Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “program verification”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Development and Implementation of Dynamic Scripts to Support Local Model Verification at National Weather Service Weather Forecast Offices

Local modeling with a customized configuration is conducted at National Weather Service (NWS) Weather Forecast Offices (WFOs) to produce high-resolution numerical forecasts that can better simulate local weather phenomena and complement larger scale global and regional models. The advent of the Environmental Modeling System (EMS), which provides a pre-compiled version of the Weather Research and Forecasting (WRF) model and wrapper Perl scripts, has enabled forecasters to easily configure and execute the WRF model on local workstations. NWS WFOs often use EMS output to help in forecasting highly localized, mesoscale features such as convective initiation, the timing and inland extent of lake effect snow bands, lake and sea breezes, and topographically-modified winds. However, quantitatively evaluating model performance to determine errors and biases still proves to be one of the challenges in running a local model. Developed at the National Center for Atmospheric Research (NCAR), the Model Evaluation Tools (MET) verification software makes performing these types of quantitative analyses easier, but operational forecasters do not generally have time to familiarize themselves with navigating the sometimes complex configurations associated with the MET tools. To assist forecasters in running a subset of MET programs and capabilities, the Short-term Prediction Research and Transition (SPoRT) Center has developed and transitioned a set of dynamic, easily configurable Perl scripts to collaborating NWS WFOs. The objective of these scripts is to provide SPoRT collaborating partners in the NWS with the ability to evaluate the skill of their local EMS model runs in near real time with little prior knowledge of the MET package. The ultimate goal is to make these verification scripts available to the broader NWS community in a future version of the EMS software. This paper provides an overview of the SPoRT MET scripts, instructions for how the scripts are run, and example use cases.

Zavodsky, Bradley↗

System Testing of Ground Cooling System Components

This internship focused primarily upon software unit testing of Ground Cooling System (GCS) components, one of the three types of tests (unit, integrated, and COTS/regression) utilized in software verification. Unit tests are used to test the software of necessary components before it is implemented into the hardware. A unit test determines that the control data, usage procedures, and operating procedures of a particular component are tested to determine if the program is fit for use. Three different files are used to make and complete an efficient unit test. These files include the following: Model Test file (.mdl), Simulink SystemTest (.test), and autotest (.m). The Model Test file includes the component that is being tested with the appropriate Discrete Physical Interface (DPI) for testing. The Simulink SystemTest is a program used to test all of the requirements of the component. The autotest tests that the component passes Model Advisor and System Testing, and puts the results into proper files. Once unit testing is completed on the GCS components they can then be implemented into the GCS Schematic and the software of the GCS model as a whole can be tested using integrated testing. Unit testing is a critical part of software verification; it allows for the testing of more basic components before a model of higher fidelity is tested, making the process of testing flow in an orderly manner.

Unit Test↗

Verification studies of Seasat-A satellite scatterometer /SASS/ measurements

Two comparisons between Seasat-A satellite scatterometer (SASS) data and surface truth, obtained from the Gulf of Alaska Seasat Experiment and the Joint Air-Sea Interaction program, have been made to determine the behavior of SASS and its algorithms. The performance of SASS was first evaluated irrespective of the algorithms employed to convert the SASS data to geophysical parameters, which was done by separating the backscatter measurements into small bins of incidence and azimuth angles and polarity and regression against wind speed measurements. The algorithms were then tested by comparing their predicted slopes and y intercepts with those derived from the regressions, and by comparing each SASS backscatter measurement with the backscatter derived from the algorithms, and the given wind velocity from the observations. It was shown that SASS was insensitive to winds at high incidence angles for horizontal polarizations. Fairly high correlations were found between backscatter and wind speeds. The algorithms functioned well at mid-ranges of incidence angle and backscattering coefficient.

Halberstam, I.↗

Independent Verification and Validation of Complex User Interfaces: A Human Factors Approach

The Usability Testing and Analysis Facility (UTAF) at the NASA Johnson Space Center has identified and evaluated a potential automated software interface inspection tool capable of assessing the degree to which space-related critical and high-risk software system user interfaces meet objective human factors standards across each NASA program and project. Testing consisted of two distinct phases. Phase 1 compared analysis times and similarity of results for the automated tool and for human-computer interface (HCI) experts. In Phase 2, HCI experts critiqued the prototype tool's user interface. Based on this evaluation, it appears that a more fully developed version of the tool will be a promising complement to a human factors-oriented independent verification and validation (IV&V) process.

Whitmore, Mihriban↗

Risk Reduction on X-33/RLV Engines

Risk management has received considerable attention in the X-33 and Reusable Launch Vehicle (RLV) program due to aggressive schedules, limited funding. and planned private investment to develop the commercial VentureStar vehicle. As an X-33 and RLV team member and main propulsion supplier, Boeing Rocketdyn Propulsion and Power has addressed risk through a methodical application of systems engineering in identifying, assessing, and mitigating risks. The methods employed involve rigorous risk mitigation planning early in development, continuous risk monitoring and assessment during the course of development, and the systematic verification of compliance with technical requirements prior to delivery. In addition, an engine system reliability analysis was conducted to reduce risk. In July 1996, NASA selected Lockheed Martin's "Skunk Works" (LMSW) as the lead contractor for the X-33 and RLV program. The X-33 vehicle is a half-scale pathfinder for the full-scale RLV. The LMSW RLV design is a lifting body shaped vehicle employing linear aerospike engine provided propulsion. The initial X-33 flight is planned for the summer of 2000, and the initial VentureStar flight is planned for between 2005 and 2007.

Crowley, Tim↗

Bringing Together Users and Developers of Forest Biomass Maps

Forests store carbon and thus represent important sinks for atmospheric carbon dioxide. Reducing uncertainty in current estimates of the amount of carbon in standing forests will improve precision of estimates of anthropogenic contributions to carbon dioxide in the atmosphere due to deforestation. Although satellite remote sensing has long been an important tool for mapping land cover, until recently aboveground forest biomass estimates have relied mostly on systematic ground sampling of forests. In alignment with fiscal year 2010 congressional direction, NASA has initiated work toward a carbon monitoring system (CMS) that includes both maps of forest biomass and total carbon flux estimates. A goal of the project is to ensure that the products are useful to a wide community of scientists, managers, and policy makers, as well as to carbon cycle scientists. Understanding the needs and requirements of these data users is helpful not just to the NASA CMS program but also to the entire community working on carbon-related activities. To that end, this meeting brought together a small group of natural resource managers and policy makers who use information on forests in their work with NASA scientists who are working to create aboveground forest biomass maps. These maps, derived from combining remote sensing and ground plots, aim to be more accurate than current inventory approaches when applied at local and regional scales. Meeting participants agreed that users of biomass information will look to the CMS effort not only to provide basic data for carbon or biomass measurements but also to provide data to help serve a broad range of goals, such as forest watershed management for water quality, habitat management for biodiversity and ecosystem services, and potential use for developing payments for ecosystem service projects. Participants also reminded the CMS group that potential users include not only public sector agencies and nongovernmental organizations but also the private sector because much forest acreage in the United States is privately held and needs data for forest management. Additional key outcomes identified by meeting participants include the following: (1) Priority should be given to building into the biomass product ease of use and low costs (including costs of hardware, software, and analysis requirements), (2) CMS products should also be relevant to other biomass measures for forest watershed management, habitat protection for biodiversity, and assessment of markets for ecosystem services, (3) CMS leadership should engage with the Subsidiary Body for Scientific and Technological Advice of the United Nations Framework Convention on Climate Change as they establish measuring, reporting, and verification standards, and (4) CMS leadership should continue to keep sister agencies and other organizations informed as CMS develops, particularly via the agencies active in the U.S. Global Change Research Program Carbon Cycle Interagency Working Group (U.S. Geological Survey, U.S. Department of Agriculture, and National Oceanic and Atmospheric Administration) and nongovernmental organizations.

Forest↗

Flight instrument and telemetry response and its inversion

Mathematical models of rate gyros, servo accelerometers, pressure transducers, and telemetry systems were derived and their parameters were obtained from laboratory tests. Analog computer simulations were used extensively for verification of the validity for fast and large input signals. An optimal inversion method was derived to reconstruct input signals from noisy output signals and a computer program was prepared.

Weinberger, M. R.↗

Expert systems and imaging - NASA's start-up work in intelligent image management

The problem of image management for NASA's Space Shuttle program and the future role of expert systems are considered. The difficulties involved in the storage and retrieval of the estimated 100,000 color photographs used for verification of essential installation, test, and repair procedures for Space Shuttle prelaunch are discussed. It is noted that the collection, classification, storage, and retrieval of high-quality pictoral images is possible through the use of pixels and an expert systems-assisted relational data base management system. The development of a query by pictorial example process is discussed. The NASA Intelligent Interactive Visual Data Base Management Systems project is detailed. It aims to conduct a systems analysis of a large-scale traditional image processing operation, collect data on critical human performance factors in the areas of image creation, processing, classification, storage, and retreival, and validate the attributes identified through the creation and testing of prototype models.

Ragusa, James M.↗

Space Station Freedom ground systems program - A survey

The key facilities identified to support Space Station Freedom Program (SSFP) integrated operations and their SSFP roles are described in detail. The ground infrastructure, which must be able to support both assembly and long-term operations, will consist of ground facilities, support systems, and the associated planning and management procedures. During 1992 the SSFP is conducting a major program review of the ground infrastructure including the definition of all facility and support system functional capabilities, interfaces, and data-flow requirements. Operations functionality and interface verification tests are being identified, and operations readiness dates are being set.

Accola, A.↗

Implementation of an Adaptive Controller System from Concept to Flight Test

The National Aeronautics and Space Administration Dryden Flight Research Center (Edwards, California) is conducting ongoing flight research using adaptive controller algorithms. A highly modified McDonnell-Douglas NF-15B airplane called the F-15 Intelligent Flight Control System (IFCS) is used to test and develop these algorithms. Modifications to this airplane include adding canards and changing the flight control systems to interface a single-string research controller processor for neural network algorithms. Research goals include demonstration of revolutionary control approaches that can efficiently optimize aircraft performance in both normal and failure conditions and advancement of neural-network-based flight control technology for new aerospace system designs. This report presents an overview of the processes utilized to develop adaptive controller algorithms during a flight-test program, including a description of initial adaptive controller concepts and a discussion of modeling formulation and performance testing. Design finalization led to integration with the system interfaces, verification of the software, validation of the hardware to the requirements, design of failure detection, development of safety limiters to minimize the effect of erroneous neural network commands, and creation of flight test control room displays to maximize human situational awareness; these are also discussed.

Larson, Richard R.↗

James Webb Space Telescope (JWST) Integrated Science Instruments Module (ISIM) Cryo-Vacuum (CV) Test Campaign Summary

JWST Integrated Science Instruments Module (ISIM) has completed its system-level testing program at the NASA Goddard Space Flight Center (GSFC). In March 2016, ISIM was successfully delivered for integration with the Optical Telescope Element (OTE) after the successful verification of the system through a series of three cryo-vacuum (CV) tests. The first test served as a risk reduction test; the second test provided the initial verification of the fully-integrated flight instruments; and the third test verified the system in its final flight configuration. The complexity of the mission has generated challenging requirements that demand highly reliable system performance and capabilities from the Space Environment Simulator (SES) vacuum chamber. As JWST progressed through its CV testing campaign, deficiencies in the test configuration and support equipment were uncovered from one test to the next. Subsequent upgrades and modifications were implemented to improve the facility support capabilities required to achieve test requirements. This paper: (1) provides an overview of the integrated mechanical and thermal facility systems required to achieve the objectives of JWST ISIM testing, (2) compares the overall facility performance and instrumentation results from the three ISIM CV tests, and (3) summarizes lessons learned from the ISIM testing campaign.

Yew, Calinda↗

ARRISTOTLE Simulation Demo

NASA’s Katherine Johnson Independent Verification and Validation (NASA IV&V) Jon McBride Software Testing and Research (JSTAR) laboratory has developed the Advanced Risk Reduction Integrated Software Test and Operations Tri-program Lightweight Environment (ARRISTOTLE). ARRISTOTLE is a digital twin of NASA’s Artemis mission. ARRISTOLE executes the true SLS and Orion flight binaries integrated on a single laptop computer. This demo will showcase the execution of the full Artemis liftoff. Once airborne, an inflight anomaly will be injected, resulting in Orion detaching from the booster. The Launch Abort System (LAS) will safely bring Orion back to earth. The Unity game engine is used to visualize the flyout as flight software executes.

emulation↗

Structural technology challenges for evolutionary growth of Space Station Freedom

A proposed evolutionary growth scenario for Space Station Freedom was defined recently by a NASA task force created to study requirements for a Human Exploration Initiative. The study was an initial response to President Bush's July 20, 1989 proposal to begin a long range program of human exploration of space including a permanently manned lunar base and a manned mission to Mars. This growth scenario evolves Freedom into a critical transportation node to support lunar and Mars missions. The growth scenario begins with the Assembly Complete configuration and adds structure, power, and facilities to support a Lunar Transfer Vehicle (LTV) verification flight. Evolutionary growth continues to support expendable, then reusable LTV operations, and finally, LTV and Mars Transfer Vehicle (MTV) operations. The significant structural growth and additional operations creating new loading conditions will present new technological and structural design challenges in addition to the considerable technology requirements of the baseline Space Station Freedom program. Several structural design and technology issues of the baseline program are reviewed and related technology development required by the growth scenario is identified.

Doiron, Harold H.↗

Experimental verification of dynamic simulation

The dynamics model here is a backhoe, which is a four degree of freedom manipulator from the dynamics standpoint. Two types of experiment are chosen that can also be simulated by a multibody dynamics simulation program. In the experiment, recorded were the configuration and force histories; that is, velocity and position, and force output and differential pressure change from the hydraulic cylinder, in the time domain. When the experimental force history is used as driving force in the simulation model, the forward dynamics simulation produces a corresponding configuration history. Then, the experimental configuration history is used in the inverse dynamics analysis to generate a corresponding force history. Therefore, two sets of configuration and force histories--one set from experiment, and the other from the simulation that is driven forward and backward with the experimental data--are compared in the time domain. More comparisons are made in regard to the effects of initial conditions, friction, and viscous damping.

Yae, K. Harold↗

Development and Testing of a High Stability Engine Control (HISTEC) System

Flight tests were recently completed to demonstrate an inlet-distortion-tolerant engine control system. These flight tests were part of NASA's High Stability Engine Control (HISTEC) program. The objective of the HISTEC program was to design, develop, and flight demonstrate an advanced integrated engine control system that uses measurement-based, real-time estimates of inlet airflow distortion to enhance engine stability. With improved stability and tolerance of inlet airflow distortion, future engine designs may benefit from a reduction in design stall-margin requirements and enhanced reliability, with a corresponding increase in performance and decrease in fuel consumption. This paper describes the HISTEC methodology, presents an aircraft test bed description (including HISTEC-specific modifications) and verification and validation ground tests. Additionally, flight test safety considerations, test plan and technique design and approach, and flight operations are addressed. Some illustrative results are presented to demonstrate the type of analysis and results produced from the flight test program.

Orme, John S.↗

Chapter 9 - Pre-Flight Tests

Pre-flight testing is critical to the success of any flight test program. Pre-flight tests are performed to measure and evaluate the characteristics of an aircraft in a non-flying environment and to verify that these characteristics are as desired. Since aircraft systems are becoming more and more complex, conducting proper pre-flight testing to help identify system characteristics and deficiencies prior to flight is more important now than ever before. Much flight test time has been lost fixing problems that should have been found and corrected prior to flight. Accidents have occurred because pre-flight tests and verification procedures were not conducted thoroughly enough to identify the aircraft's characteristics properly or to find system discrepancies. Proper pre-flight testing helps ensure that the aircraft is ready to fly and contributes toward an efficient, productive, and safe flight test program. The reader should be aware that this Section is dedicated to the testing that should take place prior to the first flight. There are other "pre-flight" tests that take place prior to each individual flight. These latter tests are not discussed in this Section. The following paragraphs of this Section describe significant tests that are usually accomplished prior to flying a new or highly modified aircraft. Test objectives, descriptions, products, and requirements are provided in the following subsections: 9.1 Wind tunnel tests 9.2 Simulation tests 9.3 Propulsion tests 9.4 Weight and balance tests 9.5 Ground vibration tests 9.6 Structural loads tests 9.7 Gain margin tests 9.8 Verification and calibration tests 9.9 Taxi tests The specific examples given and the test facilities mentioned in this Section will illustrate the approach taken and the techniques used by the US Air Force; however, they are typical of those used by other test organizations.

Paul W Kirsten↗

Human Factors in the Design of the Crew Exploration Vehicle (CEV)

NASA s Space Exploration vision for humans to venture to the moon and beyond provides interesting human factors opportunities and challenges. The Human Engineering group at NASA has been involved in the initial phases of development of the Crew Exploration Vehicle (CEV), Orion. Getting involved at the ground level, Human Factors engineers are beginning to influence design; this involvement is expected to continue throughout the development lifecycle. The information presented here describes what has been done to date, what is currently going on, and what is expected in the future. During Phase 1, prior to the contract award to Lockheed Martin, the Human Engineering group was involved in generating requirements, conducting preliminary task analyses based on interviews with subject matter experts in all vehicle systems areas, and developing preliminary concepts of operations based on the task analysis results. In addition, some early evaluations to look at CEV net habitable volume were also conducted. The program is currently in Phase 2, which is broken down into design cycles, including System Readiness Review, Preliminary Design Review, and Critical Design Review. Currently, there are ongoing Human Engineering Technical Interchange Meetings being held with both NASA and Lockheed Martin in order to establish processes, desired products, and schedules. Multiple design trades and quick-look evaluations (e.g. display device layout and external window size) are also in progress. Future Human Engineering activities include requirement verification assessments and crew/stakeholder evaluations of increasing fidelity. During actual flights of the CEV, the Human Engineering group is expected to be involved in in-situ testing and lessons learned reporting, in order to benefit human space flight beyond the initial CEV program.

Whitmore, Mihriban↗