, the plant may be dismantled. Work is scoped and defined within packages (at plant or cell level) to aid control and commercial monitoring as the decommissioning is progressed. This package approach also enables clean or lightly contaminated items to be removed separately to aid potential re-cycling and minimize decontamination and waste disposal costs. Westinghouse is further optimising work package delivery by planning parallel POCO and Decommissioning work phases within plant at a cell level to systematically remove redundant plant and reduce hazard earlier, whilst optimising use of both internal and external resources to reduce total project cost. Waste and Residues from all phases are disposed of via authorized disposal routes and in accordance with our environmental authorizations. On completion of decommissioning and removal of plant and equipment the building is re-assessed radiologically, categorized and appropriate remediation work progressed to render it safe for conventional demolition. The major elements of the success achieved to date can be attributed to the following elements: - Overall programme management with extensive experience of planning, cost, and risk management. Integration of the programme within a major commercial site without compromising safety or operations. - Complete site EHS management working within a complex regulatory framework including the Nuclear Site Licenses, Environmental Authorisations and Security requirements. - Avoiding safety complacency by use of rigorous and systematic process to emphasise safety over competing goals. Including structured use of Human Performance and Corrective Action and Learning processes. - Unique safety experiences attained through complex hazard reduction across a broad range of uranium manufacturing and chemical hazard/agent facilities. - Project leadership and excellence utilizing a core site team to deploy repeatable processes and safe practices to deliver complex scope within budget and schedule. - Optimised use of internal and external resources, with extensive use of Operating Experience to drive continuous improvement and problem resolution. - Management of Contractors from initial selection, pre-qualification, tender assessment and Performance using varied contract forms across delivery phases. - Use of Westinghouse expertise for safety case, waste management, uranium recovery, health physics and design. - Implementation of a work package to ensure gated discreet manageable packages. Underpinned by package specific method statements, with appropriate hold points to maintain management and control of the works. - Continuous local safety focus via safety planning, induction, plant specific training, proactive risk assessment, and a defined approach to decoupling operating plant safety cases enabling focussed and usable documentation. This paper will provide an overview of the latest decommissioning activities achieved on the Springfields site and will focus on best practices that allowed Westinghouse to maintain the program on time and on budget. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Summary of operations and performance of the Murdock site restoration project in 2007.

This document summarizes the performance of the groundwater and surface water restoration systems installed by the Commodity Credit Corporation of the U.S. Department of Agriculture (CCC/USDA) at the former CCC/USDA grain storage facility in Murdock, Nebraska, during the second full year of system operation, from January 1 through December 31, 2007. Performance in June 2005 through December 2006 was reported previously (Argonne 2007). In the Murdock project, several innovative technologies are being used to remove carbon tetrachloride contamination from a shallow aquifer underlying the town, as well as from water naturally discharged to the surface at the headwaters of a small creek (a tributary to Pawnee Creek) north of the town (Figure 1.1). The restoration activities at Murdock are being conducted by the CCC/USDA as a non-time-critical removal action under the regulatory authority and supervision of the U.S. Environmental Protection Agency (EPA), Region VII. Argonne National Laboratory assisted the CCC/USDA by providing technical oversight for the restoration effort and facilities during this review period. Included in this report are the results of all sampling and monitoring activities performed in accord with the EPA-approved Monitoring Plan for this site (Argonne 2006), as well as additional investigative activities conducted during the review period. The annual performance reports for the Murdock project assemble information that will become part of the five-year review and evaluation of the remediation effort. This review will occur in 2010. This document presents overviews of the treatment facilities (Section 2) and site operations and activities (Section 3), then describes the groundwater, surface water, vegetation, and atmospheric monitoring results (Section 4) and modifications and costs during the review period (Section 5). Section 6 summarizes the current period of operation. A gallery of photographs of the Murdock project is in Appendix A. A brief videorecording of the trees in high-wind conditions is on the compact disc (CD) inside the back cover of this document.

54 ENVIRONMENTAL SCIENCES↗

Current Status on the Manufacturing of Nanomaterials for Proton Exchange Membrane Energy Systems by Vapor-Based Processes

Development of novel technologies for catalyst synthesis and membrane electrode assembly (MEA) fabrication is of primary importance for further improvement of the performance and economics of proton exchange membrane fuel cells (PEMFCs) and proton exchange membrane water electrolyzers (PEMWEs). While the traditional manufacturing methods are time-consuming, energy intensive, and require many processing steps, the new vapor-based methods provide many benefits including the development of improved catalysts and catalyst supports, deposition of uniform thin films, reduction of catalyst loading, and minimizing the number of manufacturing steps. Recent publications in the field identified spray pyrolysis, reactive spray deposition technology, chemical vapor deposition, and atomic layer deposition as advanced vapor-based catalyst synthesis and deposition methods used for fabrication of MEAs for PEMFCs and PEMWEs. Here, the MEAs fabricated via vapor-based processes have shown significant performance improvements in comparison to the state-of-the-art MEAs, which are attributed to better catalyst distribution, improved catalyst supports, and controlled, uniform catalyst layer microstructures. This review provides an overview of the vapor-based synthesis and deposition methods currently being used for the development of PEM-based devices. The advantages and disadvantages of these methods are critically compared and discussed while the outlook for future development is provided.

25 ENERGY STORAGE↗

Radiation and Thermal Effects on Used Nuclear Fuel and Nuclear Waste Forms

This is the final report of the NEUP project “Radiation and Thermal Effects on Used Nuclear Fuel and Nuclear Waste Forms.” This project started on July 1, 2012 and was successfully completed on June 30, 2016. This report provides an overview of the main achievements, results and findings through the duration of the project. Additional details can be found in the main body of this report and in the individual Quarterly Reports and associated Deliverables of this project, which have been uploaded in PICS-NE. The objective of this research was to advance understanding and develop validated models on the effects of self-radiation from beta and alpha decay on the response of used nuclear fuel and nuclear waste forms during high-temperature interim storage and long-term permanent disposition. To achieve this objective, model used-fuel materials and model waste form materials were identified, fabricated, and studied.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Energy 101 Geothermal [Slides]

The Energy 101: Geothermal presentation, developed for the Energy Technology Innovation Partnership Project (ETIPP), provides an overview of geothermal energy. It covers fundamental concepts, technologies, considerations, case studies, and additional resources.

15 GEOTHERMAL ENERGY↗

Progress on the Design of the Storage Ring Vacuum System for the Advanced Photon Source Upgrade Project

Recent work on the design of the storage ring vacuum system for the Advanced Photon Source Upgrade project (APS-U) includes: revising the vacuum system design to accommodate a new lattice with reverse bend magnets, modifying the designs of vacuum chambers in the FODO sections for more intense incident synchrotron radiation power, modifying the design of rf-shielding bellows liners for better performance and reliability, modifying photon absorber designs to make better use of available space, and integrated planning of components needed in the injection, extraction and rf cavity straight sections. An overview of progress in these areas is presented.

Stillwell, B.↗

Overview and History of DOE's Hanford Site - 12502

Hanford's DOE offices are responsible for one of the largest nuclear cleanup efforts in the world, cleaning up the legacy of nearly five decades of nuclear weapons production. Nowhere in the DOE Complex is cleanup more challenging than at the Hanford Site in southeastern Washington. Hanford cleanup entails remediation of hundreds of large complex hazardous waste sites; disposition of nine production reactors and the preservation of one as a National Historic Landmark; demolition of hundreds of contaminated facilities including five enormous process canyons; remediation of billions of gallons of contaminated groundwater; disposition of millions of tons of low-level, mixed low-level, and transuranic waste; disposition of significant quantities of special nuclear material; storage and ultimate disposition of irradiated nuclear fuel; remediation of contamination deep in the soil that could impact groundwater; decontamination and decommissioning of hundreds of buildings and structures; and treatment of 56 million gallons of radioactive waste in 177 large underground tanks through the construction of a first-of-its-kind Waste Treatment Plant. Cleanup of the Hanford Site is a complex and challenging undertaking. The DOE Richland Operations Office has a vision and a strategy for completing Hanford's cleanup including the transition to post-cleanup activities. Information on the strategy is outlined in the Hanford Site Completion Framework. The framework describes three major components of cleanup - River Corridor, Central Plateau, and Tank Waste. It provides the context for individual cleanup actions by describing the key challenges and approaches for the decisions needed to complete cleanup. The U.S. Department of Energy (DOE), as regulated by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology (Ecology), is implementing a strategy to achieve final cleanup decisions for the River Corridor portion of the Hanford Site. The DOE Richland Operations Office (RL) and DOE Office of River Protection (ORP) have prepared this document to describe the strategy and to begin developing the approach for making cleanup decisions for the remainder of the Hanford Site. DOE's intent is that the Completion Framework document will facilitate dialogue among the Tri-Parties and with Hanford's diverse interest groups, including Tribal Nations, State of Oregon, Hanford Advisory Board, Natural Resource Trustees, and the public. Future cleanup decisions will be enhanced by an improved understanding of the challenges facing cleanup and a common understanding of the goals and approaches for cleanup completion. The overarching goals for cleanup are sevenfold. - Goal 1: Protect the Columbia River. - Goal 2: Restore groundwater to its beneficial use to protect human health, the environment, and the Columbia River. - Goal 3: Clean up River Corridor waste sites and facilities to: Protect groundwater and the Columbia River. Shrink the active cleanup footprint to the Central Plateau, and support anticipated future uses of the land. - Goal 4: Clean up Central Plateau waste sites, tank farms, and facilities to: Protect groundwater. Minimize the footprint of areas requiring long-term waste management activities. Support anticipated future uses of the land. - Goal 5: Safely manage and transfer legacy materials scheduled for off-site disposition including special nuclear material (including plutonium), spent nuclear fuel, transuranic waste, and immobilized high-level waste. - Goal 6: Consolidate waste treatment, storage, and disposal operations on the Central Plateau. - Goal 7: Develop and implement institutional controls and long-term stewardship activities that protect human health, the environment, and Hanford's unique cultural, historical and ecological resources after cleanup activities are completed. These goals embody more than 20 years of dialogue among the Tri-Party Agencies, Tribal Nations, State of Oregon, stakeholders, and the public. They carry forward key values captured in forums such as the Hanford Future Site Uses Working Group, Tank Waste Task Force, Hanford Summits, and Hanford Advisory Board Exposure Scenario Workshops, as well as more than 200 advice letters issued by the Hanford Advisory Board (http://www.hanford.gov/page.cfm/hab). These goals help guide all aspects of Hanford Site cleanup. Cleanup activities at various areas of the site support the achievement of one or more of these goals. These goals help set priorities to apply resources and sequence cleanup efforts for the greatest benefit. These goals reflect DOE's recognition that the Columbia River is a critical resource for the people and ecology of the Pacific Northwest. The 50-mile stretch of the river known as the Hanford Reach is home to the last free-flowing section of the river in the U.S. As one of the largest rivers in North America, its waters support a multitude of uses that are vital to the economic and environmental well being of the region and it is particularly important in sustaining the culture of Native Americans. Cleanup actions must protect this river. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Fossil Energy in the Hydrogen Economy – A Carbon-Water-Energy Nexus Adaptive Evaluation Platform

This project develops tools to evaluate fossil energy within the hydrogen economy. In particular, the project seeks to explore the Carbon-Water-Energy Nexus and develop adaptive evaluation tools. The primary goal of this project was to evaluate fossil-based hydrogen production methods with an emphasis on their sustainability, particularly with respect to carbon emissions and water use. The overall technical objectives that guided this evaluation consisted of 1) technology assessment, which sought to establish a comprehensive baseline of existing and emerging technologies for the generation, transportation, storage, and end use of hydrogen derived from fossil fuels, 2) carbon footprint analysis through quantification and analysis of carbon emissions associated with these hydrogen technologies, and identification of novel strategies and technologies that can effectively mitigate the carbon footprint, 3) water intensity assessment by evaluating the water needs (water-energy nexus) associated with different fossil fuel-based hydrogen technologies and proposing strategies to reduce water use, thus ensuring sustainable resource management, and 4) review of regulatory, policy and economic trends were examined to provide an overview of the factors influencing the adoption and integration of fossil fuel-derived hydrogen technologies into current energy markets. Beyond the technical outcomes, this project contributed to 5) education and workforce development through targeted training and educational opportunities for engineering students, preparing the next generation of professionals with technical, economic, and regulatory expertise in the hydrogen economy. Ultimately, this effort was intended to train the future workforce to provide useful insights to policymakers, industry stakeholders, and the broader energy community to facilitate informed decisions and responsible development within the hydrogen economy.

08 HYDROGEN↗

A feasibility study and mission analysis for the Hybrid Plume Plasma Rocket

The Hybrid Plume Plasma Rocket (HPPR) is a high power electric propulsion concept which is being developed at the MIT Plasma Fusion Center. This paper presents a theoretical overview of the concept as well as the results and conclusions of an independent study which has been conducted to identify and categorize those technologies which require significant development before the HPPR can be considered a viable electric propulsion device. It has been determined that the technologies which require the most development are high power radio-frequency and microwave generation for space applications and the associated power processing units, low mass superconducting magnets, a reliable, long duration, multi-megawatt space nuclear power source, and long term storage of liquid hydrogen propellant. In addition to this, a mission analysis of a one-way transfer from low earth orbit (LEO) to Mars indicates that a constant acceleration thrust profile, which can be obtained using the HPPR, results in faster trip times and greater payload capacities than those afforded by more conventional constant thrust profiles.

Sullivan, Daniel J.↗

SAVY-4000 Lifetime Extension Overview for FY23

The SAVY-4000 (hereafter “SAVY) was granted a 15 year design life as of June 11, 2019. Since that time, a concerted effort to evaluate the SAVY lifetime beyond 15 years initiated. Several key gaps in knowledge were identified by subject matter expert reviewers across the complex, along with testing that should be included or addressed in the next technical basis. While surveillance has not fundamentally changed since the last life extension, many key techniques have since been identified as necessary to evaluate key container performance requirements not addressed previously (i.e. drop qualification release rate). FY23 provided an opportunity to establish the groundwork for the development of those key techniques that aid in addressing DOE Manual 441.1-1 (hereafter “Manual”) requirements for safe storage of nuclear material.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Security of Mobile Radiological Sources: Overview of Industry Applied Technologies

Small radiological sources used in industrial settings recurrently require transit between job sites. Securing these sources, while stationary, can be addressed with standard security approaches and equipment. Transport of these sources increases the risk and complexity of managing and maintaining control of these sources. Implementing methodologies to securely monitor and locate sources improves response and resolution of anomalous events during transit. The Mobile Source Transit Security (MSTS) system was developed to improve security and provide situational awareness of these mobile sources throughout their job cycle. The MSTS development effort focused on creating a set of systems that could be successfully implemented in industrial radiography and well-logging applications. The MSTS team worked to address source presence and location through use and storage. The MSTS system monitors radiological sources as they move from the base of operations to the job site and back. The system provides near-real-time monitoring of the mobile source location and status and early notification of source loss or theft by transmitting operational status and alerting anomalous conditions over telematic links worldwide. The MSTS system can trigger an armed response or initiation of search and recovery operations and will automatically alert management and responsible staff if a radioactive source is lost or stolen whether it is on-site, in transport, or in storage.

98 NUCLEAR DISARMAMENT, SAFEGUARDS, AND PHYSICAL P↗

Warm Compressor system Overview and status of the PIP-II cryogenic system

The Proton Improvement Plan-II (PIP-II) is a major upgrade to the Fermilab accelerator complex, featuring a new 800-MeV Superconducting Radio-Frequency (SRF) linear accelerator (Linac) powering the accelerator complex to provide the world's most intense high-energy neutrino beam. The PIP-II Linac consists of 23 SRF cryomodules operating at 2 K, 5 K, and 40 K temperature levels supplied by a single helium cryoplant providing 2.5 kW of cooling capacity at 2.0 K. The PIP-II cryogenic system consists of two major systems: a helium cryogenic plant and a cryogenic distribution system. The cryogenic plant includes a refrigerator cold box, a warm compressor system, and helium storage, recovery, and purification systems. The cryogenic distribution system includes a distribution box, intermediate transfer line, and a tunnel transfer line consisting of modular bayonet cans which supply and return cryogens to the cryomodules. A turnaround can is located at the end of the Linac to turnaround cryogenic flows. This paper describes the layout, design, and current status of the PIP-II cryogenic system.

43 PARTICLE ACCELERATORS↗

Space transfer vehicle concepts and requirements study. Volume 2, book 4: Integrated advanced technology development

The Space Transfer Vehicle (STV) program provides both an opportunity and a requirement to increase our upper stage capabilities with the development and applications of new technologies. Issues such as man rating, space basing, reusability, and long lunar surface storage times drive the need for new technology developments and applications. In addition, satisfaction of mission requirements such as lunar cargo delivery capability and lunar landing either require new technology development or can be achieved in a more cost-effective manner with judicious applications of advanced technology. During the STV study, advanced technology development requirements and plans have been addressed by the Technology/Advanced Development Working Group composed of NASA and contractor representatives. This report discusses the results to date of this working group. The first section gives an overview of the technologies that have potential or required applications for the STV and identifies those technologies baselined for the STV. Figures are provided that list the technology categories and show the priority placed on those technology categories for either the space-based or ground-based options. The second section covers the plans and schedules for incorporating the technologies into the STV program.

Weber, Gary A.↗

Computational Modeling of Battery Materials

This chapter provides a broad overview of the various computational modeling techniques used to gain fundamental insights into coupled electrochemical processes that occur in battery materials at electronic-to-mesoscopic scales. Furthermore, representative successes of these techniques in modeling electrodes, electrolytes, and electrode-electrolyte interfaces are highlighted to establish the current state-of-the-art in the field.

25 ENERGY STORAGE↗

2018 Wind Technologies Market Report

The U.S. Department of Energy (DOE)’s Wind Technologies Market Report provides an annual overview of trends in the U.S. wind power market. Highlights of this year’s report include: ~Wind power capacity additions continued at a robust pace in 2018: $11 billion was invested in new wind power plants in 2018. In 2018, wind energy contributed 6.5% of the nation’s electricity supply, more than 10% of total electricity generation in fourteen states, and more than 30% in three of those states—Kansas, Iowa, and Oklahoma. 232 gigawatts of wind are seeking transmission interconnection, 2% of which represents proposed wind plants paired with storage. ~Bigger turbines are enhancing wind project performance: Increased blade lengths have dramatically increased wind project capacity factors, one measure of project performance, and taller towers are on the horizon. The average 2018 capacity factor among projects built from 2014 through 2017 was 42%, compared to an average of 31% among projects built from 2004 to 2011 and 24% among projects built from 1998 to 2001. Low wind turbine pricing continues to push down installed project costs: Wind turbine prices have fallen to $700–$900/kW. The average installed cost of wind projects in 2018 was $1,470/kW, down 40 percent since the peak in 2009 and 2010. ~Wind energy prices are at historical lows: After topping out at 7¢/kWh for power purchase agreements (PPAs) executed in 2009, the national average price of wind PPAs has dropped to below 2¢/kWh—though this nationwide average is dominated by projects that hail from the lowest-priced Interior region of the country. These prices, which are possible in part due to federal tax support, compare favorably to the projected future fuel costs of gas-fired generation. Solar PPA prices have declined precipitously, pressuring wind’s competitive position. ~The grid-system value of wind has declined over the last decade, but rebounded over the last two years. The value of wind in wholesale power markets is impacted by the location of wind plants, their hourly output profiles, and how those characteristics correlate with real-time electricity prices and capacity markets. The market value of wind in 2018 was the lowest in the Southwest Power Pool and Texas (average of $17/MWh and $18/MWh, respectively) whereas the highest-value market was New England (at $41/MWh). Wind energy prices are generally competitive with these value estimates. ~The domestic supply chain for wind equipment is diverse: For wind projects recently installed in the U.S., domestically manufactured content is highest for nacelle assembly (>90%), towers (75-90%), and blades and hubs (50-70%), but is much lower (<20%) for most components internal to the nacelle. Wind sector employment reached a new high of more than 114,000 full-time workers at the end of 2018. ~Continued strong growth in wind capacity is anticipated in the near term: With federal tax incentives still available, various forecasts for the domestic market show expected wind power capacity additions of 9,000-12,000 MW in 2019 and 11,000-15,000 in 2020, with market contraction anticipated beginning in 2021 as those tax incentives are phased out.