Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “radioactive waste”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

14 Steps to Creating Value in Cost and Schedule Resources for Nuclear Waste Management - 20188

While Waste Management budgets are shrinking, DOE required cost and schedule controls are becoming increasingly stringent. At the same time, there is a scarcity of adept, qualified, and competent projects controls staff who both understand nuclear waste management and are capable of addressing today's cost and schedule challenges. In response, we have developed a systematic approach to training and mentoring project controls staff. The approach is based on the observations and lessons learned on projects, both successful and unsuccessful, over the past 20 years. During that time, we evaluated staff development and used that experience to design a program that progresses the maturity, knowledge and experience of the individual. The program is based on the unique needs of cost and schedule specialists while incorporating the best leadership and managerial applications. The system is not limited to developing individual software skills, which is a primary focus of many project controls training programs. Instead, our system develops an individual's soft and hard skill sets. The system develops the user's skill, talent, attitude, and drive to do the best job possible. It focuses on all aspects of becoming a more productive technical team while accepting responsibility for individual growth. It also enhances the project controls team by setting up checks and balances that everyone is aware of and participates in. The system is based on 14 steps of increasing complexity in knowledge and application. The system clarifies roles, responsibilities and expectations. It helps eliminate uncertainty and reduces stress on staff and managers. It contains everyday routine actions and is simple to implement. It allows the development of a consistent rhythm to staff growth and development. Mastering the steps will allow the user to achieve excellence in cost and schedule control. The 14 steps are: 1 - Key Performance Objectives, 2 - Check Lists, 3 - Desktop Guides, 4 - System Description, 5 - Procedures, 6 - Software and On the Job Training (OTJ), 7 - Traceability Checks, 8 - Surveillances, 9 - 32 Criteria, 10 - The Contract, 11 - Customer/Government Guidance, 12 - Training and Mentoring Others, 13 - Master your weekly and daily schedules, 14 - Improving your interpersonal skills. Application and mastery of this system will produce better cost and schedule control results. Your project controls staff will write better reports, analyze data better, make better use of their time, and be more valuable to decision makers. If followed rigorously, our system will produce a great project controls team, which is invaluable to the success of each project. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Vitrification of Hanford Tank 241-AP-101 Waste and Simulant

Hanford tank 241-AP-101 (referred to herein as AP-101) is the second Hanford radioactive tank waste planned to be processed and vitrified. A simulant version of AP 101 waste was formulated from the best-basis inventory (BBI) for the Hanford Tank 241-AP-101 liquid with an assumed target dilution of the waste from the BBI sodium molarity of 8.61 M to the desired 5.5 M Na. After the addition of glass-forming chemicals (GFCs), the simulant melter feed was processed in a non-radioactive, continuous laboratory-scale melter (CLSM) system. The AP-101 simulant melter feed was charged into the CLSM for 6.11 h of processing, which produced 6.55 kg of glass, for an average glass production rate of 2275 kg m 2 d -1 . Since there were no processing issues with the AP-101 simulant melter feed, AP-101 melter feed made with actual waste was then processed in a CLSM system built into a contamination area in a radioactive environment. The melting behavior characteristics appeared similar for both the simulant and waste melter feeds. The AP-101 waste melter feed was charged into the CLSM for 12.14 h of processing, which produced 8.75 kg of glass, for an average glass production rate of 1530 kg m 2 d -1 . During the AP-101 waste melter feed charging, the pump used to move the feed reached a maximum and it is believed that if the pump had a greater capacity, a greater average glass production rate could have been achieved. A constituent of interest present in low quantities in the AP-101 waste is 99 Tc or its non-radioactive surrogate, Re, added to the AP-101 simulant. Analysis for the quantities of 99 Tc and Re in the AP-101 glass product resulted in an average single-pass retention from the melter feed during relative chemical steady state of 55 ± 2 % for 99 Tc and 45 ± 2 % for Re. Compared to the processing of other melter feeds, the retention of 99 Tc in the AP-101 glass was greater than in both AP-107 and AP-105 glass, while the retention of Re in the AP-101 was less than in the AP-107 glass, but greater than in the AP-105 glass. A spike of I was added into the AP-101 melter feed that could be detected above the analysis detection limits. However, the iodine was only detectable above the ~6 ppm limit in one glass pour: the pour immediately following the burn off of the cold cap, where the I level reached ~30 ppm. This event was significant because the glass was poured immediately after burn off and thus it is presumed that the iodine had yet to volatilize from the glass melt while idling. It is recommended to perform future tests with I spikes at greater levels so that it can be detected in additional glass pours to determine if the expected 50 % retention of I used in the Kim et al. glass models can be confirmed. Offgas liquid samples were analyzed for acetonitrile, which was present at greater concentrations in CLSM liquids than in other scaled melter systems. This result was expected based on unique conditions with the CLSM system including a small plenum space leading to low residence time for offgas and the rapidity of offgas cooling upon exiting the CLSM vessel due to the location and environment. About 90 % of the total acetonitrile captured during both the AP-101 simulant and waste CLSM runs was found in the offgas condensate and demister liquids, thus it is recommended that only those liquids be sent for analysis if future testing to study the presence of acetonitrile in offgas products is desired.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Preliminary Evaluation of Removing SNF from Nuclear Power Plant Sites - Pilgrim Site Visit - 20048

The U.S. Department of Energy Office of Integrated Waste Management (DOE-IWM)a conducted an evaluation of removing spent nuclear fuel (SNF) from the Pilgrim site on November 4-8, 2019. The Pilgrim site is located on the western shore of Cape Cod Bay in the Town of Plymouth, Massachusetts, about 61 km southeast of Boston and 71 km east of Providence, Rhode Island. Participants in the site visit included the U.S. Department of Energy, Oak Ridge National Laboratory, Pacific Northwest National Laboratory, the state of Massachusetts, the Federal Railroad Administration, the U.S. Coast Guard, the U.S. Army Corps of Engineers, the Mashpee Wampanoag Tribe, the Consolidated Group of Tribes and Organizations, the Council of State Governments-Eastern Regional Conference, the Pilgrim Nuclear Decommissioning Citizens Advisory Panel, and the Massachusetts Coastal Railroad. The Pilgrim site was found to have two transportation mode options for the removal of SNF, offsite rail access and onsite barge access. Two offsite heavy haul truck to rail transload locations were evaluated, one in Middleborough, Massachusetts, about 35-47 km from the Pilgrim site, and a second location in Middleborough about 36-43 km from the Pilgrim site. A passenger railroad terminates in Plymouth, Massachusetts, about 11 km from the Pilgrim site; however, this location is not suitable for freight rail involving large SNF transportation casks. There is also an onsite barge facility located on the Pilgrim site that was used during construction and would require refurbishment to be used. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Progress on Advancing the Robotic Air-slot Volumetric Inspection System (RAVIS) for Hanford Under-tank Inspection - 20519

The 27 in-service double-shell tank (DST) systems at Hanford provide interim storage for nearly 56 million gallons of nuclear and hazardous chemical legacy waste. The safe and reliable storage of the waste is critical to the site's extended cleanup mission. While in service, the leak integrity of the DSTs must be demonstrated to satisfy the Washington Administrative Code, inform decisions on tank management, and gauge fitness for continued service beyond originally intended design lives. The carbon steel plates and welds that comprise DST primary tank sidewalls and lower knuckles are routinely 'sampled' for volumetric non-destructive testing using ultrasonic inspection technology to determine whether corrosion pitting, cracking, or general corrosion are occurring that could compromise tank leak integrity. However, the carbon steel plates and welds that comprise the bottoms of primary tanks have not been thoroughly inspected since the DSTs were constructed (i.e., since 1968-1986) due to limited physical access to the exterior tank bottoms. The Robotic Air-slot Volumetric Inspection System, or 'RAVIS,' is being engineered to overcome the challenge of tank bottom in-service inspection. The system will be deployed under primary tanks within the small cooling channels/air-slots in the refractory pads upon which the tanks rest and will use ultrasonic guided wave inspection technology to volumetrically inspect physically inaccessible regions that make up ∼90% of a tank bottom, as well as regions that are physically accessible from the air-slots but comprise only ∼10% of a tank bottom. This paper describes the air-slot sensor and robotic deployment system and focuses on the testing approach and methods that are being applied to support (1) design feedback and performance acceptance (requirement verification) and (2) performance repeatability/reliability assessments (qualification) to ensure the RAVIS is prepared for successful inservice inspections of primary tank bottoms. Test progress made against the test plan, the results of 2019 testing, and the future outlook are included. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Prediction for Pressure Differential Across HEPA Filter Media Based on Media Characteristics and Particle Size Distribution

A new method for predicting the pressure drop across High Efficiency Particulate Air (HEPA) filter media is proposed based upon mass deposited onto the filter and known physical characteristics of the filter media. Detailed are the methods used in conjunction with current filter loading models to predict the pressure drop, as well as tests conducted to validate the methods. The benefit of a prediction model for practical use lies in the manufacturing and service life of nuclear grade HEPA filters. HEPA filters for use in nuclear facilities have a prescribed expiration date and a maximum allowable operating pressure drop. Therefore, the ability to predict the pressure drop across a filter and relate it to an expected length of service time can enable a reduction in wasted filters. This will allow for more informed decisions to be made based upon the dictated life cycle of the filters. Also, understanding and predicting how the pressure drop of HEPA filter media behaves as a function of physical characteristics and loaded mass can assist in future design and manufacturing of filter media. Currently, most existing pressure drop models are either computationally based or analytical methods relying on data gathered during tests. Neither are practical for prediction; the computational methods are difficult to implement, and the current analytical methods are more useful as tools for analysis. The current analytical model developed by Bergman et al. is based upon the pressure drop from each media fiber and modeling the deposited particles as newly formed fibers. Using Bergman's model and the media properties, air properties, and known aerosol particle size distribution, a pressure drop curve as a function of loaded mass can be created. This curve implies initial loading in the depth of the filter media with a transition to pure surface loading on the filter face, and a sensitivity to an evolving particle size distribution as mass continues to load onto the filter. To implement the predictive model, knowledge of the mean filter fiber diameter and porosity of the filter media is required. Traditionally, the mean fiber diameter is calculated as an effective diameter from prior media testing, however, in this study a Scanning Electron Microscope (SEM) technique is used to acquire this variable. Validation of the predictive model is provided by flat sheet media tests under a controlled environment with a measured particle size distribution of the challenge aerosol and shows reasonable preliminary agreement.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Improbability of Post-Closure Criticality in Compacted Criticality Control Overpacks after Room Closure at Waste Isolation Pilot Plant

As part of its periodic re-certification of the Waste Isolation Pilot Plant (WIPP), an operating repository in bedded salt for the disposal of transuranic (TRU) waste from atomic energy defense activities, the United States Environmental Protection Agency expects a re-evaluation of features, events, and processes, such as post-closure nuclear criticality. Although salt creep beneficially encapsulates the TRU waste in the closed WIPP repository, the spacing between an array of waste packages is disrupted as the salt creep closes disposal rooms and containers lose structural integrity. For most TRU waste, the possibility of post-closure criticality is exceedingly small either because the salt neutronically isolates TRU waste canisters or because closure of a disposal room from salt creep does not sufficiently compact the low mass of fissile material. The criticality evaluation was updated, however, because of the introduction of criticality control overpack (CCO) containers, which may dispose up to 380 fissile gram equivalent plutonium-239 in each container. The criticality potential is evaluated through high-fidelity geomechanical modeling of a disposal room filled with CCO containers during two representative conditions: (1) large salt block fall, and (2) gradual disposal room closure from salt creep. Geomechanical models of roof fall demonstrate three tiers of CCO containers are not greatly disrupted. Geomechanical models of gradual room closure from salt creep (without brine seepage and subsequent gas generation to permit maximum room closure) were used to predict irregular arrays of closely packed CCOs after 1000 years, when room closure has asymptotically approached maximum compaction. Models of spheres or cylinders with 380 fissile gram equivalent of plutonium (as oxide) at the predicted irregular compacted spacing demonstrate that an array of CCO containers is not critical when surrounded by salt and magnesium oxide, provided the mass of hydrogenous material shipped in CCO containers (usually plastics) is controlled or boron carbide (a neutron poison) is mixed with the fissile contents.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Innovative Approaches to the Decommissioning of a Redundant Plutonium Processing Facility - 20147

At Sellafield, in the North West of the United Kingdom (UK), there are a number of redundant plutonium processing facilities. Over the past three decades several decommissioning strategies have been deployed to clean up these redundant facilities. Whilst there have been many successes previously reported, there remain many challenges. As previously presented at WM2017 (Paper Ref 17081) some of these challenges have recently been addressed through a new approach which introduced a number of innovations. The purpose of these innovations is to seek ways to significantly reduce risks to both decommissioning personnel and the environment by minimising the extent of physical 'hands on' decommissioning activities and by simplifying the waste production process. This paper provides an update on the progress of these innovations since 2017. Additionally, the paper also provides details of the new decommissioning technologies which have been introduced over the past 2 years to enable the most challenging aspects of the redundant plutonium processing facility to be decommissioned. These new decommissioning technologies address challenges associated with the preparation of process vessels and pipework to enable their safe in-situ size reduction by remote means: - New decommissioning techniques have been introduced to allow penetrations to be remotely cut into process vessels and pipework to provide a means of accessing and controlling the venting of any potential hydrogen gas present. - Additionally, a new large scale bespoke remote diamond wire cutting machine has been designed and manufactured to enable the process vessels to be size reduced in situ. Both of these new cutting technologies have involved collaborative working with specialist equipment suppliers including extensive development, trialling demonstration and commissioning prior to bringing the equipment into operational service. Several years of work have now culminated in reaching the final stages of decommissioning of the redundant plutonium processing facility with decommissioning of the final process vessels now underway and completion expected by the end of 2019. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

HTO and selenate diffusion through compacted Na-, Na–Ca-, and Ca-montmorillonite

Radionuclide transport in smectite clay barrier systems used for nuclear waste disposal is controlled by diffusion, with adsorption significantly retarding transport rates. While a relatively minor component of spent nuclear fuel, 79 Se is a major driver of the safety case for spent fuel disposal due to its long half-life (3.3×10 5 yr) and its low adsorption to clay (K D < 10 L/kg), thus a thorough understanding of Se diffusion through clay is critical for understanding the long-term safety of spent fuel disposal systems. Through-diffusion experiments with tritiated water (HTO, conservative tracer) and Se(VI) were conducted with a well-characterized, purified montmorillonite source clay (SWy-2) under a constant ionic strength (0.1 M) and three different electrolyte compositions: Na + , Ca 2+ , and a Na + -Ca 2+ mixture at pH 6.5 in order to probe the effects of electrolyte composition and interlayer cation composition on clay microstructure, Se(VI) aqueous speciation, and ultimately diffusion. Further, the results were modeled using a reactive transport modeling approach to determine values of porosity (ε), D e (effective diffusion coefficient), and K D (distribution coefficient for adsorption). HTO diffusive flux was higher in Ca-montmorillonite (D e =1.68×10 -10 m 2 s -1 ) compared to Na-montmorillonite (De=7.83×10 -11 m 2 s -1 ). This increase in flux is likely due to a greater degree of clay layer stacking in the presence of Ca 2+ compared to Na + , which leads to larger inter-particle pores. Overall, the Se(VI) flux was much lower than the HTO flux due to anion exclusion, with Se(VI) flux following the order Ca (D e = 1.03×10 -11 m 2 s -1 ) > Na–Ca (D e = 2.12×10 -12 m 2 s -1 ) > Na (D e = 1.28×10 -12 m 2 s -1 ). These differences in Se(VI) flux are due to a combination of factors, including (1) larger accessible porosity in Ca-montmorillonite due to clay layer stacking and smaller electrostatic effects compared to Na-montmorillonite, (2) larger accessible porosity for neutral-charge CaSeO4 species which makes up 32% of aqueous Se(VI) in the pure Ca system, and (3) possibly higher Se(VI) adsorption for Ca-montmorillonite. Through a combination of experimental and modeling work, this study highlights the compounding effects that electrolyte and counterion compositions can have on radionuclide transport through clay. Diffusion models that neglect these effects are not transferable from laboratory experimental conditions to in situ repository conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Evaluating Remediation Options for a Perched-Water Unit at the Hanford Site - 20378

At the U.S. Department of Energy's Hanford Site, liquid-phase waste was discharged using surface disposal features such as ponds, trenches, and cribs. These practices distributed contaminants in the subsurface, some of which are currently in the vadose zone above the groundwater. At the 200-DV-1 operable unit (OU) at the Hanford Site, a key feature is a perched-water zone. This perched-water zone contains several million liters of water contaminated with high concentrations of uranium, technetium-99 (Tc-99), and nitrate that serves as a continuing source of contamination to the underlying aquifer. Currently, a pumping system is used to remove contaminant mass from the perched-water zone. However, water extraction will become more challenging as the perched unit dewaters. As a result, residual contaminants remaining after pumping is no longer effective needs to be addressed with post-extraction mitigation approaches, appropriate monitoring, and selection of suitable remediation endpoints. Thus, a remedy evaluation needs to include the unique conditions of this perched-water zone. As part of the initial evaluation, a set of technologies have been preliminarily identified as potentially applicable to the perched-water zone, including in situ remediation technologies to sequester uranium and Tc-99 and to degrade nitrate. While there is sufficient information available for direct consideration of some of the reviewed technologies in a feasibility study, five in situ remediation technologies were identified as needing additional information on their effectiveness under the geochemical and contaminant conditions of the perched-water zone. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Uranium Mill Tailings Radiation Control Act Title II DOE Due Diligence and Lessons Learned from a Previous Site Transfer - 20352

Title II of the Uranium Mill Tailings Radiation Control Act (UMTRCA) established that a government agency will provide perpetual care for closed uranium and thorium ore-processing sites that were operating under an NRC source material license in 1978 or were licensed thereafter. Commercial owners (licensees) operating under an NRC or agreement state specific license when UMTRCA was passed are responsible for conducting reclamation of any byproduct material remaining from uranium-ore processing operations in accordance with an NRC or agreement state approved reclamation plan. Reclamation includes both surface and groundwater remedies. Upon completion of reclamation and approval by NRC, the site is required to be transferred to either the host state or the DOE for long-term surveillance and maintenance. Since UMTRCA's enactment, six Title II sites have been transferred to DOE; an additional 24 Title II sites are anticipated to be transferred before 2050. DoE's role mandated under UMTRCA Title II as the long-term care custodian is to perform 'monitoring, maintenance, and emergency measures necessary to protect the public health and safety.' UMTRCA requires that the licensee pay a long-term surveillance charge 'sufficient to cover the annual costs of site surveillance.' However, at some sites such as the Bluewater, New Mexico, Disposal Site, this mandate has required additional effort and expense by DOE, beyond the originally anticipated and intended scope within UMTRCA, but within the authority of DOE under UMTRCA. In 1997, the Bluewater site became the second UMTRCA Title II site to be transferred to DOE. The site was the location of a uranium mill operated from 1953 until 1982. The specific licensee began site reclamation in 1991, and by 1995 all tailings and contaminated materials were encapsulated in two tailings disposal cells and other disposal areas. In addition to surface contamination, milling activities impacted groundwater in the two upper aquifers. In 1989, the specific licensee attempted active groundwater remediation; however, no significant reduction in contaminant concentrations was observed. As a result, the specific licensee applied to NRC for alternate concentration limits (ACLs) in 1990, which were approved in 1996 as being protective, after additional corrective actions were performed. Since transfer of the Bluewater site to DOE, unforeseen challenges have occurred, requiring additional actions. The first challenge is the occurrence of surface depressions located on the northern section of the main tailings disposal cell. The depressions were first observed during DoE's initial inspection in 1998; however, evidence of these can be observed on satellite images taken prior to transfer. Since being first observed, the depressions have continued to grow both in depth and areal extent. Due to the design of the main tailings disposal cell, the depressions impede storm water from being effectively shed off the 101- hectare (250-acre) top slope of the main tailings disposal cell. Instead, storm water accumulates in the depressions, forming a large ephemeral pond that has stored up to 16.3 x 10{sup 6} liters (4.3 million gallons) of stormwater. The ponding poses a potential risk to the integrity of the main tailings disposal cell in the case of a large storm event, with the potential to cause the pond to overtop and erode the cover material and underlying waste. DOE has taken a number of short-term actions to monitor, measure, and reduce the ponding and is currently working with the US Army Corps of Engineers to design and construct a repair. Additional challenges are associated with groundwater at the Bluewater site. Nine wells were present on the 1335-hectare (3300-acre) site upon transfer. Groundwater compliance was called into question after the State of New Mexico reduced its uranium groundwater standard from 5.0 to 0.03 milligrams per liter in 2004, and when an ACL for uranium was exceeded in a site monitoring well in 2010. Acquiring historical groundwater data and subsequent evaluations as well as additional DOE groundwater monitoring led to installing 10 new monitoring wells and performing additional site hydrogeology recharacterization. DOE continues to evaluate groundwater conditions at the site and works with the NRC to determine regulatory requirements and a path forward. As a result of lessons learned at the Bluewater site and other Title II sites, improved processes have been implemented at a programmatic level to increase due diligence before site transfer and prevent similar issues from occurring at other UMTRCA Title II sites under long-term management. DoE's due diligence process is documented in the Process for Transition of UMTRCA Title II Disposal Sites to DOE for Long-Term Surveillance and Maintenance and is designed to ensure that DOE has no technical or compliance concerns with regulatory decisions that might compromise protectiveness following site transfer to DOE. Implementation of the due diligence process has increased DoE's role prior to site transfer and has been effective in identifying potential issues. Actions by NRC and specific licensees, in response to enhanced due diligence efforts by DOE, are expected to minimize, if not totally prevent, the need for unanticipated actions by DOE pertaining to the surface and groundwater remedies after site transfer. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

An Improved Model For Determining Salinity Recharge Time for Deep Borehole Disposal - 20405

In a previous publication (K. P. Travis, D. Burley and F. G. F. Gibb, WM2017 Conference, Phoenix Arizona paper no. 17480) we introduced a numerical model to estimate the time it would take for a pressure perturbation to subside following its creation from the construction of a deep geological borehole in water-saturated rock. The model was based on the notion of a point source of momentum - a solution of the time-dependent pressure-diffusion equation. Using the model, we estimated that it would take on the order of 10 k years for physical equilibrium to become re-established following the sinking of a 5 km borehole in granite. The significance of such a model is that it places an upper bound on the lifetime required of a borehole sealing system - a necessary input to a borehole post-closure safety case assessment. No engineered sealing system has ever been devised which is capable of retaining its sealing properties for 10 half-lives of long-lived radioisotopes in spent fuel or high-level waste. One of the key advantages of disposing of nuclear waste via Deep Borehole Disposal (DBD) is the natural sealing provided by density stratified groundwater. Upon sinking of a borehole, and subsequent filling with fresh water, brine or drilling mud, this natural barrier may be temporarily damaged. Over time, fresh brine from the far-field will flow towards or away from the hole (driven by a pressure gradient) and will eventually re-establish the original salinity gradient. It follows that the engineered seals need last only as long as the time required for this salinity gradient to reset itself. One of the limitations of our previous model was the use of a static boundary condition on the borehole wall. The model used a boundary pressure which varied quadratically with depth (arising from differences between the pressure of a column of fresh water in the borehole and that of a column of brine in the host rock). However as brine replaces fresh water in the borehole (driven by a pressure gradient), the boundary function must change with time. We now introduce an improved model which takes this time dependent boundary condition into account. The model also takes into account the time taken for a mixture of brine and fresh water to re-establish chemical equilibrium through the process of diffusion. The paper contains the mathematical details of our new iterative model as well as results showing the time taken to reach steady state, and concentration profiles for the components of the brine-filled borehole as a function of time together with a discussion on the implications of the results for developing a post-closure safety assessment for DBD. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

WIPP Safety Significant Confinement Ventilation System (SSCVS) HEPA Filtration System - 20165

Construction and major equipment fabrication are underway for a new ventilation exhaust system at the Waste Isolation Pilot Plant (WIPP). The new system will provide continuous High Efficiency Particulate Air (HEPA) filtration of the exhaust from the WIPP underground while meeting the ventilation demands for expanded waste emplacement and mining operations over the next 40 years. The integrated system design provides for reducing the salt, clay and diesel particulates from the exhaust airflow from the mine, prior to full filtration using Nuclear Safety Significant HEPA filters. The SSCVS design and equipment provides for continuous HEPA filtration over a wide range of operating and environmental conditions. The new exhaust system connects to the existing underground exhaust shaft, and the exhaust air flows from the underground through Salt Reduction Units (SRUs) to protect the final filter banks from excessive moisture and rapid salt/dust buildup. Each of the six (6) SRUs consists of a demister to remove entrained moisture, a dry salt remover unit to filter approximately 90% of the entrained salt/dust, and an automated water treatment system to periodically clean the demisters and to remove salt from the SRU filters. At the maximum expected exhaust flowrate of 540,000 Cubic Feet per Minute (CFM) / 255 Cubic Meters per Second (m{sup 3}/s), five (5) salt removal units will be in operation with one unit in standby or maintenance. An in-line variable frequency drive booster fan will offset pressure losses through each SRU and reduce the relative humidity of the air exiting the SRUs. In the event of a high radiation alarm from the underground Continuous Air Monitors (CAMs), the SRUs will be automatically bypassed, which places the SRS and building outside of the Safety Significant confinement boundary. From the SRUs, the exhaust is directed to the HEPA filter banks located in the New Filter Building. The exhaust system is designed to provide continuous HEPA filtration prior to release to the exhaust stack. There are 22 HEPA filter banks rated at 27,000 CFM / 12.75 m{sup 3}/s each. Each filter bank has two stages of pre-filters and two stages of HEPA filters. The filtered air from each of the 22 filter banks discharges into a common concrete plenum, which is maintained under a negative pressure by the main exhaust fans. Six 1,000 HP variable frequency drive exhaust fans are provided on the south side of the plenum. At the maximum expected exhaust flow of 540,000 CFM, four exhaust fans and twenty filter banks will be in operation. The fans discharge vertically to a separate concrete exhaust plenum. The filtered exhaust is routed from the exhaust plenum to a 125-foot-tall exhaust stack via a 13-foot diameter duct. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Predicting Saturated Hydraulic Conductivity over Time for Degrading Saltstone Vault Concrete - 20376

At the Savannah River Site (SRS), low-level liquid tank waste is mixed with cementitious materials to produce a solid, monolithic waste form referred to as saltstone. The liquid saltstone mixture is pumped into massive concrete structures referred to as saltstone disposal units (SDUs) for curing and long-term storage. SDUs are vaults made of high performance concrete forming a barrier between saltstone and the surrounding environment. Predicting the long-term performance of SDU vault concrete, as well as the saltstone material itself, is critical to understanding the potential releases of radionuclides to the surrounding environment as described in the Saltstone Disposal Facility (SDF) performance assessment (PA). The hydraulic conductivity profile for SDU vault concrete was conservatively assumed to degrade linearly from the initial saturated hydraulic conductivity of the intact concrete over a long period of time. The initial hydraulic properties of saturated SDU vault concrete have been measured, and the final hydraulic properties of degraded vault concrete are assumed to be the same as the porous backfill material that will surround the vault after closure. The assumed final condition of the vault concrete is also conservative in that it provides a greater estimate of water penetration through the vault than would generally be expected. Therefore, insights that provide more realistic but conservative estimates as to how degradation processes may change the hydraulic properties of the SDU vault concrete, the time dependent relationship of the vault concrete hydraulic properties to degradation (and thus time), and the final hydraulic properties of the vault concrete provides useful additions to the SDF PA. This paper focuses on the assumption that the saltstone vault concrete saturated hydraulic conductivity would decrease linearly as a function of degradation time; this assumption resulted from a worst-case, weighted (by relative layer thickness), arithmetic average of intact and backfill material hydraulic conductivities representing flow parallel to a layered system. This research indicates that the effective saturated hydraulic conductivity of the degraded SDU vault concrete should be based on the relative thickness-weighted geometric mean of the intact and degraded layers hydraulic conductivities. This alternative, which is supported extensively in the relevant literature and evaluated in this paper, leads to a more realistic and defensible estimate of the effective saturated hydraulic conductivity in degraded vault concrete while remaining conservative. The impact of using the more realistic estimate of the effective saturated hydraulic conductivity for the degraded concrete decreases the effective saturated hydraulic conductivity by up to several orders of magnitude for early times (i.e., when the SDU vault concrete is assumed degraded via sulfate attack and carbonation). This revised estimate of the effective saturated hydraulic conductivity has been implemented in the recently revised SDF PA. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Brine Availability Test in Salt, a Heated Borehole Experiment at the Waste Isolation Pilot Plant, New Mexico, USA - 20233

The Brine Availability Tests in Salt is a US Department of Energy Office of Nuclear Energy supported activity as part of the Spent Fuel and Waste Disposition Campaign where we are performing simultaneous heated and control experiments in adjacent horizontal boreholes in the WIPP Salt Disposal Investigation drifts as part of experimental Phase 1. Phase 1a of BATS, a low-cost, small spatial-scale experiment performed in order to design instrumentation and methods for further experimentation in the URL, has been completed (June 2018 - May 2019) and is described elsewhere. In coincidence with multiple physical parameters that will be measured over the duration of the experiment, we will be measuring the liquid and vapor phases of H{sub 2}O as well as its isotopic content (not measured in Phase 1a). Three different forms of water occur in natural salts: as fluid in macro scale (mm size) inclusions, as intergranular free H{sub 2}O and as H{sub 2}O incorporated in hydrous minerals. Each of these forms has potentially different stable isotope signatures and will be influenced differentially by heat induced transport and by interaction with introduced tracers. Continuous measurement of vapor phase H{sub 2}O isotopes during borehole heating will be impacted by several effects: 1) evaporation as liquid brine flows into the borehole and evaporates completely or partially into the dry N{sub 2} stream; 2) steam from dehydration of hydrous minerals, that may enter the borehole; and 3) hydrous minerals that may form in the borehole (preferentially incorporating heavier isotopes). The continuous time series collected over the course of the heating test will be combined with analyses of pre-test and post-test collected samples of test site salt to investigate the contributions of each of the three water types as H{sub 2}O is mobilized due to the effects of heating. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

The Evaluation of Chemical Decontamination for Contaminated Carbon Steel Scrap by Multiphase Treatment Process - 20249

There is a significant growth in the field of decommissioning of nuclear facilities due the fact that for a lot of them their end of life is nearing. In Taiwan, the government plans to steadily reduce the dependence on nuclear power and moves gradually towards a nuclear-free homeland. Therefore, the development of decommissioning technology becomes the significant issue for the next coming years. The decommissioning of a nuclear power plant is a long process and practical work including radiological surveys, decontamination, dismantling, and the subsequent waste management. Chemical decontamination is an important task in the decommissioning of nuclear power plants and is usually performed by circulating the chemical solution in selected systems or full systems in order to reduce dose levels. However, the decontamination of segmented metal parts is also considered to reduce the contamination to such levels that they may be disposed of at a lower classification or be unconditionally released, and it helps to achieve the goal of waste minimization and provide a more economical cost for disposal management. Chemical decontamination technology is used to remove the contaminated oxides deposited on the surface of metals by dissolving them with chemical mechanisms, such as chelation, acidic or alkaline dissolution, redox reaction and so on. Carbon steel is the major material used in systems and pipelines in the nuclear power plant, thus it is also commonly selected as the target to be decontaminated in the decommissioning process. In this study, the effectiveness of chemical decontamination is evaluated by using multiphase treatment process including the reduction and the oxidation steps. In the step of redox reaction, the oxidation state of the substance is very important. Especially metals of some oxidation states show solubility in water, which has a decisive influence on the chemical decontamination. The experiment of decontamination of metal scraps is carried out by the immersion method within a chemical solution. The relative operation parameters such as temperature, pH, and concentration of the chemical solution are recorded to demonstrate the effect of the decontamination process. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerated Aging and Evaluation of Hose-In-Hose Transfer Lines in the Hanford Waste Transfer System - 20312

Nonmetallic materials are used in the United States Department of Energy's Hanford Site Tank Farm waste transfer system. These materials include the inner primary hoses in the hose-in-hose transfer lines (HIHTLs), Garlock{sup R} gaskets, ethylene propylene diene monomer (EPDM) O-rings, and other nonmetallic materials. These nonmetallic materials are exposed to β and γ radiation, caustic solutions as well as high temperature and pressure stressors. How the nonmetallic components react to each of these stressors individually has been well established. However, simultaneous exposure of these stressors has not been evaluated and is of great concern to Hanford Site engineers. Florida International University's Applied Research Center engineers worked closely with key Hanford's Washington River Protection Solutions personnel to develop an experimental test plan that determines how these nonmetallic components react to various simultaneous stressor exposures. In this paper, research on the experimental testing of the hose-in-hose transfer lines used in the Hanford tank farm waste transfer system under simultaneous stressor exposures is presented. The stressor exposure experiments consisted of various combinations of simultaneous stressor exposure of caustic solution, high temperature and high pressure stressors. Research efforts focused on evaluating the aging behavior of EPDM by exposing samples of HIHTLs as well as EPDM dog bone shaped specimens to a 25% NaOH solution at (38 deg. C), operating (54 deg. C) and design temperatures (77 deg. C) for 6 months and 12 months. In addition, HIHTL and the EPDM dog-bone specimens were exposed to only hot water at 77 deg. C for a duration of one year. The mechanical and material properties of the samples were characterized and compared with those of the unexposed samples (baseline). Evaluations included burst pressure tests of the EPDM hose-in-hose transfer lines and material tensile strength test of EPDM dog-bone coupons. Both the tensile strength of the EPDM material dog bones and the burst pressure of the HIHTLs significantly decreased with the increasing temperature and increasing exposure time. When compared with the baseline samples, the burst pressure decreased by 28.75% for the sample aged at 77 deg. C after 12 months, in comparison to sample aged at 38 deg. C and 54 deg. C which had about 1.34% and 5.70% loss in burst pressures, respectively, after 12-month exposure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Accelerating Hanford Site Cleanup through Operations Research Modeling - 20238

The Hanford Site cleanup effort will require the integration of dozens of unique facilities and processes, many of which will be first-of-a-kind in implementation and design. Each facility will be governed by its own set of operating logic, configured with a unique array of unit operations, and subject to a set of constraints that will affect its behavior. The collection of facilities have multiple points of interface, making the operations of any one facility potentially significant to the operations of other up- or downstream processes. It is therefore highly desirable to accurately predict these operations, as it allows for Site officials to identify and preempt bottlenecks and vulnerabilities before they unexpectedly inhibit the cleanup mission. With the quantity and complexity of the processes that will be on Site, building a pen-and-paper or even a spreadsheet-assisted model of the cleanup mission quickly becomes overwhelming in scope and inaccurate in execution. The Engineering organization for the Site's Tank Operations Contract (TOC) has therefore implemented the use of operations research (OR) modeling to simulate and predict future operations of Site facilities. These models are created using a discrete event simulation tool that allows for the development of detailed, versatile, and robust models. Not only can these models account for complex logical behaviors, but they can also simulate process details down to the level of vessel sizing, labor utilization, equipment reliability, and resource availability. To date, the TOC has developed OR models for several facilities on Site, including for single-shell tank (SST) farms, double-shell tank (DST) farms, the Effluent Treatment Facility (ETF), and the waste transfer system. These models have focused on identifying bottlenecks and operational constraints, and have been used to quantify the effects of implementing process changes. This latter point is particularly valuable, as it allows for several alternatives to be studied in a virtual setting before committing resources to making a change in the field. The decision to develop OR models has gained tremendous support from the Site's stakeholders and the U.S. Department of Energy (DOE) management, and has prompted the use of the tool to support additional internal and external initiatives. Recently, an initiative was proposed to use the models to help identify and provide quantitative backing for risks and opportunities for the TOC. This application of OR could not only help inform how the TOC manages its risks (e.g. quantities and types of spare parts), but could also help drive process improvements whose benefits might otherwise be hard to quantify. The models have also been used to drive the TOC's cloud computing, artificial intelligence (AI), and machine learning (ML) initiatives. These initiatives will not only improve the ability of the TOC to more rapidly respond to the needs of its customers, but it will also aid in the ability of the TOC to analyze and improve the processes it studies. Partnership with two external software development and consulting companies (Lanner and Ynformed) has furthered not only the application of AI and ML within the TOC, but has also spurred the development of new/improved software tools and platforms used by the companies. These partnerships have proven to be mutually beneficial and productive, and have set a precedent for the types of gains that can be made by exploring such options. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Use of Historical EM Practices and Policies for Management of Cleanup Program and Address GAO Concerns - 20222

As Department of Energy (DOE) Environmental Management (EM) program policies and management practices are revised over time, it might be useful to periodically reflect on the DOE EM program's past to identify practices that have worked and those that might be appropriate for possible reuse in the future. An added impetus to examine alternative approaches is the recent Government Accountability Office (GAO) report entitled 'Nuclear Waste Cleanup - DOE Could Improve Program and Project Management by Better Classifying Work and Following Leading Practices.' The February 2019 GAO report states that EM categorizes most of its work in a way that does not adequately involve independent experts and DOE senior leadership. It also noted that EM has not followed leading practices for program and project management that could help keep the cleanup efforts on schedule and control costs. The GAO report recommended that EM, working with DOE Office of Project Management (PM): - Establish requirements and then assess EM's ongoing operations activities to determine if some activities should be reclassified as capital asset projects based on these newly established requirements. - Review and revise EM's 2017 cleanup policy to include program management leading practices related to scope, cost, schedule performance, and independent reviews. - Update the cleanup policy to require that earned value management (EVM) systems be maintained and used in a way that follows EVM best practices. - Develop a policy to ensure that work is categorized as level of effort (LOE) only in appropriate, specified circumstances, such as when work is not measurable or when measurement is impractical. - Integrate EVM data into EM's performance metrics for operations activities. To assist with improving program performance and implementing audit recommendations, this paper reviewed past successful cleanups such as Weldon Springs, Rocky Flats, Fernald, Ashtabula, Battelle Columbus (abs, and other historical resources and people with experience during the early years of EM program. As such, there are several past practices which may well be suited for reuse today. Some of these practices include: - In 1990's, as the DOE EM cleanup program, known as Environmental Restoration came into effect, the known cleanup scope at each geographic location or site was organized into four levels ranging from overall site-wide cleanup effort to the individual 'release sites', providing high granularity to the program. - The cleanup program was organized by geography (Northwest, Southwest, Eastern Area Programs, etc.). These 'sub-program' managers provided a degree of Headquarters oversight and management allowing upper management (EM-1, 2, and 3) to focus on major decisions and issues. - Budget levels at selected cleanup sites were funded above 'minimum-safety' levels to accelerate actual cleanup work. - Past practice utilized EVM techniques and uniform EM oversight over all discrete project-like activities, providing for a coordinated cleanup effort. - EM managed LOE activities using benchmarking and best in class management practice techniques to help manage costs. - EM managed and reviewed entire site cleanup baselines, not only individual projects, focusing on a successful overall outcome. - Sites had a 'Road map' or 'Management Action Plan' that provided the overall strategy or plan for that site's cleanup - this helped with understanding and coordination of efforts. - EM had a robust lessons-learned program and database to capture and transmit worthy ideas. - EM had well-structured cleanup baseline change control policies to control cost and schedule changes, at the contractor and higher Headquarters levels. Finally, some of the GAO observations may be valid, however it is not clear as to their extent. For example, for some operation types of work, the use of the Level of Effort (LOE) earned value method to track progress may be appropriate. Also, to ensure independence of thought, and to obtain useful insight on past practices, it may be suitable to have former EM employees to assist with understanding past practices or to verify that activities have been properly identified. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗