Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “protocol”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Neural processing of gravito-inertial cues in humans. I. Influence of the semicircular canals following post-rotatory tilt

Sensory systems often provide ambiguous information. Integration of various sensory cues is required for the CNS to resolve sensory ambiguity and elicit appropriate responses. The vestibular system includes two types of sensors: the semicircular canals, which measure head rotation, and the otolith organs, which measure gravito-inertial force (GIF), the sum of gravitational force and inertial force due to linear acceleration. According to Einstein's equivalence principle, gravitational force is indistinguishable from inertial force due to linear acceleration. As a consequence, otolith measurements must be supplemented with other sensory information for the CNS to distinguish tilt from translation. The GIF resolution hypothesis states that the CNS estimates gravity and linear acceleration, so that the difference between estimates of gravity and linear acceleration matches the measured GIF. Both otolith and semicircular canal cues influence this estimation of gravity and linear acceleration. The GIF resolution hypothesis predicts that inaccurate estimates of both gravity and linear acceleration can occur due to central interactions of sensory cues. The existence of specific patterns of vestibuloocular reflexes (VOR) related to these inaccurate estimates can be used to test the GIF resolution hypothesis. To investigate this hypothesis, we measured eye movements during two different protocols. In one experiment, eight subjects were rotated at a constant velocity about an earth-vertical axis and then tilted 90 degrees in darkness to one of eight different evenly spaced final orientations, a so-called "dumping" protocol. Three speeds (200, 100, and 50 degrees /s) and two directions, clockwise (CW) and counterclockwise (CCW), of rotation were tested. In another experiment, four subjects were rotated at a constant velocity (200 degrees /s, CW and CCW) about an earth-horizontal axis and stopped in two different final orientations (nose-up and nose-down), a so-called "barbecue" protocol. The GIF resolution hypothesis predicts that post-rotatory horizontal VOR eye movements for both protocols should include an "induced" VOR component, compensatory to an interaural estimate of linear acceleration, even though no true interaural linear acceleration is present. The GIF resolution hypothesis accurately predicted VOR and induced VOR dependence on rotation direction, rotation speed, and head orientation. Alternative hypotheses stating that frequency segregation may discriminate tilt from translation or that the post-rotatory VOR time constant is dependent on head orientation with respect to the GIF direction did not predict the observed VOR for either experimental protocol.

Non-NASA Center↗

Physiological response of rats to delivery of helium and xenon: implications for hyperpolarized noble gas imaging

The physiological effects of various hyperpolarized helium and xenon MRI-compatible breathing protocols were investigated in 17 Sprague-Dawley rats, by continuous monitoring of blood oxygen saturation, heart rate, EKG, temperature and endotracheal pressure. The protocols included alternating breaths of pure noble gas and oxygen, continuous breaths of pure noble gas, breath-holds of pure noble gas for varying durations, and helium breath-holds preceded by two helium rinses. Alternate-breath protocols up to 128 breaths caused a decrease in oxygen saturation level of less than 5% for either helium or xenon, whereas 16 continuous-breaths caused a 31.5% +/- 2.3% decrease in oxygen saturation for helium and a 30.7% +/- 1. 3% decrease for xenon. Breath-hold protocols up to 25 s did not cause the oxygen saturation to fall below 90% for either of the noble gases. Oxygen saturation values below 90% are considered pathological. At 30 s of breath-hold, the blood oxygen saturation dropped precipitously to 82% +/- 0.6% for helium, and to 76.5% +/- 7. 4% for xenon. Breath-holds longer than 10 s preceded by pre-rinses caused oxygen saturation to drop below 90%. These findings demonstrate the need for standardized noble gas inhalation procedures that have been carefully tested, and for continuous physiological monitoring to ensure the safety of the subject. We find short breath-hold and alternate-breath protocols to be safe procedures for use in hyperpolarized noble gas MRI experiments. Copyright 2000 John Wiley & Sons, Ltd.

NASA Discipline Life Sciences Technologies↗

Blood flow dynamics in heart failure

BACKGROUND: Exercise intolerance in heart failure (HF) may be due to inadequate vasodilation, augmented vasoconstriction, and/or altered muscle metabolic responses that lead to fatigue. METHODS AND RESULTS: Vascular and metabolic responses to rhythmic forearm exercise were tested in 9 HF patients and 9 control subjects (CTL) during 2 protocols designed to examine the effect of HF on the time course of oxygen delivery versus uptake (protocol 1) and on vasoconstriction during exercise with 50 mm Hg pressure about the forearm to evoke a metaboreflex (protocol 2). In protocol 1, venous lactate and H+ were greater at 4 minutes of exercise in HF versus CTL (P<0.05) despite similar blood flow and oxygen uptake responses. In protocol 2, mean arterial pressure increased similarly in each group during ischemic exercise. In CTL, forearm blood flow and vascular conductance were similar at the end of ischemic and ambient exercise. In HF, forearm blood flow and vascular conductance were reduced during ischemic exercise compared with the ambient trial. CONCLUSIONS: Intrinsic differences in skeletal muscle metabolism, not vasodilatory dynamics, must account for the augmented glycolytic metabolic responses to moderate-intensity exercise in class II and III HF. The inability to increase forearm vascular conductance during ischemic handgrip exercise, despite a normal pressor response, suggests that enhanced vasoconstriction of strenuously exercising skeletal muscle contributes to exertional fatigue in HF.

NASA Discipline Cardiopulmonary↗

Circadian temperature rhythms of older people

This collection of studies had the aim of exploring whether older (77+ years) men and women have circadian body temperature rhythms different from those of younger adults. A total of 20 older men and 28 older women were compared with either 22 young men or 14 middle-aged men in four protocols; all but the first protocol using a subset of the sample. The four protocols were: 1) 24 h, and 2) 72 h data collections on a normal laboratory routine (sleeping at night); 3) between 36 h and 153 h of field data collection at home; and 4) 36 h of a constant conditions routine (wakeful bedrest under temporal isolation) in the laboratory. There was some evidence for an age-related phase advance in temperature rhythm, especially for the older men on a normal routine, though this was not present in the constant conditions protocol, where 5 of the older subjects showed major delays in the timing of the body temperature trough (10:00 or later). There was no statistically significant evidence from any of the protocols that older subjects generally had lower temperature rhythm amplitudes than younger adults. Only when older men were compared with younger men in 24-h rhythm amplitude by simple t-test did any comparison involving amplitude achieve statistical significance (p < 0.05).

Non-NASA Center↗

Satellite-Terrestrial Network Interoperability

The developing national and global information infrastructures (NII/GII) are being built upon the asynchronous transfer mode (ATM) telecommunications protocol and associated protocol standards. These protocols are themselves under development through the telecommunications standards process defined by the International Telecommunications Union (ITU), which as a body is sanctioned by the United Nations. All telecommunications manufacturers use these standards to create products that can interoperate. The ITU has recognized the ATM Forum as the instrument for the development of ATM protocols. This forum is a consortium of industry, academia, and government entities formed to quickly develop standards for the ATM infrastructure. However, because the participants represent a predominately terrestrial network viewpoint, the use of satellites in the national and global information infrastructures could be severely compromised. Consequently, through an ongoing task order, the NASA Lewis Research Center asked Sterling Software, Inc., to communicate with the ATM Forum in support of the interoperability of satellite-terrestrial networks. This year, Dr. Raj Jain of the Ohio State University, under contract to Sterling, authored or coauthored 32 explanatory documents delivered to the ATM Forum in the areas of Guaranteed Frame Rate for Transmission Control Protocol/Internet Protocol (TCP/IP), Available Bit Rate, performance testing, Variable Bit Rate voice over ATM, TCP over Unspecified Bit Rate+, Virtual Source/Virtual Destination, and network management. These contributions have had a significant impact on the content of the standards that the ATM Forum is developing. Some of the more significant accomplishments have been: (1) The adoption by the ATM Forum of a new definition for Message-In, Message-Out latency; and (2) Improved text (clearer wording and newly defined terms) for measurement procedures, foreground and background traffic, and scalable configuration in the latency and throughput sections of the Performance Testing Baseline Text.

vonDeak, Thomas C.↗

DSMS investment in support of satellite constellations and formation flying

Over the years, NASA has supported unmanned space missions, beyond earth orbit, through a Deep Space Mission System (DSMS) that is developed and operated by the Jet Propulsion Laboratory (JPL) and subcontractors. The DSMS capabilities have been incrementally upgraded since its establishment in the late '50s and are delivered primarily through three Deep Space Communications Complexes (DSCC 's) near Goldstone, California, Madrid, Spain, and Canberra, Australia and from facilities at JPL. Traditionally, mission support (tracking, command, telemetry, etc) is assigned on an individual-mission basis, between each mission and a ground-based asset, independent of other missions. As NASA, and its international partners, move toward flying fullconstellations and precision formations, the DSMS is developing plans and technologies to provide the requisite support. The key activities under way are: (1) integrated communications architecture for Mars exploration, including relays on science orbiters and dedicated relay satellites to provide continuous coverage for orbiters, landers and rovers. JPL is developing an architecture, as well as protocols and equipment, required for the cost-effective operations of such an infrastructure. (2) Internet-type protocols that will allow for efficient operations across the deep-space distances, accounting for and accommodating the long round-trip-light-time. JPL is working with the CCSDS to convert these protocols to an international standard and will deploy such protocol, the CCSDS File Delivery Protocol (CFDP), on the Mars Reconnaissance Orbiter (MRO) and on the Deep Impact (01) missions. (3) Techniques to perform cross-navigation between spacecrafi that fly in a loose formation. Typical cases are cross-navigation between missions that approach Mars and missionsthat are at Mars, or the determination of a baseline for missions that fly in an earth-lead- lag configuration. (4) Techniques and devices that allow the precise metrology and controllability of tightformations for precision constellation missions. In this paper we discuss the four classes of constellatiodformation support with emphasis of DSMS current status (technology and implementation) and plans in the first three areas.

space operations↗

SpaceWire Plug and Play

The ability to rapidly deploy inexpensive satellites to meet tactical goals has become an important goal for military space systems. In fact, Operationally Responsive Space (ORS) has been in the spotlight at the highest levels. The Office of the Secretary of Defense (OSD) has identified that the critical next step is developing the bus standards and modular interfaces. Historically, satellite components have been constructed based on bus standards and standardized interfaces. However, this has not been done to a degree, which would allow the rapid deployment of a satellite. Advancements in plug-and-play (PnP) technologies for terrestrial applications can serve as a baseline model for a PnP approach for satellite applications. Since SpaceWire (SpW) has become a de facto standard for satellite high-speed (greater than 200Mbp) on-board communications, it has become important for SpW to adapt to this Plug and Play (PnP) environment. Because SpW is simply a bulk transport protocol and lacks built-in PnP features, several changes are required to facilitate PnP with SpW. The first is for Host(s) to figure out what the network looks like, i.e., how pieces of the network, routers and nodes, are connected together; network mapping, and to receive notice of changes to the network. The second is for the components connected to the network to be understood so that they can communicate. The first element, network topology mapping & change of status indication, is being defined (topic of this paper). The second element describing how components are to communicate has been defined by ARFL with the electronic data sheets known as XTEDS. The first element, network mapping, is recent activities performed by Air Force Research Lab (ARFL), Naval Research Lab (NRL), NASA and US industry (Honeywell, Clearwater, FL, and others). This work has resulted in the development of a protocol that will perform the lower level functions of network mapping and Change Of Status (COS) indication required by Plug 'n' Play over SpaceWire. This work will be presented to the SpaceWire working group for standardization under European Cooperation for Space Standardization (ECSS) and to obtain a permanent Protocol ID (see SpaceWire Protocol ID: What Does it Mean to You; IEEE Aerospace Conference 2006). The portion of the Plug 'n' Play protocol that will be described in this paper is how the Host(s) of a SpaceWire network map the network and detect additions and deletions of devices on a SpaceWire network.

Rakow, Glenn↗

An Organic Decontamination Method for Sampling Devices used in Life-detection Studies

Organic decontamination of sampling and storage devices are crucial steps for life-detection, habitability, and ecological investigations of extremophiles living in the most inhospitable niches of Earth, Mars and elsewhere. However, one of the main stumbling blocks for Mars-analogue life-detection studies in terrestrial remote field-sites is the capability to clean instruments and sampling devices to organic levels consistent with null values. Here we present a new seven-step, multi-reagent cleaning and decontamination protocol that was adapted and tested on a glacial ice-coring device and on a rover-guided scoop used for sediment sampling both deployed multiple times during two field seasons of the Arctic Mars Analog Svalbard Expedition AMASE). The effectiveness of the protocols for both devices was tested by (1)in situ metabolic measurements via APT, (2)in situ lipopolysacchride (LPS) quantifications via low-level endotoxin assays, and(3) laboratory-based molecular detection via gas chromatography-mass spectrometry. Our results show that the combination and step-wise application of disinfectants with oxidative and solvation properties for sterilization are effective at removing cellular remnants and other organic traces to levels necessary for molecular organic- and life-detection studies. The validation of this seven-step protocol - specifically for ice sampling - allows us to proceed with confidence in kmskia4 analogue investigations of icy environments. However, results from a rover scoop test showed that this protocol is also suitable for null-level decontamination of sample acquisition devices. Thus, this protocol may be applicable to a variety of sampling devices and analytical instrumentation used for future astrobiology missions to Enceladus, and Europa, as well as for sample-return missions.

Eigenbrode, Jennifer↗

Generic, Extensible, Configurable Push-Pull Framework for Large-Scale Science Missions

The push-pull framework was developed in hopes that an infrastructure would be created that could literally connect to any given remote site, and (given a set of restrictions) download files from that remote site based on those restrictions. The Cataloging and Archiving Service (CAS) has recently been re-architected and re-factored in its canonical services, including file management, workflow management, and resource management. Additionally, a generic CAS Crawling Framework was built based on motivation from Apache s open-source search engine project called Nutch. Nutch is an Apache effort to provide search engine services (akin to Google), including crawling, parsing, content analysis, and indexing. It has produced several stable software releases, and is currently used in production services at companies such as Yahoo, and at NASA's Planetary Data System. The CAS Crawling Framework supports many of the Nutch Crawler's generic services, including metadata extraction, crawling, and ingestion. However, one service that was not ported over from Nutch is a generic protocol layer service that allows the Nutch crawler to obtain content using protocol plug-ins that download content using implementations of remote protocols, such as HTTP, FTP, WinNT file system, HTTPS, etc. Such a generic protocol layer would greatly aid in the CAS Crawling Framework, as the layer would allow the framework to generically obtain content (i.e., data products) from remote sites using protocols such as FTP and others. Augmented with this capability, the Orbiting Carbon Observatory (OCO) and NPP (NPOESS Preparatory Project) Sounder PEATE (Product Evaluation and Analysis Tools Elements) would be provided with an infrastructure to support generic FTP-based pull access to remote data products, obviating the need for any specialized software outside of the context of their existing process control systems. This extensible configurable framework was created in Java, and allows the use of different underlying communication middleware (at present, both XMLRPC, and RMI). In addition, the framework is entirely suitable in a multi-mission environment and is supporting both NPP Sounder PEATE and the OCO Mission. Both systems involve tasks such as high-throughput job processing, terabyte-scale data management, and science computing facilities. NPP Sounder PEATE is already using the push-pull framework to accept hundreds of gigabytes of IASI (infrared atmospheric sounding interferometer) data, and is in preparation to accept CRIMS (Cross-track Infrared Microwave Sounding Suite) data. OCO will leverage the framework to download MODIS, CloudSat, and other ancillary data products for use in the high-performance Level 2 Science Algorithm. The National Cancer Institute is also evaluating the framework for use in sharing and disseminating cancer research data through its Early Detection Research Network (EDRN).

Foster, Brian M.↗

Asynchronous Message Service Reference Implementation

This software provides a library of middleware functions with a simple application programming interface, enabling implementation of distributed applications in conformance with the CCSDS AMS (Consultative Committee for Space Data Systems Asynchronous Message Service) specification. The AMS service, and its protocols, implement an architectural concept under which the modules of mission systems may be designed as if they were to operate in isolation, each one producing and consuming mission information without explicit awareness of which other modules are currently operating. Communication relationships among such modules are self-configuring; this tends to minimize complexity in the development and operations of modular data systems. A system built on this model is a society of generally autonomous, inter-operating modules that may fluctuate freely over time in response to changing mission objectives, modules functional upgrades, and recovery from individual module failure. The purpose of AMS, then, is to reduce mission cost and risk by providing standard, reusable infrastructure for the exchange of information among data system modules in a manner that is simple to use, highly automated, flexible, robust, scalable, and efficient. The implementation is designed to spawn multiple threads of AMS functionality under the control of an AMS application program. These threads enable all members of an AMS-based, distributed application to discover one another in real time, subscribe to messages on specific topics, and to publish messages on specific topics. The query/reply (client/server) communication model is also supported. Message exchange is optionally subject to encryption (to support confidentiality) and authorization. Fault tolerance measures in the discovery protocol minimize the likelihood of overall application failure due to any single operational error anywhere in the system. The multi-threaded design simplifies processing while enabling application nodes to operate at high speeds; linked lists protected by mutex semaphores and condition variables are used for efficient, inter-thread communication. Applications may use a variety of transport protocols underlying AMS itself, including TCP (Transmission Control Protocol), UDP (User Datagram Protocol), and message queues.

Burleigh, Scott C.↗

Space Flight Middleware: Remote AMS over DTN for Delay-Tolerant Messaging

This paper describes a technique for implementing scalable, reliable, multi-source multipoint data distribution in space flight communications -- Delay-Tolerant Reliable Multicast (DTRM) -- that is fully supported by the "Remote AMS" (RAMS) protocol of the Asynchronous Message Service (AMS) proposed for standardization within the Consultative Committee for Space Data Systems (CCSDS). The DTRM architecture enables applications to easily "publish" messages that will be reliably and efficiently delivered to an arbitrary number of "subscribing" applications residing anywhere in the space network, whether in the same subnet or in a subnet on a remote planet or vehicle separated by many light minutes of interplanetary space. The architecture comprises multiple levels of protocol, each included for a specific purpose and allocated specific responsibilities: "application AMS" traffic performs end-system data introduction and delivery subject to access control; underlying "remote AMS" directs this application traffic to populations of recipients at remote locations in a multicast distribution tree, enabling the architecture to scale up to large networks; further underlying Delay-Tolerant Networking (DTN) Bundle Protocol (BP) advances RAMS protocol data units through the distribution tree using delay-tolerant storeand- forward methods; and further underlying reliable "convergence-layer" protocols ensure successful data transfer over each segment of the end-to-end route. The result is scalable, reliable, delay-tolerant multi-source multicast that is largely self-configuring.

Disruption Tolerant Networking (DTN)↗

Field Geologic Observation and Sample Collection Strategies for Planetary Surface Exploration: Insights from the 2010 Desert RATS Geologist Crewmembers

Observation is the primary role of all field geologists, and geologic observations put into an evolving conceptual context will be the most important data stream that will be relayed to Earth during a planetary exploration mission. Sample collection is also an important planetary field activity, and its success is closely tied to the quality of contextual observations. To test protocols for doing effective planetary geologic field- work, the Desert RATS(Research and Technology Studies) project deployed two prototype rovers for two weeks of simulated exploratory traverses in the San Francisco volcanic field of northern Arizona. The authors of this paper represent the geologist crew members who participated in the 2010 field test.We document the procedures adopted for Desert RATS 2010 and report on our experiences regarding these protocols. Careful consideration must be made of various issues that impact the interplay between field geologic observations and sample collection, including time management; strategies relatedtoduplicationofsamplesandobservations;logisticalconstraintson the volume and mass of samples and the volume/transfer of data collected; and paradigms for evaluation of mission success. We find that the 2010 field protocols brought to light important aspects of each of these issues, and we recommend best practices and modifications to training and operational protocols to address them. Underlying our recommendations is the recognition that the capacity of the crew to flexibly execute their activities is paramount. Careful design of mission parameters, especially field geologic protocols, is critical for enabling the crews to successfully meet their science objectives.

Hurtado, Jose M., Jr.↗

Tools and Technologies Needed for Conducting Planetary Field Geology While On EVA: Insights from the 2010 Desert RATS Geologist Crewmembers

Observation is the primary role of all field geologists, and geologic observations put into an evolving conceptual context will be the most important data stream that will be relayed to Earth during a planetary exploration mission. Sample collection is also an important planetary field activity, and its success is closely tied to the quality of contextual observations. To test protocols for doing effective planetary geologic fieldwork, the Desert RATS (Research and Technology Studies) project deployed two prototype rovers for two weeks of simulated exploratory traverses in the San Francisco volcanic field of northern Arizona. The authors of this paper represent the geologist crewmembers who participated in the 2010 field test. We document the procedures adopted for Desert RATS 2010 and report on our experiences regarding these protocols. Careful consideration must be made of various issues that impact the interplay between field geologic observations and sample collection, including time management; strategies related to duplication of samples and observations; logistical constraints on the volume and mass of samples and the volume/transfer of data collected; and paradigms for evaluation of mission success. We find that the 2010 field protocols brought to light important aspects of each of these issues, and we recommend best practices and modifications to training and operational protocols to address them. Underlying our recommendations is the recognition that the capacity of the crew to "flexibly execute" their activities is paramount. Careful design of mission parameters, especially field geologic protocols, is critical for enabling the crews to successfully meet their science objectives.

Young, Kelsey↗

NASA'S Standard Measures During Bed Rest: Adaptations in the Cardiovascular System

Bed rest is a well-accepted analog of space flight that has been used extensively to investigate physiological adaptations in a larger number of subjects in a shorter amount of time than can be studied with space flight and without the confounding effects associated with normal mission operations. However, comparison across studies of different bed rest durations, between sexes, and between various countermeasure protocols have been hampered by dissimilarities in bed rest conditions, measurement protocols, and testing schedules. To address these concerns, NASA instituted standard bed rest conditions and standard measures for all physiological disciplines participating in studies conducted at the Flight Analogs Research Unit (FARU) at the University of Texas-Medical Branch. Investigators for individual studies employed their own targeted study protocols to address specific hypothesis-driven questions, but standard measures tests were conducted within these studies on a non-interference basis to maximize data availability while reducing the need to implement multiple bed rest studies to understand the effects of a specific countermeasure. When possible, bed rest standard measures protocols were similar to tests nominally used for medically-required measures or research protocols conducted before and after Space Shuttle and International Space Station missions. Specifically, bed rest standard measures for the cardiovascular system implemented before, during, and after bed rest at the FARU included plasma volume (carbon monoxide rebreathing), cardiac mass and function (2D, 3D and Doppler echocardiography), and orthostatic tolerance testing (15- or 30-minutes of 80 degree head-up tilt). Results to-date indicate that when countermeasures are not employed, plasma volume decreases and the incidence of presyncope during head-up tilt is more frequent even after short-duration bed rest while reductions in cardiac function and mass are progressive as bed rest duration increases. Additionally, while plasma volume loss can be corrected and cardiac mass can be prevented with properly applied countermeasures, orthostatic tolerance is more difficult to protect when supine exercise is the only countermeasure. Similar results have been observed after space flight. Plasma volume, cardiac chamber volume, and orthostatic tolerance recover relatively quickly with resumption of ambulation and normal activity levels after bed rest but restoration of cardiac mass is prolonged.

Lee, Stuart M. C.↗

A Multi-Center Space Data System Prototype Based on CCSDS Standards

Deep space missions beyond earth orbit will require new methods of data communications in order to compensate for increasing Radio Frequency (RF) propagation delay. The Consultative Committee for Space Data Systems (CCSDS) standard protocols Spacecraft Monitor & Control (SM&C), Asynchronous Message Service (AMS), and Delay/Disruption Tolerant Networking (DTN) provide such a method. However, the maturity level of this protocol stack is insufficient for mission inclusion at this time. This Space Data System prototype is intended to provide experience which will raise the Technical Readiness Level (TRL) of this protocol set. In order to reduce costs, future missions can take advantage of these standard protocols, which will result in increased interoperability between control centers. This prototype demonstrates these capabilities by implementing a realistic space data system in which telemetry is published to control center applications at the Jet Propulsion Lab (JPL), the Marshall Space Flight Center (MSFC), and the Johnson Space Center (JSC). Reverse publishing paths for commanding from each control center are also implemented. The target vehicle consists of realistic flight computer hardware running Core Flight Software (CFS) in the integrated Power, Avionics, and Power (iPAS) Pathfinder Lab at JSC. This prototype demonstrates a potential upgrade path for future Deep Space Network (DSN) modification, in which the automatic error recovery and communication gap compensation capabilities of DTN would be exploited. In addition, SM&C provides architectural flexibility by allowing new service providers and consumers to be added efficiently anywhere in the network using the common interface provided by SM&C's Message Abstraction Layer (MAL). In FY 2015, this space data system was enhanced by adding telerobotic operations capability provided by the Robot API Delegate (RAPID) family of protocols developed at NASA. RAPID is one of several candidates for consideration and inclusion in a new international standard being developed by the CCSDS Telerobotic Operations Working Group. Software gateways for the purpose of interfacing RAPID messages with the existing SM&C based infrastructure were developed. Telerobotic monitor, control, and bridge applications were written in the RAPID framework, which were then tailored to the NAO telerobotic test article hardware, a product of Aldebaran Robotics.

Rich, Thomas M.↗

Overview of the Exploration Exercise Device Validation Study Plans

The NASA has determined that a multi-functional exercise device will be developed for use as an exercise device during exploration missions. The device will allow for full body resistance and metabolic exercise necessary to minimize physiological losses during space flight and to maintain fitness necessary to perform critical mission tasks. Prior to implementation as an exercise device on an Exploration vehicle, there will be verification and validation testing completed to determine device efficacy at providing the necessary training stimuli to achieve desired goals. Because the exploration device will be new device that has yet be specified, specific Verification and Validation (V&V) protocols have yet to be developed. Upon delivery of an exploration exercise device training unit, stakeholders throughout NASA will develop V&V plans that include ground-based testing and testing on the International Space Station (ISS). Stakeholders will develop test protocols that include success criterion for the device. Ground tests will occur at NASA Johnson Space Station prior to flight testing. The intents of the ground tests are to allow crew, spaceflight medicine, science, engineering, Astronaut Strength, Conditioning, and Reconditioning staff, and others to gain experience in the best utilization of the device. The goal is to obtain an evidence base for recommending use of the device on the ISS. The developed protocol will be created to achieve multiple objectives, including determining if the device provides an adequate training stimulus for 5th - 95th percentile males and females, allows for exercise modalities that protect functional capability, and is robust and can withstand extensive human use. Although protocols are yet to be determined, current expectations include use of the device by test subjects and current crew in order to obtain quantitative and qualitative feedback. Information obtained during the ground tests may be used to influence device modifications during design iterations. Assuming successful ground tests, the device will be installed on the ISS for testing during space flight. Spaceflight testing is envisioned to include an activation and checkout (ACO) phase and a V&V phase. During the ACO phase, 1-2 crewmembers will exercise with the device to ensure proper function. ACO is expected to last multiple months because of the many modes and methods of exercise that need to be assessed. However, the goal is to complete the ACO as quickly as possible. Once successful ACO occurs, the crew will be free to use the device for normal exercise pending concurrence from stakeholders. V&V tests on the ISS will ideally consist of crew using the device for all of their exercise for an entire mission. Exercise prescriptions will be supplied that replicate expected prescriptions during exploration missions. Crew that are not enrolled in the V&V studies would be also free to use the device as their schedule permits. As experience is gained by users, exercise protocols could change. The intent of all V&V testing is to ensure that all have thorough understanding of experience at optimizing device capability

DeWitt, J. K.↗

X-HAB 2020: AR Field Treks Summary and Conclusions

As part of the FY20 X-Hab Challenge, BLiSS sought to create an Augmented Reality (AR) toolkit to help with analog field trek operations under the supervision of the Solar System Exploration Research Virtual Institute (SSERVI). These treks are operational and technical demonstrations at space-like destinations on Earth to test current extra-vehicular activity (EVA) techniques. While BLiSS as an organization has experience studying operational tasks such as this, it has never developed AR software at this scale. For that reason, another team at the University was brought on to work in parallel. The Collaborative Lab for Advancing Work in Space (CLAWS) is a veteran group of the NASA Spacesuit User Interface Technologies for Students (SUITS) challenge in which Hololens displays for astronauts are created within a year. The operational and technological pairing was ideally suited for tackling this problem. The team divided its responsibilities so that BLiSS would handle the research required to shape the project. As this deliverable had an end user, it was decided that interviewing these field geologists and operations specialists would provide the best insight. These interviews paired with literature review would reveal niche applications for AR that remained within feasible bounds. These science-driven EVAs in unknown terrain require more flexible tools than the current generation of EVA assistants. Rather than focus on sequential instructions, there instead needs to be a broad toolkit that's only called upon in specific instances. This AR Toolkit for Lunar Astronauts and Scientists (ATLAS) became the development goal of the project: create a non-intrusive assembly of tools that could be accessed in AR on the field. The current ATLAS design makes use of a geospatially and temporally annotated eld note system called GeoNotes. This allows for data to be collected and coordinated in a way that's synchronized across time, space, and different users. A Mission Control Center (MCC) and Mobile Support Equipment (MSE) were all needed to transport the AR headset into the field with the user. A network infrastructure was designed and set up within the University to enable this functionality. The software is based on a Protocol-Module structure that allows for modular development of each capability. A Protocol Manager coordinates different protocols that make use of modules. Each module tackles a different individual task while the protocol puts each one to use. The protocol manager coordinates when these are called to be used. This software is hosted on a head-mounted display (HMD) with the MCC acting as support from afar. While the software would be unit-tested at each level and each hardware component verified, a final demonstration would serve to prove the system's capabilities: an analog field trek. The team would prepare to support a user in a remote location from the MCC back at the University. A local area near campus would be tested before going out to do sample field geology further away. This unfortunately became impossible with the arrival of COVID-19. Access to all of the facilities to complete the project as planned were shut down. Our team was scattered across the globe and forced to complete the rest virtually. Adjustments were made to produce a small virtual concept in Adobe XD in the meantime. Even digital surveys were created based on the NASA task-load index (TLX) originally intended for testing actual users. The goal shifted towards completing software and getting feedback on the user interfaces (UI) and user experiences (UX). This team has reformed in response to COVID and its focus has shifted to what can be done remotely. There is still an intention to finish the original deliverable described in this report. The work has been expanded beyond the original X-Hab challenge and has instead become its own research e ort to be continued afterwards. This report collects the processes and knowledge gained from a year of studying and working at this problem with two teams. It should preserve it for the time until the world returns to normal and work can resume. CLAWS will be taking over full responsibility from that point forward, eventually surpassing the original needs of the project. While this document captures the work done towards an eventual end, the CLAWS team has written their own proposal alongside it. It outlines a new future for ATLAS beyond X-Hab, BLiSS, and hopefully beyond COVID-19. This project began as a vague goal hoping to place a new technology into the unique setting of exploration science. The project has since comfortably taken root and will hopefully bloom over the next year.

Alex Sena↗

BPv6 and BPv7 Coexistence in Delay Tolerant Networking (DTN)

As DTN has progressed since its inception in 2002, the community stabilized around Bundle Protocol version 6 (BPv6). This protocol was standardized by the RFC 5050’s definition of BPv6 and was later standardized and refined for space operations by the CCSDS Bundle Protocol Specification. After the release of RFC 5050, a variety of implementations and missions used BPv6 and noted several improvements that could be made to the protocol. These improvements culminated in a push to release a new protocol version, BPv7. Unfortunately, the vast improvements and difference in encoding that separates BPv7 from BPv6 also makes the two versions inherently incompatible. Consequently, there is an issue implementing BPv7 in existing systems while continuing support for BPv6 implementations. In response to this issue, two solutions emerge: (1) Bundle-in-Bundle Encapsulation (BIBE), a capability that wraps a bundle in another bundle for shipping between intermediary nodes, and (2) version agnostic DTN implementations. These concepts have been proven out in the MSFC DTN implementation known as DTNME.

Joshua Deaton↗