Engineering Papers⌕ Search

SEARCH · Engineering Papers

Results for “performance management”

Search indexed NASA NTRS and DOE OSTI research on propulsion, heat transfer, battery materials and energy systems. Follow report and document links to the original sources.

Quote a phrase for an exact phrase match. Source license links do not imply unrestricted reuse.

At least 919 records · Page 51

Performance Assessment Results for the Hanford Integrated Disposal Facility - 19134

In 2014, the US DOE Office of River Protection and its contractors began to develop a performance assessment for the near-surface disposal of low-level and mixed low-level waste at the Hanford Integrated Disposal Facility. The Hanford Integrated Disposal Facility is a doubly-lined landfill that was constructed between 2004 and 2006 to be the disposal facility for the vitrified low-activity waste containers that will be produced at the Hanford Waste Treatment and Immobilization Plant. The disposal facility is also expected to receive solid secondary waste produced at the Hanford Waste Treatment and Immobilization Plant and other solid wastes from site activities. The constructed facility is awaiting authorization to receive waste. Although no waste destined for the facility is currently being generated, operations cannot begin until the facility has received a Disposal Authorization Statement from US DOE and a permit modification from the State of Washington Department of Ecology. Both the Disposal Authorization Statement and permit modification require a demonstration that the system of engineered and natural features of the disposal facility will limit releases from the facility and be protective of human health and the environment for the next 1,000 to 10,000 years. Based on the analyses presented in the Integrated Disposal Facility Performance Assessment, US DOE issued a conditional Disposal Authorization Statement for the facility in June 2018. Demonstrating the long-term performance of the facility to be protective of human health and the environment was evaluated under the requirements of US DOE Order 435.1, Radioactive Waste Management. Computer simulations were performed to evaluate whether or not the disposal facility would comply with the performance objectives specified in the order. The evaluation was performed using numerical models to simulate source term releases from vitrified and cement-based waste forms. Source term releases were subsequently transported through an air pathway and a groundwater pathway to a point of compliance 100 meters from the disposed of waste. In addition, an analysis evaluating the consequences of an inadvertent intrusion into the waste was also performed. In accordance with US DoE's technical standard for performance assessments, deterministic and probabilistic analyses were performed to demonstrate that the Hanford Integrated Disposal Facility, together with the engineered features of the waste forms and natural features of the selected site, provides a reasonable expectation that the low-level waste and mixed low-level waste disposal will meet the radiological performance objectives established by US DOE. Post-closure doses to future members of the public were evaluated after the time of closure and included a 100-year period of institutional controls that limited exposure immediately following closure of the facility. Calculated doses to a future member of the public from the air pathway were below the 100 μSv/yr dose performance objective. Calculated doses to a future member of the public from all exposure pathways, including the air pathway and the groundwater pathway, were below the 250 μSv/yr dose performance objective. Doses following an inadvertent intrusion into the facility after the institutional control period were below the 5 mSv acute dose performance measure and the 1 mSv/yr chronic dose performance measure. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

A New Redox Flow Battery Using Fe/V Redox Couples in Chloride Supporting Electrolyte

A new redox flow battery using Fe2+/Fe3+ and V2+/V3+ redox couples in chloride supporting electrolyte was proposed and investigated for potential stationary energy storage applications. The Fe/V redox flow cell using mixed reactant solutions operated within a voltage window of 0.5-1.35 V with a nearly 100% utilization ratio and demonstrated stable cycling with energy efficiency around 80% at room temperature. Compared with Fe/Cr redox flow battery operating at an elevated temperature of 65 C, the necessity of external heat management is eliminated. Similar performance was also achieved using low-cost hydrocarbon-based ion exchange membranes, which allow for further cost reduction. The improved room temperature electrochemical performance makes the Fe/V redox flow battery a promising option as stationary energy storage device to enable renewable integration and stabilization of electrical grid.

25 ENERGY STORAGE↗

Special Analysis for the Disposal of the Materials and Energy Corporation Sealed Sources at the Area 5 Radioactive Waste Management Site

This special analysis (SA) evaluates whether the Materials and Energy Corporation (M&EC) Sealed Source waste stream (PERM000000036, Revision 0) is suitable for shallow land burial (SLB) at the Area 5 Radioactive Waste Management Site (RWMS) on the Nevada National Security Site (NNSS). Disposal of the M&EC Sealed Source waste meets all U.S. Department of Energy (DOE) Manual DOE M 435.1-1, “Radioactive Waste Management Manual,” Chapter IV, Section P performance objectives (DOE 1999). The M&EC Sealed Source waste stream is recommended for acceptance without conditions.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Development of management technology for large power systems

Autonomous power management has been proposed as a method to perform optimization of power subsystem performance in connection with the management of multikilowatt space platforms. A concept for a 250-kW utility-type power subsystem was developed. A Cassegrain concentrator solar array primary source is conditioned by a solar array switching unit which supplies seventeen 220 +20 Vdc power channels. A power management subsystem provides the monitoring and control of the overall electrical power subsystem. The discussed system concept for autonomous management of high power space platforms utilizes on-board microprocessors in a decentralized data management architecture. A data bus protocol and a data bus contention resolution scheme were selected in conjunction with the dencentralized management architecture.

Decker, D. K.↗

Assessing the Costs and Benefits of the Superior Energy Performance Program

Industrial companies are seeking to manage energy consumption and costs, mitigate risks associated with energy, and introduce transparency into reports of their energy performance achievements. Forty industrial facilities are participating in the U.S. DOE supported Superior Energy Performance (SEP) program in which facilities implement an energy management system based on the ISO 50001 standard, and pursue third-party verification of their energy performance improvements. SEP certification provides industrial facilities recognition for implementing a consistent, rigorous, internationally recognized business process for continually improving energy performance and achievement of established energy performance improvement targets. This paper focuses on the business value of SEP and ISO 50001, providing an assessment of the costs and benefits associated with SEP implementation at nine SEP-certified facilities across a variety of industrial sectors. These cost-benefit analyses are part of the U.S. DOE?s contribution to the Global Superior Energy Performance (GSEP) partnership, a multi-country effort to demonstrate, using facility data, that energy management system implementation enables companies to improve their energy performance with a greater return on investment than business-as-usual (BAU) activity. To examine the business value of SEP certification, interviews were conducted with SEP-certified facilities. The costs of implementing the SEP program, including internal facility staff time, are described and a marginal payback of SEP certification has been determined. Additionally, more qualitative factors with regard to the business value and challenges related to SEP and ISO 50001 implementation are summarized.

29 ENERGY PLANNING, POLICY, AND ECONOMY↗

Performance Evaluation of a Data Validation System

Online data validation is a performance-enhancing component of modern control and health management systems. It is essential that performance of the data validation system be verified prior to its use in a control and health management system. A new Data Qualification and Validation (DQV) Test-bed application was developed to provide a systematic test environment for this performance verification. The DQV Test-bed was used to evaluate a model-based data validation package known as the Data Quality Validation Studio (DQVS). DQVS was employed as the primary data validation component of a rocket engine health management (EHM) system developed under NASA's NGLT (Next Generation Launch Technology) program. In this paper, the DQVS and DQV Test-bed software applications are described, and the DQV Test-bed verification procedure for this EHM system application is presented. Test-bed results are summarized and implications for EHM system performance improvements are discussed.

Wong, Edmond↗

High Resolution Nature Runs and the Big Data Challenge

NASA's Global Modeling and Assimilation Office at Goddard Space Flight Center is undertaking a series of very computationally intensive Nature Runs and a downscaled reanalysis. The nature runs use the GEOS-5 as an Atmospheric General Circulation Model (AGCM) while the reanalysis uses the GEOS-5 in Data Assimilation mode. This paper will present computational challenges from three runs, two of which are AGCM and one is downscaled reanalysis using the full DAS. The nature runs will be completed at two surface grid resolutions, 7 and 3 kilometers and 72 vertical levels. The 7 km run spanned 2 years (2005-2006) and produced 4 PB of data while the 3 km run will span one year and generate 4 BP of data. The downscaled reanalysis (MERRA-II Modern-Era Reanalysis for Research and Applications) will cover 15 years and generate 1 PB of data. Our efforts to address the big data challenges of climate science, we are moving toward a notion of Climate Analytics-as-a-Service (CAaaS), a specialization of the concept of business process-as-a-service that is an evolving extension of IaaS, PaaS, and SaaS enabled by cloud computing. In this presentation, we will describe two projects that demonstrate this shift. MERRA Analytic Services (MERRA/AS) is an example of cloud-enabled CAaaS. MERRA/AS enables MapReduce analytics over MERRA reanalysis data collection by bringing together the high-performance computing, scalable data management, and a domain-specific climate data services API. NASA's High-Performance Science Cloud (HPSC) is an example of the type of compute-storage fabric required to support CAaaS. The HPSC comprises a high speed Infinib and network, high performance file systems and object storage, and a virtual system environments specific for data intensive, science applications. These technologies are providing a new tier in the data and analytic services stack that helps connect earthbound, enterprise-level data and computational resources to new customers and new mobility-driven applications and modes of work. In our experience, CAaaS lowers the barriers and risk to organizational change, fosters innovation and experimentation, and provides the agility required to meet our customers' increasing and changing needs

big data analysis↗

Performance of Low-Complexity Spectrally Selective One-Dimensional Mirrors for Photovoltaic Thermal Management: Preprint

Operation at elevated temperatures is detrimental to the performance of crystalline Si solar modules. One method of reducing module operating temperature is selective reflection of sub-band gap photons, which can otherwise only be absorbed parasitically. We numerically optimize the design of a series of multilayer photonic mirrors based on real materials using a previously developed optimization routine. Combined ray tracing and finite element simulations reveal the ability of each mirror to increase energy yield and decrease operating temperature. The best design outperforms a conventional glass antireflection coating, contains only nine layers, and maintains performance regardless of geographic location.

14 SOLAR ENERGY↗

Tuning of Nacelle Feedback Gains for Floating Wind Turbine Controllers Using a Two-DOF Model

Designing a collective blade pitch controller for floating offshore wind turbines (FOWTs) poses unique challenges due to the interaction of the controller with the dynamics of the platform. The controller must also handle the competing objectives of power production performance and fatigue load management. Existing solutions either detune the controller with the result of slowed response, make use of complicated tuning methods, or incorporate a nacelle velocity feedback gain. With the goal of developing a simple control tuning method for the general FOWT researcher that is easily extensible to a wide array of turbine and hull configurations, this last idea is built upon by proposing a simple tuning strategy for the feedback gain. This strategy uses a two degree-of-freedom (DoF) turbine model that considers tower-top fore-aft and rotor angular displacements. For evaluation, the nacelle velocity term is added to an existing gain scheduled proportional-integral controller as a proportional gain. The modified controller is then compared to baseline land-based and detuned controllers on an example system for several load cases. First-pass results are favorable, demonstrating how researchers can use the proposed tuning method to efficiently schedule gains for adequate controller performance as they investigate new FOWT configurations.

49 EE - Wind and Water Power Program - Wind (EE-4W↗

Verbal Workload in Distributed Air Traffic Management

The effects of alternative traffic management possibilities on task performance and pilot controller verbal workloads were studied. Two new rule structures - sequencing and advisory - in addition to vectoring were studied in conjunction with CRT pilot displays incorporating traffic situation displays with and without aircraft flight path predictors. The sequencing and advisory systems gave increasing control responsibility to the pilots. It was concluded that distributed management systems could in practice significantly reduce controller verbal workload without reducing system performance. Implications of this conclusion suggest that distributed management would allow controllers to handle a larger volume of traffic safely either as a normal operating procedure or as a failure mode alternative in a highly automated ground centered system.

Kreifeldt, J. G.↗

NEXT Propellant Management System Integration With Multiple Ion Thrusters

As a critical part of the NEXT test validation process, a multiple-string integration test was performed on the NEXT propellant management system and ion thrusters. The objectives of this test were to verify that the PMS is capable of providing stable flow control to multiple thrusters operating over the NEXT system throttling range and to demonstrate to potential users that the NEXT PMS is ready for transition to flight. A test plan was developed for the sub-system integration test for verification of PMS and thruster system performance and functionality requirements. Propellant management system calibrations were checked during the single and multi-thruster testing. The low pressure assembly total flow rates to the thruster(s) were within 1.4 percent of the calibrated support equipment flow rates. The inlet pressures to the main, cathode, and neutralizer ports of Thruster PM1R were measured as the PMS operated in 1-thruster, 2-thruster, and 3-thruster configurations. It was found that the inlet pressures to Thruster PM1R for 2-thruster and 3-thruster operation as well as single thruster operation with the PMS compare very favorably indicating that flow rates to Thruster PM1R were similar in all cases. Characterizations of discharge losses, accelerator grid current, and neutralizer performance were performed as more operating thrusters were added to the PMS. There were no variations in these parameters as thrusters were throttled and single and multiple thruster operations were conducted. The propellant management system power consumption was at a fixed voltage to the DCIU and a fixed thermal throttle temperature of 75 C. The total power consumed by the PMS was 10.0, 17.9, and 25.2 W, respectively, for single, 2-thruster, and 3-thruster operation with the PMS. These sub-system integration tests of the PMS, the DCIU Simulator, and multiple thrusters addressed, in part, the NEXT PMS and propulsion system performance and functionality requirements.

Sovey, James S.↗

Risk-Informed Margin Management (RIMM) Industry Applications IA1 - Integrated Cladding ECCS/LOCA Performance Analysis - Problem Statement

The U. S. NRC is currently proposing rulemaking designated as “10 CFR 50.46c” to revise the LOCA/ECCS acceptance criteria to include the effects of higher burnup on cladding performance as well as to address some other issues. The NRC is also currently resolving the public comments with the final rule expected to be issued in the summer of 2016. The impact of the final 50.46c rule on the industry will involve updating of fuel vendor LOCA evaluation models, NRC review and approval, and licensee submittal of new LOCA evaluations or reanalyses and associated technical specification revisions for NRC review and approval. The rule implementation process, both industry and NRC activities, is expected to take 5-10 years following the rule effective date. The need to use advanced cladding designs is expected. A loss of operational margin will result due to the more restrictive cladding embrittlement criteria. Initial and future compliance with the rule may significantly increase vendor workload and licensee cost as a spectrum of fuel rod initial burnup states may need to be analyzed to demonstrate compliance. Consequently there will be an increased focus on licensee decision making related to LOCA analysis to minimize cost and impact, and to manage margin.

21 SPECIFIC NUCLEAR REACTORS AND ASSOCIATED PLANTS↗

Radiological Performance Modeling: Platform Comparison

Zapadnoe Uranium Mill Tailings Site, Pridneprovsky Chemical Plant Ukraine: Two exposure scenarios were utilized to develop performance assessment models in GoldSim and NORMALYSA. The first scenario is an onsite worker exposed to radioactivity through external ground irradiation as well as radon and radioactive dust inhalation. The second being an offsite Resident 300 years after institutional control exposed through the ingestion of garden vegetables irrigated by contaminated ground water, ingestion of fish from Konoplyanka River, and agricultural activities in contaminated garden. NORMALYSA utilizes a modular interface to connect extensive pre-created modules to develop contaminant transport and risk assessment models for safety assessments and performance assessments at NORM and legacy sites. Developed by Facilia AB, the program was tested with the creation of the Zapadnoe model under the International Atomic Energy Agency MODARIA Il Working Group 1 (WG1). Default values are provided for input parameters where site specific data and distributions lack. Probabilistic simulations and inputs are limited to parameters with assigned Gaussian probability functions. Similar results for transient worker inhalation dose were found in comparison with the Zapadnoe GoldSim model. However, the NORMALYSA model has results larger by an order of magnitude for external radiation in the transient worker and for aquatic food ingestion, inhalation, and garden food ingestion to the resident. Performance Assessment Modeling: Radiological performance models promote good management and support in remediation and environmental decision making by optimizing radioactive waste disposal site performance. a performance assessment model of the Zapadnoe uranium mill tailings site and a model for calculating authorized limits at Los Alamos National Laboratory are created to demonstrate and highlight the respective capabilities of three modeling platforms: GoldSim, NORMALYSA, and RESRAD-Onsite. GoldSim is a general-purpose modeling platform with the ability to simulate site-specific FT radionuclide transport and risk assessment using a graphical interface to create and link elements that act as indivisible building blocks of the model. The Zapadnoe performance assessment model created in GoldSim is composed of input parameters collected from site specific parameters from WG1 as well as standard assumptions seen in the Generic PA Model from Neptune and Company. The multivariate Zapadnoe simulation contains both deterministic and probabilistic simulation capabilities with the ability to quantitatively represent the uncertainty and associated risks of the site via the Monte Carlo simulation method. Model parameters, documentation, and assumptions are built directly into the model creating a transparent, reproducible, and more purposeful site specific model. To demonstrate this, an ingestion of water pathway was included in addition to the exposure pathways included in the NORMALYSA model. GoldSim offers a wide variety of probability distributions to choose from as well as many tools to visualize the uncertainty of the models and explore which pathways and radionuclides dominate dose. In contrast to the NORMALYSA model, the GoldSim model uses dynamic simulation to calculate tritium concentrations. Authorized limits support the evaluation of radiological health effects from radionuclides present in bulk contaminated soil in order to assist in the process of clearing land for release under different uses. Calculations of authorized limits in RESRAD-Onsite and GoldSim models support the evaluation for 15 radionuclides using a residential exposure scenario, indoor and outdoor inhalation of dust and vapor phase radionuclides (tritium), incidental soil ingestion, and ingestion grown fruits and Vegetables. RESRAD-Onsite, developed by Argonne National Laboratory is a dedicated computer code for calculating radiation doses and cancer risks to an individual located on top of radioactively contaminated soils. It can also be used to provide guidelines for deriving radionuclide soil levels corresponding to a specific dose criterion. The menu driven user interface facilitates selection of radionuclides and soil concentrations, as well as defines parameter values related to materials, environmental factors, and exposure pathways. The program contains radionuclide-specific data such as dose conversion factors and risk coefficients, as well as soil-water partition coefficients and transfer factors for biotic media. The GoldSim model successfully emulates the RESRAD-Onsite code using identical radiological decay and ingrowth factors, radiation dose conversion factors, and other input parameters. DE EEDE ETS Each model supports dynamic modeling of radionuclide ingrowth and decay over time, and integrate this capability with the transport of radionuclides in the environment via processes such as advection and/or diffusion in fluids, or within porous solid media, The applicability of each program is heavily dependent on project context. In the context of developing Authorized Limits, RESRAD-Onsite may be a more desirable option as it was developed for this particular application. For simple disposal or legacy sites or sites that do not need site-specific model structure, NORMALYSA may be a desirable modeling platform, GoldSim can be used to model any problem for which RESRAD or NORMALYSA is applicable, but its strength lies in its flexibility, analytical, and probabilistic capabilities.

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

How Successful Site Preparation Work at a Large, Commercial, Hazardous and Toxic Waste Site Can Benefit DOE Cleanup Projects - 18111

Jacobs recently completed site preparation work supporting the private commercial development of a world-scale petrochemical complex (an 'ethylene cracker' to produce the primary building block for many forms of plastic) in Monaca, Pennsylvania - the first major U.S. project of its kind outside the Gulf Coast region in 20 years and one of the largest (multi-billion dollar) construction projects in the eastern U.S. Prior to beginning construction on the petrochemical complex, the site's previous large, industrial zinc smelter operations had to be decommissioned and the facilities had to be removed. During the previous 80 years, the smelting operations at the site were used to produce zinc, lead, mercury, and sulfuric acid (a by-product of smelting). The smelting operations left landfills and industrial soil over a large area that had to be removed or closed under regulatory review to allow development across the 81,000 m{sup 2} (200-acre) industrial site located near a major river and local populations. In order to meet Pennsylvania's site-specific Land Recycling Program (commonly referred to as 'Act 2') legislative requirements, the direct contact pathway for landfill soil and slag was removed or mitigated. The site preparation work, or 'Early Works', started in January 2015. As the selected Early Works overall Engineering, Procurement, and Construction Management (EPCM) contractor, Jacobs performed the front end engineering and design. Subsequently, Jacobs had overall responsibility for procurement, construction management, health and safety, quality, security, and environmental services for the entire site and all contractors. The Early Works project included eight separate work scope packages: 1) Site Preparation, 2) Site Development, 3) Marine Works, 4) Rail Works, 5) Road Works and Offsite Utilities, 6) Site Security, 7) Construction Facilities, and 8) High Voltage Line Relocation. The Early Works scope was successfully completed in 2017. The challenges faced by this privately funded commercial project have much in common with large DOE and government construction projects. This paper explores lessons learned from the project and compares how project challenges were addressed on this private commercial project with those anticipated at large DOE/government construction and remediation sites, particularly those in the areas of Safety, Logistics, Infrastructure, and Stakeholder Involvement. The identification of best practices demonstrated on this successful project are shared for the purpose of bringing outside, commercial perspectives to ongoing or planned DOE/government construction projects. (authors)

12 MANAGEMENT OF RADIOACTIVE AND NON-RADIOACTIVE W↗

Heat Management Strategy Trade Study

This Heat Management Trade Study was performed in 2008-2009 to expand on prior studies in continued efforts to analyze and evaluate options for cost-effectively managing SNF reprocessing wastes. The primary objective was to develop a simplified cost/benefit evaluation for spent nuclear fuel (SNF) reprocessing that combines the characteristics of the waste generated through reprocessing with the impacts of the waste on heating the repository. Under consideration were age of the SNF prior to reprocessing, plutonium and minor actinide (MA) separation from the spent fuel for recycle, fuel value of the recycled Pu and MA, age of the remaining spent fuel waste prior to emplacement in the repository, length of time that active ventilation is employed in the repository, and elemental concentration and heat limits for acceptable glass waste form durability. A secondary objective was to identify and qualitatively analyze remaining issues such as (a) impacts of aging SNF prior to reprocessing on the fuel value of the recovered fissile materials, and (b) impact of reprocessing on the dose risk as developed in the Yucca Mountain Total System Performance Assessment (TSPA). Results of this study can be used to evaluate different options for managing decay heat in waste streams from spent nuclear fuel.

11 NUCLEAR FUEL CYCLE AND FUEL MATERIALS↗

International perspectives on mitigating laboratory biorisks.

The International Perspectives on Mitigating Laboratory Biorisks workshop, held at the Renaissance Polat Istanbul Hotel in Istanbul, Republic of Turkey, from October 25 to 27, 2010, sought to promote discussion between experts and stakeholders from around the world on issues related to the management of biological risk in laboratories. The event was organized by Sandia National Laboratories International Biological Threat Reduction program, on behalf of the US Department of State Biosecurity Engagement Program and the US Department of Defense Cooperative Biological Engagement Program. The workshop came about as a response to US Under Secretary of State Ellen O. Tauscher's statements in Geneva on December 9, 2009, during the Annual Meeting of the States Parties to the Biological Weapons Convention (BWC). Pursuant to those remarks, the workshop was intended to provide a forum for interested countries to share information on biorisk management training, standards, and needs. Over the course of the meeting's three days, participants discussed diverse topics such as the role of risk assessment in laboratory biorisk management, strategies for mitigating risk, measurement of performance and upkeep, international standards, training and building workforce competence, and the important role of government and regulation. The meeting concluded with affirmations of the utility of international cooperation in this sphere and recognition of positive prospects for the future. The workshop was organized as a series of short presentations by international experts on the field of biorisk management, followed by breakout sessions in which participants were divided into four groups and urged to discuss a particular topic with the aid of a facilitator and a set of guiding questions. Rapporteurs were present during the plenary session as well as breakout sessions and in particular were tasked with taking notes during discussions and reporting back to the assembled participants a brief summary of points discussed. The presentations and breakout sessions were divided into five topic areas: 'Challenges in Biorisk Management,' 'Risk Assessment and Mitigation Measures,' 'Biorisk Management System Performance,' 'Training,' and 'National Oversight and Regulations.' The topics and questions were chosen by the organizers through consultation with US Government sponsors. The Chattham House Rule on non-attribution was in effect during question and answer periods and breakout session discussions.

45 MILITARY TECHNOLOGY, WEAPONRY, AND NATIONAL DEF↗