Final Report for Phase 1 STTR “Domestication of the Microalga Scenedesmus obliquus for Biomass Feedstock Production”
Explore the source record for details and available documents.
SEARCH · Engineering Papers
Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.
Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.
Explore the source record for details and available documents.
Abstract not provided.
Explore the source record for details and available documents.
Procedural changes to this document shall be logged and justified using the EQP Change Log below. Typographical errors do not need to be logged, but do require the Lead Engineers initials and date. Each entry shall be numbered (i.e., CN #1) for identification in the left-hand margin of the table. Each entry may include individual or groups of related procedural changes. Changes to the EQP shall made by pen and ink and/or addition of additional pages depending on the extent of the change.
Abstract not provided.
Explore the source record for details and available documents.
The U.S. Department of Energy (DOE) Wind Energy Technologies Office's (WETO) Collegiate Wind Competition (CWC, also referred to as the "Competition" in this rules document) invites interdisciplinary teams of undergraduate students from a variety of academic programs to solve complex wind energy challenges. Through the competition, WETO intends to offer students direct industry experience, valuable exposure to wind energy career pathways, and greater knowledge of wind energy's potential to contribute to a clean energy future. The competition will select up to 35 teams to start, making them eligible to compete for a cash prize pool of up to $280,000 . Each year, the competition identifies a new challenge and set of activities that address real-world research questions, thus demonstrating skills that students will need to work in the wind or wider renewable energy industries. The Collegiate Wind Competition 2025 challenge requires participants to compete simultaneously in four contests: 1) Turbine Prototype Contest: Design, build, and present a unique, wind-driven power system based on market research; 2) Turbine Testing Contest: Test the wind turbine in a competition wind tunnel at the final event; 3) Project Development Contest: Research wind resource data, transmission infrastructure, and environmental factors to create a site plan and financial analysis for a hypothetical wind farm; and Connection Creation Contest: Partner with wind industry professionals, raise awareness of wind energy in your local community, and work with local media to promote your team's accomplishments. The competition does not prescribe a power system market or wind regime. It is expected that each team will participate in all four contests.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
Explore the source record for details and available documents.
The Hanford Site in Washington State has legacy radiological waste that is being retrieved from single shell tanks (SSTs) and transferred to newer, double shell tanks (DSTs) for eventual closure of the SSTs. The waste is maintained in the DSTs until eventual immobilization can be performed at the Waste Treatment and Immobilization Plant (WTP), currently under construction. Until full immobilization is complete, extended service of the DSTs must be ensured by mitigating corrosion of the steel tank walls and buried steel pipelines. A Pit Air Supply System has been developed to mitigate corrosion of the leak detection pits connected to the concrete foundations of the DSTs. The objectives for the present study are: (i) to corrode steel specimens in an electrolytic simulant to form artificial pits with specific pit depths, and (ii) to determine the temperature and humidity levels that will mitigate further pit growth. Experimental work and results will be presented to evaluate conditions associated with the PASS system and predict corrosion rates when the PASS is operating.
Explore the source record for details and available documents.
In 2021: Los Alamos National Laboratory (LANL) conducted a Technical Ransomware Event (Phase 1). Phase 1 activities to restore to operations were successful, mission essential functions were restored. All incident response notifications derived during Phase 1 were completed.
The Petra Nova Project (Project) is a commercial scale post-combustion carbon capture project developed by a joint venture between NRG Energy, Inc. (NRG) and JX Nippon Oil Exploration (EOR) Limited (JX). The Project is designed to separate and capture carbon dioxide (CO2) from an existing coal-fired unit’s flue gas slipstream at NRG’s W.A. Parish Electric Generating Station (WAP) located southwest of Houston, Texas. The captured CO2 is dried, compressed, and transported via an 81-mile pipeline to the West Ranch oilfield (West Ranch) in Jackson County, Texas, where it is injected to boost oil production. The Project, which is partially funded by a grant (Grant) from the United States (U.S.) Department of Energy (DOE) under the Clean Coal Power Initiative (CCPI) Round 3, uses the Kansai Mitsubishi Carbon Dioxide Recovery advanced amine-based CO 2 absorption technology (KM-CDR Process®), which was jointly developed by Mitsubishi Heavy Industries, Ltd. (MHI) and the Kansai Electric Power Co. Inc., to treat and capture at least ninety percent (90%) of the CO 2 from a 240-megawatt equivalent (MWe) flue gas slipstream off of Unit 8 at WAP. When operating at full capacity, the Project captures approximately 5,200 short tons of CO 2 per day, which would otherwise be emitted into the atmosphere, representing the largest commercial scale deployment of post-combustion CO2 capture technology at a coal power plant to date. Under the Grant, the Project was managed in 3 phases: (1) Phase 1: Project Definition / Front End Engineering Design (FEED) (2) Phase 2: Detailed Engineering, Procurement & Construction (3) Phase 3: Demonstration and Monitoring. On December 29, 2016, commercial operation of the Project was achieved, ending Phase 2 and starting Phase 3, a 3-year demonstration period running from January 1, 2017 through December 31, 2019. The key objectives of Phase 3 were to (a) demonstrate the specific advanced technologies constructed during Phase 2 and (b) monitor the injected CO 2 at West Ranch to demonstrate technologies and protocols for monitoring, verification, and accounting (MVA). As of the end of Phase 3, Petra Nova captured 3,904,978 short tons of CO 2 (3,542,537 metric tons) that was transported to West Ranch. To support the DOE obligation to monitor, verify, and account for the sequestered CO 2 at West Ranch, Petra Nova contracted with the Bureau of Economic Geology (in the Jackson School of Geosciences at The University of Texas at Austin) to (a) design a monitoring program, (b) draft an MVA Plan for DOE review and approval, and (c) working with Petra Nova and the operator of West Ranch to manage and report on the MVA activity. This report discussed the technical aspects of the project during each of the 3 phases of the project as identified above.