Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “pilots”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use

A multiyear pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and 1940 homes in Greenbelt, Maryland. The three predominant construction methods of the townhomes in the community are materials common to the area and climate zone including 8 in. concrete masonry unit (CMU) block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the rollout of a decade-long community upgrade program that will incorporate energy efficiency upgrades to the building envelope from the exterior and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Extended Operations of the Pratt & Whitney Rocketdyne Pilot-Scale Compact Reformer: Year 6 - Activity 3.2 - Development of a National Center for Hydrogen Technology

U.S. and global demand for hydrogen is large and growing for use in the production of chemicals, materials, foods, pharmaceuticals, and fuels (including some low-carbon biofuels). Conventional hydrogen production technologies are expensive, have sizeable space requirements, and are large carbon dioxide emitters. A novel sorbent-based hydrogen production technology is being developed and advanced toward field demonstration that promises smaller size, greater efficiency, lower costs, and reduced to no net carbon dioxide emissions compared to conventional hydrogen production technology. Development efforts at the pilot scale have addressed materials compatibility, hot-gas filtration, and high-temperature solids transport and metering, among other issues, and have provided the basis for a preliminary process design with associated economics. The process was able to achieve a 93% hydrogen purity on a purge gasfree basis directly out of the pilot unit prior to downstream purification.

08 HYDROGEN↗

Light Water Reactor Sustainability Constellation Pilot Project FY13 Summary Report

Summary report for Light Water Reactor Sustainability (LWRS) activities related to the R. E. Ginna and Nine Mile Point Unit 1 for FY13. This report summarizes the activities in focus areas performed from October 1, 2012 through September 30, 2013. (FY13). Refer to INL/EXT-11-23461, Light Water Reactor Sustainability Constellation Pilot Project FY11 Summary Report for the period from October 1, 2010 through September 30, 2011. (FY11) and INL/EXT-12-27304, Light Water Reactor Sustainability Constellation Pilot Project FY12 Summary Report, for the period from October 1, 2011 through September 30, 2012 (FY12).

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

PILOT TESTING: PRETREATMENT OPTIONS TO ALLOW RE-USE OF FRAC FLOWBACK AND PRODUCED BRINE FOR GAS SHALE RESOURCE DEVELOPMENT

The goal of the A&M DOE NETL Project No. DE-FE0000847 was to develop a mobile, multifunctional water treatment capability designed specifically for “pre-treatment” of field waste brine. The project consisted of constructing s mobile “field laboratory” incorporating new technology for treating high salinity produced water and using the lab to conduct a side-by-side comparison between this new technology and that already existing in field operations. A series of four field trials were performed utilizing the mobile unit to demonstrate the effectiveness of different technology suitable for use with high salinity flow back brines and produced water. The design of the mobile unit was based on previous and current work at the Texas A&M Separation Sciences Pilot Plant. The several treatment techniques which have been found to be successful in both pilot plant and field tests had been tested to incorporate into a single multifunctional process train. Eight different components were evaluated during the trials, two types of oil and grease removal, one BTEX removal step, three micro-filters, and two different nanofilters. The performance of each technique was measured by its separation efficiency, power consumption, and ability to withstand fouling. The field trials were a success. Four different field brines were evaluated in the first trial in New York. Over 16,000 gallons of brine were processed. Using a power cost of $.10 per kWh, media pretreatment power use averaged $0.004 per barrel, solids removal $.04 per barrel and brine “softening” $.84 per barrel. Total power cost was approximately $1.00 per barrel of fluid treated. In Pennsylvania, brines collected from frac ponds were tested in two additional trials. Each of the brines was converted to an oil-free, solids-free brine with no biological activity. Brines were stable over time and would be good candidates for use as a make-up fluid in a subsequent fracturing fluid design. Reports on all of the field trials and subcontractor research have been summarized in this Final Report. Individual field trial reports and research reports are contained in the companion volume titled “Appendices”

Burnett, David↗

Conceptual Design for the Pilot-Scale Plutonium Oxide Processing Unit in the Radiochemical Processing Laboratory

This report describes a conceptual design for a pilot-scale capability to produce plutonium oxide for use as exercise and reference materials, and for use in identifying and validating nuclear forensics signatures associated with plutonium production. This capability is referred to as the Pilot-scale Plutonium oxide Processing Unit (P3U), and it will be located in the Radiochemical Processing Laboratory at the Pacific Northwest National Laboratory. The key unit operations are described, including plutonium dioxide (PuO2) dissolution, purification of the Pu by ion exchange, precipitation, and conversion to oxide by calcination.

plutonium oxide↗

100-OL-1 Operable Unit Field Portable X-Ray Fluorescence (XRF) Analyzer Pilot Study Plans

A pilot study is being conducted to support the approval of the Remedial Investigation/Feasibility Study (RI/FS) Work Plan to evaluate the 100-OL-1 Operable Unit (OU) pre-Hanford orchard lands. Based on comments received by the U.S. Environmental Protection Agency (EPA) and Washington State Department of Ecology, the pilot study will evaluate the use of field portable X-ray fluorescence (XRF) spectrometry measurements for evaluating lead and arsenic concentrations on the soil surface as an indicator of past use of lead arsenate pesticide residue in the OU. The work will be performed in the field during the summer of 2014, and assist in the planning for the characterization activities in the RI/FS.

46 INSTRUMENTATION RELATED TO NUCLEAR SCIENCE AND ↗

Field-Metered Data from Portable Unit Dehumidifiers in the U.S. Residential Sector: Initial Results of a Pilot Study

The work described herein is intended to enrich the body of literature regarding dehumidifiers in residential settings—in particular the hours of use and energy consumption of various types of dehumidifiers. In the United States, portable unit dehumidifiers most commonly are used in basements during humid summer days in northern climates. Dehumidifier energy consumption differs among households depending on settings selected by the user, frequency of use, and conditions of operation. Although some estimates of dehumidifier use have been developed, and a few metering studies performed, there remains a paucity of metered data collected from individual households that use dehumidifiers. For this study we obtained field data on the energy consumption of dehumidifiers to supplement currently available analyses. Our goal was to obtain data from a pilot study that we could use to develop initial distributions describing the capacities and applications of dehumidifiers used in individual homes. More precisely characterizing the use of dehumidifiers in real-world applications will enable a more accurate estimate of the range of energy use in various operational modes. Our pilot field-metering exercise was aimed at compiling real-time data on the energy consumption of portable dehumidifiers in residential households in the New England and Mid-Atlantic areas. Our analysis furthers the process of developing a more precise estimate of dehumidifier energy use, which will support the evaluation of the potential energy savings and attendant costs associated with more energy efficient dehumidifiers.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Pilot Scale Advanced Fogging Demonstration

Radiological contamination control is crucial during decommissioning and demolition (D&D) activities, as well as during modifications to existing radiological systems. It is well known that contamination, in some cases substantial contamination, is present throughout the exhaust ductwork in several older processing facilities within the Department of Energy (DOE) complex, due to years of processing radioactive materials in areas served by closed ventilation systems. Accumulations of radioactive dust and lint – commonly found in laundry facilities, exhaust ventilation ducting, and exhaust stacks – present a specific contamination control issue. Particle suspension is more likely to occur during cleaning, modification, or demolition of these systems and during disposal site exhumation. In a recent demolition of large ventilation ducting (~10’ × 10’ cross section, ~100’ long) at Brookhaven National Laboratory, a spray coating was manually applied to the inside of the duct – requiring painters, dressed in anti-contamination clothing and an airline respirator system, to enter the duct.1 The advanced fogging technique offers an alternative method to mitigate these airborne contamination hazards with minimal personnel entry. Experiments in 2006 developed a useful fog solution using three different chemical constituents. Optimization of the fog recipe and use of commercially available equipment were identified as needs that had not been addressed. During 2012 development work it was noted that low concentrations of the components hampered coverage and drying in the United Kingdom’s National Nuclear Laboratory’s testing much more so than was evident in the 2006 tests. In fiscal year 2014 the Idaho National Laboratory undertook a systematic optimization of the fogging formulation and conducted a non-radioactive, pilot scale demonstration using commercially available fogging equipment. While not as sophisticated as the equipment used in earlier testing, the new approach is much less expensive and readily available for smaller scale operations. Pilot scale testing was important to validate new equipment of an appropriate scale, optimize the chemistry of the fogging solution, and to realize the conceptual approach.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Greenbelt Homes Pilot Energy Efficiency Program Phase 1 Summary: Existing Conditions and Baseline Energy Use

A multi-year pilot energy efficiency retrofit project has been undertaken by Greenbelt Homes, Inc, (GHI) a 1,566 co-operative of circa 1930 and '40 homes. The three predominate construction methods of the townhomes in the community are materials common to the area and climate zone including 8” CMU block, wood frame with brick veneer and wood frame with vinyl siding. GHI has established a pilot project that will serve as a basis for decision making for the roll out of a decade-long community upgrade program that will incorporate energy efficiency to the building envelope and equipment with the modernization of other systems like plumbing, mechanical equipment, and cladding.

32 ENERGY CONSERVATION, CONSUMPTION, AND UTILIZATI↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at theWaste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Radiological Operations Support Specialist (ROSS) Pilot Course Summary and Recommendations

In support of the Department of Homeland Security / Science and Technology Directorate’s (DHS/S&T) creation of a new position called the Radiological Operations Support Specialist (ROSS), Lawrence Livermore National Laboratory (LLNL) in Sub-task 1.1 and 1.2 has assisted in the development of the ROSS skills, knowledge, and abilities (SKAs); identified potentially relevant training; cross-mapped the training to the SKAs; and identified gaps in the training related to the SKAs, as well as their respective level of training knowledge - current versus desired. In the follow on task, Sub-task 1.3, a 5 day ROSS Pilot Training course was developed to fill the priority gaps identified in Sub-Task 1.2. Additionally, in Sub-Task 1.5, LLNL has performed a gap analysis of electronic tools, handbooks, and job-aides currently available to the ROSS and developed recommendations for additional and next generation tools to ensure the operational effectiveness of the ROSS position. This document summarizes the feedback received from the instructors and pilot course observers on what worked in the course and what could be improved as well as an assessment of the Pre- and Post-Test administered to the students.

61 RADIATION PROTECTION AND DOSIMETRY↗

FY2017 Pilot Project Plan for the Nuclear Energy Knowledge and Validation Center Initiative

To prepare for technical development of computational code validation under the Nuclear Energy Knowledge and Validation Center (NEKVAC) initiative, several meetings were held by a group of experts of the Idaho National Laboratory (INL) and the Oak Ridge National Laboratory (ORNL) to develop requirements of, and formulate a structure for, a transient fuel database through leveraging existing resources. It was concluded in discussions of these meetings that a pilot project is needed to address the most fundamental issues that can generate immediate stimulus to near-future validation developments as well as long-lasting benefits to NEKVAC operation. The present project is proposed based on the consensus of these discussions. Analysis of common scenarios in code validation indicates that the incapability of acquiring satisfactory validation data is often a showstopper that must first be tackled before any confident validation developments can be carried out. Validation data are usually found scattered in different places most likely with interrelationships among the data not well documented, incomplete with information for some parameters missing, nonexistent, or unrealistic to experimentally generate. Furthermore, with very different technical backgrounds, the modeler, the experimentalist, and the knowledgebase developer that must be involved in validation data development often cannot communicate effectively without a data package template that is representative of the data structure for the information domain of interest to the desired code validation. This pilot project is proposed to use the legendary TREAT Experiments Database to provide core elements for creating an ideal validation data package. Data gaps and missing data interrelationships will be identified from these core elements. All the identified missing elements will then be filled in with experimental data if available from other existing sources or with dummy data if nonexistent. The resulting hybrid validation data package (composed of experimental and dummy data) will provide a clear and complete instance delineating the structure of the desired validation data and enabling effective communication among the modeler, the experimentalist, and the knowledgebase developer. With a good common understanding of the desired data structure by the three parties of subject matter experts, further existing data hunting will be effectively conducted, new experimental data generation will be realistically pursued, knowledgebase schema will be practically designed; and code validation will be confidently planned.

22 GENERAL STUDIES OF NUCLEAR REACTORS↗

Reinvestigation into Closure Predictions of Room D at the Waste Isolation Pilot Plant

Room D was an in-situ, isothermal, underground experiment conducted at the Waste Isolation Pilot Plant between 1984 and 1991. The room was carefully instrumented to measure the horizontal and vertical closure immediately upon excavation and for several years thereafter. Early finite element simulations of salt creep around Room D under-predicted the vertical closure by 4.5×, causing investigators to explore a series of changes to the way Room D was modeled. Discrepancies between simulations and measurements were resolved through a series of adjustments to model parameters, which were openly acknowledged in published reports. Interest in Room D has been rekindled recently by the U.S./German Joint Project III and Project WEIMOS, which seek to improve the predictions of rock salt constitutive models. Joint Project participants calibrate their models solely against laboratory tests, and benchmark the models against underground experiments, such as room D. This report describes updating legacy Room D simulations to today’s computational standards by rectifying several numerical issues. Subsequently, the constitutive model used in previous modeling is recalibrated two different ways against a suite of new laboratory creep experiments on salt extracted from the repository horizon of the Waste Isolation Pilot Plant. Simulations with the new, laboratory-based, calibrations under-predict Room D vertical closure by 3.1×. A list of potential improvements is discussed.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Los Alamos National Security, LLC Request for Interest (RFI) for Investment Mentors to participate in the Laboratory’s Entrepreneurial Postdoctoral Pilot.

Los Alamos National Laboratory (LANL) is committed to understanding how the role of venture funding, new investment mechanisms, and fostering the development of a culture of entrepreneurship may enhance the Laboratory and bring strength and creativity to its people. LANL, in partnership with the University of California (UC), has created the Entrepreneurial Postdoctoral Fellowship Pilot (Pilot) to provide an immersion-based learning opportunity to post-doctoral researchers to develop and practice skills in entrepreneurship and comercialization.

99 GENERAL AND MISCELLANEOUS↗

UC/Los Alamos Entrepreneurial Postdoctoral Fellowship Pilot Program

The UC/Los Alamos Entrepreneurial Postdoctoral Fellowship Pilot Program (Pilot) for existing postdoctoral researchers at Los Alamos National Laboratory (Los Alamos) to gain skills in entrepreneurship and commercializing technology as part of their postdoctoral experience. This program will incorporate training and mentoring during the first 6-month period, culminating in a focused 6-month Fellowship aimed at creating a new business in Northern New Mexico.

99 GENERAL AND MISCELLANEOUS↗

Technical Details on Beyond Design Basis Event Pilot Evaluations

The primary focus of the BDBE pilot project was the review of BDBE analysis and mitigation features at four DOE nuclear facilities representing a range of DOE sites, nuclear facility types/activities, and responsible program offices. The pilots looked at (1) how beyond design basis accidents were evaluated and documented in the facility Documented Safety Analysis, (2) potential BDBE vulnerabilities and margins to failure of facility safety features as obtained from general area and specific system walkdowns and design documents reviews, and (3) preparations made in facility and site emergency management programs to respond to severe accidents. It also evaluated whether draft BDBE guidance on safety analysis and emergency management could be used to improve the analysis of and preparations for mitigating severe and beyond design basis accidents. The details of these activities are organized in this report as described below.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Large Pilot-Scale Carbon Dioxide (CO2) Capture Project Using Aminosilicone Solvent.Final Scientific/Technical Report

GE Global Research has developed, over the last 8 years, a platform of cost effective CO2 capture technologies based on a non-aqueous aminosilicone solvent (GAP-1m). As demonstrated in previous funded DOE projects (DE-FE0007502 and DEFE0013755), the GAP-1m solvent has increased CO2 working capacity, lower volatility and corrosivity than the benchmark aqueous amine technology. Performance of the GAP-1m solvent was recently demonstrated in a 0.5 MWe pilot at National Carbon Capture Center, AL with real flue gas for over 500 hours of operation using a Steam Stripper Column (SSC). The pilot-scale PSTU engineering data were used to (i) update the techno-economic analysis, and EH&S assessment, (ii) perform technology gap analysis, and (iii) conduct the solvent manufacturability and scale-up study.

01 COAL, LIGNITE, AND PEAT↗

Department of Energy Operational Readiness Review for the Waste Isolation Pilot Plant

The U.S. Department of Energy (DOE) has completed an Operational Readiness Review (ORR) for the restart of Contact Handled (CH) waste emplacement at the Waste Isolation Pilot Plant (WIPP) located near Carlsbad, New Mexico. The ORR team assessed the readiness of Nuclear Waste Partnership, LLC (NWP) to manage and perform receipt through CH waste emplacement, and associated waste handling and management activities, including the ability of the National TRU Program (NTP) to evaluate the waste currently stored at the WIPP site against the revised and enhanced Waste Acceptance Criteria (WAC). Field work for this review began on November 14, 2015 and was completed on November 30, 2016. The DOE ORR was conducted in accordance with the Department of Energy Operational Readiness Review Implementation Plan for the Waste Isolation Pilot Plant, dated November 8, 2016, and DOE Order 425.1D, Verification of Readiness to Start Up or Restart Nuclear Facilities. The review activities included personnel interviews, record reviews, direct observation of operations and maintenance demonstrations, and observation of multiple operational and emergency drills/exercises. The DOE ORR also evaluated the adequacy of the contractor’s ORR (CORR) and the readiness of the DOE Carlsbad field Office (CBFO) to oversee the startup and execution of CH waste emplacement activities at the WIPP facility. The WIPP facility is categorized as a Hazard Category 2 DOE Nonreactor Nuclear Facility for all surface and Underground (UG) operations per DOE-STD-1027-92, Hazard Categorization and Accident Analysis Techniques for Compliance with DOE Order 5480.23, Nuclear Safety Analysis Reports. In addition, the WIPP experienced two events in February, 2014 that resulted in Accident Investigations being performed in accordance with the requirements of DOE Order 225.1B, Accident Investigations. Based upon the results of the accident investigations and hazard categorization of the facility, the team placed significant emphasis on the following areas: fire protection, emergency preparedness, radiological protection, nuclear safety, and operations. The identification of specific focus areas was not intended to diminish the importance of other areas of the review, but to ensure that these areas received a particularly thorough and in-depth evaluation due to their significance with respect to the safe operation of the facility.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗